---------------------------------------------------------------------- Collection of eye diagram for rx: rod1.Q215.ch2/rod1.GT.ch22 ---------------------------------------------------------------------- [Aug 7 14:52:13 2023]: Beginning collection process. Setting prescale to 0 Value after writing: 0 Setting mgtchselect to 22 Value after writing: 22 Lowering eye_go Value of eye_go after lowering: 0 Issuing eye diagram reset, waiting for eye_datardy low ... Eye_datardy is low after 1 reset attempts. Raising eye_go. Value of eye_go after raising: 1 Waiting for eye_datardy high (timeout of 3.00 seconds) ... Eye data ready in 2.00 seconds. Proceeding to obtain data from registers. Collecting eye diagram data from registers. [Aug 7 14:52:24 2023]: Finished collection process. Required 0 realignments. Open Area: 48.9% (8240) Horizontal Opening: 58.8% (40) Vertical Opening: 100.0% (248)