6/5/2001 14:03 |
|
|
|
(maximum) |
|
Assumed |
|
Summary |
running |
test stand |
data copies |
extra power |
spares |
Max |
|
Ordered |
Wastage |
|
Alpha |
16 |
9 |
0 |
14 |
4 |
43 |
Alpha |
38 |
2 |
only 7 extra power, so 36 max |
trim test stand 4 by 2 (cannibalize
for max power?) |
MBT |
11 |
8 |
0 |
4 |
3 |
26 |
MBT |
30 |
4 |
use prototype for HWFW |
trim more? 3 extra power for 5 workers, 1 CTT |
SFO |
4 |
0 |
16 |
4 |
3 |
27 |
SFO |
28 |
1 |
probably OK: 2 extra in mu, 1 HWFW,
1 CTT |
|
FIC |
7 |
0 |
0 |
1 |
2 |
10 |
FIC |
12 |
3 |
actually, just spec change |
|
SLIC |
16 |
1 |
0 |
4 |
2 |
23 |
SLIC |
20 |
-3 |
20 so far |
|
still looks like want 4 more |
proto? |
|
CIC |
14 |
0 |
0 |
1 |
2 |
17 |
CIC |
18 |
1 |
|
Bit3 |
6 |
5 |
0 |
0 |
3 |
14 |
Bit3 |
14 |
0 |
one 617 owned by Nevis… |
sell within D0? |
|
VBD |
6 |
4 |
0 |
0 |
2 |
12 |
VBD |
|
Did we tell Cutts about all these? |
|
VTM |
7 |
0 |
0 |
1 |
2 |
10 |
VTM |
12 |
3 |
actually, just spec change |
sell within D0? |
|
Magic Bus |
6 |
5 |
0 |
0 |
3 |
14 |
Magic Bus |
14 |
0 |
|
blanks |
35 |
47 |
0 |
0 |
0 |
82 |
blanks |
45 |
0 |
a guess…look at location in test
crates more |
|
FTRV |
3 |
3 |
0 |
0 |
1 |
7 |
useable for testing ? |
0 |
0 |
not really that many at the test
stand |
|
|
Fallbacks:
probably too late to save now… |
would have to SELL equipment, break
contracts with no charge for parts… |
|
power
"by hand" for "data source" crate |
|
4K |
?
Half a rack? Not likely… |
|
delete MSU crate |
|
27K |
2alpha, 2 mbt, 1 sfo |
|
merge
Worker crates |
|
24K |
2 alpha, 2 mbt |
|
only 3 more
SLICS |
|
10 K |
|
recable to
do tests: |
|
6K |
4 SFO's, say |
2 tracking, 2 mu |
|
|
but not cal/global? |
|
|
70 K total… |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|