Trics CHTCR PROM Test Notes Created: 05-Apr-2005 These notes can be useful for debugging errors found by the Trics tests of the CHTCR PROMs. When we have a hardware problem with a CTFE card, backplane line, CHTCR PROM, cabling, CAT2 Paddle board or CAT2 card, the CHTCR test will report errors during the test of one or more of the 1st or 2nd pass PROMs. Most problems will cause multiple errors, and a clear understanding of the test method and steps will be the key to reconstruct the actual problem from the often convoluted symptoms observed. PROM Locations ============== ^ backplane connectors card viewed from top | | <- left edge | right edge -> +----+ +----+ +----+ +-- --+ +----+ +----+ +----+ +-- | | | | | | | | | | | | | | | | 1st| | 1st| | 1st| | | | 1st| | 1st| | 1st| | |Pass| |Pass| |Pass| | o o o | |Pass| |Pass| |Pass| | o o o |PROM| |PROM| |PROM| | | |PROM| |PROM| |PROM| | | #0 | | #1 | | #2 | | | | #0 | | #1 | | #2 | | | | | | | | | | | | | | | | | +----+ +----+ +----+ +-- --+ +----+ +----+ +----+ +-- +--------+ +--------+ | | Tot Et | | EM Et | | Ref Set | | Ref Set | 2nd | #3 ...#2...#1...#0 | 2nd | #3 ...#2...#1...#0 | Pass | | Pass | | PROM | | PROM | | | | | | | | | | | | | +--------+ +--------+ | | v front panel 1st pass PROM address lines =========================== Input Rel Rel 1st Pass Addr Addr Num Eta Phi Prom Num Line Line Tot Et EM Et 0 0 0 0 A6 A10 1 0 1 0 A5 A2 2 0 2 0 A4 A1 3 0 3 0 A3 A0 4 0 4 0 A0 A3 5 0 5 0 A1 A4 6 0 6 0 A2 A5 7 0 7 0 A10 A6 8 1 0 0 A7 A0 9 1 1 0 A8 A3 10 1 2 0 A9 A4 11 1 3 1 A6 A5 12 1 4 1 A5 A6 13 1 5 1 A4 A9 14 1 6 1 A3 A8 15 1 7 1 A0 A7 16 2 0 1 A1 A5 17 2 1 1 A2 A6 18 2 2 1 A10 A9 19 2 3 1 A7 A8 20 2 4 1 A8 A7 21 2 5 1 A9 A10 22 2 6 2 A6 A2 23 2 7 2 A5 A1 24 3 0 2 A4 A8 25 3 1 2 A3 A7 26 3 2 2 A0 A10 27 3 3 2 A1 A2 28 3 4 2 A2 A1 29 3 5 2 A10 A0 30 3 6 2 A7 A3 31 3 7 2 A8 A4 2 A9 Grounded The relative order of Trigger Towers into the 1st Pass PROM address lines for Tot Et is { 4, 5, 6, 3, 2, 1, 0, 8, 9, 10, 7 } The address lines are different for EM Et vs Tot Et Channels because the Phi order of the input channels runs in opposite direction (Phi 7..0 for EM Et vs Phi 0..7 for Tot Et) cf. ctbp_description_revision_b.txt in http://www.pa.msu.edu/hep/d0/ftp/run1/l1/caltrig/cards/ The 1st pass prom #2 only uses 10 of its 11 address lines to count trigger towers and its unused address line is grounded. CHTCR PROM Test Sequence ======================== The test first scans through the CHTCR channels (i.e. ref sets). For each Reference Set the test first scans the three 1st pass PROMs and then the 2nd pass PROM. For each PROM the test sequentially checks the output for all possible input patterns. The Test only has access to the output of the CHTCR PROMs at the input operand of the Tier#2 CAT2 downstream. The test can control the state of each input bit by programming the input Trigger Towers on the CTFE cards with simulated data (at mid scale = 128) and switching the reference set threshold value (0 to assert and 255 to negate). The test scans the prom address lines in a sequence similar to a gray code. The goal is to optimize testing speed by minimizing the number of CBUS IO, which means minimizing the number of times it needs to turn on/off each input bit from the CTFE cards while still scanning all input addresses. Using a gray code means Trics only needs to change one trigger tower reference set threshold per prom address tested. The address space of the 2nd pass PROM does not need to be (and cannot be) fully scanned as the 1st pass proms wiill only count up to 11 (as each only counts 11/10 input towers). The 2nd pass prom is also scanned in a gray-like sequence by only incrementing or decrementing the output of one of the 1st pass proms. The dump below is not the typical output of the test, but a temporary modification showing the checking order. Each line shows a linear step number within each prom test, as well as the actual gray code input address bits, which relative trigger tower was last changed (on or off) to arrive there, and the expected output. I$ Select eta(+1:+4),phi(1:8) RS#0,EMEt,TotEt I$ Checking EM RefSet #0 Proms on CHTCR for Eta(+1:+4),Phi(1:8) I$ Using Tier #2 EM Et Ref Set #0 CAT2 for Eta(1:4) Op#0 @MBA#153/CA# 2/FA# 0 I$ Scanning First Pass Prom # 0 B$ Linear= 0=0b00000000001 Gray=0b00000000001 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 1=0b00000000010 Gray=0b00000000011 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 2=0b00000000011 Gray=0b00000000010 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 3=0b00000000100 Gray=0b00000000110 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 4=0b00000000101 Gray=0b00000000111 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 5=0b00000000110 Gray=0b00000000101 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 6=0b00000000111 Gray=0b00000000100 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 7=0b00000001000 Gray=0b00000001100 Rel Eta,Phi=0,4 Expect 2 B$ Linear= 8=0b00000001001 Gray=0b00000001101 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 9=0b00000001010 Gray=0b00000001111 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 10=0b00000001011 Gray=0b00000001110 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 11=0b00000001100 Gray=0b00000001010 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 12=0b00000001101 Gray=0b00000001011 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 13=0b00000001110 Gray=0b00000001001 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 14=0b00000001111 Gray=0b00000001000 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 15=0b00000010000 Gray=0b00000011000 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 16=0b00000010001 Gray=0b00000011001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 17=0b00000010010 Gray=0b00000011011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 18=0b00000010011 Gray=0b00000011010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 19=0b00000010100 Gray=0b00000011110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 20=0b00000010101 Gray=0b00000011111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 21=0b00000010110 Gray=0b00000011101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 22=0b00000010111 Gray=0b00000011100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 23=0b00000011000 Gray=0b00000010100 Rel Eta,Phi=0,4 Expect 2 B$ Linear= 24=0b00000011001 Gray=0b00000010101 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 25=0b00000011010 Gray=0b00000010111 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 26=0b00000011011 Gray=0b00000010110 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 27=0b00000011100 Gray=0b00000010010 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 28=0b00000011101 Gray=0b00000010011 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 29=0b00000011110 Gray=0b00000010001 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 30=0b00000011111 Gray=0b00000010000 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 31=0b00000100000 Gray=0b00000110000 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 32=0b00000100001 Gray=0b00000110001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 33=0b00000100010 Gray=0b00000110011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 34=0b00000100011 Gray=0b00000110010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 35=0b00000100100 Gray=0b00000110110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 36=0b00000100101 Gray=0b00000110111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 37=0b00000100110 Gray=0b00000110101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 38=0b00000100111 Gray=0b00000110100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 39=0b00000101000 Gray=0b00000111100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 40=0b00000101001 Gray=0b00000111101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 41=0b00000101010 Gray=0b00000111111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 42=0b00000101011 Gray=0b00000111110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 43=0b00000101100 Gray=0b00000111010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 44=0b00000101101 Gray=0b00000111011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 45=0b00000101110 Gray=0b00000111001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 46=0b00000101111 Gray=0b00000111000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 47=0b00000110000 Gray=0b00000101000 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 48=0b00000110001 Gray=0b00000101001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 49=0b00000110010 Gray=0b00000101011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 50=0b00000110011 Gray=0b00000101010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 51=0b00000110100 Gray=0b00000101110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 52=0b00000110101 Gray=0b00000101111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 53=0b00000110110 Gray=0b00000101101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 54=0b00000110111 Gray=0b00000101100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 55=0b00000111000 Gray=0b00000100100 Rel Eta,Phi=0,4 Expect 2 B$ Linear= 56=0b00000111001 Gray=0b00000100101 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 57=0b00000111010 Gray=0b00000100111 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 58=0b00000111011 Gray=0b00000100110 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 59=0b00000111100 Gray=0b00000100010 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 60=0b00000111101 Gray=0b00000100011 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 61=0b00000111110 Gray=0b00000100001 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 62=0b00000111111 Gray=0b00000100000 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 63=0b00001000000 Gray=0b00001100000 Rel Eta,Phi=0,7 Expect 2 B$ Linear= 64=0b00001000001 Gray=0b00001100001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 65=0b00001000010 Gray=0b00001100011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 66=0b00001000011 Gray=0b00001100010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 67=0b00001000100 Gray=0b00001100110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 68=0b00001000101 Gray=0b00001100111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 69=0b00001000110 Gray=0b00001100101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 70=0b00001000111 Gray=0b00001100100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 71=0b00001001000 Gray=0b00001101100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 72=0b00001001001 Gray=0b00001101101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 73=0b00001001010 Gray=0b00001101111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 74=0b00001001011 Gray=0b00001101110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 75=0b00001001100 Gray=0b00001101010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 76=0b00001001101 Gray=0b00001101011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 77=0b00001001110 Gray=0b00001101001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 78=0b00001001111 Gray=0b00001101000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 79=0b00001010000 Gray=0b00001111000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 80=0b00001010001 Gray=0b00001111001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 81=0b00001010010 Gray=0b00001111011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 82=0b00001010011 Gray=0b00001111010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 83=0b00001010100 Gray=0b00001111110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 84=0b00001010101 Gray=0b00001111111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 85=0b00001010110 Gray=0b00001111101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 86=0b00001010111 Gray=0b00001111100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 87=0b00001011000 Gray=0b00001110100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 88=0b00001011001 Gray=0b00001110101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 89=0b00001011010 Gray=0b00001110111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 90=0b00001011011 Gray=0b00001110110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 91=0b00001011100 Gray=0b00001110010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 92=0b00001011101 Gray=0b00001110011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 93=0b00001011110 Gray=0b00001110001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 94=0b00001011111 Gray=0b00001110000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 95=0b00001100000 Gray=0b00001010000 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 96=0b00001100001 Gray=0b00001010001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 97=0b00001100010 Gray=0b00001010011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 98=0b00001100011 Gray=0b00001010010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 99=0b00001100100 Gray=0b00001010110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 100=0b00001100101 Gray=0b00001010111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 101=0b00001100110 Gray=0b00001010101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 102=0b00001100111 Gray=0b00001010100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 103=0b00001101000 Gray=0b00001011100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 104=0b00001101001 Gray=0b00001011101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 105=0b00001101010 Gray=0b00001011111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 106=0b00001101011 Gray=0b00001011110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 107=0b00001101100 Gray=0b00001011010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 108=0b00001101101 Gray=0b00001011011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 109=0b00001101110 Gray=0b00001011001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 110=0b00001101111 Gray=0b00001011000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 111=0b00001110000 Gray=0b00001001000 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 112=0b00001110001 Gray=0b00001001001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 113=0b00001110010 Gray=0b00001001011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 114=0b00001110011 Gray=0b00001001010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 115=0b00001110100 Gray=0b00001001110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 116=0b00001110101 Gray=0b00001001111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 117=0b00001110110 Gray=0b00001001101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 118=0b00001110111 Gray=0b00001001100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 119=0b00001111000 Gray=0b00001000100 Rel Eta,Phi=0,4 Expect 2 B$ Linear= 120=0b00001111001 Gray=0b00001000101 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 121=0b00001111010 Gray=0b00001000111 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 122=0b00001111011 Gray=0b00001000110 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 123=0b00001111100 Gray=0b00001000010 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 124=0b00001111101 Gray=0b00001000011 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 125=0b00001111110 Gray=0b00001000001 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 126=0b00001111111 Gray=0b00001000000 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 127=0b00010000000 Gray=0b00011000000 Rel Eta,Phi=1,7 Expect 2 B$ Linear= 128=0b00010000001 Gray=0b00011000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 129=0b00010000010 Gray=0b00011000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 130=0b00010000011 Gray=0b00011000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 131=0b00010000100 Gray=0b00011000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 132=0b00010000101 Gray=0b00011000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 133=0b00010000110 Gray=0b00011000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 134=0b00010000111 Gray=0b00011000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 135=0b00010001000 Gray=0b00011001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 136=0b00010001001 Gray=0b00011001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 137=0b00010001010 Gray=0b00011001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 138=0b00010001011 Gray=0b00011001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 139=0b00010001100 Gray=0b00011001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 140=0b00010001101 Gray=0b00011001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 141=0b00010001110 Gray=0b00011001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 142=0b00010001111 Gray=0b00011001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 143=0b00010010000 Gray=0b00011011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 144=0b00010010001 Gray=0b00011011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 145=0b00010010010 Gray=0b00011011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 146=0b00010010011 Gray=0b00011011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 147=0b00010010100 Gray=0b00011011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 148=0b00010010101 Gray=0b00011011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 149=0b00010010110 Gray=0b00011011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 150=0b00010010111 Gray=0b00011011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 151=0b00010011000 Gray=0b00011010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 152=0b00010011001 Gray=0b00011010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 153=0b00010011010 Gray=0b00011010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 154=0b00010011011 Gray=0b00011010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 155=0b00010011100 Gray=0b00011010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 156=0b00010011101 Gray=0b00011010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 157=0b00010011110 Gray=0b00011010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 158=0b00010011111 Gray=0b00011010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 159=0b00010100000 Gray=0b00011110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 160=0b00010100001 Gray=0b00011110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 161=0b00010100010 Gray=0b00011110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 162=0b00010100011 Gray=0b00011110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 163=0b00010100100 Gray=0b00011110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 164=0b00010100101 Gray=0b00011110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 165=0b00010100110 Gray=0b00011110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 166=0b00010100111 Gray=0b00011110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 167=0b00010101000 Gray=0b00011111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 168=0b00010101001 Gray=0b00011111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 169=0b00010101010 Gray=0b00011111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 170=0b00010101011 Gray=0b00011111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 171=0b00010101100 Gray=0b00011111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 172=0b00010101101 Gray=0b00011111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 173=0b00010101110 Gray=0b00011111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 174=0b00010101111 Gray=0b00011111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 175=0b00010110000 Gray=0b00011101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 176=0b00010110001 Gray=0b00011101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 177=0b00010110010 Gray=0b00011101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 178=0b00010110011 Gray=0b00011101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 179=0b00010110100 Gray=0b00011101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 180=0b00010110101 Gray=0b00011101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 181=0b00010110110 Gray=0b00011101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 182=0b00010110111 Gray=0b00011101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 183=0b00010111000 Gray=0b00011100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 184=0b00010111001 Gray=0b00011100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 185=0b00010111010 Gray=0b00011100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 186=0b00010111011 Gray=0b00011100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 187=0b00010111100 Gray=0b00011100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 188=0b00010111101 Gray=0b00011100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 189=0b00010111110 Gray=0b00011100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 190=0b00010111111 Gray=0b00011100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 191=0b00011000000 Gray=0b00010100000 Rel Eta,Phi=0,7 Expect 2 B$ Linear= 192=0b00011000001 Gray=0b00010100001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 193=0b00011000010 Gray=0b00010100011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 194=0b00011000011 Gray=0b00010100010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 195=0b00011000100 Gray=0b00010100110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 196=0b00011000101 Gray=0b00010100111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 197=0b00011000110 Gray=0b00010100101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 198=0b00011000111 Gray=0b00010100100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 199=0b00011001000 Gray=0b00010101100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 200=0b00011001001 Gray=0b00010101101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 201=0b00011001010 Gray=0b00010101111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 202=0b00011001011 Gray=0b00010101110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 203=0b00011001100 Gray=0b00010101010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 204=0b00011001101 Gray=0b00010101011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 205=0b00011001110 Gray=0b00010101001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 206=0b00011001111 Gray=0b00010101000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 207=0b00011010000 Gray=0b00010111000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 208=0b00011010001 Gray=0b00010111001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 209=0b00011010010 Gray=0b00010111011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 210=0b00011010011 Gray=0b00010111010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 211=0b00011010100 Gray=0b00010111110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 212=0b00011010101 Gray=0b00010111111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 213=0b00011010110 Gray=0b00010111101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 214=0b00011010111 Gray=0b00010111100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 215=0b00011011000 Gray=0b00010110100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 216=0b00011011001 Gray=0b00010110101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 217=0b00011011010 Gray=0b00010110111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 218=0b00011011011 Gray=0b00010110110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 219=0b00011011100 Gray=0b00010110010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 220=0b00011011101 Gray=0b00010110011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 221=0b00011011110 Gray=0b00010110001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 222=0b00011011111 Gray=0b00010110000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 223=0b00011100000 Gray=0b00010010000 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 224=0b00011100001 Gray=0b00010010001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 225=0b00011100010 Gray=0b00010010011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 226=0b00011100011 Gray=0b00010010010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 227=0b00011100100 Gray=0b00010010110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 228=0b00011100101 Gray=0b00010010111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 229=0b00011100110 Gray=0b00010010101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 230=0b00011100111 Gray=0b00010010100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 231=0b00011101000 Gray=0b00010011100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 232=0b00011101001 Gray=0b00010011101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 233=0b00011101010 Gray=0b00010011111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 234=0b00011101011 Gray=0b00010011110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 235=0b00011101100 Gray=0b00010011010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 236=0b00011101101 Gray=0b00010011011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 237=0b00011101110 Gray=0b00010011001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 238=0b00011101111 Gray=0b00010011000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 239=0b00011110000 Gray=0b00010001000 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 240=0b00011110001 Gray=0b00010001001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 241=0b00011110010 Gray=0b00010001011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 242=0b00011110011 Gray=0b00010001010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 243=0b00011110100 Gray=0b00010001110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 244=0b00011110101 Gray=0b00010001111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 245=0b00011110110 Gray=0b00010001101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 246=0b00011110111 Gray=0b00010001100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 247=0b00011111000 Gray=0b00010000100 Rel Eta,Phi=0,4 Expect 2 B$ Linear= 248=0b00011111001 Gray=0b00010000101 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 249=0b00011111010 Gray=0b00010000111 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 250=0b00011111011 Gray=0b00010000110 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 251=0b00011111100 Gray=0b00010000010 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 252=0b00011111101 Gray=0b00010000011 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 253=0b00011111110 Gray=0b00010000001 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 254=0b00011111111 Gray=0b00010000000 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 255=0b00100000000 Gray=0b00110000000 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 256=0b00100000001 Gray=0b00110000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 257=0b00100000010 Gray=0b00110000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 258=0b00100000011 Gray=0b00110000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 259=0b00100000100 Gray=0b00110000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 260=0b00100000101 Gray=0b00110000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 261=0b00100000110 Gray=0b00110000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 262=0b00100000111 Gray=0b00110000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 263=0b00100001000 Gray=0b00110001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 264=0b00100001001 Gray=0b00110001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 265=0b00100001010 Gray=0b00110001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 266=0b00100001011 Gray=0b00110001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 267=0b00100001100 Gray=0b00110001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 268=0b00100001101 Gray=0b00110001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 269=0b00100001110 Gray=0b00110001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 270=0b00100001111 Gray=0b00110001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 271=0b00100010000 Gray=0b00110011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 272=0b00100010001 Gray=0b00110011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 273=0b00100010010 Gray=0b00110011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 274=0b00100010011 Gray=0b00110011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 275=0b00100010100 Gray=0b00110011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 276=0b00100010101 Gray=0b00110011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 277=0b00100010110 Gray=0b00110011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 278=0b00100010111 Gray=0b00110011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 279=0b00100011000 Gray=0b00110010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 280=0b00100011001 Gray=0b00110010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 281=0b00100011010 Gray=0b00110010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 282=0b00100011011 Gray=0b00110010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 283=0b00100011100 Gray=0b00110010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 284=0b00100011101 Gray=0b00110010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 285=0b00100011110 Gray=0b00110010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 286=0b00100011111 Gray=0b00110010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 287=0b00100100000 Gray=0b00110110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 288=0b00100100001 Gray=0b00110110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 289=0b00100100010 Gray=0b00110110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 290=0b00100100011 Gray=0b00110110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 291=0b00100100100 Gray=0b00110110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 292=0b00100100101 Gray=0b00110110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 293=0b00100100110 Gray=0b00110110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 294=0b00100100111 Gray=0b00110110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 295=0b00100101000 Gray=0b00110111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 296=0b00100101001 Gray=0b00110111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 297=0b00100101010 Gray=0b00110111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 298=0b00100101011 Gray=0b00110111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 299=0b00100101100 Gray=0b00110111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 300=0b00100101101 Gray=0b00110111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 301=0b00100101110 Gray=0b00110111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 302=0b00100101111 Gray=0b00110111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 303=0b00100110000 Gray=0b00110101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 304=0b00100110001 Gray=0b00110101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 305=0b00100110010 Gray=0b00110101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 306=0b00100110011 Gray=0b00110101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 307=0b00100110100 Gray=0b00110101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 308=0b00100110101 Gray=0b00110101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 309=0b00100110110 Gray=0b00110101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 310=0b00100110111 Gray=0b00110101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 311=0b00100111000 Gray=0b00110100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 312=0b00100111001 Gray=0b00110100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 313=0b00100111010 Gray=0b00110100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 314=0b00100111011 Gray=0b00110100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 315=0b00100111100 Gray=0b00110100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 316=0b00100111101 Gray=0b00110100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 317=0b00100111110 Gray=0b00110100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 318=0b00100111111 Gray=0b00110100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 319=0b00101000000 Gray=0b00111100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear= 320=0b00101000001 Gray=0b00111100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 321=0b00101000010 Gray=0b00111100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 322=0b00101000011 Gray=0b00111100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 323=0b00101000100 Gray=0b00111100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 324=0b00101000101 Gray=0b00111100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 325=0b00101000110 Gray=0b00111100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 326=0b00101000111 Gray=0b00111100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 327=0b00101001000 Gray=0b00111101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 328=0b00101001001 Gray=0b00111101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 329=0b00101001010 Gray=0b00111101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 330=0b00101001011 Gray=0b00111101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 331=0b00101001100 Gray=0b00111101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 332=0b00101001101 Gray=0b00111101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 333=0b00101001110 Gray=0b00111101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 334=0b00101001111 Gray=0b00111101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 335=0b00101010000 Gray=0b00111111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 336=0b00101010001 Gray=0b00111111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 337=0b00101010010 Gray=0b00111111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 338=0b00101010011 Gray=0b00111111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 339=0b00101010100 Gray=0b00111111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 340=0b00101010101 Gray=0b00111111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 341=0b00101010110 Gray=0b00111111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 342=0b00101010111 Gray=0b00111111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 343=0b00101011000 Gray=0b00111110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 344=0b00101011001 Gray=0b00111110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 345=0b00101011010 Gray=0b00111110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 346=0b00101011011 Gray=0b00111110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 347=0b00101011100 Gray=0b00111110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 348=0b00101011101 Gray=0b00111110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 349=0b00101011110 Gray=0b00111110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 350=0b00101011111 Gray=0b00111110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 351=0b00101100000 Gray=0b00111010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 352=0b00101100001 Gray=0b00111010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 353=0b00101100010 Gray=0b00111010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 354=0b00101100011 Gray=0b00111010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 355=0b00101100100 Gray=0b00111010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 356=0b00101100101 Gray=0b00111010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 357=0b00101100110 Gray=0b00111010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 358=0b00101100111 Gray=0b00111010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 359=0b00101101000 Gray=0b00111011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 360=0b00101101001 Gray=0b00111011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 361=0b00101101010 Gray=0b00111011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 362=0b00101101011 Gray=0b00111011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 363=0b00101101100 Gray=0b00111011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 364=0b00101101101 Gray=0b00111011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 365=0b00101101110 Gray=0b00111011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 