This file is a Log Book to keep track of what Hub Modules and HTM Cards are installed in the 6 Slot and 14 Slot ATCA Shelves in the MSU Test setup ------------------------------------------------------- Current Rev. 19-Feb-2020 Summary of the Current Status in the MSU Hub/HTM Test Shelves ----------------==============-------------------------------- Current Status 14 Slot Shelf: ---------------------------------------------------------------- Slot Current Card Slot Current Card ---- ----------------- ---- -------------------- 13 HTM SN-09 2 Hub (change often) 11 HTM SN-16 4 HTM SN-17 * 9 HTM SN-03 * 6 HTM SN-11 * 7 HTM SN-04 * 8 HTM SN-12 * 5 HTM SN-18 10 HTM SN-13 * 3 HTM SN-01 * 12 HTM SN-06 1 Hub (change often) 14 HTM SN-08 Current Status 6 Slot Shelf: during tests of HTM Trenz clock problems ------------------------------ Slot Current Card Current Mezz Default IP ---- ----------------- ------------ ----------- 6 HTM SN-05 * Mezz SN-02 10.11.30.96 5 HTM SN-02 * Mezz SN-05 10.11.30.93 4 HTM SN-07 Mezz SN-10 10.11.30.88 3 HTM SN-10 Mezz SN-07 10.11.30.91 2 Hub SN-04 No ROD 10.11.30.51 1 Hub SN-05 No ROD 10.11.30.53 -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=- -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=- Log Book of Card Changes in the Hub/HTM Test Shelves ---------------------------------------------------- The most recent entry is at the top of this file. Other significant hardware changes in the MSU Test Shelves should also be noted in this log book. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 11-Oct-2019 at 2 PM 14 Slot Shelf SN-12 removed from Hub2 slot and placed in storage file SN-07 inserted as Hub2 for testing after return from CERN -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= Sep-2019 6 Slot Shelf The 6 slot shelf is being used to investigate the various problems with Trenz mezzanine SiChip clock and MGT link issues. The 4 HTMs with previously known issues are currently in the 6 Slot shelf. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 26-June-2019 at 10 AM 14 Slot Shelf Two swaps of the Hubs in the 14SS: Pull Hub SN-05 with "original" ROD from Hub Slot #1 and for a few hours operate Hub SN-12 in Hub Slot #1. Then swap Hubs SN-12 and SN-11 between Hub Slots 1,2. The final configuration is: hub slot #1 now has Hub SN-11 with ROD V3 #3 hub slot #2 now has Hub SN-12 -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 20-June-2019 at 10 AM 14 Slot Shelf Swap the Hubs (with their RODs) in the 14SS: hub slot #1 now has Hub SN-05 with "original" ROD hub slot #2 now has Hub SN-11 with ROD V3 #3 -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 17-June-2019 14 Slot Shelf Today we received ROD V3 #3 from Ed. It does not have any of its MiniPODs or fiber optic cables. Pull Hub SN-11 from hub slot 1, install ROD V3 #3 onto Hub SN-11 and re-install this Hub in hub slot 1 of the 14SS. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 3:7-June-2019 14 Slot Shelf Hub SN-08 operated on both 14SS Hub Slots for testing. Hub SN-08 was typically operated with Hub SN-11. Testing of Enet, MGT Links, and IPMC power control. After testing Hub SN-08 is finished, install SN-11 in Hub Slot #1 and SN-05 with ROD in Hub Slot #2. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 21-May-2019 6 Slot Shelf Move HTMs between slots in the 6SS and add 2 more HTMs so that the 6SS now has 4 HTMs installed. Pull HTM SN-14 from Slot #5 and install it in Slot #6. Pull HTM SN-15 from Slot #3 and install it in Slot #4. Install the new un-tested HTM SN-19 in Slot #5. Install the new un-tested HTM SN-20 in Slot #3. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 20-May-2019 14 Slot Shelf Swap the Hubs between Hub Slots #1 and #2 in the 14SS. