6/5/2001 14:03
(maximum) Assumed
Summary running test stand data copies extra power spares Max Ordered Wastage
Alpha 16 9 0 14 4 43 Alpha 38 2 only 7 extra power, so 36 max trim test stand 4 by 2 (cannibalize for max power?)
MBT 11 8 0 4 3 26 MBT 30 4 use prototype for HWFW trim more?  3 extra power for 5 workers, 1 CTT
SFO 4 0 16 4 3 27 SFO 28 1 probably OK: 2 extra in mu, 1 HWFW, 1 CTT
FIC 7 0 0 1 2 10 FIC 12 3 actually, just spec change
SLIC 16 1 0 4 2 23 SLIC 20 -3 20 so far still looks like want 4 more proto?
CIC 14 0 0 1 2 17 CIC 18 1
Bit3 6 5 0 0 3 14 Bit3 14 0 one 617 owned by Nevis… sell within D0?
VBD 6 4 0 0 2 12 VBD Did we tell Cutts about all these?
VTM 7 0 0 1 2 10 VTM 12 3 actually, just spec change sell within D0?
Magic Bus 6 5 0 0 3 14 Magic Bus 14 0
blanks 35 47 0 0 0 82 blanks 45 0 a guess…look at location in test crates more
FTRV 3 3 0 0 1 7 useable for testing ? 0 0 not really that many at the test stand
Fallbacks: probably too late to save now… would have to SELL equipment, break contracts with no charge for parts…
power "by hand" for "data source" crate 4K ?  Half a rack?  Not likely…
delete MSU crate 27K 2alpha, 2 mbt, 1 sfo
merge Worker crates 24K 2 alpha, 2 mbt
only 3 more SLICS 10 K
recable to do tests: 6K 4 SFO's, say 2 tracking, 2 mu
but not cal/global?
70 K total…