366=0b00101101111 Gray=0b00111011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 367=0b00101110000 Gray=0b00111001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 368=0b00101110001 Gray=0b00111001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 369=0b00101110010 Gray=0b00111001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 370=0b00101110011 Gray=0b00111001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 371=0b00101110100 Gray=0b00111001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 372=0b00101110101 Gray=0b00111001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 373=0b00101110110 Gray=0b00111001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 374=0b00101110111 Gray=0b00111001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 375=0b00101111000 Gray=0b00111000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 376=0b00101111001 Gray=0b00111000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 377=0b00101111010 Gray=0b00111000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 378=0b00101111011 Gray=0b00111000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 379=0b00101111100 Gray=0b00111000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 380=0b00101111101 Gray=0b00111000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 381=0b00101111110 Gray=0b00111000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 382=0b00101111111 Gray=0b00111000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 383=0b00110000000 Gray=0b00101000000 Rel Eta,Phi=1,7 Expect 2 B$ Linear= 384=0b00110000001 Gray=0b00101000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 385=0b00110000010 Gray=0b00101000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 386=0b00110000011 Gray=0b00101000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 387=0b00110000100 Gray=0b00101000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 388=0b00110000101 Gray=0b00101000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 389=0b00110000110 Gray=0b00101000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 390=0b00110000111 Gray=0b00101000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 391=0b00110001000 Gray=0b00101001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 392=0b00110001001 Gray=0b00101001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 393=0b00110001010 Gray=0b00101001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 394=0b00110001011 Gray=0b00101001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 395=0b00110001100 Gray=0b00101001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 396=0b00110001101 Gray=0b00101001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 397=0b00110001110 Gray=0b00101001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 398=0b00110001111 Gray=0b00101001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 399=0b00110010000 Gray=0b00101011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 400=0b00110010001 Gray=0b00101011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 401=0b00110010010 Gray=0b00101011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 402=0b00110010011 Gray=0b00101011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 403=0b00110010100 Gray=0b00101011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 404=0b00110010101 Gray=0b00101011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 405=0b00110010110 Gray=0b00101011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 406=0b00110010111 Gray=0b00101011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 407=0b00110011000 Gray=0b00101010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 408=0b00110011001 Gray=0b00101010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 409=0b00110011010 Gray=0b00101010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 410=0b00110011011 Gray=0b00101010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 411=0b00110011100 Gray=0b00101010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 412=0b00110011101 Gray=0b00101010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 413=0b00110011110 Gray=0b00101010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 414=0b00110011111 Gray=0b00101010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 415=0b00110100000 Gray=0b00101110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 416=0b00110100001 Gray=0b00101110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 417=0b00110100010 Gray=0b00101110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 418=0b00110100011 Gray=0b00101110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 419=0b00110100100 Gray=0b00101110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 420=0b00110100101 Gray=0b00101110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 421=0b00110100110 Gray=0b00101110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 422=0b00110100111 Gray=0b00101110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 423=0b00110101000 Gray=0b00101111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 424=0b00110101001 Gray=0b00101111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 425=0b00110101010 Gray=0b00101111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 426=0b00110101011 Gray=0b00101111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 427=0b00110101100 Gray=0b00101111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 428=0b00110101101 Gray=0b00101111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 429=0b00110101110 Gray=0b00101111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 430=0b00110101111 Gray=0b00101111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 431=0b00110110000 Gray=0b00101101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 432=0b00110110001 Gray=0b00101101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 433=0b00110110010 Gray=0b00101101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 434=0b00110110011 Gray=0b00101101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 435=0b00110110100 Gray=0b00101101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 436=0b00110110101 Gray=0b00101101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 437=0b00110110110 Gray=0b00101101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 438=0b00110110111 Gray=0b00101101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 439=0b00110111000 Gray=0b00101100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 440=0b00110111001 Gray=0b00101100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 441=0b00110111010 Gray=0b00101100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 442=0b00110111011 Gray=0b00101100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 443=0b00110111100 Gray=0b00101100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 444=0b00110111101 Gray=0b00101100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 445=0b00110111110 Gray=0b00101100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 446=0b00110111111 Gray=0b00101100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 447=0b00111000000 Gray=0b00100100000 Rel Eta,Phi=0,7 Expect 2 B$ Linear= 448=0b00111000001 Gray=0b00100100001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 449=0b00111000010 Gray=0b00100100011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 450=0b00111000011 Gray=0b00100100010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 451=0b00111000100 Gray=0b00100100110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 452=0b00111000101 Gray=0b00100100111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 453=0b00111000110 Gray=0b00100100101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 454=0b00111000111 Gray=0b00100100100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 455=0b00111001000 Gray=0b00100101100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 456=0b00111001001 Gray=0b00100101101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 457=0b00111001010 Gray=0b00100101111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 458=0b00111001011 Gray=0b00100101110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 459=0b00111001100 Gray=0b00100101010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 460=0b00111001101 Gray=0b00100101011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 461=0b00111001110 Gray=0b00100101001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 462=0b00111001111 Gray=0b00100101000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 463=0b00111010000 Gray=0b00100111000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 464=0b00111010001 Gray=0b00100111001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 465=0b00111010010 Gray=0b00100111011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 466=0b00111010011 Gray=0b00100111010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 467=0b00111010100 Gray=0b00100111110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 468=0b00111010101 Gray=0b00100111111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 469=0b00111010110 Gray=0b00100111101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 470=0b00111010111 Gray=0b00100111100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 471=0b00111011000 Gray=0b00100110100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 472=0b00111011001 Gray=0b00100110101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 473=0b00111011010 Gray=0b00100110111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 474=0b00111011011 Gray=0b00100110110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 475=0b00111011100 Gray=0b00100110010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 476=0b00111011101 Gray=0b00100110011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 477=0b00111011110 Gray=0b00100110001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 478=0b00111011111 Gray=0b00100110000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 479=0b00111100000 Gray=0b00100010000 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 480=0b00111100001 Gray=0b00100010001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 481=0b00111100010 Gray=0b00100010011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 482=0b00111100011 Gray=0b00100010010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 483=0b00111100100 Gray=0b00100010110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 484=0b00111100101 Gray=0b00100010111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 485=0b00111100110 Gray=0b00100010101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 486=0b00111100111 Gray=0b00100010100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 487=0b00111101000 Gray=0b00100011100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 488=0b00111101001 Gray=0b00100011101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 489=0b00111101010 Gray=0b00100011111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 490=0b00111101011 Gray=0b00100011110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 491=0b00111101100 Gray=0b00100011010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 492=0b00111101101 Gray=0b00100011011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 493=0b00111101110 Gray=0b00100011001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 494=0b00111101111 Gray=0b00100011000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 495=0b00111110000 Gray=0b00100001000 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 496=0b00111110001 Gray=0b00100001001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 497=0b00111110010 Gray=0b00100001011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 498=0b00111110011 Gray=0b00100001010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 499=0b00111110100 Gray=0b00100001110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 500=0b00111110101 Gray=0b00100001111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 501=0b00111110110 Gray=0b00100001101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 502=0b00111110111 Gray=0b00100001100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 503=0b00111111000 Gray=0b00100000100 Rel Eta,Phi=0,4 Expect 2 B$ Linear= 504=0b00111111001 Gray=0b00100000101 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 505=0b00111111010 Gray=0b00100000111 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 506=0b00111111011 Gray=0b00100000110 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 507=0b00111111100 Gray=0b00100000010 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 508=0b00111111101 Gray=0b00100000011 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 509=0b00111111110 Gray=0b00100000001 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 510=0b00111111111 Gray=0b00100000000 Rel Eta,Phi=0,3 Expect 1 B$ Linear= 511=0b01000000000 Gray=0b01100000000 Rel Eta,Phi=1,5 Expect 2 B$ Linear= 512=0b01000000001 Gray=0b01100000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 513=0b01000000010 Gray=0b01100000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 514=0b01000000011 Gray=0b01100000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 515=0b01000000100 Gray=0b01100000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 516=0b01000000101 Gray=0b01100000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 517=0b01000000110 Gray=0b01100000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 518=0b01000000111 Gray=0b01100000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 519=0b01000001000 Gray=0b01100001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 520=0b01000001001 Gray=0b01100001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 521=0b01000001010 Gray=0b01100001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 522=0b01000001011 Gray=0b01100001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 523=0b01000001100 Gray=0b01100001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 524=0b01000001101 Gray=0b01100001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 525=0b01000001110 Gray=0b01100001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 526=0b01000001111 Gray=0b01100001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 527=0b01000010000 Gray=0b01100011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 528=0b01000010001 Gray=0b01100011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 529=0b01000010010 Gray=0b01100011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 530=0b01000010011 Gray=0b01100011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 531=0b01000010100 Gray=0b01100011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 532=0b01000010101 Gray=0b01100011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 533=0b01000010110 Gray=0b01100011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 534=0b01000010111 Gray=0b01100011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 535=0b01000011000 Gray=0b01100010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 536=0b01000011001 Gray=0b01100010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 537=0b01000011010 Gray=0b01100010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 538=0b01000011011 Gray=0b01100010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 539=0b01000011100 Gray=0b01100010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 540=0b01000011101 Gray=0b01100010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 541=0b01000011110 Gray=0b01100010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 542=0b01000011111 Gray=0b01100010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 543=0b01000100000 Gray=0b01100110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 544=0b01000100001 Gray=0b01100110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 545=0b01000100010 Gray=0b01100110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 546=0b01000100011 Gray=0b01100110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 547=0b01000100100 Gray=0b01100110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 548=0b01000100101 Gray=0b01100110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 549=0b01000100110 Gray=0b01100110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 550=0b01000100111 Gray=0b01100110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 551=0b01000101000 Gray=0b01100111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 552=0b01000101001 Gray=0b01100111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 553=0b01000101010 Gray=0b01100111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 554=0b01000101011 Gray=0b01100111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 555=0b01000101100 Gray=0b01100111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 556=0b01000101101 Gray=0b01100111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 557=0b01000101110 Gray=0b01100111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 558=0b01000101111 Gray=0b01100111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 559=0b01000110000 Gray=0b01100101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 560=0b01000110001 Gray=0b01100101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 561=0b01000110010 Gray=0b01100101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 562=0b01000110011 Gray=0b01100101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 563=0b01000110100 Gray=0b01100101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 564=0b01000110101 Gray=0b01100101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 565=0b01000110110 Gray=0b01100101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 566=0b01000110111 Gray=0b01100101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 567=0b01000111000 Gray=0b01100100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 568=0b01000111001 Gray=0b01100100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 569=0b01000111010 Gray=0b01100100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 570=0b01000111011 Gray=0b01100100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 571=0b01000111100 Gray=0b01100100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 572=0b01000111101 Gray=0b01100100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 573=0b01000111110 Gray=0b01100100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 574=0b01000111111 Gray=0b01100100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 575=0b01001000000 Gray=0b01101100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear= 576=0b01001000001 Gray=0b01101100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 577=0b01001000010 Gray=0b01101100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 578=0b01001000011 Gray=0b01101100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 579=0b01001000100 Gray=0b01101100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 580=0b01001000101 Gray=0b01101100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 581=0b01001000110 Gray=0b01101100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 582=0b01001000111 Gray=0b01101100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 583=0b01001001000 Gray=0b01101101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 584=0b01001001001 Gray=0b01101101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 585=0b01001001010 Gray=0b01101101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 586=0b01001001011 Gray=0b01101101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 587=0b01001001100 Gray=0b01101101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 588=0b01001001101 Gray=0b01101101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 589=0b01001001110 Gray=0b01101101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 590=0b01001001111 Gray=0b01101101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 591=0b01001010000 Gray=0b01101111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 592=0b01001010001 Gray=0b01101111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 593=0b01001010010 Gray=0b01101111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 594=0b01001010011 Gray=0b01101111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 595=0b01001010100 Gray=0b01101111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 596=0b01001010101 Gray=0b01101111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 597=0b01001010110 Gray=0b01101111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 598=0b01001010111 Gray=0b01101111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 599=0b01001011000 Gray=0b01101110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 600=0b01001011001 Gray=0b01101110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 601=0b01001011010 Gray=0b01101110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 602=0b01001011011 Gray=0b01101110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 603=0b01001011100 Gray=0b01101110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 604=0b01001011101 Gray=0b01101110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 605=0b01001011110 Gray=0b01101110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 606=0b01001011111 Gray=0b01101110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 607=0b01001100000 Gray=0b01101010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 608=0b01001100001 Gray=0b01101010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 609=0b01001100010 Gray=0b01101010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 610=0b01001100011 Gray=0b01101010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 611=0b01001100100 Gray=0b01101010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 612=0b01001100101 Gray=0b01101010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 613=0b01001100110 Gray=0b01101010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 614=0b01001100111 Gray=0b01101010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 615=0b01001101000 Gray=0b01101011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 616=0b01001101001 Gray=0b01101011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 617=0b01001101010 Gray=0b01101011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 618=0b01001101011 Gray=0b01101011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 619=0b01001101100 Gray=0b01101011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 620=0b01001101101 Gray=0b01101011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 621=0b01001101110 Gray=0b01101011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 622=0b01001101111 Gray=0b01101011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 623=0b01001110000 Gray=0b01101001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 624=0b01001110001 Gray=0b01101001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 625=0b01001110010 Gray=0b01101001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 626=0b01001110011 Gray=0b01101001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 627=0b01001110100 Gray=0b01101001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 628=0b01001110101 Gray=0b01101001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 629=0b01001110110 Gray=0b01101001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 630=0b01001110111 Gray=0b01101001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 631=0b01001111000 Gray=0b01101000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 632=0b01001111001 Gray=0b01101000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 633=0b01001111010 Gray=0b01101000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 634=0b01001111011 Gray=0b01101000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 635=0b01001111100 Gray=0b01101000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 636=0b01001111101 Gray=0b01101000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 637=0b01001111110 Gray=0b01101000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 638=0b01001111111 Gray=0b01101000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 639=0b01010000000 Gray=0b01111000000 Rel Eta,Phi=1,7 Expect 4 B$ Linear= 640=0b01010000001 Gray=0b01111000001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 641=0b01010000010 Gray=0b01111000011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 642=0b01010000011 Gray=0b01111000010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 643=0b01010000100 Gray=0b01111000110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 644=0b01010000101 Gray=0b01111000111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 645=0b01010000110 Gray=0b01111000101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 646=0b01010000111 Gray=0b01111000100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 647=0b01010001000 Gray=0b01111001100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 648=0b01010001001 Gray=0b01111001101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 649=0b01010001010 Gray=0b01111001111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 650=0b01010001011 Gray=0b01111001110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 651=0b01010001100 Gray=0b01111001010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 652=0b01010001101 Gray=0b01111001011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 653=0b01010001110 Gray=0b01111001001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 654=0b01010001111 Gray=0b01111001000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 655=0b01010010000 Gray=0b01111011000 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 656=0b01010010001 Gray=0b01111011001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 657=0b01010010010 Gray=0b01111011011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 658=0b01010010011 Gray=0b01111011010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 659=0b01010010100 Gray=0b01111011110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 660=0b01010010101 Gray=0b01111011111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 661=0b01010010110 Gray=0b01111011101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 662=0b01010010111 Gray=0b01111011100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 663=0b01010011000 Gray=0b01111010100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 664=0b01010011001 Gray=0b01111010101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 665=0b01010011010 Gray=0b01111010111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 666=0b01010011011 Gray=0b01111010110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 667=0b01010011100 Gray=0b01111010010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 668=0b01010011101 Gray=0b01111010011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 669=0b01010011110 Gray=0b01111010001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 670=0b01010011111 Gray=0b01111010000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 671=0b01010100000 Gray=0b01111110000 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 672=0b01010100001 Gray=0b01111110001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 673=0b01010100010 Gray=0b01111110011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 674=0b01010100011 Gray=0b01111110010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 675=0b01010100100 Gray=0b01111110110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 676=0b01010100101 Gray=0b01111110111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 677=0b01010100110 Gray=0b01111110101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 678=0b01010100111 Gray=0b01111110100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 679=0b01010101000 Gray=0b01111111100 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 680=0b01010101001 Gray=0b01111111101 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 681=0b01010101010 Gray=0b01111111111 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 682=0b01010101011 Gray=0b01111111110 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 683=0b01010101100 Gray=0b01111111010 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 684=0b01010101101 Gray=0b01111111011 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 685=0b01010101110 Gray=0b01111111001 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 686=0b01010101111 Gray=0b01111111000 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 687=0b01010110000 Gray=0b01111101000 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 688=0b01010110001 Gray=0b01111101001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 689=0b01010110010 Gray=0b01111101011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 690=0b01010110011 Gray=0b01111101010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 691=0b01010110100 Gray=0b01111101110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 692=0b01010110101 Gray=0b01111101111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 693=0b01010110110 Gray=0b01111101101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 694=0b01010110111 Gray=0b01111101100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 695=0b01010111000 Gray=0b01111100100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 696=0b01010111001 Gray=0b01111100101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 697=0b01010111010 Gray=0b01111100111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 698=0b01010111011 Gray=0b01111100110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 699=0b01010111100 Gray=0b01111100010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 700=0b01010111101 Gray=0b01111100011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 701=0b01010111110 Gray=0b01111100001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 702=0b01010111111 Gray=0b01111100000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 703=0b01011000000 Gray=0b01110100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear= 704=0b01011000001 Gray=0b01110100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 705=0b01011000010 Gray=0b01110100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 706=0b01011000011 Gray=0b01110100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 707=0b01011000100 Gray=0b01110100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 708=0b01011000101 Gray=0b01110100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 709=0b01011000110 Gray=0b01110100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 710=0b01011000111 Gray=0b01110100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 711=0b01011001000 Gray=0b01110101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 712=0b01011001001 Gray=0b01110101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 713=0b01011001010 Gray=0b01110101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 714=0b01011001011 Gray=0b01110101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 715=0b01011001100 Gray=0b01110101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 716=0b01011001101 Gray=0b01110101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 717=0b01011001110 Gray=0b01110101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 718=0b01011001111 Gray=0b01110101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 719=0b01011010000 Gray=0b01110111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 720=0b01011010001 Gray=0b01110111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 721=0b01011010010 Gray=0b01110111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 722=0b01011010011 Gray=0b01110111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 723=0b01011010100 Gray=0b01110111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 724=0b01011010101 Gray=0b01110111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 725=0b01011010110 Gray=0b01110111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 726=0b01011010111 Gray=0b01110111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 727=0b01011011000 Gray=0b01110110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 728=0b01011011001 Gray=0b01110110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 729=0b01011011010 Gray=0b01110110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 730=0b01011011011 Gray=0b01110110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 731=0b01011011100 Gray=0b01110110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 732=0b01011011101 Gray=0b01110110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 733=0b01011011110 Gray=0b01110110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 734=0b01011011111 Gray=0b01110110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 735=0b01011100000 Gray=0b01110010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 736=0b01011100001 Gray=0b01110010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 737=0b01011100010 Gray=0b01110010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 738=0b01011100011 Gray=0b01110010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 739=0b01011100100 Gray=0b01110010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 740=0b01011100101 Gray=0b01110010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 741=0b01011100110 Gray=0b01110010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 742=0b01011100111 Gray=0b01110010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 743=0b01011101000 Gray=0b01110011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 744=0b01011101001 Gray=0b01110011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 745=0b01011101010 Gray=0b01110011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 746=0b01011101011 Gray=0b01110011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 747=0b01011101100 Gray=0b01110011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 748=0b01011101101 Gray=0b01110011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 749=0b01011101110 Gray=0b01110011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 750=0b01011101111 Gray=0b01110011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 751=0b01011110000 Gray=0b01110001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 752=0b01011110001 Gray=0b01110001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 753=0b01011110010 Gray=0b01110001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 754=0b01011110011 Gray=0b01110001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 755=0b01011110100 Gray=0b01110001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 756=0b01011110101 Gray=0b01110001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 757=0b01011110110 Gray=0b01110001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 758=0b01011110111 Gray=0b01110001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 759=0b01011111000 Gray=0b01110000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 760=0b01011111001 Gray=0b01110000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 761=0b01011111010 Gray=0b01110000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 762=0b01011111011 Gray=0b01110000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 763=0b01011111100 Gray=0b01110000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 764=0b01011111101 Gray=0b01110000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 765=0b01011111110 Gray=0b01110000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 766=0b01011111111 Gray=0b01110000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 767=0b01100000000 Gray=0b01010000000 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 768=0b01100000001 Gray=0b01010000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 769=0b01100000010 Gray=0b01010000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 770=0b01100000011 Gray=0b01010000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 771=0b01100000100 Gray=0b01010000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 772=0b01100000101 Gray=0b01010000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 773=0b01100000110 Gray=0b01010000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 774=0b01100000111 Gray=0b01010000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 775=0b01100001000 Gray=0b01010001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 776=0b01100001001 Gray=0b01010001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 777=0b01100001010 Gray=0b01010001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 778=0b01100001011 Gray=0b01010001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 779=0b01100001100 Gray=0b01010001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 780=0b01100001101 Gray=0b01010001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 781=0b01100001110 Gray=0b01010001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 