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 15-May-2019 10:30 14 Slot Shelf Install the first Production Hub SN-11 in the 14SS: Pull Hub SN-08 without ROD from 14SS Hub Slot #1 Install Hub SN-11 without ROD into 14SS Hub Slot #1 -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= February-2019 14 and 6 Slot Shelves In the 14SS, Hubs SN-8, SN-5 with our original ROD, and SN-9 with ROD SN-4 were all in use as part of the re-testing of Hub SN-9 before shipping it back to CERN. In the 14SS, HTM slot 11, which was HTM SN-10 had a problem with its MGT links to/from its Quad 110, thus HTM SN-10 was pulled out and replaced with HTM SN-16. In the 14SS, HTM SN-4 in HTM slot 7 had both MiniPODs and fiber optic ribbon cables installed. This should have been done back in late December as part of the overall HTM clean up in the 14SS. In the 6SS, both of its HTM Cards (HTMs SN-14 and SN-15) had both trap door front panel MPO connectors and MiniPODs installed on them (but not all fiber optic ribbon cables were installed). -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 2-Jan-2019 16:30 14 Slot Shelf Swap Hubs in the 14SS: Hub SN-09 with ROD is now Hub #1 in the 14SS Hub SN-05 with ROD is now Hub #2 in the 14SS Using the same Hub cards - just swapped their slots. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 21-Dec-2018 15:30 14 Slot Shelf Move almost all of the HTMs in FEX slots of the 14SS. All HTMs now have FPGA Heat Sinks and all HTMs now have the modification installed for the FPGA's 40.08 MHz Logic Clock Input. There are now 4 HTMs with MiniPODs to service each of the Hub/ROD. Before this work the arrangement of HTMs in the FEX slots had been: Slot HTM SN Slot HTM SN ---- ------ ---- ------ 3 9 4 6 5 1 6 17 7 4 8 8 9 5 10 11 11 10 12 12 13 3 14 13 The NEW arrangements of HTMs in the FEX slots is: Slot HTM SN Slot HTM SN ---- ------ ---- ------ 3 5 # 4 17 # 5 1 #@ 6 11 # 7 4 #@ 8 12 # 9 3 # 10 13 # 11 10 @ 12 6 13 9 14 8 # ---> This HTM Card has MiniPODs installed. @ ---> This HTM Card is in the same slot now as it was in the old setup that was in use up until today. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 19-Dec-2018 14:30 14 Slot Shelf Change HTMs in FEX slots 4 and 6 of the 14SS Pull HTM SN-16 from HTM #4 Push HTM SN-6 into HTM #4 Pull HTM SN-6 from HTM #6 Push HTM SN-17 into HTM #6 HTM SN-16 is a known good HTM that will now be stored in the HTM storage crate in RM 1200C. HTM SN-6 is a good working HTM that is now back in its original slot #4 in the 14SS. HTM SN-17 just yesterday had the FPGA Mezzanine from Brian's home setup installed on it. The Config Memory of HTM SN-17 was programmed with Pawel's SiLab startup and so far SN-17 is running well in Slot 6 of the 14SS. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 6-Dec-2018 18:00 14 Slot Shelf Swap Hub #1 in the 14SS: Pull Hub SN-08 without IPMC from Hub #1 in 14SS Push Hub SN-05 with original ROD into Hub #1 in 14SS Until yesterday Hub SN-05 with its ROD was Hub #2 in 14SS. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 5-Dec-2018 16:00 14 Slot Shelf Swap HTMs in FEX slot 4 of the 14SS Pull HTM SN-02 (with confirmed problem) from HTM #4 Push HTM SN-16 (with just installed FPGA) into HTM #4 Just now installed the FPGA Mezzanine from Brian's desk onto HTM SN-16 and programmed its Config Memory with Pawel's SiLab startup program as per log book instructions. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 5-Dec-2018 15:00 14 Slot Shelf Swap Hub #2 in the 14SS: Pull Hub SN-05 with original ROD from Hub #2 in 14SS Push Hub SN-09 with ROD SN-04 into Hub #2 in 14SS Hub SN-09 with its ROD SN-04 is just today back from CERN. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 5-Dec-2018 14:00 14 Slot Shelf Swap HTMs in FEX slot 4 of the 14SS Pull HTM SN-07 (with suspected problem) from HTM #4 Push HTM SN-02 (with suspected problem) into HTM #4 Philippe immediately sees problems with HTM SN-02. Initial MiniPOD test on HTM SN-02 did not work. Pawel had trouble with SN-02 during Thanksgiving. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 5-Dec-2018 13:00 14 Slot Shelf Swap HTMs between FEX slots 4 and 6 of the 14SS HTM SN-07 (with sepected problem) is now HTM #4 in 14SS HTM SN-06 is now HTM #6 in 14SS -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 25-Nov-2018 15:30 6 Slot Shelf Replace the HTM Card in Slot #3 of the 6SS. Pull HTM SN-02 from Slot #3 - install HTM SN-15 into Slot #3. HTM SN-15 is now HTM #3 in the 6SS HTM SN-14 remains HTM #5 in the 6SS -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 19-Nov-2018 15:30 14 Slot Shelf Remove the IPMC from Hub SN-08 in Hub slot #1: Hub SN-08 now without IPMC is Hub #1 in the 14SS Hub SN-05 with ROD is Hub #2 in the 14SS Hub SN-08 had been using IPMC SN-205. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 16-Nov-2018 13:00 14 Slot Shelf Re-install the IPMC on Hub SN-08 in Hub slot #1: Hub SN-08 now with IPMC is Hub #1 in the 14SS Hub SN-05 with ROD is Hub #2 in the 14SS -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 15-Nov-2018 17:45 14 Slot Shelf Swap Hubs in the 14SS, pull IPMC from Hub SN-08: Hub SN-08 without IPMC is now Hub #1 in the 14SS Hub SN-05 with ROD is now Hub #2 in the 14SS -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 14-Nov-2018 6 Slot Shelf ReInstall the IPMC on the Hub #2 card in the 6SS. This is Hub SN-04. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 9-Nov-2018 14 Slot Shelf 18:30 Swap Hub #2s in the 14SS: Pull SN-07 Install SN-08 Hub SN-05 with ROD is now Hub #1 in the 14SS Hub SN-08 is now Hub #2 in the 14SS 9-Nov-2018 14 Slot Shelf 17:00 Swap Hub #2s in the 14SS: Pull SN-04 Install SN-07 Hub SN-05 with ROD is now Hub #1 in the 14SS Hub SN-07 is now Hub #2 in the 14SS 9-Nov-2018 6 Slot Shelf 17:00 Swap Hub #2s in the 6SS: Pull SN-08 Install SN-04 Hub SN-06 is now Hub #1 in the 6SS Hub SN-04 without IPMC is now Hub #2 in the 6SS -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 8-Nov-2018 14 Slot Shelf Swap Hubs in the 14SS: Hub SN-05 with ROD is now Hub #1 in the 14SS Hub SN-04 without IPMC is now Hub #2 in the 14SS Hub SN-05 has the ROD on it. Hub NS-04 is without IPMC for a HWmonit test. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 7-Nov-2018 14 Slot Shelf and 6 Slot Shelf Record the HTM Card SNs in the 14SS: Slot HTM SN Slot HTM SN ---- ------ ---- ------ 3 9 4 6 5 1 6 7 7 4 8 8 9 5 10 11 11 10 12 12 13 3 14 13 Record the HTM Card SNs in the 6SS: Slot HTM SN Slot HTM SN ---- ------ ---- ------ 3 2 5 14 4 - 6 - -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 7-Nov-2018 6 Slot Shelf Swap Hub #1s in the 6SS: Pull Hub SN-07 from Hub #1 in the 6SS Install Hub SN-08 as Hub #1 in the 6SS Hub SN-07 had the Enet Switch Reset Push Buttons on it and this card is now being prepared to ship to Yuri. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 5-Nov-2018 14 Slot Shelf Swap Hubs in the 14SS: Hub SN-04 is moved to Hub #1 in the 14SS Hub SN-05 is moved to Hub #2 in the 14SS Hub SN-05 has the ROD on it. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 2-Nov-2018 14 Slot Shelf and 6 Slot Shelf Swap Hubs between 14SS and 6SS: Hub SN-05 is moved to Hub #1 in the 14SS Hub SN-04 is moved to Hub #2 in the 14SS Hub SN-05 has the ROD on it. Hub SN-06 is moved to Hub #1 in the 6SS Hub SN-07 is moved to Hub #2 in the 6SS -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 26-Oct-2018 14 Slot Shelf Swap Hubs in the 14SS: Hub SN-07 is moved to Hub #2 SN-07 has the Enet Switch Reset push button Hub SN-06 is moved to Hub #1 -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 23-Oct-2018 14 Slot Shelf Replace all of the red cross-over type Ethernet cables with new yellow straight through Cat-6 cables. These cables connect the small Enet test computers to the HTM cards (and thus to the Hub #1 Switch) and they connect the Hubs to the commercial switch. -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= 11-Oct-2018 14 Slot Shelf Swap Hubs in the 14SS: Hub SN-06 had been Hub #1 move it to Hub #2 Hub SN-07 had been Hub #2 move it to Hub #1 -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=