Hub SN-22 Trailer Sheet 02 MAR 2020 - Begin work on Hub SN22 per instructions at /hub/hardware/details/Hub_Inventory_Status_Final_Assembly/hub_msu_final_assembly_prod_only_print.txt - Check GND/ESD continuity - Verify power supply resistances to GND - Preliminary mechanical work - mounting blocks, removing runners, etc. - Begin component R&R. NOTE: When making my first attempt at final bench checks on SN22, I couldn't get a 1.8V readout at J3. Also, the PLLs wouldn't lock. Investigation led me to R2357 coming off of DC/DC7. Its value is given as 100 Ohms in mentor comps, but it was millions of Ohms in-circuit, and wide-open out. Replaced it with a 100 Ohm 0603 I had on hand and re-tested the board. Board conformed to specs after that. 09 MAR 2020 - Completed final assembly of Hub SN22. - Work conformed to given instructions. - Installed RC filter components on MGT_AVCC, MGT_AVTT, and Fan_1V8 supplies. - Installed discrete power wires. - Installed light pipes and front panel. - Installed IPMC module #195 - Powered on and configured DC/DC converters. - Programmed with safe/foundation firmware. - Installed minipods. - Installed MPOs. - Installed FPGA heat sink. - Installed fiber ribbons and clipped to side of heat sink. - Verified 25MHz, 40MHz, and 320MHz clocks with oscilloscope: PLL Free Run Hi-Lock Lo-Lock ------ -------- ------- ------- 40MHz 40.09 40.0844 40.0729 320MHz 320.7 40.0819 40.0752 - Final voltage measurements as follows: Power Bus: FPGA MGT MGT Swch Bulk Fan Bulk Core AVCC AVTT 1V2 1V8 1V8 3V3 ---- ---- ---- ---- ---- ---- ---- Address: 40 41 42 43 44 45 46 Volts: 0.95 1.00 1.19 1.20 1.78 1.80 3.303 Amps: 1.38 0.38 0.25 1.69 0.44 12.19 1.625 Fluke Volts: 0.952 1.00 1.199 1.197 1.800 1.795 3.306 - Removed IPMC bypass (yellow wire) after testing. IPMC module now has direct control of ISO_12V supply. - Unit has been placed in the storage cabinet to wait for its turn in the 14SS. 24 APR 2020 - Powered unit up on bench to update IPMC firmware. 06 AUG 2020 - This note is to confirm that this Hub has been cleaned with G3 flux remover. See l1calo/hub/hardware/details/Hub_Inventory_Status_Final_Assembly/FluxProblemOnHubs.txt for details. 09 SEP 2020 - This note is to confirm that this hub has been through the component replacement process described at the bottom of the file at the above link. 23 SEP 2020 - This Hub has been mated with ROD V4 SN06. 11 MAY 2021 - This is a note to confirm that the board has been through the fiber ribbon replacement. See hub/hardware/details/Hub_Inventory_Status_Final_Assembly/Fiber%20Ribbon%20Problem/00_Hub_Fiber_Ribbon_Issue.txt for details.