782=0b01100001111 Gray=0b01010001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 783=0b01100010000 Gray=0b01010011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 784=0b01100010001 Gray=0b01010011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 785=0b01100010010 Gray=0b01010011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 786=0b01100010011 Gray=0b01010011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 787=0b01100010100 Gray=0b01010011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 788=0b01100010101 Gray=0b01010011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 789=0b01100010110 Gray=0b01010011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 790=0b01100010111 Gray=0b01010011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 791=0b01100011000 Gray=0b01010010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 792=0b01100011001 Gray=0b01010010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 793=0b01100011010 Gray=0b01010010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 794=0b01100011011 Gray=0b01010010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 795=0b01100011100 Gray=0b01010010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 796=0b01100011101 Gray=0b01010010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 797=0b01100011110 Gray=0b01010010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 798=0b01100011111 Gray=0b01010010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 799=0b01100100000 Gray=0b01010110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 800=0b01100100001 Gray=0b01010110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 801=0b01100100010 Gray=0b01010110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 802=0b01100100011 Gray=0b01010110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 803=0b01100100100 Gray=0b01010110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 804=0b01100100101 Gray=0b01010110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 805=0b01100100110 Gray=0b01010110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 806=0b01100100111 Gray=0b01010110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 807=0b01100101000 Gray=0b01010111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 808=0b01100101001 Gray=0b01010111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 809=0b01100101010 Gray=0b01010111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 810=0b01100101011 Gray=0b01010111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 811=0b01100101100 Gray=0b01010111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 812=0b01100101101 Gray=0b01010111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 813=0b01100101110 Gray=0b01010111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 814=0b01100101111 Gray=0b01010111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 815=0b01100110000 Gray=0b01010101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 816=0b01100110001 Gray=0b01010101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 817=0b01100110010 Gray=0b01010101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 818=0b01100110011 Gray=0b01010101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 819=0b01100110100 Gray=0b01010101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 820=0b01100110101 Gray=0b01010101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 821=0b01100110110 Gray=0b01010101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 822=0b01100110111 Gray=0b01010101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 823=0b01100111000 Gray=0b01010100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 824=0b01100111001 Gray=0b01010100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 825=0b01100111010 Gray=0b01010100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 826=0b01100111011 Gray=0b01010100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 827=0b01100111100 Gray=0b01010100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 828=0b01100111101 Gray=0b01010100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 829=0b01100111110 Gray=0b01010100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 830=0b01100111111 Gray=0b01010100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 831=0b01101000000 Gray=0b01011100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear= 832=0b01101000001 Gray=0b01011100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 833=0b01101000010 Gray=0b01011100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 834=0b01101000011 Gray=0b01011100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 835=0b01101000100 Gray=0b01011100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 836=0b01101000101 Gray=0b01011100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 837=0b01101000110 Gray=0b01011100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 838=0b01101000111 Gray=0b01011100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 839=0b01101001000 Gray=0b01011101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 840=0b01101001001 Gray=0b01011101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 841=0b01101001010 Gray=0b01011101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 842=0b01101001011 Gray=0b01011101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 843=0b01101001100 Gray=0b01011101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 844=0b01101001101 Gray=0b01011101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 845=0b01101001110 Gray=0b01011101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 846=0b01101001111 Gray=0b01011101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 847=0b01101010000 Gray=0b01011111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 848=0b01101010001 Gray=0b01011111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 849=0b01101010010 Gray=0b01011111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 850=0b01101010011 Gray=0b01011111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 851=0b01101010100 Gray=0b01011111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 852=0b01101010101 Gray=0b01011111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 853=0b01101010110 Gray=0b01011111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 854=0b01101010111 Gray=0b01011111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 855=0b01101011000 Gray=0b01011110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 856=0b01101011001 Gray=0b01011110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 857=0b01101011010 Gray=0b01011110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 858=0b01101011011 Gray=0b01011110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 859=0b01101011100 Gray=0b01011110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 860=0b01101011101 Gray=0b01011110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 861=0b01101011110 Gray=0b01011110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 862=0b01101011111 Gray=0b01011110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 863=0b01101100000 Gray=0b01011010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 864=0b01101100001 Gray=0b01011010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 865=0b01101100010 Gray=0b01011010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 866=0b01101100011 Gray=0b01011010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 867=0b01101100100 Gray=0b01011010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 868=0b01101100101 Gray=0b01011010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 869=0b01101100110 Gray=0b01011010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 870=0b01101100111 Gray=0b01011010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 871=0b01101101000 Gray=0b01011011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 872=0b01101101001 Gray=0b01011011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 873=0b01101101010 Gray=0b01011011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 874=0b01101101011 Gray=0b01011011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 875=0b01101101100 Gray=0b01011011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 876=0b01101101101 Gray=0b01011011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 877=0b01101101110 Gray=0b01011011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 878=0b01101101111 Gray=0b01011011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 879=0b01101110000 Gray=0b01011001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 880=0b01101110001 Gray=0b01011001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 881=0b01101110010 Gray=0b01011001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 882=0b01101110011 Gray=0b01011001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 883=0b01101110100 Gray=0b01011001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 884=0b01101110101 Gray=0b01011001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 885=0b01101110110 Gray=0b01011001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 886=0b01101110111 Gray=0b01011001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 887=0b01101111000 Gray=0b01011000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 888=0b01101111001 Gray=0b01011000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 889=0b01101111010 Gray=0b01011000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 890=0b01101111011 Gray=0b01011000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 891=0b01101111100 Gray=0b01011000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 892=0b01101111101 Gray=0b01011000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 893=0b01101111110 Gray=0b01011000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 894=0b01101111111 Gray=0b01011000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 895=0b01110000000 Gray=0b01001000000 Rel Eta,Phi=1,7 Expect 2 B$ Linear= 896=0b01110000001 Gray=0b01001000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 897=0b01110000010 Gray=0b01001000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 898=0b01110000011 Gray=0b01001000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 899=0b01110000100 Gray=0b01001000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 900=0b01110000101 Gray=0b01001000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 901=0b01110000110 Gray=0b01001000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 902=0b01110000111 Gray=0b01001000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 903=0b01110001000 Gray=0b01001001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 904=0b01110001001 Gray=0b01001001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 905=0b01110001010 Gray=0b01001001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 906=0b01110001011 Gray=0b01001001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 907=0b01110001100 Gray=0b01001001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 908=0b01110001101 Gray=0b01001001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 909=0b01110001110 Gray=0b01001001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 910=0b01110001111 Gray=0b01001001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 911=0b01110010000 Gray=0b01001011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 912=0b01110010001 Gray=0b01001011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 913=0b01110010010 Gray=0b01001011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 914=0b01110010011 Gray=0b01001011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 915=0b01110010100 Gray=0b01001011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 916=0b01110010101 Gray=0b01001011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 917=0b01110010110 Gray=0b01001011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 918=0b01110010111 Gray=0b01001011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 919=0b01110011000 Gray=0b01001010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 920=0b01110011001 Gray=0b01001010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 921=0b01110011010 Gray=0b01001010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 922=0b01110011011 Gray=0b01001010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 923=0b01110011100 Gray=0b01001010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 924=0b01110011101 Gray=0b01001010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 925=0b01110011110 Gray=0b01001010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 926=0b01110011111 Gray=0b01001010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 927=0b01110100000 Gray=0b01001110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 928=0b01110100001 Gray=0b01001110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 929=0b01110100010 Gray=0b01001110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 930=0b01110100011 Gray=0b01001110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 931=0b01110100100 Gray=0b01001110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 932=0b01110100101 Gray=0b01001110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 933=0b01110100110 Gray=0b01001110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 934=0b01110100111 Gray=0b01001110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 935=0b01110101000 Gray=0b01001111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 936=0b01110101001 Gray=0b01001111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 937=0b01110101010 Gray=0b01001111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 938=0b01110101011 Gray=0b01001111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 939=0b01110101100 Gray=0b01001111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 940=0b01110101101 Gray=0b01001111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 941=0b01110101110 Gray=0b01001111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 942=0b01110101111 Gray=0b01001111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 943=0b01110110000 Gray=0b01001101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 944=0b01110110001 Gray=0b01001101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 945=0b01110110010 Gray=0b01001101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 946=0b01110110011 Gray=0b01001101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 947=0b01110110100 Gray=0b01001101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 948=0b01110110101 Gray=0b01001101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 949=0b01110110110 Gray=0b01001101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 950=0b01110110111 Gray=0b01001101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 951=0b01110111000 Gray=0b01001100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 952=0b01110111001 Gray=0b01001100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 953=0b01110111010 Gray=0b01001100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 954=0b01110111011 Gray=0b01001100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 955=0b01110111100 Gray=0b01001100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 956=0b01110111101 Gray=0b01001100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 957=0b01110111110 Gray=0b01001100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 958=0b01110111111 Gray=0b01001100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 959=0b01111000000 Gray=0b01000100000 Rel Eta,Phi=0,7 Expect 2 B$ Linear= 960=0b01111000001 Gray=0b01000100001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 961=0b01111000010 Gray=0b01000100011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 962=0b01111000011 Gray=0b01000100010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 963=0b01111000100 Gray=0b01000100110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 964=0b01111000101 Gray=0b01000100111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 965=0b01111000110 Gray=0b01000100101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 966=0b01111000111 Gray=0b01000100100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 967=0b01111001000 Gray=0b01000101100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 968=0b01111001001 Gray=0b01000101101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 969=0b01111001010 Gray=0b01000101111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 970=0b01111001011 Gray=0b01000101110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 971=0b01111001100 Gray=0b01000101010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 972=0b01111001101 Gray=0b01000101011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 973=0b01111001110 Gray=0b01000101001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 974=0b01111001111 Gray=0b01000101000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 975=0b01111010000 Gray=0b01000111000 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 976=0b01111010001 Gray=0b01000111001 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 977=0b01111010010 Gray=0b01000111011 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 978=0b01111010011 Gray=0b01000111010 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 979=0b01111010100 Gray=0b01000111110 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 980=0b01111010101 Gray=0b01000111111 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 981=0b01111010110 Gray=0b01000111101 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 982=0b01111010111 Gray=0b01000111100 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 983=0b01111011000 Gray=0b01000110100 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 984=0b01111011001 Gray=0b01000110101 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 985=0b01111011010 Gray=0b01000110111 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 986=0b01111011011 Gray=0b01000110110 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 987=0b01111011100 Gray=0b01000110010 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 988=0b01111011101 Gray=0b01000110011 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 989=0b01111011110 Gray=0b01000110001 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 990=0b01111011111 Gray=0b01000110000 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 991=0b01111100000 Gray=0b01000010000 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 992=0b01111100001 Gray=0b01000010001 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 993=0b01111100010 Gray=0b01000010011 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 994=0b01111100011 Gray=0b01000010010 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 995=0b01111100100 Gray=0b01000010110 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 996=0b01111100101 Gray=0b01000010111 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 997=0b01111100110 Gray=0b01000010101 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 998=0b01111100111 Gray=0b01000010100 Rel Eta,Phi=0,3 Expect 3 B$ Linear= 999=0b01111101000 Gray=0b01000011100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1000=0b01111101001 Gray=0b01000011101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1001=0b01111101010 Gray=0b01000011111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1002=0b01111101011 Gray=0b01000011110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1003=0b01111101100 Gray=0b01000011010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1004=0b01111101101 Gray=0b01000011011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1005=0b01111101110 Gray=0b01000011001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1006=0b01111101111 Gray=0b01000011000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1007=0b01111110000 Gray=0b01000001000 Rel Eta,Phi=0,5 Expect 2 B$ Linear=1008=0b01111110001 Gray=0b01000001001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1009=0b01111110010 Gray=0b01000001011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1010=0b01111110011 Gray=0b01000001010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1011=0b01111110100 Gray=0b01000001110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1012=0b01111110101 Gray=0b01000001111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1013=0b01111110110 Gray=0b01000001101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1014=0b01111110111 Gray=0b01000001100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1015=0b01111111000 Gray=0b01000000100 Rel Eta,Phi=0,4 Expect 2 B$ Linear=1016=0b01111111001 Gray=0b01000000101 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1017=0b01111111010 Gray=0b01000000111 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1018=0b01111111011 Gray=0b01000000110 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1019=0b01111111100 Gray=0b01000000010 Rel Eta,Phi=0,1 Expect 2 B$ Linear=1020=0b01111111101 Gray=0b01000000011 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1021=0b01111111110 Gray=0b01000000001 Rel Eta,Phi=0,2 Expect 2 B$ Linear=1022=0b01111111111 Gray=0b01000000000 Rel Eta,Phi=0,3 Expect 1 B$ Linear=1023=0b10000000000 Gray=0b11000000000 Rel Eta,Phi=0,0 Expect 2 B$ Linear=1024=0b10000000001 Gray=0b11000000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1025=0b10000000010 Gray=0b11000000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1026=0b10000000011 Gray=0b11000000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1027=0b10000000100 Gray=0b11000000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1028=0b10000000101 Gray=0b11000000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1029=0b10000000110 Gray=0b11000000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1030=0b10000000111 Gray=0b11000000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1031=0b10000001000 Gray=0b11000001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1032=0b10000001001 Gray=0b11000001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1033=0b10000001010 Gray=0b11000001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1034=0b10000001011 Gray=0b11000001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1035=0b10000001100 Gray=0b11000001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1036=0b10000001101 Gray=0b11000001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1037=0b10000001110 Gray=0b11000001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1038=0b10000001111 Gray=0b11000001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1039=0b10000010000 Gray=0b11000011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1040=0b10000010001 Gray=0b11000011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1041=0b10000010010 Gray=0b11000011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1042=0b10000010011 Gray=0b11000011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1043=0b10000010100 Gray=0b11000011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1044=0b10000010101 Gray=0b11000011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1045=0b10000010110 Gray=0b11000011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1046=0b10000010111 Gray=0b11000011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1047=0b10000011000 Gray=0b11000010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1048=0b10000011001 Gray=0b11000010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1049=0b10000011010 Gray=0b11000010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1050=0b10000011011 Gray=0b11000010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1051=0b10000011100 Gray=0b11000010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1052=0b10000011101 Gray=0b11000010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1053=0b10000011110 Gray=0b11000010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1054=0b10000011111 Gray=0b11000010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1055=0b10000100000 Gray=0b11000110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1056=0b10000100001 Gray=0b11000110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1057=0b10000100010 Gray=0b11000110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1058=0b10000100011 Gray=0b11000110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1059=0b10000100100 Gray=0b11000110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1060=0b10000100101 Gray=0b11000110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1061=0b10000100110 Gray=0b11000110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1062=0b10000100111 Gray=0b11000110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1063=0b10000101000 Gray=0b11000111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1064=0b10000101001 Gray=0b11000111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1065=0b10000101010 Gray=0b11000111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1066=0b10000101011 Gray=0b11000111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1067=0b10000101100 Gray=0b11000111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1068=0b10000101101 Gray=0b11000111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1069=0b10000101110 Gray=0b11000111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1070=0b10000101111 Gray=0b11000111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1071=0b10000110000 Gray=0b11000101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1072=0b10000110001 Gray=0b11000101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1073=0b10000110010 Gray=0b11000101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1074=0b10000110011 Gray=0b11000101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1075=0b10000110100 Gray=0b11000101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1076=0b10000110101 Gray=0b11000101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1077=0b10000110110 Gray=0b11000101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1078=0b10000110111 Gray=0b11000101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1079=0b10000111000 Gray=0b11000100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1080=0b10000111001 Gray=0b11000100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1081=0b10000111010 Gray=0b11000100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1082=0b10000111011 Gray=0b11000100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1083=0b10000111100 Gray=0b11000100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1084=0b10000111101 Gray=0b11000100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1085=0b10000111110 Gray=0b11000100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1086=0b10000111111 Gray=0b11000100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1087=0b10001000000 Gray=0b11001100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear=1088=0b10001000001 Gray=0b11001100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1089=0b10001000010 Gray=0b11001100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1090=0b10001000011 Gray=0b11001100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1091=0b10001000100 Gray=0b11001100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1092=0b10001000101 Gray=0b11001100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1093=0b10001000110 Gray=0b11001100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1094=0b10001000111 Gray=0b11001100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1095=0b10001001000 Gray=0b11001101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1096=0b10001001001 Gray=0b11001101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1097=0b10001001010 Gray=0b11001101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1098=0b10001001011 Gray=0b11001101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1099=0b10001001100 Gray=0b11001101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1100=0b10001001101 Gray=0b11001101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1101=0b10001001110 Gray=0b11001101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1102=0b10001001111 Gray=0b11001101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1103=0b10001010000 Gray=0b11001111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1104=0b10001010001 Gray=0b11001111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1105=0b10001010010 Gray=0b11001111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1106=0b10001010011 Gray=0b11001111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1107=0b10001010100 Gray=0b11001111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1108=0b10001010101 Gray=0b11001111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1109=0b10001010110 Gray=0b11001111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1110=0b10001010111 Gray=0b11001111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1111=0b10001011000 Gray=0b11001110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1112=0b10001011001 Gray=0b11001110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1113=0b10001011010 Gray=0b11001110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1114=0b10001011011 Gray=0b11001110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1115=0b10001011100 Gray=0b11001110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1116=0b10001011101 Gray=0b11001110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1117=0b10001011110 Gray=0b11001110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1118=0b10001011111 Gray=0b11001110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1119=0b10001100000 Gray=0b11001010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1120=0b10001100001 Gray=0b11001010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1121=0b10001100010 Gray=0b11001010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1122=0b10001100011 Gray=0b11001010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1123=0b10001100100 Gray=0b11001010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1124=0b10001100101 Gray=0b11001010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1125=0b10001100110 Gray=0b11001010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1126=0b10001100111 Gray=0b11001010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1127=0b10001101000 Gray=0b11001011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1128=0b10001101001 Gray=0b11001011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1129=0b10001101010 Gray=0b11001011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1130=0b10001101011 Gray=0b11001011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1131=0b10001101100 Gray=0b11001011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1132=0b10001101101 Gray=0b11001011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1133=0b10001101110 Gray=0b11001011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1134=0b10001101111 Gray=0b11001011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1135=0b10001110000 Gray=0b11001001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1136=0b10001110001 Gray=0b11001001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1137=0b10001110010 Gray=0b11001001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1138=0b10001110011 Gray=0b11001001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1139=0b10001110100 Gray=0b11001001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1140=0b10001110101 Gray=0b11001001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1141=0b10001110110 Gray=0b11001001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1142=0b10001110111 Gray=0b11001001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1143=0b10001111000 Gray=0b11001000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1144=0b10001111001 Gray=0b11001000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1145=0b10001111010 Gray=0b11001000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1146=0b10001111011 Gray=0b11001000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1147=0b10001111100 Gray=0b11001000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1148=0b10001111101 Gray=0b11001000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1149=0b10001111110 Gray=0b11001000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1150=0b10001111111 Gray=0b11001000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1151=0b10010000000 Gray=0b11011000000 Rel Eta,Phi=1,7 Expect 4 B$ Linear=1152=0b10010000001 Gray=0b11011000001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1153=0b10010000010 Gray=0b11011000011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1154=0b10010000011 Gray=0b11011000010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1155=0b10010000100 Gray=0b11011000110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1156=0b10010000101 Gray=0b11011000111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1157=0b10010000110 Gray=0b11011000101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1158=0b10010000111 Gray=0b11011000100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1159=0b10010001000 Gray=0b11011001100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1160=0b10010001001 Gray=0b11011001101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1161=0b10010001010 Gray=0b11011001111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1162=0b10010001011 Gray=0b11011001110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1163=0b10010001100 Gray=0b11011001010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1164=0b10010001101 Gray=0b11011001011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1165=0b10010001110 Gray=0b11011001001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1166=0b10010001111 Gray=0b11011001000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1167=0b10010010000 Gray=0b11011011000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1168=0b10010010001 Gray=0b11011011001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1169=0b10010010010 Gray=0b11011011011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1170=0b10010010011 Gray=0b11011011010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1171=0b10010010100 Gray=0b11011011110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1172=0b10010010101 Gray=0b11011011111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1173=0b10010010110 Gray=0b11011011101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1174=0b10010010111 Gray=0b11011011100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1175=0b10010011000 Gray=0b11011010100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1176=0b10010011001 Gray=0b11011010101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1177=0b10010011010 Gray=0b11011010111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1178=0b10010011011 Gray=0b11011010110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1179=0b10010011100 Gray=0b11011010010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1180=0b10010011101 Gray=0b11011010011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1181=0b10010011110 Gray=0b11011010001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1182=0b10010011111 Gray=0b11011010000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1183=0b10010100000 Gray=0b11011110000 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1184=0b10010100001 Gray=0b11011110001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1185=0b10010100010 Gray=0b11011110011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1186=0b10010100011 Gray=0b11011110010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1187=0b10010100100 Gray=0b11011110110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1188=0b10010100101 Gray=0b11011110111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1189=0b10010100110 Gray=0b11011110101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1190=0b10010100111 Gray=0b11011110100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1191=0b10010101000 Gray=0b11011111100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1192=0b10010101001 Gray=0b11011111101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1193=0b10010101010 Gray=0b11011111111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1194=0b10010101011 Gray=0b11011111110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1195=0b10010101100 Gray=0b11011111010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1196=0b10010101101 Gray=0b11011111011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1197=0b10010101110 Gray=0b11011111001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1198=0b10010101111 Gray=0b11011111000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1199=0b10010110000 