Hub SN-29 Trailer Sheet 04 MAY 2020 - Begin work on Hub SN29 per instructions at /hub/hardware/details/Hub_Inventory_Status_Final_Assembly/hub_msu_final_assembly_prod_only_print.txt - Check GND/ESD continuity - Verify power supply resistances to GND - Preliminary mechanical work - mounting blocks, removing runners, etc. - Begin component R&R. 08 MAY 2020 - Completed final assembly of Hub SN29: - Work conformed to given instructions. - Installed RC filter components on MGT_AVCC, MGT_AVTT, and Fan_1V8 supplies. - Installed discrete power wires. - Installed light pipes and front panel. - Installed IPMC module #140 - Powered on and configured DC/DC converters. - Programmed with safe/foundation firmware. - Installed minipods. * NOTE: Took the minipods from SN11 for this Hub per Wade's instructions, since none of our new Minipods have heat sinks yet. - Installed MPOs. - Installed FPGA heat sink. - Installed fiber ribbons and clipped to side of heat sink. - Verified 25MHz, 40MHz, and 320MHz clocks with oscilloscope: PLL Free Run Hi-Lock Lo-Lock ------ -------- ------- ------- 40MHz 40.09 40.0837 40.0721 320MHz 320.5 40.0815 40.0754 - Final voltage measurements as follows: Power Bus: FPGA MGT MGT Swch Bulk Fan Bulk Core AVCC AVTT 1V2 1V8 1V8 3V3 ---- ---- ---- ---- ---- ---- ---- Address: 40 41 42 43 44 45 46 Volts: 0.940 0.996 1.198 1.205 1.795 1.831 3.317 Amps: 1.250 0.062 0.000 1.875 0.500 12.188 1.500 Fluke Volts: 0.955 1.001 1.199 1.197 1.802 1.794 3.304 - Removed IPMC bypass (yellow wire) after testing. IPMC module now has direct control of ISO_12V supply. - Flashed IPMC module with current binaries. Address is now in the 10 subnet. Logfile in folder. - Unit has been placed in the storage cabinet to wait for its turn in the 14SS. 05 AUG 2020 - See l1calo/hub/hardware/details/Hub_Inventory_Status_Final_Assembly/FluxProblemOnHubs.txt for details. This note is to confirm that this Hub has been cleaned with G3 flux remover. 15 SEP 2020 - This note is to confirm that this hub has been through the component replacement process described at the bottom of the file at the above link. 03 FEB 2021 - This Hub has been mated to ROD #15. 06 MAY 2021 - This is a note to confirm that the board has been through the fiber ribbon replacement. See hub/hardware/details/Hub_Inventory_Status_Final_Assembly/Fiber%20Ribbon%20Problem/00_Hub_Fiber_Ribbon_Issue.txt for details.