Run II Trigger Framework and Level 1 Calorimeter Trigger 3 Phase Power Contactor Boxes Location, Circuit Breaker Feed, and Loads Supplied ---------------------------------------------------- Original Rev 1-FEB-1993 Current Rev. 10-MAR-2006 This file describes what Power Panel Breaker feeds what Contactor Box or Pulizzi Box and then what components of the TFW or L1 Calorimeter Trigger are feed from each Contactor or Pulizzi Box. The current version of this file is located in: www.pa.msu.edu/hep/d0/ftp/l1/framework/hardware/rack_crate/ power_panel_and_contactor_boxes.txt Pulizzi or Contactor Box ----------------- Pulizzi Box or Located Contactor Box Feed Pulizzi or Index Above/In from Circuit Breaker Contactor Box Currently Letter Rack(s) Panel Contacts Supplies Power to: In Use ------ -------- ----- --------- ----------------------- --------- - FrmWk - M124 MCR 1 37-39-41 Trigger Framework M122 yes - FrmWk - M124 MCR 1 26-28-30 Trigger Framework M123 yes - FrmWk - M124 MCR 1A-1 19-21-23 Trigger Framework M124 yes SCL Hub-End Trig Framework Readout - FrmWk - M124 MCR 1 32 120 V Control Supply Feed yes & Trigger Control Computers in M125 - M100 MCR 1 2-4-6 Master Clock rack M100 yes - B - M102 MCR 1A-1 13-15-17 Cal Trig Readout in M101 yes Routing Master in M101 TCC Flat Panel Display Pulizzi M104 MCR 1B 1-3-5 L1 Cal Trig ADF Crate "A" (0) yes Pulizzi M106 MCR 1B 2-4-6 L1 Cal Trig ADF Crate "B" (1) yes Pulizzi M107 MCR 1B 7-9-11 L1 Cal Trig TAB/GAB Crate yes Pulizzi M108 MCR 1B 8-10-12 L1 Cal Trig Comm/Ctrl Crate yes Pulizzi M109 MCR 1B 13-15-17 L1 Cal Trig ADF Crate "C" (2) yes Pulizzi M111 MCR 1B 19-21-23 L1 Cal Trig ADF Crate "D" (3) yes Outlet M113 MCR 1B 20 VESDA Permit for TFW Power yes Strip located in M113