Gray=0b11011101000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1200=0b10010110001 Gray=0b11011101001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1201=0b10010110010 Gray=0b11011101011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1202=0b10010110011 Gray=0b11011101010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1203=0b10010110100 Gray=0b11011101110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1204=0b10010110101 Gray=0b11011101111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1205=0b10010110110 Gray=0b11011101101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1206=0b10010110111 Gray=0b11011101100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1207=0b10010111000 Gray=0b11011100100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1208=0b10010111001 Gray=0b11011100101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1209=0b10010111010 Gray=0b11011100111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1210=0b10010111011 Gray=0b11011100110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1211=0b10010111100 Gray=0b11011100010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1212=0b10010111101 Gray=0b11011100011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1213=0b10010111110 Gray=0b11011100001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1214=0b10010111111 Gray=0b11011100000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1215=0b10011000000 Gray=0b11010100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear=1216=0b10011000001 Gray=0b11010100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1217=0b10011000010 Gray=0b11010100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1218=0b10011000011 Gray=0b11010100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1219=0b10011000100 Gray=0b11010100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1220=0b10011000101 Gray=0b11010100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1221=0b10011000110 Gray=0b11010100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1222=0b10011000111 Gray=0b11010100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1223=0b10011001000 Gray=0b11010101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1224=0b10011001001 Gray=0b11010101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1225=0b10011001010 Gray=0b11010101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1226=0b10011001011 Gray=0b11010101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1227=0b10011001100 Gray=0b11010101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1228=0b10011001101 Gray=0b11010101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1229=0b10011001110 Gray=0b11010101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1230=0b10011001111 Gray=0b11010101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1231=0b10011010000 Gray=0b11010111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1232=0b10011010001 Gray=0b11010111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1233=0b10011010010 Gray=0b11010111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1234=0b10011010011 Gray=0b11010111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1235=0b10011010100 Gray=0b11010111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1236=0b10011010101 Gray=0b11010111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1237=0b10011010110 Gray=0b11010111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1238=0b10011010111 Gray=0b11010111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1239=0b10011011000 Gray=0b11010110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1240=0b10011011001 Gray=0b11010110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1241=0b10011011010 Gray=0b11010110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1242=0b10011011011 Gray=0b11010110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1243=0b10011011100 Gray=0b11010110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1244=0b10011011101 Gray=0b11010110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1245=0b10011011110 Gray=0b11010110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1246=0b10011011111 Gray=0b11010110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1247=0b10011100000 Gray=0b11010010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1248=0b10011100001 Gray=0b11010010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1249=0b10011100010 Gray=0b11010010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1250=0b10011100011 Gray=0b11010010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1251=0b10011100100 Gray=0b11010010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1252=0b10011100101 Gray=0b11010010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1253=0b10011100110 Gray=0b11010010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1254=0b10011100111 Gray=0b11010010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1255=0b10011101000 Gray=0b11010011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1256=0b10011101001 Gray=0b11010011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1257=0b10011101010 Gray=0b11010011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1258=0b10011101011 Gray=0b11010011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1259=0b10011101100 Gray=0b11010011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1260=0b10011101101 Gray=0b11010011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1261=0b10011101110 Gray=0b11010011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1262=0b10011101111 Gray=0b11010011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1263=0b10011110000 Gray=0b11010001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1264=0b10011110001 Gray=0b11010001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1265=0b10011110010 Gray=0b11010001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1266=0b10011110011 Gray=0b11010001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1267=0b10011110100 Gray=0b11010001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1268=0b10011110101 Gray=0b11010001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1269=0b10011110110 Gray=0b11010001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1270=0b10011110111 Gray=0b11010001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1271=0b10011111000 Gray=0b11010000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1272=0b10011111001 Gray=0b11010000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1273=0b10011111010 Gray=0b11010000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1274=0b10011111011 Gray=0b11010000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1275=0b10011111100 Gray=0b11010000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1276=0b10011111101 Gray=0b11010000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1277=0b10011111110 Gray=0b11010000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1278=0b10011111111 Gray=0b11010000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1279=0b10100000000 Gray=0b11110000000 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1280=0b10100000001 Gray=0b11110000001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1281=0b10100000010 Gray=0b11110000011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1282=0b10100000011 Gray=0b11110000010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1283=0b10100000100 Gray=0b11110000110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1284=0b10100000101 Gray=0b11110000111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1285=0b10100000110 Gray=0b11110000101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1286=0b10100000111 Gray=0b11110000100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1287=0b10100001000 Gray=0b11110001100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1288=0b10100001001 Gray=0b11110001101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1289=0b10100001010 Gray=0b11110001111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1290=0b10100001011 Gray=0b11110001110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1291=0b10100001100 Gray=0b11110001010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1292=0b10100001101 Gray=0b11110001011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1293=0b10100001110 Gray=0b11110001001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1294=0b10100001111 Gray=0b11110001000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1295=0b10100010000 Gray=0b11110011000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1296=0b10100010001 Gray=0b11110011001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1297=0b10100010010 Gray=0b11110011011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1298=0b10100010011 Gray=0b11110011010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1299=0b10100010100 Gray=0b11110011110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1300=0b10100010101 Gray=0b11110011111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1301=0b10100010110 Gray=0b11110011101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1302=0b10100010111 Gray=0b11110011100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1303=0b10100011000 Gray=0b11110010100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1304=0b10100011001 Gray=0b11110010101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1305=0b10100011010 Gray=0b11110010111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1306=0b10100011011 Gray=0b11110010110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1307=0b10100011100 Gray=0b11110010010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1308=0b10100011101 Gray=0b11110010011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1309=0b10100011110 Gray=0b11110010001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1310=0b10100011111 Gray=0b11110010000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1311=0b10100100000 Gray=0b11110110000 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1312=0b10100100001 Gray=0b11110110001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1313=0b10100100010 Gray=0b11110110011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1314=0b10100100011 Gray=0b11110110010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1315=0b10100100100 Gray=0b11110110110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1316=0b10100100101 Gray=0b11110110111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1317=0b10100100110 Gray=0b11110110101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1318=0b10100100111 Gray=0b11110110100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1319=0b10100101000 Gray=0b11110111100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1320=0b10100101001 Gray=0b11110111101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1321=0b10100101010 Gray=0b11110111111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1322=0b10100101011 Gray=0b11110111110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1323=0b10100101100 Gray=0b11110111010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1324=0b10100101101 Gray=0b11110111011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1325=0b10100101110 Gray=0b11110111001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1326=0b10100101111 Gray=0b11110111000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1327=0b10100110000 Gray=0b11110101000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1328=0b10100110001 Gray=0b11110101001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1329=0b10100110010 Gray=0b11110101011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1330=0b10100110011 Gray=0b11110101010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1331=0b10100110100 Gray=0b11110101110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1332=0b10100110101 Gray=0b11110101111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1333=0b10100110110 Gray=0b11110101101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1334=0b10100110111 Gray=0b11110101100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1335=0b10100111000 Gray=0b11110100100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1336=0b10100111001 Gray=0b11110100101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1337=0b10100111010 Gray=0b11110100111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1338=0b10100111011 Gray=0b11110100110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1339=0b10100111100 Gray=0b11110100010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1340=0b10100111101 Gray=0b11110100011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1341=0b10100111110 Gray=0b11110100001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1342=0b10100111111 Gray=0b11110100000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1343=0b10101000000 Gray=0b11111100000 Rel Eta,Phi=0,7 Expect 6 B$ Linear=1344=0b10101000001 Gray=0b11111100001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1345=0b10101000010 Gray=0b11111100011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1346=0b10101000011 Gray=0b11111100010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1347=0b10101000100 Gray=0b11111100110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1348=0b10101000101 Gray=0b11111100111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1349=0b10101000110 Gray=0b11111100101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1350=0b10101000111 Gray=0b11111100100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1351=0b10101001000 Gray=0b11111101100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1352=0b10101001001 Gray=0b11111101101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1353=0b10101001010 Gray=0b11111101111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1354=0b10101001011 Gray=0b11111101110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1355=0b10101001100 Gray=0b11111101010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1356=0b10101001101 Gray=0b11111101011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1357=0b10101001110 Gray=0b11111101001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1358=0b10101001111 Gray=0b11111101000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1359=0b10101010000 Gray=0b11111111000 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1360=0b10101010001 Gray=0b11111111001 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1361=0b10101010010 Gray=0b11111111011 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1362=0b10101010011 Gray=0b11111111010 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1363=0b10101010100 Gray=0b11111111110 Rel Eta,Phi=0,1 Expect 10 B$ Linear=1364=0b10101010101 Gray=0b11111111111 Rel Eta,Phi=0,3 Expect 11 B$ Linear=1365=0b10101010110 Gray=0b11111111101 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1366=0b10101010111 Gray=0b11111111100 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1367=0b10101011000 Gray=0b11111110100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1368=0b10101011001 Gray=0b11111110101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1369=0b10101011010 Gray=0b11111110111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1370=0b10101011011 Gray=0b11111110110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1371=0b10101011100 Gray=0b11111110010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1372=0b10101011101 Gray=0b11111110011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1373=0b10101011110 Gray=0b11111110001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1374=0b10101011111 Gray=0b11111110000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1375=0b10101100000 Gray=0b11111010000 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1376=0b10101100001 Gray=0b11111010001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1377=0b10101100010 Gray=0b11111010011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1378=0b10101100011 Gray=0b11111010010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1379=0b10101100100 Gray=0b11111010110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1380=0b10101100101 Gray=0b11111010111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1381=0b10101100110 Gray=0b11111010101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1382=0b10101100111 Gray=0b11111010100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1383=0b10101101000 Gray=0b11111011100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1384=0b10101101001 Gray=0b11111011101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1385=0b10101101010 Gray=0b11111011111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1386=0b10101101011 Gray=0b11111011110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1387=0b10101101100 Gray=0b11111011010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1388=0b10101101101 Gray=0b11111011011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1389=0b10101101110 Gray=0b11111011001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1390=0b10101101111 Gray=0b11111011000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1391=0b10101110000 Gray=0b11111001000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1392=0b10101110001 Gray=0b11111001001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1393=0b10101110010 Gray=0b11111001011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1394=0b10101110011 Gray=0b11111001010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1395=0b10101110100 Gray=0b11111001110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1396=0b10101110101 Gray=0b11111001111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1397=0b10101110110 Gray=0b11111001101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1398=0b10101110111 Gray=0b11111001100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1399=0b10101111000 Gray=0b11111000100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1400=0b10101111001 Gray=0b11111000101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1401=0b10101111010 Gray=0b11111000111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1402=0b10101111011 Gray=0b11111000110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1403=0b10101111100 Gray=0b11111000010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1404=0b10101111101 Gray=0b11111000011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1405=0b10101111110 Gray=0b11111000001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1406=0b10101111111 Gray=0b11111000000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1407=0b10110000000 Gray=0b11101000000 Rel Eta,Phi=1,7 Expect 4 B$ Linear=1408=0b10110000001 Gray=0b11101000001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1409=0b10110000010 Gray=0b11101000011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1410=0b10110000011 Gray=0b11101000010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1411=0b10110000100 Gray=0b11101000110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1412=0b10110000101 Gray=0b11101000111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1413=0b10110000110 Gray=0b11101000101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1414=0b10110000111 Gray=0b11101000100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1415=0b10110001000 Gray=0b11101001100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1416=0b10110001001 Gray=0b11101001101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1417=0b10110001010 Gray=0b11101001111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1418=0b10110001011 Gray=0b11101001110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1419=0b10110001100 Gray=0b11101001010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1420=0b10110001101 Gray=0b11101001011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1421=0b10110001110 Gray=0b11101001001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1422=0b10110001111 Gray=0b11101001000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1423=0b10110010000 Gray=0b11101011000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1424=0b10110010001 Gray=0b11101011001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1425=0b10110010010 Gray=0b11101011011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1426=0b10110010011 Gray=0b11101011010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1427=0b10110010100 Gray=0b11101011110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1428=0b10110010101 Gray=0b11101011111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1429=0b10110010110 Gray=0b11101011101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1430=0b10110010111 Gray=0b11101011100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1431=0b10110011000 Gray=0b11101010100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1432=0b10110011001 Gray=0b11101010101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1433=0b10110011010 Gray=0b11101010111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1434=0b10110011011 Gray=0b11101010110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1435=0b10110011100 Gray=0b11101010010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1436=0b10110011101 Gray=0b11101010011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1437=0b10110011110 Gray=0b11101010001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1438=0b10110011111 Gray=0b11101010000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1439=0b10110100000 Gray=0b11101110000 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1440=0b10110100001 Gray=0b11101110001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1441=0b10110100010 Gray=0b11101110011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1442=0b10110100011 Gray=0b11101110010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1443=0b10110100100 Gray=0b11101110110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1444=0b10110100101 Gray=0b11101110111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1445=0b10110100110 Gray=0b11101110101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1446=0b10110100111 Gray=0b11101110100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1447=0b10110101000 Gray=0b11101111100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1448=0b10110101001 Gray=0b11101111101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1449=0b10110101010 Gray=0b11101111111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1450=0b10110101011 Gray=0b11101111110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1451=0b10110101100 Gray=0b11101111010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1452=0b10110101101 Gray=0b11101111011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1453=0b10110101110 Gray=0b11101111001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1454=0b10110101111 Gray=0b11101111000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1455=0b10110110000 Gray=0b11101101000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1456=0b10110110001 Gray=0b11101101001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1457=0b10110110010 Gray=0b11101101011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1458=0b10110110011 Gray=0b11101101010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1459=0b10110110100 Gray=0b11101101110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1460=0b10110110101 Gray=0b11101101111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1461=0b10110110110 Gray=0b11101101101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1462=0b10110110111 Gray=0b11101101100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1463=0b10110111000 Gray=0b11101100100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1464=0b10110111001 Gray=0b11101100101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1465=0b10110111010 Gray=0b11101100111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1466=0b10110111011 Gray=0b11101100110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1467=0b10110111100 Gray=0b11101100010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1468=0b10110111101 Gray=0b11101100011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1469=0b10110111110 Gray=0b11101100001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1470=0b10110111111 Gray=0b11101100000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1471=0b10111000000 Gray=0b11100100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear=1472=0b10111000001 Gray=0b11100100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1473=0b10111000010 Gray=0b11100100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1474=0b10111000011 Gray=0b11100100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1475=0b10111000100 Gray=0b11100100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1476=0b10111000101 Gray=0b11100100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1477=0b10111000110 Gray=0b11100100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1478=0b10111000111 Gray=0b11100100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1479=0b10111001000 Gray=0b11100101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1480=0b10111001001 Gray=0b11100101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1481=0b10111001010 Gray=0b11100101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1482=0b10111001011 Gray=0b11100101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1483=0b10111001100 Gray=0b11100101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1484=0b10111001101 Gray=0b11100101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1485=0b10111001110 Gray=0b11100101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1486=0b10111001111 Gray=0b11100101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1487=0b10111010000 Gray=0b11100111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1488=0b10111010001 Gray=0b11100111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1489=0b10111010010 Gray=0b11100111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1490=0b10111010011 Gray=0b11100111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1491=0b10111010100 Gray=0b11100111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1492=0b10111010101 Gray=0b11100111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1493=0b10111010110 Gray=0b11100111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1494=0b10111010111 Gray=0b11100111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1495=0b10111011000 Gray=0b11100110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1496=0b10111011001 Gray=0b11100110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1497=0b10111011010 Gray=0b11100110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1498=0b10111011011 Gray=0b11100110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1499=0b10111011100 Gray=0b11100110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1500=0b10111011101 Gray=0b11100110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1501=0b10111011110 Gray=0b11100110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1502=0b10111011111 Gray=0b11100110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1503=0b10111100000 Gray=0b11100010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1504=0b10111100001 Gray=0b11100010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1505=0b10111100010 Gray=0b11100010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1506=0b10111100011 Gray=0b11100010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1507=0b10111100100 Gray=0b11100010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1508=0b10111100101 Gray=0b11100010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1509=0b10111100110 Gray=0b11100010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1510=0b10111100111 Gray=0b11100010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1511=0b10111101000 Gray=0b11100011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1512=0b10111101001 Gray=0b11100011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1513=0b10111101010 Gray=0b11100011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1514=0b10111101011 Gray=0b11100011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1515=0b10111101100 Gray=0b11100011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1516=0b10111101101 Gray=0b11100011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1517=0b10111101110 Gray=0b11100011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1518=0b10111101111 Gray=0b11100011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1519=0b10111110000 Gray=0b11100001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1520=0b10111110001 Gray=0b11100001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1521=0b10111110010 Gray=0b11100001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1522=0b10111110011 Gray=0b11100001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1523=0b10111110100 Gray=0b11100001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1524=0b10111110101 Gray=0b11100001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1525=0b10111110110 Gray=0b11100001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1526=0b10111110111 Gray=0b11100001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1527=0b10111111000 Gray=0b11100000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1528=0b10111111001 Gray=0b11100000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1529=0b10111111010 Gray=0b11100000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1530=0b10111111011 Gray=0b11100000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1531=0b10111111100 Gray=0b11100000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1532=0b10111111101 Gray=0b11100000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1533=0b10111111110 Gray=0b11100000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1534=0b10111111111 Gray=0b11100000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1535=0b11000000000 Gray=0b10100000000 Rel Eta,Phi=1,5 Expect 2 B$ Linear=1536=0b11000000001 Gray=0b10100000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1537=0b11000000010 Gray=0b10100000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1538=0b11000000011 Gray=0b10100000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1539=0b11000000100 Gray=0b10100000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1540=0b11000000101 Gray=0b10100000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1541=0b11000000110 Gray=0b10100000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1542=0b11000000111 Gray=0b10100000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1543=0b11000001000 Gray=0b10100001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1544=0b11000001001 Gray=0b10100001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1545=0b11000001010 Gray=0b10100001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1546=0b11000001011 Gray=0b10100001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1547=0b11000001100 Gray=0b10100001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1548=0b11000001101 Gray=0b10100001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1549=0b11000001110 Gray=0b10100001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1550=0b11000001111 Gray=0b10100001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1551=0b11000010000 Gray=0b10100011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1552=0b11000010001 Gray=0b10100011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1553=0b11000010010 Gray=0b10100011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1554=0b11000010011 Gray=0b10100011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1555=0b11000010100 Gray=0b10100011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1556=0b11000010101 Gray=0b10100011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1557=0b11000010110 Gray=0b10100011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1558=0b11000010111 Gray=0b10100011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1559=0b11000011000 Gray=0b10100010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1560=0b11000011001 Gray=0b10100010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1561=0b11000011010 Gray=0b10100010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1562=0b11000011011 Gray=0b10100010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1563=0b11000011100 Gray=0b10100010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1564=0b11000011101 Gray=0b10100010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1565=0b11000011110 Gray=0b10100010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1566=0b11000011111 Gray=0b10100010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1567=0b11000100000 Gray=0b10100110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1568=0b11000100001 Gray=0b10100110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1569=0b11000100010 Gray=0b10100110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1570=0b11000100011 Gray=0b10100110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1571=0b11000100100 Gray=0b10100110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1572=0b11000100101 Gray=0b10100110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1573=0b11000100110 Gray=0b10100110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1574=0b11000100111 Gray=0b10100110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1575=0b11000101000 Gray=0b10100111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1576=0b11000101001 Gray=0b10100111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1577=0b11000101010 Gray=0b10100111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1578=0b11000101011 Gray=0b10100111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1579=0b11000101100 Gray=0b10100111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1580=0b11000101101 Gray=0b10100111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1581=0b11000101110 Gray=0b10100111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1582=0b11000101111 Gray=0b10100111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1583=0b11000110000 Gray=0b10100101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1584=0b11000110001 Gray=0b10100101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1585=0b11000110010 Gray=0b10100101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1586=0b11000110011 Gray=0b10100101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1587=0b11000110100 Gray=0b10100101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1588=0b11000110101 Gray=0b10100101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1589=0b11000110110 Gray=0b10100101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1590=0b11000110111 Gray=0b10100101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1591=0b11000111000 Gray=0b10100100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1592=0b11000111001 Gray=0b10100100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1593=0b11000111010 Gray=0b10100100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1594=0b11000111011 Gray=0b10100100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1595=0b11000111100 Gray=0b10100100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1596=0b11000111101 Gray=0b10100100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1597=0b11000111110 Gray=0b10100100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1598=0b11000111111 Gray=0b10100100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1599=0b11001000000 Gray=0b10101100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear=1600=0b11001000001 Gray=0b10101100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1601=0b11001000010 Gray=0b10101100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1602=0b11001000011 Gray=0b10101100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1603=0b11001000100 Gray=0b10101100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1604=0b11001000101 Gray=0b10101100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1605=0b11001000110 Gray=0b10101100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1606=0b11001000111 Gray=0b10101100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1607=0b11001001000 Gray=0b10101101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1608=0b11001001001 Gray=0b10101101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1609=0b11001001010 Gray=0b10101101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1610=0b11001001011 Gray=0b10101101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1611=0b11001001100 Gray=0b10101101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1612=0b11001001101 Gray=0b10101101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1613=0b11001001110 Gray=0b10101101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1614=0b11001001111 Gray=0b10101101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1615=0b11001010000 Gray=0b10101111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1616=0b11001010001 Gray=0b10101111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1617=0b11001010010 Gray=0b10101111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1618=0b11001010011 Gray=0b10101111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1619=0b11001010100 Gray=0b10101111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1620=0b11001010101 Gray=0b10101111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1621=0b11001010110 Gray=0b10101111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1622=0b11001010111 Gray=0b10101111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1623=0b11001011000 Gray=0b10101110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1624=0b11001011001 Gray=0b10101110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1625=0b11001011010 Gray=0b10101110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1626=0b11001011011 Gray=0b10101110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1627=0b11001011100 Gray=0b10101110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1628=0b11001011101 Gray=0b10101110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1629=0b11001011110 Gray=0b10101110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1630=0b11001011111 Gray=0b10101110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1631=0b11001100000 Gray=0b10101010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1632=0b11001100001 Gray=0b10101010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1633=0b11001100010 Gray=0b10101010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1634=0b11001100011 Gray=0b10101010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1635=0b11001100100 Gray=0b10101010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1636=0b11001100101 Gray=0b10101010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1637=0b11001100110 Gray=0b10101010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1638=0b11001100111 Gray=0b10101010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1639=0b11001101000 Gray=0b10101011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1640=0b11001101001 Gray=0b10101011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1641=0b11001101010 Gray=0b10101011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1642=0b11001101011 Gray=0b10101011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1643=0b11001101100 Gray=0b10101011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1644=0b11001101101 Gray=0b10101011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1645=0b11001101110 Gray=0b10101011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1646=0b11001101111 Gray=0b10101011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1647=0b11001110000 Gray=0b10101001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1648=0b11001110001 Gray=0b10101001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1649=0b11001110010 Gray=0b10101001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1650=0b11001110011 Gray=0b10101001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1651=0b11001110100 Gray=0b10101001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1652=0b11001110101 Gray=0b10101001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1653=0b11001110110 Gray=0b10101001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1654=0b11001110111 Gray=0b10101001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1655=0b11001111000 Gray=0b10101000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1656=0b11001111001 Gray=0b10101000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1657=0b11001111010 Gray=0b10101000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1658=0b11001111011 Gray=0b10101000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1659=0b11001111100 Gray=0b10101000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1660=0b11001111101 Gray=0b10101000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1661=0b11001111110 Gray=0b10101000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1662=0b11001111111 Gray=0b10101000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1663=0b11010000000 Gray=0b10111000000 Rel Eta,Phi=1,7 Expect 4 B$ Linear=1664=0b11010000001 Gray=0b10111000001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1665=0b11010000010 Gray=0b10111000011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1666=0b11010000011 Gray=0b10111000010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1667=0b11010000100 Gray=0b10111000110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1668=0b11010000101 Gray=0b10111000111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1669=0b11010000110 Gray=0b10111000101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1670=0b11010000111 Gray=0b10111000100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1671=0b11010001000 Gray=0b10111001100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1672=0b11010001001 Gray=0b10111001101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1673=0b11010001010 Gray=0b10111001111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1674=0b11010001011 Gray=0b10111001110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1675=0b11010001100 Gray=0b10111001010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1676=0b11010001101 Gray=0b10111001011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1677=0b11010001110 Gray=0b10111001001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1678=0b11010001111 Gray=0b10111001000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1679=0b11010010000 Gray=0b10111011000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1680=0b11010010001 Gray=0b10111011001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1681=0b11010010010 Gray=0b10111011011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1682=0b11010010011 Gray=0b10111011010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1683=0b11010010100 Gray=0b10111011110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1684=0b11010010101 Gray=0b10111011111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1685=0b11010010110 Gray=0b10111011101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1686=0b11010010111 Gray=0b10111011100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1687=0b11010011000 Gray=0b10111010100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1688=0b11010011001 Gray=0b10111010101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1689=0b11010011010 Gray=0b10111010111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1690=0b11010011011 Gray=0b10111010110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1691=0b11010011100 Gray=0b10111010010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1692=0b11010011101 Gray=0b10111010011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1693=0b11010011110 Gray=0b10111010001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1694=0b11010011111 Gray=0b10111010000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1695=0b11010100000 Gray=0b10111110000 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1696=0b11010100001 Gray=0b10111110001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1697=0b11010100010 Gray=0b10111110011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1698=0b11010100011 Gray=0b10111110010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1699=0b11010100100 Gray=0b10111110110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1700=0b11010100101 Gray=0b10111110111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1701=0b11010100110 Gray=0b10111110101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1702=0b11010100111 Gray=0b10111110100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1703=0b11010101000 Gray=0b10111111100 Rel Eta,Phi=0,4 Expect 8 B$ Linear=1704=0b11010101001 Gray=0b10111111101 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1705=0b11010101010 Gray=0b10111111111 Rel Eta,Phi=0,2 Expect 10 B$ Linear=1706=0b11010101011 Gray=0b10111111110 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1707=0b11010101100 Gray=0b10111111010 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1708=0b11010101101 Gray=0b10111111011 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1709=0b11010101110 Gray=0b10111111001 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1710=0b11010101111 Gray=0b10111111000 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1711=0b11010110000 Gray=0b10111101000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1712=0b11010110001 Gray=0b10111101001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1713=0b11010110010 Gray=0b10111101011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1714=0b11010110011 Gray=0b10111101010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1715=0b11010110100 Gray=0b10111101110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1716=0b11010110101 Gray=0b10111101111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1717=0b11010110110 Gray=0b10111101101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1718=0b11010110111 Gray=0b10111101100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1719=0b11010111000 Gray=0b10111100100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1720=0b11010111001 Gray=0b10111100101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1721=0b11010111010 Gray=0b10111100111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1722=0b11010111011 Gray=0b10111100110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1723=0b11010111100 Gray=0b10111100010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1724=0b11010111101 Gray=0b10111100011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1725=0b11010111110 Gray=0b10111100001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1726=0b11010111111 Gray=0b10111100000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1727=0b11011000000 Gray=0b10110100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear=1728=0b11011000001 Gray=0b10110100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1729=0b11011000010 Gray=0b10110100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1730=0b11011000011 Gray=0b10110100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1731=0b11011000100 Gray=0b10110100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1732=0b11011000101 Gray=0b10110100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1733=0b11011000110 Gray=0b10110100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1734=0b11011000111 Gray=0b10110100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1735=0b11011001000 Gray=0b10110101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1736=0b11011001001 Gray=0b10110101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1737=0b11011001010 Gray=0b10110101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1738=0b11011001011 Gray=0b10110101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1739=0b11011001100 Gray=0b10110101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1740=0b11011001101 Gray=0b10110101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1741=0b11011001110 Gray=0b10110101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1742=0b11011001111 Gray=0b10110101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1743=0b11011010000 Gray=0b10110111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1744=0b11011010001 Gray=0b10110111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1745=0b11011010010 Gray=0b10110111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1746=0b11011010011 Gray=0b10110111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1747=0b11011010100 Gray=0b10110111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1748=0b11011010101 Gray=0b10110111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1749=0b11011010110 Gray=0b10110111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1750=0b11011010111 Gray=0b10110111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1751=0b11011011000 Gray=0b10110110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1752=0b11011011001 Gray=0b10110110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1753=0b11011011010 Gray=0b10110110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1754=0b11011011011 Gray=0b10110110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1755=0b11011011100 Gray=0b10110110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1756=0b11011011101 Gray=0b10110110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1757=0b11011011110 Gray=0b10110110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1758=0b11011011111 Gray=0b10110110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1759=0b11011100000 Gray=0b10110010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1760=0b11011100001 Gray=0b10110010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1761=0b11011100010 Gray=0b10110010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1762=0b11011100011 Gray=0b10110010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1763=0b11011100100 Gray=0b10110010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1764=0b11011100101 Gray=0b10110010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1765=0b11011100110 Gray=0b10110010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1766=0b11011100111 Gray=0b10110010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1767=0b11011101000 Gray=0b10110011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1768=0b11011101001 Gray=0b10110011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1769=0b11011101010 Gray=0b10110011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1770=0b11011101011 Gray=0b10110011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1771=0b11011101100 Gray=0b10110011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1772=0b11011101101 Gray=0b10110011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1773=0b11011101110 Gray=0b10110011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1774=0b11011101111 Gray=0b10110011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1775=0b11011110000 Gray=0b10110001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1776=0b11011110001 Gray=0b10110001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1777=0b11011110010 Gray=0b10110001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1778=0b11011110011 Gray=0b10110001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1779=0b11011110100 Gray=0b10110001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1780=0b11011110101 Gray=0b10110001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1781=0b11011110110 Gray=0b10110001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1782=0b11011110111 Gray=0b10110001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1783=0b11011111000 Gray=0b10110000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1784=0b11011111001 Gray=0b10110000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1785=0b11011111010 Gray=0b10110000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1786=0b11011111011 Gray=0b10110000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1787=0b11011111100 Gray=0b10110000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1788=0b11011111101 Gray=0b10110000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1789=0b11011111110 Gray=0b10110000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1790=0b11011111111 Gray=0b10110000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1791=0b11100000000 Gray=0b10010000000 Rel Eta,Phi=1,6 Expect 2 B$ Linear=1792=0b11100000001 Gray=0b10010000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1793=0b11100000010 Gray=0b10010000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1794=0b11100000011 Gray=0b10010000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1795=0b11100000100 Gray=0b10010000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1796=0b11100000101 Gray=0b10010000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1797=0b11100000110 Gray=0b10010000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1798=0b11100000111 Gray=0b10010000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1799=0b11100001000 Gray=0b10010001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1800=0b11100001001 Gray=0b10010001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1801=0b11100001010 Gray=0b10010001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1802=0b11100001011 Gray=0b10010001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1803=0b11100001100 Gray=0b10010001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1804=0b11100001101 Gray=0b10010001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1805=0b11100001110 Gray=0b10010001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1806=0b11100001111 Gray=0b10010001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1807=0b11100010000 Gray=0b10010011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1808=0b11100010001 Gray=0b10010011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1809=0b11100010010 Gray=0b10010011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1810=0b11100010011 Gray=0b10010011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1811=0b11100010100 Gray=0b10010011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1812=0b11100010101 Gray=0b10010011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1813=0b11100010110 Gray=0b10010011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1814=0b11100010111 Gray=0b10010011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1815=0b11100011000 Gray=0b10010010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1816=0b11100011001 Gray=0b10010010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1817=0b11100011010 Gray=0b10010010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1818=0b11100011011 Gray=0b10010010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1819=0b11100011100 Gray=0b10010010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1820=0b11100011101 Gray=0b10010010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1821=0b11100011110 Gray=0b10010010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1822=0b11100011111 Gray=0b10010010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1823=0b11100100000 Gray=0b10010110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1824=0b11100100001 Gray=0b10010110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1825=0b11100100010 Gray=0b10010110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1826=0b11100100011 Gray=0b10010110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1827=0b11100100100 Gray=0b10010110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1828=0b11100100101 Gray=0b10010110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1829=0b11100100110 Gray=0b10010110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1830=0b11100100111 Gray=0b10010110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1831=0b11100101000 Gray=0b10010111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1832=0b11100101001 Gray=0b10010111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1833=0b11100101010 Gray=0b10010111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1834=0b11100101011 Gray=0b10010111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1835=0b11100101100 Gray=0b10010111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1836=0b11100101101 Gray=0b10010111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1837=0b11100101110 Gray=0b10010111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1838=0b11100101111 Gray=0b10010111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1839=0b11100110000 Gray=0b10010101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1840=0b11100110001 Gray=0b10010101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1841=0b11100110010 Gray=0b10010101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1842=0b11100110011 Gray=0b10010101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1843=0b11100110100 Gray=0b10010101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1844=0b11100110101 Gray=0b10010101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1845=0b11100110110 Gray=0b10010101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1846=0b11100110111 Gray=0b10010101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1847=0b11100111000 Gray=0b10010100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1848=0b11100111001 Gray=0b10010100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1849=0b11100111010 Gray=0b10010100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1850=0b11100111011 Gray=0b10010100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1851=0b11100111100 Gray=0b10010100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1852=0b11100111101 Gray=0b10010100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1853=0b11100111110 Gray=0b10010100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1854=0b11100111111 Gray=0b10010100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1855=0b11101000000 Gray=0b10011100000 Rel Eta,Phi=0,7 Expect 4 B$ Linear=1856=0b11101000001 Gray=0b10011100001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1857=0b11101000010 Gray=0b10011100011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1858=0b11101000011 Gray=0b10011100010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1859=0b11101000100 Gray=0b10011100110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1860=0b11101000101 Gray=0b10011100111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1861=0b11101000110 Gray=0b10011100101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1862=0b11101000111 Gray=0b10011100100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1863=0b11101001000 Gray=0b10011101100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1864=0b11101001001 Gray=0b10011101101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1865=0b11101001010 Gray=0b10011101111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1866=0b11101001011 Gray=0b10011101110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1867=0b11101001100 Gray=0b10011101010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1868=0b11101001101 Gray=0b10011101011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1869=0b11101001110 Gray=0b10011101001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1870=0b11101001111 Gray=0b10011101000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1871=0b11101010000 Gray=0b10011111000 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1872=0b11101010001 Gray=0b10011111001 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1873=0b11101010010 Gray=0b10011111011 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1874=0b11101010011 Gray=0b10011111010 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1875=0b11101010100 Gray=0b10011111110 Rel Eta,Phi=0,1 Expect 8 B$ Linear=1876=0b11101010101 Gray=0b10011111111 Rel Eta,Phi=0,3 Expect 9 B$ Linear=1877=0b11101010110 Gray=0b10011111101 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1878=0b11101010111 Gray=0b10011111100 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1879=0b11101011000 Gray=0b10011110100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1880=0b11101011001 Gray=0b10011110101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1881=0b11101011010 Gray=0b10011110111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1882=0b11101011011 Gray=0b10011110110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1883=0b11101011100 Gray=0b10011110010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1884=0b11101011101 Gray=0b10011110011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1885=0b11101011110 Gray=0b10011110001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1886=0b11101011111 Gray=0b10011110000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1887=0b11101100000 Gray=0b10011010000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1888=0b11101100001 Gray=0b10011010001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1889=0b11101100010 Gray=0b10011010011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1890=0b11101100011 Gray=0b10011010010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1891=0b11101100100 Gray=0b10011010110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1892=0b11101100101 Gray=0b10011010111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1893=0b11101100110 Gray=0b10011010101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1894=0b11101100111 Gray=0b10011010100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1895=0b11101101000 Gray=0b10011011100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1896=0b11101101001 Gray=0b10011011101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1897=0b11101101010 Gray=0b10011011111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1898=0b11101101011 Gray=0b10011011110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1899=0b11101101100 Gray=0b10011011010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1900=0b11101101101 Gray=0b10011011011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1901=0b11101101110 Gray=0b10011011001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1902=0b11101101111 Gray=0b10011011000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1903=0b11101110000 Gray=0b10011001000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1904=0b11101110001 Gray=0b10011001001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1905=0b11101110010 Gray=0b10011001011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1906=0b11101110011 Gray=0b10011001010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1907=0b11101110100 Gray=0b10011001110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1908=0b11101110101 Gray=0b10011001111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1909=0b11101110110 Gray=0b10011001101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1910=0b11101110111 Gray=0b10011001100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1911=0b11101111000 Gray=0b10011000100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1912=0b11101111001 Gray=0b10011000101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1913=0b11101111010 Gray=0b10011000111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1914=0b11101111011 Gray=0b10011000110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1915=0b11101111100 Gray=0b10011000010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1916=0b11101111101 Gray=0b10011000011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1917=0b11101111110 Gray=0b10011000001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1918=0b11101111111 Gray=0b10011000000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1919=0b11110000000 Gray=0b10001000000 Rel Eta,Phi=1,7 Expect 2 B$ Linear=1920=0b11110000001 Gray=0b10001000001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1921=0b11110000010 Gray=0b10001000011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1922=0b11110000011 Gray=0b10001000010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1923=0b11110000100 Gray=0b10001000110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1924=0b11110000101 Gray=0b10001000111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1925=0b11110000110 Gray=0b10001000101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1926=0b11110000111 Gray=0b10001000100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1927=0b11110001000 Gray=0b10001001100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1928=0b11110001001 Gray=0b10001001101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1929=0b11110001010 Gray=0b10001001111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1930=0b11110001011 Gray=0b10001001110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1931=0b11110001100 Gray=0b10001001010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1932=0b11110001101 Gray=0b10001001011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1933=0b11110001110 Gray=0b10001001001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1934=0b11110001111 Gray=0b10001001000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1935=0b11110010000 Gray=0b10001011000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1936=0b11110010001 Gray=0b10001011001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1937=0b11110010010 Gray=0b10001011011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1938=0b11110010011 Gray=0b10001011010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1939=0b11110010100 Gray=0b10001011110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1940=0b11110010101 Gray=0b10001011111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1941=0b11110010110 Gray=0b10001011101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1942=0b11110010111 Gray=0b10001011100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1943=0b11110011000 Gray=0b10001010100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1944=0b11110011001 Gray=0b10001010101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1945=0b11110011010 Gray=0b10001010111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1946=0b11110011011 Gray=0b10001010110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1947=0b11110011100 Gray=0b10001010010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1948=0b11110011101 Gray=0b10001010011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1949=0b11110011110 Gray=0b10001010001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1950=0b11110011111 Gray=0b10001010000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1951=0b11110100000 Gray=0b10001110000 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1952=0b11110100001 Gray=0b10001110001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1953=0b11110100010 Gray=0b10001110011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1954=0b11110100011 Gray=0b10001110010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1955=0b11110100100 Gray=0b10001110110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1956=0b11110100101 Gray=0b10001110111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1957=0b11110100110 Gray=0b10001110101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1958=0b11110100111 Gray=0b10001110100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1959=0b11110101000 Gray=0b10001111100 Rel Eta,Phi=0,4 Expect 6 B$ Linear=1960=0b11110101001 Gray=0b10001111101 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1961=0b11110101010 Gray=0b10001111111 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1962=0b11110101011 Gray=0b10001111110 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1963=0b11110101100 Gray=0b10001111010 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1964=0b11110101101 Gray=0b10001111011 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1965=0b11110101110 Gray=0b10001111001 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1966=0b11110101111 Gray=0b10001111000 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1967=0b11110110000 Gray=0b10001101000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1968=0b11110110001 Gray=0b10001101001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1969=0b11110110010 Gray=0b10001101011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1970=0b11110110011 Gray=0b10001101010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1971=0b11110110100 Gray=0b10001101110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1972=0b11110110101 Gray=0b10001101111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=1973=0b11110110110 Gray=0b10001101101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1974=0b11110110111 Gray=0b10001101100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1975=0b11110111000 Gray=0b10001100100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1976=0b11110111001 Gray=0b10001100101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1977=0b11110111010 Gray=0b10001100111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1978=0b11110111011 Gray=0b10001100110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1979=0b11110111100 Gray=0b10001100010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1980=0b11110111101 Gray=0b10001100011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1981=0b11110111110 Gray=0b10001100001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1982=0b11110111111 Gray=0b10001100000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1983=0b11111000000 Gray=0b10000100000 Rel Eta,Phi=0,7 Expect 2 B$ Linear=1984=0b11111000001 Gray=0b10000100001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1985=0b11111000010 Gray=0b10000100011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1986=0b11111000011 Gray=0b10000100010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1987=0b11111000100 Gray=0b10000100110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1988=0b11111000101 Gray=0b10000100111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1989=0b11111000110 Gray=0b10000100101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1990=0b11111000111 Gray=0b10000100100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1991=0b11111001000 Gray=0b10000101100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=1992=0b11111001001 Gray=0b10000101101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1993=0b11111001010 Gray=0b10000101111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1994=0b11111001011 Gray=0b10000101110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1995=0b11111001100 Gray=0b10000101010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1996=0b11111001101 Gray=0b10000101011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=1997=0b11111001110 Gray=0b10000101001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1998=0b11111001111 Gray=0b10000101000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=1999=0b11111010000 Gray=0b10000111000 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2000=0b11111010001 Gray=0b10000111001 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2001=0b11111010010 Gray=0b10000111011 Rel Eta,Phi=0,2 Expect 6 B$ Linear=2002=0b11111010011 Gray=0b10000111010 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2003=0b11111010100 Gray=0b10000111110 Rel Eta,Phi=0,1 Expect 6 B$ Linear=2004=0b11111010101 Gray=0b10000111111 Rel Eta,Phi=0,3 Expect 7 B$ Linear=2005=0b11111010110 Gray=0b10000111101 Rel Eta,Phi=0,2 Expect 6 B$ Linear=2006=0b11111010111 Gray=0b10000111100 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2007=0b11111011000 Gray=0b10000110100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=2008=0b11111011001 Gray=0b10000110101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2009=0b11111011010 Gray=0b10000110111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=2010=0b11111011011 Gray=0b10000110110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2011=0b11111011100 Gray=0b10000110010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=2012=0b11111011101 Gray=0b10000110011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2013=0b11111011110 Gray=0b10000110001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2014=0b11111011111 Gray=0b10000110000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2015=0b11111100000 Gray=0b10000010000 Rel Eta,Phi=0,6 Expect 2 B$ Linear=2016=0b11111100001 Gray=0b10000010001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2017=0b11111100010 Gray=0b10000010011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2018=0b11111100011 Gray=0b10000010010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2019=0b11111100100 Gray=0b10000010110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=2020=0b11111100101 Gray=0b10000010111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2021=0b11111100110 Gray=0b10000010101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2022=0b11111100111 Gray=0b10000010100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2023=0b11111101000 Gray=0b10000011100 Rel Eta,Phi=0,4 Expect 4 B$ Linear=2024=0b11111101001 Gray=0b10000011101 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2025=0b11111101010 Gray=0b10000011111 Rel Eta,Phi=0,2 Expect 6 B$ Linear=2026=0b11111101011 Gray=0b10000011110 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2027=0b11111101100 Gray=0b10000011010 Rel Eta,Phi=0,1 Expect 4 B$ Linear=2028=0b11111101101 Gray=0b10000011011 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2029=0b11111101110 Gray=0b10000011001 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2030=0b11111101111 Gray=0b10000011000 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2031=0b11111110000 Gray=0b10000001000 Rel Eta,Phi=0,5 Expect 2 B$ Linear=2032=0b11111110001 Gray=0b10000001001 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2033=0b11111110010 Gray=0b10000001011 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2034=0b11111110011 Gray=0b10000001010 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2035=0b11111110100 Gray=0b10000001110 Rel Eta,Phi=0,1 Expect 4 B$ Linear=2036=0b11111110101 Gray=0b10000001111 Rel Eta,Phi=0,3 Expect 5 B$ Linear=2037=0b11111110110 Gray=0b10000001101 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2038=0b11111110111 Gray=0b10000001100 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2039=0b11111111000 Gray=0b10000000100 Rel Eta,Phi=0,4 Expect 2 B$ Linear=2040=0b11111111001 Gray=0b10000000101 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2041=0b11111111010 Gray=0b10000000111 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2042=0b11111111011 Gray=0b10000000110 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2043=0b11111111100 Gray=0b10000000010 Rel Eta,Phi=0,1 Expect 2 B$ Linear=2044=0b11111111101 Gray=0b10000000011 Rel Eta,Phi=0,3 Expect 3 B$ Linear=2045=0b11111111110 Gray=0b10000000001 Rel Eta,Phi=0,2 Expect 2 B$ Linear=2046=0b11111111111 Gray=0b10000000000 Rel Eta,Phi=0,3 Expect 1 B$ Linear=2047=0b10000000000 Gray=0b00000000000 Rel Eta,Phi=0,0 Expect 0 I$ Scanning First Pass Prom # 1 B$ Linear= 0=0b00000000001 Gray=0b00000000001 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 1=0b00000000010 Gray=0b00000000011 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 2=0b00000000011 Gray=0b00000000010 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 3=0b00000000100 Gray=0b00000000110 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 4=0b00000000101 Gray=0b00000000111 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 5=0b00000000110 Gray=0b00000000101 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 6=0b00000000111 Gray=0b00000000100 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 7=0b00000001000 Gray=0b00000001100 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 8=0b00000001001 Gray=0b00000001101 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 9=0b00000001010 Gray=0b00000001111 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 10=0b00000001011 Gray=0b00000001110 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 11=0b00000001100 Gray=0b00000001010 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 12=0b00000001101 Gray=0b00000001011 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 13=0b00000001110 Gray=0b00000001001 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 14=0b00000001111 Gray=0b00000001000 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 15=0b00000010000 Gray=0b00000011000 Rel Eta,Phi=1,2 Expect 2 B$ Linear= 16=0b00000010001 Gray=0b00000011001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 17=0b00000010010 Gray=0b00000011011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 18=0b00000010011 Gray=0b00000011010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 19=0b00000010100 Gray=0b00000011110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 20=0b00000010101 Gray=0b00000011111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 21=0b00000010110 Gray=0b00000011101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 22=0b00000010111 Gray=0b00000011100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 23=0b00000011000 Gray=0b00000010100 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 24=0b00000011001 Gray=0b00000010101 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 25=0b00000011010 Gray=0b00000010111 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 26=0b00000011011 Gray=0b00000010110 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 27=0b00000011100 Gray=0b00000010010 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 28=0b00000011101 Gray=0b00000010011 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 29=0b00000011110 Gray=0b00000010001 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 30=0b00000011111 Gray=0b00000010000 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 31=0b00000100000 Gray=0b00000110000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 32=0b00000100001 Gray=0b00000110001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 33=0b00000100010 Gray=0b00000110011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 34=0b00000100011 Gray=0b00000110010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 35=0b00000100100 Gray=0b00000110110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 36=0b00000100101 Gray=0b00000110111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 37=0b00000100110 Gray=0b00000110101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 38=0b00000100111 Gray=0b00000110100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 39=0b00000101000 Gray=0b00000111100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 40=0b00000101001 Gray=0b00000111101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 41=0b00000101010 Gray=0b00000111111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 42=0b00000101011 Gray=0b00000111110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 43=0b00000101100 Gray=0b00000111010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 44=0b00000101101 Gray=0b00000111011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 45=0b00000101110 Gray=0b00000111001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 46=0b00000101111 Gray=0b00000111000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 47=0b00000110000 Gray=0b00000101000 Rel Eta,Phi=1,2 Expect 2 B$ Linear= 48=0b00000110001 Gray=0b00000101001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 49=0b00000110010 Gray=0b00000101011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 50=0b00000110011 Gray=0b00000101010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 51=0b00000110100 Gray=0b00000101110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 52=0b00000110101 Gray=0b00000101111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 53=0b00000110110 Gray=0b00000101101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 54=0b00000110111 Gray=0b00000101100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 55=0b00000111000 Gray=0b00000100100 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 56=0b00000111001 Gray=0b00000100101 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 57=0b00000111010 Gray=0b00000100111 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 58=0b00000111011 Gray=0b00000100110 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 59=0b00000111100 Gray=0b00000100010 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 60=0b00000111101 Gray=0b00000100011 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 61=0b00000111110 Gray=0b00000100001 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 62=0b00000111111 Gray=0b00000100000 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 63=0b00001000000 Gray=0b00001100000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 64=0b00001000001 Gray=0b00001100001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 65=0b00001000010 Gray=0b00001100011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 66=0b00001000011 Gray=0b00001100010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 67=0b00001000100 Gray=0b00001100110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 68=0b00001000101 Gray=0b00001100111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 69=0b00001000110 Gray=0b00001100101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 70=0b00001000111 Gray=0b00001100100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 71=0b00001001000 Gray=0b00001101100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 72=0b00001001001 Gray=0b00001101101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 73=0b00001001010 Gray=0b00001101111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 74=0b00001001011 Gray=0b00001101110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 75=0b00001001100 Gray=0b00001101010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 76=0b00001001101 Gray=0b00001101011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 77=0b00001001110 Gray=0b00001101001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 78=0b00001001111 Gray=0b00001101000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 79=0b00001010000 Gray=0b00001111000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 80=0b00001010001 Gray=0b00001111001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 81=0b00001010010 Gray=0b00001111011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 82=0b00001010011 Gray=0b00001111010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 83=0b00001010100 Gray=0b00001111110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 84=0b00001010101 Gray=0b00001111111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 85=0b00001010110 Gray=0b00001111101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 86=0b00001010111 Gray=0b00001111100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 87=0b00001011000 Gray=0b00001110100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 88=0b00001011001 Gray=0b00001110101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 89=0b00001011010 Gray=0b00001110111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 90=0b00001011011 Gray=0b00001110110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 91=0b00001011100 Gray=0b00001110010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 92=0b00001011101 Gray=0b00001110011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 93=0b00001011110 Gray=0b00001110001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 94=0b00001011111 Gray=0b00001110000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 95=0b00001100000 Gray=0b00001010000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 96=0b00001100001 Gray=0b00001010001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 97=0b00001100010 Gray=0b00001010011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 98=0b00001100011 Gray=0b00001010010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 99=0b00001100100 Gray=0b00001010110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 100=0b00001100101 Gray=0b00001010111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 101=0b00001100110 Gray=0b00001010101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 102=0b00001100111 Gray=0b00001010100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 103=0b00001101000 Gray=0b00001011100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 104=0b00001101001 Gray=0b00001011101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 105=0b00001101010 Gray=0b00001011111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 106=0b00001101011 Gray=0b00001011110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 107=0b00001101100 Gray=0b00001011010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 108=0b00001101101 Gray=0b00001011011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 109=0b00001101110 Gray=0b00001011001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 110=0b00001101111 Gray=0b00001011000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 111=0b00001110000 Gray=0b00001001000 Rel Eta,Phi=1,2 Expect 2 B$ Linear= 112=0b00001110001 Gray=0b00001001001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 113=0b00001110010 Gray=0b00001001011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 114=0b00001110011 Gray=0b00001001010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 115=0b00001110100 Gray=0b00001001110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 116=0b00001110101 Gray=0b00001001111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 117=0b00001110110 Gray=0b00001001101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 118=0b00001110111 Gray=0b00001001100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 119=0b00001111000 Gray=0b00001000100 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 120=0b00001111001 Gray=0b00001000101 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 121=0b00001111010 Gray=0b00001000111 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 122=0b00001111011 Gray=0b00001000110 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 123=0b00001111100 Gray=0b00001000010 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 124=0b00001111101 Gray=0b00001000011 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 125=0b00001111110 Gray=0b00001000001 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 126=0b00001111111 Gray=0b00001000000 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 127=0b00010000000 Gray=0b00011000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear= 128=0b00010000001 Gray=0b00011000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 129=0b00010000010 Gray=0b00011000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 130=0b00010000011 Gray=0b00011000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 131=0b00010000100 Gray=0b00011000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 132=0b00010000101 Gray=0b00011000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 133=0b00010000110 Gray=0b00011000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 134=0b00010000111 Gray=0b00011000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 135=0b00010001000 Gray=0b00011001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 136=0b00010001001 Gray=0b00011001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 137=0b00010001010 Gray=0b00011001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 138=0b00010001011 Gray=0b00011001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 139=0b00010001100 Gray=0b00011001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 140=0b00010001101 Gray=0b00011001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 141=0b00010001110 Gray=0b00011001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 142=0b00010001111 Gray=0b00011001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 143=0b00010010000 Gray=0b00011011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 144=0b00010010001 Gray=0b00011011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 145=0b00010010010 Gray=0b00011011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 146=0b00010010011 Gray=0b00011011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 147=0b00010010100 Gray=0b00011011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 148=0b00010010101 Gray=0b00011011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 149=0b00010010110 Gray=0b00011011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 150=0b00010010111 Gray=0b00011011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 151=0b00010011000 Gray=0b00011010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 152=0b00010011001 Gray=0b00011010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 153=0b00010011010 Gray=0b00011010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 154=0b00010011011 Gray=0b00011010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 155=0b00010011100 Gray=0b00011010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 156=0b00010011101 Gray=0b00011010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 157=0b00010011110 Gray=0b00011010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 158=0b00010011111 Gray=0b00011010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 159=0b00010100000 Gray=0b00011110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 160=0b00010100001 Gray=0b00011110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 161=0b00010100010 Gray=0b00011110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 162=0b00010100011 Gray=0b00011110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 163=0b00010100100 Gray=0b00011110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 164=0b00010100101 Gray=0b00011110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 165=0b00010100110 Gray=0b00011110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 166=0b00010100111 Gray=0b00011110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 167=0b00010101000 Gray=0b00011111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 168=0b00010101001 Gray=0b00011111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 169=0b00010101010 Gray=0b00011111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 170=0b00010101011 Gray=0b00011111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 171=0b00010101100 Gray=0b00011111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 172=0b00010101101 Gray=0b00011111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 173=0b00010101110 Gray=0b00011111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 174=0b00010101111 Gray=0b00011111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 175=0b00010110000 Gray=0b00011101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 176=0b00010110001 Gray=0b00011101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 177=0b00010110010 Gray=0b00011101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 178=0b00010110011 Gray=0b00011101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 179=0b00010110100 Gray=0b00011101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 180=0b00010110101 Gray=0b00011101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 181=0b00010110110 Gray=0b00011101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 182=0b00010110111 Gray=0b00011101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 183=0b00010111000 Gray=0b00011100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 184=0b00010111001 Gray=0b00011100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 185=0b00010111010 Gray=0b00011100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 186=0b00010111011 Gray=0b00011100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 187=0b00010111100 Gray=0b00011100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 188=0b00010111101 Gray=0b00011100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 189=0b00010111110 Gray=0b00011100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 190=0b00010111111 Gray=0b00011100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 191=0b00011000000 Gray=0b00010100000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 192=0b00011000001 Gray=0b00010100001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 193=0b00011000010 Gray=0b00010100011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 194=0b00011000011 Gray=0b00010100010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 195=0b00011000100 Gray=0b00010100110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 196=0b00011000101 Gray=0b00010100111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 197=0b00011000110 Gray=0b00010100101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 198=0b00011000111 Gray=0b00010100100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 199=0b00011001000 Gray=0b00010101100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 200=0b00011001001 Gray=0b00010101101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 201=0b00011001010 Gray=0b00010101111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 202=0b00011001011 Gray=0b00010101110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 203=0b00011001100 Gray=0b00010101010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 204=0b00011001101 Gray=0b00010101011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 205=0b00011001110 Gray=0b00010101001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 206=0b00011001111 Gray=0b00010101000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 207=0b00011010000 Gray=0b00010111000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 208=0b00011010001 Gray=0b00010111001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 209=0b00011010010 Gray=0b00010111011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 210=0b00011010011 Gray=0b00010111010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 211=0b00011010100 Gray=0b00010111110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 212=0b00011010101 Gray=0b00010111111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 213=0b00011010110 Gray=0b00010111101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 214=0b00011010111 Gray=0b00010111100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 215=0b00011011000 Gray=0b00010110100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 216=0b00011011001 Gray=0b00010110101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 217=0b00011011010 Gray=0b00010110111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 218=0b00011011011 Gray=0b00010110110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 219=0b00011011100 Gray=0b00010110010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 220=0b00011011101 Gray=0b00010110011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 221=0b00011011110 Gray=0b00010110001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 222=0b00011011111 Gray=0b00010110000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 223=0b00011100000 Gray=0b00010010000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 224=0b00011100001 Gray=0b00010010001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 225=0b00011100010 Gray=0b00010010011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 226=0b00011100011 Gray=0b00010010010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 227=0b00011100100 Gray=0b00010010110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 228=0b00011100101 Gray=0b00010010111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 229=0b00011100110 Gray=0b00010010101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 230=0b00011100111 Gray=0b00010010100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 231=0b00011101000 Gray=0b00010011100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 232=0b00011101001 Gray=0b00010011101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 233=0b00011101010 Gray=0b00010011111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 234=0b00011101011 Gray=0b00010011110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 235=0b00011101100 Gray=0b00010011010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 236=0b00011101101 Gray=0b00010011011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 237=0b00011101110 Gray=0b00010011001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 238=0b00011101111 Gray=0b00010011000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 239=0b00011110000 Gray=0b00010001000 Rel Eta,Phi=1,2 Expect 2 B$ Linear= 240=0b00011110001 Gray=0b00010001001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 241=0b00011110010 Gray=0b00010001011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 242=0b00011110011 Gray=0b00010001010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 243=0b00011110100 Gray=0b00010001110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 244=0b00011110101 Gray=0b00010001111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 245=0b00011110110 Gray=0b00010001101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 246=0b00011110111 Gray=0b00010001100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 247=0b00011111000 Gray=0b00010000100 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 248=0b00011111001 Gray=0b00010000101 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 249=0b00011111010 Gray=0b00010000111 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 250=0b00011111011 Gray=0b00010000110 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 251=0b00011111100 Gray=0b00010000010 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 252=0b00011111101 Gray=0b00010000011 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 253=0b00011111110 Gray=0b00010000001 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 254=0b00011111111 Gray=0b00010000000 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 255=0b00100000000 Gray=0b00110000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear= 256=0b00100000001 Gray=0b00110000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 257=0b00100000010 Gray=0b00110000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 258=0b00100000011 Gray=0b00110000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 259=0b00100000100 Gray=0b00110000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 260=0b00100000101 Gray=0b00110000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 261=0b00100000110 Gray=0b00110000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 262=0b00100000111 Gray=0b00110000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 263=0b00100001000 Gray=0b00110001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 264=0b00100001001 Gray=0b00110001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 265=0b00100001010 Gray=0b00110001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 266=0b00100001011 Gray=0b00110001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 267=0b00100001100 Gray=0b00110001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 268=0b00100001101 Gray=0b00110001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 269=0b00100001110 Gray=0b00110001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 270=0b00100001111 Gray=0b00110001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 271=0b00100010000 Gray=0b00110011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 272=0b00100010001 Gray=0b00110011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 273=0b00100010010 Gray=0b00110011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 274=0b00100010011 Gray=0b00110011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 275=0b00100010100 Gray=0b00110011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 276=0b00100010101 Gray=0b00110011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 277=0b00100010110 Gray=0b00110011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 278=0b00100010111 Gray=0b00110011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 279=0b00100011000 Gray=0b00110010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 280=0b00100011001 Gray=0b00110010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 281=0b00100011010 Gray=0b00110010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 282=0b00100011011 Gray=0b00110010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 283=0b00100011100 Gray=0b00110010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 284=0b00100011101 Gray=0b00110010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 285=0b00100011110 Gray=0b00110010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 286=0b00100011111 Gray=0b00110010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 287=0b00100100000 Gray=0b00110110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 288=0b00100100001 Gray=0b00110110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 289=0b00100100010 Gray=0b00110110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 290=0b00100100011 Gray=0b00110110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 291=0b00100100100 Gray=0b00110110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 292=0b00100100101 Gray=0b00110110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 293=0b00100100110 Gray=0b00110110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 294=0b00100100111 Gray=0b00110110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 295=0b00100101000 Gray=0b00110111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 296=0b00100101001 Gray=0b00110111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 297=0b00100101010 Gray=0b00110111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 298=0b00100101011 Gray=0b00110111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 299=0b00100101100 Gray=0b00110111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 300=0b00100101101 Gray=0b00110111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 301=0b00100101110 Gray=0b00110111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 302=0b00100101111 Gray=0b00110111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 303=0b00100110000 Gray=0b00110101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 304=0b00100110001 Gray=0b00110101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 305=0b00100110010 Gray=0b00110101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 306=0b00100110011 Gray=0b00110101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 307=0b00100110100 Gray=0b00110101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 308=0b00100110101 Gray=0b00110101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 309=0b00100110110 Gray=0b00110101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 310=0b00100110111 Gray=0b00110101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 311=0b00100111000 Gray=0b00110100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 312=0b00100111001 Gray=0b00110100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 313=0b00100111010 Gray=0b00110100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 314=0b00100111011 Gray=0b00110100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 315=0b00100111100 Gray=0b00110100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 316=0b00100111101 Gray=0b00110100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 317=0b00100111110 Gray=0b00110100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 318=0b00100111111 Gray=0b00110100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 319=0b00101000000 Gray=0b00111100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 320=0b00101000001 Gray=0b00111100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 321=0b00101000010 Gray=0b00111100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 322=0b00101000011 Gray=0b00111100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 323=0b00101000100 Gray=0b00111100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 324=0b00101000101 Gray=0b00111100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 325=0b00101000110 Gray=0b00111100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 326=0b00101000111 Gray=0b00111100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 327=0b00101001000 Gray=0b00111101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 328=0b00101001001 Gray=0b00111101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 329=0b00101001010 Gray=0b00111101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 330=0b00101001011 Gray=0b00111101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 331=0b00101001100 Gray=0b00111101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 332=0b00101001101 Gray=0b00111101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 333=0b00101001110 Gray=0b00111101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 334=0b00101001111 Gray=0b00111101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 335=0b00101010000 Gray=0b00111111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear= 336=0b00101010001 Gray=0b00111111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 337=0b00101010010 Gray=0b00111111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 338=0b00101010011 Gray=0b00111111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 339=0b00101010100 Gray=0b00111111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 340=0b00101010101 Gray=0b00111111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 341=0b00101010110 Gray=0b00111111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 342=0b00101010111 Gray=0b00111111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 343=0b00101011000 Gray=0b00111110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 344=0b00101011001 Gray=0b00111110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 345=0b00101011010 Gray=0b00111110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 346=0b00101011011 Gray=0b00111110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 347=0b00101011100 Gray=0b00111110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 348=0b00101011101 Gray=0b00111110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 349=0b00101011110 Gray=0b00111110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 350=0b00101011111 Gray=0b00111110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 351=0b00101100000 Gray=0b00111010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 352=0b00101100001 Gray=0b00111010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 353=0b00101100010 Gray=0b00111010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 354=0b00101100011 Gray=0b00111010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 355=0b00101100100 Gray=0b00111010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 356=0b00101100101 Gray=0b00111010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 357=0b00101100110 Gray=0b00111010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 358=0b00101100111 Gray=0b00111010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 359=0b00101101000 Gray=0b00111011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 360=0b00101101001 Gray=0b00111011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 361=0b00101101010 Gray=0b00111011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 362=0b00101101011 Gray=0b00111011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 363=0b00101101100 Gray=0b00111011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 364=0b00101101101 Gray=0b00111011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 365=0b00101101110 Gray=0b00111011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 366=0b00101101111 Gray=0b00111011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 367=0b00101110000 Gray=0b00111001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 368=0b00101110001 Gray=0b00111001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 369=0b00101110010 Gray=0b00111001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 370=0b00101110011 Gray=0b00111001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 371=0b00101110100 Gray=0b00111001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 372=0b00101110101 Gray=0b00111001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 373=0b00101110110 Gray=0b00111001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 374=0b00101110111 Gray=0b00111001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 375=0b00101111000 Gray=0b00111000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 376=0b00101111001 Gray=0b00111000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 377=0b00101111010 Gray=0b00111000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 378=0b00101111011 Gray=0b00111000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 379=0b00101111100 Gray=0b00111000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 380=0b00101111101 Gray=0b00111000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 381=0b00101111110 Gray=0b00111000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 382=0b00101111111 Gray=0b00111000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 383=0b00110000000 Gray=0b00101000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear= 384=0b00110000001 Gray=0b00101000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 385=0b00110000010 Gray=0b00101000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 386=0b00110000011 Gray=0b00101000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 387=0b00110000100 Gray=0b00101000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 388=0b00110000101 Gray=0b00101000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 389=0b00110000110 Gray=0b00101000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 390=0b00110000111 Gray=0b00101000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 391=0b00110001000 Gray=0b00101001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 392=0b00110001001 Gray=0b00101001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 393=0b00110001010 Gray=0b00101001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 394=0b00110001011 Gray=0b00101001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 395=0b00110001100 Gray=0b00101001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 396=0b00110001101 Gray=0b00101001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 397=0b00110001110 Gray=0b00101001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 398=0b00110001111 Gray=0b00101001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 399=0b00110010000 Gray=0b00101011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 400=0b00110010001 Gray=0b00101011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 401=0b00110010010 Gray=0b00101011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 402=0b00110010011 Gray=0b00101011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 403=0b00110010100 Gray=0b00101011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 404=0b00110010101 Gray=0b00101011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 405=0b00110010110 Gray=0b00101011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 406=0b00110010111 Gray=0b00101011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 407=0b00110011000 Gray=0b00101010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 408=0b00110011001 Gray=0b00101010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 409=0b00110011010 Gray=0b00101010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 410=0b00110011011 Gray=0b00101010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 411=0b00110011100 Gray=0b00101010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 412=0b00110011101 Gray=0b00101010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 413=0b00110011110 Gray=0b00101010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 414=0b00110011111 Gray=0b00101010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 415=0b00110100000 Gray=0b00101110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 416=0b00110100001 Gray=0b00101110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 417=0b00110100010 Gray=0b00101110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 418=0b00110100011 Gray=0b00101110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 419=0b00110100100 Gray=0b00101110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 420=0b00110100101 Gray=0b00101110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 421=0b00110100110 Gray=0b00101110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 422=0b00110100111 Gray=0b00101110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 423=0b00110101000 Gray=0b00101111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 424=0b00110101001 Gray=0b00101111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 425=0b00110101010 Gray=0b00101111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 426=0b00110101011 Gray=0b00101111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 427=0b00110101100 Gray=0b00101111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 428=0b00110101101 Gray=0b00101111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 429=0b00110101110 Gray=0b00101111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 430=0b00110101111 Gray=0b00101111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 431=0b00110110000 Gray=0b00101101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 432=0b00110110001 Gray=0b00101101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 433=0b00110110010 Gray=0b00101101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 434=0b00110110011 Gray=0b00101101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 435=0b00110110100 Gray=0b00101101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 436=0b00110110101 Gray=0b00101101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 437=0b00110110110 Gray=0b00101101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 438=0b00110110111 Gray=0b00101101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 439=0b00110111000 Gray=0b00101100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 440=0b00110111001 Gray=0b00101100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 441=0b00110111010 Gray=0b00101100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 442=0b00110111011 Gray=0b00101100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 443=0b00110111100 Gray=0b00101100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 444=0b00110111101 Gray=0b00101100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 445=0b00110111110 Gray=0b00101100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 446=0b00110111111 Gray=0b00101100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 447=0b00111000000 Gray=0b00100100000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 448=0b00111000001 Gray=0b00100100001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 449=0b00111000010 Gray=0b00100100011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 450=0b00111000011 Gray=0b00100100010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 451=0b00111000100 Gray=0b00100100110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 452=0b00111000101 Gray=0b00100100111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 453=0b00111000110 Gray=0b00100100101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 454=0b00111000111 Gray=0b00100100100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 455=0b00111001000 Gray=0b00100101100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 456=0b00111001001 Gray=0b00100101101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 457=0b00111001010 Gray=0b00100101111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 458=0b00111001011 Gray=0b00100101110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 459=0b00111001100 Gray=0b00100101010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 460=0b00111001101 Gray=0b00100101011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 461=0b00111001110 Gray=0b00100101001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 462=0b00111001111 Gray=0b00100101000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 463=0b00111010000 Gray=0b00100111000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 464=0b00111010001 Gray=0b00100111001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 465=0b00111010010 Gray=0b00100111011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 466=0b00111010011 Gray=0b00100111010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 467=0b00111010100 Gray=0b00100111110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 468=0b00111010101 Gray=0b00100111111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 469=0b00111010110 Gray=0b00100111101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 470=0b00111010111 Gray=0b00100111100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 471=0b00111011000 Gray=0b00100110100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 472=0b00111011001 Gray=0b00100110101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 473=0b00111011010 Gray=0b00100110111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 474=0b00111011011 Gray=0b00100110110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 475=0b00111011100 Gray=0b00100110010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 476=0b00111011101 Gray=0b00100110011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 477=0b00111011110 Gray=0b00100110001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 478=0b00111011111 Gray=0b00100110000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 479=0b00111100000 Gray=0b00100010000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 480=0b00111100001 Gray=0b00100010001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 481=0b00111100010 Gray=0b00100010011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 482=0b00111100011 Gray=0b00100010010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 483=0b00111100100 Gray=0b00100010110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 484=0b00111100101 Gray=0b00100010111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 485=0b00111100110 Gray=0b00100010101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 486=0b00111100111 Gray=0b00100010100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 487=0b00111101000 Gray=0b00100011100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 488=0b00111101001 Gray=0b00100011101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 489=0b00111101010 Gray=0b00100011111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 490=0b00111101011 Gray=0b00100011110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 491=0b00111101100 Gray=0b00100011010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 492=0b00111101101 Gray=0b00100011011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 493=0b00111101110 Gray=0b00100011001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 494=0b00111101111 Gray=0b00100011000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 495=0b00111110000 Gray=0b00100001000 Rel Eta,Phi=1,2 Expect 2 B$ Linear= 496=0b00111110001 Gray=0b00100001001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 497=0b00111110010 Gray=0b00100001011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 498=0b00111110011 Gray=0b00100001010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 499=0b00111110100 Gray=0b00100001110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 500=0b00111110101 Gray=0b00100001111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 501=0b00111110110 Gray=0b00100001101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 502=0b00111110111 Gray=0b00100001100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 503=0b00111111000 Gray=0b00100000100 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 504=0b00111111001 Gray=0b00100000101 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 505=0b00111111010 Gray=0b00100000111 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 506=0b00111111011 Gray=0b00100000110 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 507=0b00111111100 Gray=0b00100000010 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 508=0b00111111101 Gray=0b00100000011 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 509=0b00111111110 Gray=0b00100000001 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 510=0b00111111111 Gray=0b00100000000 Rel Eta,Phi=1,0 Expect 1 B$ Linear= 511=0b01000000000 Gray=0b01100000000 Rel Eta,Phi=2,2 Expect 2 B$ Linear= 512=0b01000000001 Gray=0b01100000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 513=0b01000000010 Gray=0b01100000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 514=0b01000000011 Gray=0b01100000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 515=0b01000000100 Gray=0b01100000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 516=0b01000000101 Gray=0b01100000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 517=0b01000000110 Gray=0b01100000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 518=0b01000000111 Gray=0b01100000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 519=0b01000001000 Gray=0b01100001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 520=0b01000001001 Gray=0b01100001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 521=0b01000001010 Gray=0b01100001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 522=0b01000001011 Gray=0b01100001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 523=0b01000001100 Gray=0b01100001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 524=0b01000001101 Gray=0b01100001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 525=0b01000001110 Gray=0b01100001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 526=0b01000001111 Gray=0b01100001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 527=0b01000010000 Gray=0b01100011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 528=0b01000010001 Gray=0b01100011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 529=0b01000010010 Gray=0b01100011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 530=0b01000010011 Gray=0b01100011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 531=0b01000010100 Gray=0b01100011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 532=0b01000010101 Gray=0b01100011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 533=0b01000010110 Gray=0b01100011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 534=0b01000010111 Gray=0b01100011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 535=0b01000011000 Gray=0b01100010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 536=0b01000011001 Gray=0b01100010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 537=0b01000011010 Gray=0b01100010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 538=0b01000011011 Gray=0b01100010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 539=0b01000011100 Gray=0b01100010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 540=0b01000011101 Gray=0b01100010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 541=0b01000011110 Gray=0b01100010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 542=0b01000011111 Gray=0b01100010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 543=0b01000100000 Gray=0b01100110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 544=0b01000100001 Gray=0b01100110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 545=0b01000100010 Gray=0b01100110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 546=0b01000100011 Gray=0b01100110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 547=0b01000100100 Gray=0b01100110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 548=0b01000100101 Gray=0b01100110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 549=0b01000100110 Gray=0b01100110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 550=0b01000100111 Gray=0b01100110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 551=0b01000101000 Gray=0b01100111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 552=0b01000101001 Gray=0b01100111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 553=0b01000101010 Gray=0b01100111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 554=0b01000101011 Gray=0b01100111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 555=0b01000101100 Gray=0b01100111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 556=0b01000101101 Gray=0b01100111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 557=0b01000101110 Gray=0b01100111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 558=0b01000101111 Gray=0b01100111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 559=0b01000110000 Gray=0b01100101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 560=0b01000110001 Gray=0b01100101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 561=0b01000110010 Gray=0b01100101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 562=0b01000110011 Gray=0b01100101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 563=0b01000110100 Gray=0b01100101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 564=0b01000110101 Gray=0b01100101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 565=0b01000110110 Gray=0b01100101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 566=0b01000110111 Gray=0b01100101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 567=0b01000111000 Gray=0b01100100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 568=0b01000111001 Gray=0b01100100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 569=0b01000111010 Gray=0b01100100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 570=0b01000111011 Gray=0b01100100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 571=0b01000111100 Gray=0b01100100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 572=0b01000111101 Gray=0b01100100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 573=0b01000111110 Gray=0b01100100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 574=0b01000111111 Gray=0b01100100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 575=0b01001000000 Gray=0b01101100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 576=0b01001000001 Gray=0b01101100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 577=0b01001000010 Gray=0b01101100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 578=0b01001000011 Gray=0b01101100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 579=0b01001000100 Gray=0b01101100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 580=0b01001000101 Gray=0b01101100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 581=0b01001000110 Gray=0b01101100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 582=0b01001000111 Gray=0b01101100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 583=0b01001001000 Gray=0b01101101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 584=0b01001001001 Gray=0b01101101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 585=0b01001001010 Gray=0b01101101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 586=0b01001001011 Gray=0b01101101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 587=0b01001001100 Gray=0b01101101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 588=0b01001001101 Gray=0b01101101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 589=0b01001001110 Gray=0b01101101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 590=0b01001001111 Gray=0b01101101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 591=0b01001010000 Gray=0b01101111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear= 592=0b01001010001 Gray=0b01101111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 593=0b01001010010 Gray=0b01101111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 594=0b01001010011 Gray=0b01101111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 595=0b01001010100 Gray=0b01101111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 596=0b01001010101 Gray=0b01101111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 597=0b01001010110 Gray=0b01101111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 598=0b01001010111 Gray=0b01101111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 599=0b01001011000 Gray=0b01101110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 600=0b01001011001 Gray=0b01101110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 601=0b01001011010 Gray=0b01101110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 602=0b01001011011 Gray=0b01101110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 603=0b01001011100 Gray=0b01101110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 604=0b01001011101 Gray=0b01101110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 605=0b01001011110 Gray=0b01101110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 606=0b01001011111 Gray=0b01101110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 607=0b01001100000 Gray=0b01101010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 608=0b01001100001 Gray=0b01101010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 609=0b01001100010 Gray=0b01101010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 610=0b01001100011 Gray=0b01101010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 611=0b01001100100 Gray=0b01101010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 612=0b01001100101 Gray=0b01101010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 613=0b01001100110 Gray=0b01101010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 614=0b01001100111 Gray=0b01101010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 615=0b01001101000 Gray=0b01101011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 616=0b01001101001 Gray=0b01101011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 617=0b01001101010 Gray=0b01101011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 618=0b01001101011 Gray=0b01101011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 619=0b01001101100 Gray=0b01101011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 620=0b01001101101 Gray=0b01101011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 621=0b01001101110 Gray=0b01101011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 622=0b01001101111 Gray=0b01101011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 623=0b01001110000 Gray=0b01101001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 624=0b01001110001 Gray=0b01101001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 625=0b01001110010 Gray=0b01101001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 626=0b01001110011 Gray=0b01101001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 627=0b01001110100 Gray=0b01101001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 628=0b01001110101 Gray=0b01101001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 629=0b01001110110 Gray=0b01101001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 630=0b01001110111 Gray=0b01101001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 631=0b01001111000 Gray=0b01101000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 632=0b01001111001 Gray=0b01101000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 633=0b01001111010 Gray=0b01101000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 634=0b01001111011 Gray=0b01101000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 635=0b01001111100 Gray=0b01101000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 636=0b01001111101 Gray=0b01101000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 637=0b01001111110 Gray=0b01101000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 638=0b01001111111 Gray=0b01101000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 639=0b01010000000 Gray=0b01111000000 Rel Eta,Phi=2,4 Expect 4 B$ Linear= 640=0b01010000001 Gray=0b01111000001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 641=0b01010000010 Gray=0b01111000011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 642=0b01010000011 Gray=0b01111000010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 643=0b01010000100 Gray=0b01111000110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 644=0b01010000101 Gray=0b01111000111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 645=0b01010000110 Gray=0b01111000101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 646=0b01010000111 Gray=0b01111000100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 647=0b01010001000 Gray=0b01111001100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 648=0b01010001001 Gray=0b01111001101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 649=0b01010001010 Gray=0b01111001111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 650=0b01010001011 Gray=0b01111001110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 651=0b01010001100 Gray=0b01111001010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 652=0b01010001101 Gray=0b01111001011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 653=0b01010001110 Gray=0b01111001001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 654=0b01010001111 Gray=0b01111001000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 655=0b01010010000 Gray=0b01111011000 Rel Eta,Phi=1,2 Expect 6 B$ Linear= 656=0b01010010001 Gray=0b01111011001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 657=0b01010010010 Gray=0b01111011011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 658=0b01010010011 Gray=0b01111011010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 659=0b01010010100 Gray=0b01111011110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 660=0b01010010101 Gray=0b01111011111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 661=0b01010010110 Gray=0b01111011101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 662=0b01010010111 Gray=0b01111011100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 663=0b01010011000 Gray=0b01111010100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 664=0b01010011001 Gray=0b01111010101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 665=0b01010011010 Gray=0b01111010111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 666=0b01010011011 Gray=0b01111010110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 667=0b01010011100 Gray=0b01111010010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 668=0b01010011101 Gray=0b01111010011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 669=0b01010011110 Gray=0b01111010001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 670=0b01010011111 Gray=0b01111010000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 671=0b01010100000 Gray=0b01111110000 Rel Eta,Phi=1,3 Expect 6 B$ Linear= 672=0b01010100001 Gray=0b01111110001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 673=0b01010100010 Gray=0b01111110011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 674=0b01010100011 Gray=0b01111110010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 675=0b01010100100 Gray=0b01111110110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 676=0b01010100101 Gray=0b01111110111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 677=0b01010100110 Gray=0b01111110101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 678=0b01010100111 Gray=0b01111110100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 679=0b01010101000 Gray=0b01111111100 Rel Eta,Phi=1,1 Expect 8 B$ Linear= 680=0b01010101001 Gray=0b01111111101 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 681=0b01010101010 Gray=0b01111111111 Rel Eta,Phi=2,7 Expect 10 B$ Linear= 682=0b01010101011 Gray=0b01111111110 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 683=0b01010101100 Gray=0b01111111010 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 684=0b01010101101 Gray=0b01111111011 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 685=0b01010101110 Gray=0b01111111001 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 686=0b01010101111 Gray=0b01111111000 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 687=0b01010110000 Gray=0b01111101000 Rel Eta,Phi=1,2 Expect 6 B$ Linear= 688=0b01010110001 Gray=0b01111101001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 689=0b01010110010 Gray=0b01111101011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 690=0b01010110011 Gray=0b01111101010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 691=0b01010110100 Gray=0b01111101110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 692=0b01010110101 Gray=0b01111101111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 693=0b01010110110 Gray=0b01111101101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 694=0b01010110111 Gray=0b01111101100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 695=0b01010111000 Gray=0b01111100100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 696=0b01010111001 Gray=0b01111100101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 697=0b01010111010 Gray=0b01111100111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 698=0b01010111011 Gray=0b01111100110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 699=0b01010111100 Gray=0b01111100010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 700=0b01010111101 Gray=0b01111100011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 701=0b01010111110 Gray=0b01111100001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 702=0b01010111111 Gray=0b01111100000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 703=0b01011000000 Gray=0b01110100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 704=0b01011000001 Gray=0b01110100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 705=0b01011000010 Gray=0b01110100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 706=0b01011000011 Gray=0b01110100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 707=0b01011000100 Gray=0b01110100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 708=0b01011000101 Gray=0b01110100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 709=0b01011000110 Gray=0b01110100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 710=0b01011000111 Gray=0b01110100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 711=0b01011001000 Gray=0b01110101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 712=0b01011001001 Gray=0b01110101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 713=0b01011001010 Gray=0b01110101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 714=0b01011001011 Gray=0b01110101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 715=0b01011001100 Gray=0b01110101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 716=0b01011001101 Gray=0b01110101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 717=0b01011001110 Gray=0b01110101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 718=0b01011001111 Gray=0b01110101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 719=0b01011010000 Gray=0b01110111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear= 720=0b01011010001 Gray=0b01110111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 721=0b01011010010 Gray=0b01110111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 722=0b01011010011 Gray=0b01110111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 723=0b01011010100 Gray=0b01110111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 724=0b01011010101 Gray=0b01110111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 725=0b01011010110 Gray=0b01110111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 726=0b01011010111 Gray=0b01110111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 727=0b01011011000 Gray=0b01110110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 728=0b01011011001 Gray=0b01110110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 729=0b01011011010 Gray=0b01110110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 730=0b01011011011 Gray=0b01110110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 731=0b01011011100 Gray=0b01110110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 732=0b01011011101 Gray=0b01110110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 733=0b01011011110 Gray=0b01110110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 734=0b01011011111 Gray=0b01110110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 735=0b01011100000 Gray=0b01110010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 736=0b01011100001 Gray=0b01110010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 737=0b01011100010 Gray=0b01110010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 738=0b01011100011 Gray=0b01110010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 739=0b01011100100 Gray=0b01110010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 740=0b01011100101 Gray=0b01110010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 741=0b01011100110 Gray=0b01110010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 742=0b01011100111 Gray=0b01110010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 743=0b01011101000 Gray=0b01110011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 744=0b01011101001 Gray=0b01110011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 745=0b01011101010 Gray=0b01110011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 746=0b01011101011 Gray=0b01110011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 747=0b01011101100 Gray=0b01110011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 748=0b01011101101 Gray=0b01110011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 749=0b01011101110 Gray=0b01110011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 750=0b01011101111 Gray=0b01110011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 751=0b01011110000 Gray=0b01110001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 752=0b01011110001 Gray=0b01110001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 753=0b01011110010 Gray=0b01110001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 754=0b01011110011 Gray=0b01110001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 755=0b01011110100 Gray=0b01110001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 756=0b01011110101 Gray=0b01110001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 757=0b01011110110 Gray=0b01110001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 758=0b01011110111 Gray=0b01110001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 759=0b01011111000 Gray=0b01110000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 760=0b01011111001 Gray=0b01110000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 761=0b01011111010 Gray=0b01110000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 762=0b01011111011 Gray=0b01110000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 763=0b01011111100 Gray=0b01110000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 764=0b01011111101 Gray=0b01110000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 765=0b01011111110 Gray=0b01110000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 766=0b01011111111 Gray=0b01110000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 767=0b01100000000 Gray=0b01010000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear= 768=0b01100000001 Gray=0b01010000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 769=0b01100000010 Gray=0b01010000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 770=0b01100000011 Gray=0b01010000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 771=0b01100000100 Gray=0b01010000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 772=0b01100000101 Gray=0b01010000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 773=0b01100000110 Gray=0b01010000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 774=0b01100000111 Gray=0b01010000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 775=0b01100001000 Gray=0b01010001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 776=0b01100001001 Gray=0b01010001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 777=0b01100001010 Gray=0b01010001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 778=0b01100001011 Gray=0b01010001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 779=0b01100001100 Gray=0b01010001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 780=0b01100001101 Gray=0b01010001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 781=0b01100001110 Gray=0b01010001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 782=0b01100001111 Gray=0b01010001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 783=0b01100010000 Gray=0b01010011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 784=0b01100010001 Gray=0b01010011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 785=0b01100010010 Gray=0b01010011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 786=0b01100010011 Gray=0b01010011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 787=0b01100010100 Gray=0b01010011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 788=0b01100010101 Gray=0b01010011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 789=0b01100010110 Gray=0b01010011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 790=0b01100010111 Gray=0b01010011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 791=0b01100011000 Gray=0b01010010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 792=0b01100011001 Gray=0b01010010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 793=0b01100011010 Gray=0b01010010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 794=0b01100011011 Gray=0b01010010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 795=0b01100011100 Gray=0b01010010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 796=0b01100011101 Gray=0b01010010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 797=0b01100011110 Gray=0b01010010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 798=0b01100011111 Gray=0b01010010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 799=0b01100100000 Gray=0b01010110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 800=0b01100100001 Gray=0b01010110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 801=0b01100100010 Gray=0b01010110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 802=0b01100100011 Gray=0b01010110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 803=0b01100100100 Gray=0b01010110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 804=0b01100100101 Gray=0b01010110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 805=0b01100100110 Gray=0b01010110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 806=0b01100100111 Gray=0b01010110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 807=0b01100101000 Gray=0b01010111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 808=0b01100101001 Gray=0b01010111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 809=0b01100101010 Gray=0b01010111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 810=0b01100101011 Gray=0b01010111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 811=0b01100101100 Gray=0b01010111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 812=0b01100101101 Gray=0b01010111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 813=0b01100101110 Gray=0b01010111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 814=0b01100101111 Gray=0b01010111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 815=0b01100110000 Gray=0b01010101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 816=0b01100110001 Gray=0b01010101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 817=0b01100110010 Gray=0b01010101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 818=0b01100110011 Gray=0b01010101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 819=0b01100110100 Gray=0b01010101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 820=0b01100110101 Gray=0b01010101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 821=0b01100110110 Gray=0b01010101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 822=0b01100110111 Gray=0b01010101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 823=0b01100111000 Gray=0b01010100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 824=0b01100111001 Gray=0b01010100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 825=0b01100111010 Gray=0b01010100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 826=0b01100111011 Gray=0b01010100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 827=0b01100111100 Gray=0b01010100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 828=0b01100111101 Gray=0b01010100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 829=0b01100111110 Gray=0b01010100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 830=0b01100111111 Gray=0b01010100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 831=0b01101000000 Gray=0b01011100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 832=0b01101000001 Gray=0b01011100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 833=0b01101000010 Gray=0b01011100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 834=0b01101000011 Gray=0b01011100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 835=0b01101000100 Gray=0b01011100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 836=0b01101000101 Gray=0b01011100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 837=0b01101000110 Gray=0b01011100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 838=0b01101000111 Gray=0b01011100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 839=0b01101001000 Gray=0b01011101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 840=0b01101001001 Gray=0b01011101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 841=0b01101001010 Gray=0b01011101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 842=0b01101001011 Gray=0b01011101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 843=0b01101001100 Gray=0b01011101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 844=0b01101001101 Gray=0b01011101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 845=0b01101001110 Gray=0b01011101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 846=0b01101001111 Gray=0b01011101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 847=0b01101010000 Gray=0b01011111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear= 848=0b01101010001 Gray=0b01011111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 849=0b01101010010 Gray=0b01011111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 850=0b01101010011 Gray=0b01011111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 851=0b01101010100 Gray=0b01011111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear= 852=0b01101010101 Gray=0b01011111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 853=0b01101010110 Gray=0b01011111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 854=0b01101010111 Gray=0b01011111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 855=0b01101011000 Gray=0b01011110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 856=0b01101011001 Gray=0b01011110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 857=0b01101011010 Gray=0b01011110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 858=0b01101011011 Gray=0b01011110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 859=0b01101011100 Gray=0b01011110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 860=0b01101011101 Gray=0b01011110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 861=0b01101011110 Gray=0b01011110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 862=0b01101011111 Gray=0b01011110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 863=0b01101100000 Gray=0b01011010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 864=0b01101100001 Gray=0b01011010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 865=0b01101100010 Gray=0b01011010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 866=0b01101100011 Gray=0b01011010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 867=0b01101100100 Gray=0b01011010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 868=0b01101100101 Gray=0b01011010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 869=0b01101100110 Gray=0b01011010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 870=0b01101100111 Gray=0b01011010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 871=0b01101101000 Gray=0b01011011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 872=0b01101101001 Gray=0b01011011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 873=0b01101101010 Gray=0b01011011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 874=0b01101101011 Gray=0b01011011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 875=0b01101101100 Gray=0b01011011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 876=0b01101101101 Gray=0b01011011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 877=0b01101101110 Gray=0b01011011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 878=0b01101101111 Gray=0b01011011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 879=0b01101110000 Gray=0b01011001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 880=0b01101110001 Gray=0b01011001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 881=0b01101110010 Gray=0b01011001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 882=0b01101110011 Gray=0b01011001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 883=0b01101110100 Gray=0b01011001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 884=0b01101110101 Gray=0b01011001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 885=0b01101110110 Gray=0b01011001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 886=0b01101110111 Gray=0b01011001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 887=0b01101111000 Gray=0b01011000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 888=0b01101111001 Gray=0b01011000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 889=0b01101111010 Gray=0b01011000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 890=0b01101111011 Gray=0b01011000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 891=0b01101111100 Gray=0b01011000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 892=0b01101111101 Gray=0b01011000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 893=0b01101111110 Gray=0b01011000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 894=0b01101111111 Gray=0b01011000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 895=0b01110000000 Gray=0b01001000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear= 896=0b01110000001 Gray=0b01001000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 897=0b01110000010 Gray=0b01001000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 898=0b01110000011 Gray=0b01001000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 899=0b01110000100 Gray=0b01001000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 900=0b01110000101 Gray=0b01001000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 901=0b01110000110 Gray=0b01001000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 902=0b01110000111 Gray=0b01001000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 903=0b01110001000 Gray=0b01001001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 904=0b01110001001 Gray=0b01001001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 905=0b01110001010 Gray=0b01001001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 906=0b01110001011 Gray=0b01001001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 907=0b01110001100 Gray=0b01001001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 908=0b01110001101 Gray=0b01001001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 909=0b01110001110 Gray=0b01001001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 910=0b01110001111 Gray=0b01001001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 911=0b01110010000 Gray=0b01001011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 912=0b01110010001 Gray=0b01001011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 913=0b01110010010 Gray=0b01001011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 914=0b01110010011 Gray=0b01001011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 915=0b01110010100 Gray=0b01001011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 916=0b01110010101 Gray=0b01001011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 917=0b01110010110 Gray=0b01001011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 918=0b01110010111 Gray=0b01001011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 919=0b01110011000 Gray=0b01001010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 920=0b01110011001 Gray=0b01001010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 921=0b01110011010 Gray=0b01001010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 922=0b01110011011 Gray=0b01001010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 923=0b01110011100 Gray=0b01001010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 924=0b01110011101 Gray=0b01001010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 925=0b01110011110 Gray=0b01001010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 926=0b01110011111 Gray=0b01001010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 927=0b01110100000 Gray=0b01001110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 928=0b01110100001 Gray=0b01001110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 929=0b01110100010 Gray=0b01001110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 930=0b01110100011 Gray=0b01001110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 931=0b01110100100 Gray=0b01001110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 932=0b01110100101 Gray=0b01001110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 933=0b01110100110 Gray=0b01001110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 934=0b01110100111 Gray=0b01001110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 935=0b01110101000 Gray=0b01001111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 936=0b01110101001 Gray=0b01001111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 937=0b01110101010 Gray=0b01001111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 938=0b01110101011 Gray=0b01001111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 939=0b01110101100 Gray=0b01001111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 940=0b01110101101 Gray=0b01001111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 941=0b01110101110 Gray=0b01001111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 942=0b01110101111 Gray=0b01001111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 943=0b01110110000 Gray=0b01001101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 944=0b01110110001 Gray=0b01001101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 945=0b01110110010 Gray=0b01001101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 946=0b01110110011 Gray=0b01001101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 947=0b01110110100 Gray=0b01001101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 948=0b01110110101 Gray=0b01001101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 949=0b01110110110 Gray=0b01001101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 950=0b01110110111 Gray=0b01001101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 951=0b01110111000 Gray=0b01001100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 952=0b01110111001 Gray=0b01001100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 953=0b01110111010 Gray=0b01001100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 954=0b01110111011 Gray=0b01001100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 955=0b01110111100 Gray=0b01001100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 956=0b01110111101 Gray=0b01001100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 957=0b01110111110 Gray=0b01001100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 958=0b01110111111 Gray=0b01001100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 959=0b01111000000 Gray=0b01000100000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 960=0b01111000001 Gray=0b01000100001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 961=0b01111000010 Gray=0b01000100011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 962=0b01111000011 Gray=0b01000100010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 963=0b01111000100 Gray=0b01000100110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 964=0b01111000101 Gray=0b01000100111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 965=0b01111000110 Gray=0b01000100101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 966=0b01111000111 Gray=0b01000100100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 967=0b01111001000 Gray=0b01000101100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 968=0b01111001001 Gray=0b01000101101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 969=0b01111001010 Gray=0b01000101111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 970=0b01111001011 Gray=0b01000101110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 971=0b01111001100 Gray=0b01000101010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 972=0b01111001101 Gray=0b01000101011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 973=0b01111001110 Gray=0b01000101001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 974=0b01111001111 Gray=0b01000101000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 975=0b01111010000 Gray=0b01000111000 Rel Eta,Phi=1,2 Expect 4 B$ Linear= 976=0b01111010001 Gray=0b01000111001 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 977=0b01111010010 Gray=0b01000111011 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 978=0b01111010011 Gray=0b01000111010 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 979=0b01111010100 Gray=0b01000111110 Rel Eta,Phi=2,6 Expect 6 B$ Linear= 980=0b01111010101 Gray=0b01000111111 Rel Eta,Phi=1,0 Expect 7 B$ Linear= 981=0b01111010110 Gray=0b01000111101 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 982=0b01111010111 Gray=0b01000111100 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 983=0b01111011000 Gray=0b01000110100 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 984=0b01111011001 Gray=0b01000110101 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 985=0b01111011010 Gray=0b01000110111 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 986=0b01111011011 Gray=0b01000110110 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 987=0b01111011100 Gray=0b01000110010 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 988=0b01111011101 Gray=0b01000110011 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 989=0b01111011110 Gray=0b01000110001 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 990=0b01111011111 Gray=0b01000110000 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 991=0b01111100000 Gray=0b01000010000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 992=0b01111100001 Gray=0b01000010001 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 993=0b01111100010 Gray=0b01000010011 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 994=0b01111100011 Gray=0b01000010010 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 995=0b01111100100 Gray=0b01000010110 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 996=0b01111100101 Gray=0b01000010111 Rel Eta,Phi=1,0 Expect 5 B$ Linear= 997=0b01111100110 Gray=0b01000010101 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 998=0b01111100111 Gray=0b01000010100 Rel Eta,Phi=1,0 Expect 3 B$ Linear= 999=0b01111101000 Gray=0b01000011100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1000=0b01111101001 Gray=0b01000011101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1001=0b01111101010 Gray=0b01000011111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1002=0b01111101011 Gray=0b01000011110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1003=0b01111101100 Gray=0b01000011010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1004=0b01111101101 Gray=0b01000011011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1005=0b01111101110 Gray=0b01000011001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1006=0b01111101111 Gray=0b01000011000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1007=0b01111110000 Gray=0b01000001000 Rel Eta,Phi=1,2 Expect 2 B$ Linear=1008=0b01111110001 Gray=0b01000001001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1009=0b01111110010 Gray=0b01000001011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1010=0b01111110011 Gray=0b01000001010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1011=0b01111110100 Gray=0b01000001110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1012=0b01111110101 Gray=0b01000001111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1013=0b01111110110 Gray=0b01000001101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1014=0b01111110111 Gray=0b01000001100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1015=0b01111111000 Gray=0b01000000100 Rel Eta,Phi=1,1 Expect 2 B$ Linear=1016=0b01111111001 Gray=0b01000000101 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1017=0b01111111010 Gray=0b01000000111 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1018=0b01111111011 Gray=0b01000000110 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1019=0b01111111100 Gray=0b01000000010 Rel Eta,Phi=2,6 Expect 2 B$ Linear=1020=0b01111111101 Gray=0b01000000011 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1021=0b01111111110 Gray=0b01000000001 Rel Eta,Phi=2,7 Expect 2 B$ Linear=1022=0b01111111111 Gray=0b01000000000 Rel Eta,Phi=1,0 Expect 1 B$ Linear=1023=0b10000000000 Gray=0b11000000000 Rel Eta,Phi=2,5 Expect 2 B$ Linear=1024=0b10000000001 Gray=0b11000000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1025=0b10000000010 Gray=0b11000000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1026=0b10000000011 Gray=0b11000000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1027=0b10000000100 Gray=0b11000000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1028=0b10000000101 Gray=0b11000000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1029=0b10000000110 Gray=0b11000000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1030=0b10000000111 Gray=0b11000000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1031=0b10000001000 Gray=0b11000001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1032=0b10000001001 Gray=0b11000001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1033=0b10000001010 Gray=0b11000001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1034=0b10000001011 Gray=0b11000001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1035=0b10000001100 Gray=0b11000001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1036=0b10000001101 Gray=0b11000001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1037=0b10000001110 Gray=0b11000001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1038=0b10000001111 Gray=0b11000001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1039=0b10000010000 Gray=0b11000011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1040=0b10000010001 Gray=0b11000011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1041=0b10000010010 Gray=0b11000011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1042=0b10000010011 Gray=0b11000011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1043=0b10000010100 Gray=0b11000011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1044=0b10000010101 Gray=0b11000011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1045=0b10000010110 Gray=0b11000011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1046=0b10000010111 Gray=0b11000011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1047=0b10000011000 Gray=0b11000010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1048=0b10000011001 Gray=0b11000010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1049=0b10000011010 Gray=0b11000010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1050=0b10000011011 Gray=0b11000010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1051=0b10000011100 Gray=0b11000010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1052=0b10000011101 Gray=0b11000010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1053=0b10000011110 Gray=0b11000010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1054=0b10000011111 Gray=0b11000010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1055=0b10000100000 Gray=0b11000110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1056=0b10000100001 Gray=0b11000110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1057=0b10000100010 Gray=0b11000110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1058=0b10000100011 Gray=0b11000110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1059=0b10000100100 Gray=0b11000110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1060=0b10000100101 Gray=0b11000110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1061=0b10000100110 Gray=0b11000110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1062=0b10000100111 Gray=0b11000110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1063=0b10000101000 Gray=0b11000111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1064=0b10000101001 Gray=0b11000111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1065=0b10000101010 Gray=0b11000111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1066=0b10000101011 Gray=0b11000111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1067=0b10000101100 Gray=0b11000111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1068=0b10000101101 Gray=0b11000111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1069=0b10000101110 Gray=0b11000111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1070=0b10000101111 Gray=0b11000111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1071=0b10000110000 Gray=0b11000101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1072=0b10000110001 Gray=0b11000101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1073=0b10000110010 Gray=0b11000101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1074=0b10000110011 Gray=0b11000101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1075=0b10000110100 Gray=0b11000101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1076=0b10000110101 Gray=0b11000101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1077=0b10000110110 Gray=0b11000101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1078=0b10000110111 Gray=0b11000101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1079=0b10000111000 Gray=0b11000100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1080=0b10000111001 Gray=0b11000100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1081=0b10000111010 Gray=0b11000100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1082=0b10000111011 Gray=0b11000100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1083=0b10000111100 Gray=0b11000100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1084=0b10000111101 Gray=0b11000100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1085=0b10000111110 Gray=0b11000100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1086=0b10000111111 Gray=0b11000100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1087=0b10001000000 Gray=0b11001100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1088=0b10001000001 Gray=0b11001100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1089=0b10001000010 Gray=0b11001100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1090=0b10001000011 Gray=0b11001100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1091=0b10001000100 Gray=0b11001100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1092=0b10001000101 Gray=0b11001100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1093=0b10001000110 Gray=0b11001100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1094=0b10001000111 Gray=0b11001100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1095=0b10001001000 Gray=0b11001101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1096=0b10001001001 Gray=0b11001101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1097=0b10001001010 Gray=0b11001101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1098=0b10001001011 Gray=0b11001101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1099=0b10001001100 Gray=0b11001101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1100=0b10001001101 Gray=0b11001101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1101=0b10001001110 Gray=0b11001101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1102=0b10001001111 Gray=0b11001101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1103=0b10001010000 Gray=0b11001111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1104=0b10001010001 Gray=0b11001111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1105=0b10001010010 Gray=0b11001111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1106=0b10001010011 Gray=0b11001111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1107=0b10001010100 Gray=0b11001111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1108=0b10001010101 Gray=0b11001111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1109=0b10001010110 Gray=0b11001111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1110=0b10001010111 Gray=0b11001111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1111=0b10001011000 Gray=0b11001110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1112=0b10001011001 Gray=0b11001110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1113=0b10001011010 Gray=0b11001110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1114=0b10001011011 Gray=0b11001110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1115=0b10001011100 Gray=0b11001110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1116=0b10001011101 Gray=0b11001110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1117=0b10001011110 Gray=0b11001110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1118=0b10001011111 Gray=0b11001110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1119=0b10001100000 Gray=0b11001010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1120=0b10001100001 Gray=0b11001010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1121=0b10001100010 Gray=0b11001010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1122=0b10001100011 Gray=0b11001010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1123=0b10001100100 Gray=0b11001010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1124=0b10001100101 Gray=0b11001010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1125=0b10001100110 Gray=0b11001010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1126=0b10001100111 Gray=0b11001010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1127=0b10001101000 Gray=0b11001011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1128=0b10001101001 Gray=0b11001011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1129=0b10001101010 Gray=0b11001011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1130=0b10001101011 Gray=0b11001011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1131=0b10001101100 Gray=0b11001011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1132=0b10001101101 Gray=0b11001011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1133=0b10001101110 Gray=0b11001011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1134=0b10001101111 Gray=0b11001011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1135=0b10001110000 Gray=0b11001001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1136=0b10001110001 Gray=0b11001001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1137=0b10001110010 Gray=0b11001001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1138=0b10001110011 Gray=0b11001001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1139=0b10001110100 Gray=0b11001001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1140=0b10001110101 Gray=0b11001001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1141=0b10001110110 Gray=0b11001001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1142=0b10001110111 Gray=0b11001001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1143=0b10001111000 Gray=0b11001000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1144=0b10001111001 Gray=0b11001000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1145=0b10001111010 Gray=0b11001000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1146=0b10001111011 Gray=0b11001000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1147=0b10001111100 Gray=0b11001000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1148=0b10001111101 Gray=0b11001000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1149=0b10001111110 Gray=0b11001000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1150=0b10001111111 Gray=0b11001000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1151=0b10010000000 Gray=0b11011000000 Rel Eta,Phi=2,4 Expect 4 B$ Linear=1152=0b10010000001 Gray=0b11011000001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1153=0b10010000010 Gray=0b11011000011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1154=0b10010000011 Gray=0b11011000010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1155=0b10010000100 Gray=0b11011000110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1156=0b10010000101 Gray=0b11011000111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1157=0b10010000110 Gray=0b11011000101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1158=0b10010000111 Gray=0b11011000100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1159=0b10010001000 Gray=0b11011001100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1160=0b10010001001 Gray=0b11011001101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1161=0b10010001010 Gray=0b11011001111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1162=0b10010001011 Gray=0b11011001110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1163=0b10010001100 Gray=0b11011001010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1164=0b10010001101 Gray=0b11011001011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1165=0b10010001110 Gray=0b11011001001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1166=0b10010001111 Gray=0b11011001000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1167=0b10010010000 Gray=0b11011011000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1168=0b10010010001 Gray=0b11011011001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1169=0b10010010010 Gray=0b11011011011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1170=0b10010010011 Gray=0b11011011010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1171=0b10010010100 Gray=0b11011011110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1172=0b10010010101 Gray=0b11011011111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1173=0b10010010110 Gray=0b11011011101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1174=0b10010010111 Gray=0b11011011100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1175=0b10010011000 Gray=0b11011010100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1176=0b10010011001 Gray=0b11011010101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1177=0b10010011010 Gray=0b11011010111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1178=0b10010011011 Gray=0b11011010110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1179=0b10010011100 Gray=0b11011010010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1180=0b10010011101 Gray=0b11011010011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1181=0b10010011110 Gray=0b11011010001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1182=0b10010011111 Gray=0b11011010000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1183=0b10010100000 Gray=0b11011110000 Rel Eta,Phi=1,3 Expect 6 B$ Linear=1184=0b10010100001 Gray=0b11011110001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1185=0b10010100010 Gray=0b11011110011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1186=0b10010100011 Gray=0b11011110010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1187=0b10010100100 Gray=0b11011110110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1188=0b10010100101 Gray=0b11011110111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1189=0b10010100110 Gray=0b11011110101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1190=0b10010100111 Gray=0b11011110100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1191=0b10010101000 Gray=0b11011111100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1192=0b10010101001 Gray=0b11011111101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1193=0b10010101010 Gray=0b11011111111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1194=0b10010101011 Gray=0b11011111110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1195=0b10010101100 Gray=0b11011111010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1196=0b10010101101 Gray=0b11011111011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1197=0b10010101110 Gray=0b11011111001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1198=0b10010101111 Gray=0b11011111000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1199=0b10010110000 Gray=0b11011101000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1200=0b10010110001 Gray=0b11011101001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1201=0b10010110010 Gray=0b11011101011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1202=0b10010110011 Gray=0b11011101010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1203=0b10010110100 Gray=0b11011101110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1204=0b10010110101 Gray=0b11011101111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1205=0b10010110110 Gray=0b11011101101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1206=0b10010110111 Gray=0b11011101100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1207=0b10010111000 Gray=0b11011100100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1208=0b10010111001 Gray=0b11011100101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1209=0b10010111010 Gray=0b11011100111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1210=0b10010111011 Gray=0b11011100110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1211=0b10010111100 Gray=0b11011100010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1212=0b10010111101 Gray=0b11011100011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1213=0b10010111110 Gray=0b11011100001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1214=0b10010111111 Gray=0b11011100000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1215=0b10011000000 Gray=0b11010100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1216=0b10011000001 Gray=0b11010100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1217=0b10011000010 Gray=0b11010100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1218=0b10011000011 Gray=0b11010100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1219=0b10011000100 Gray=0b11010100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1220=0b10011000101 Gray=0b11010100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1221=0b10011000110 Gray=0b11010100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1222=0b10011000111 Gray=0b11010100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1223=0b10011001000 Gray=0b11010101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1224=0b10011001001 Gray=0b11010101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1225=0b10011001010 Gray=0b11010101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1226=0b10011001011 Gray=0b11010101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1227=0b10011001100 Gray=0b11010101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1228=0b10011001101 Gray=0b11010101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1229=0b10011001110 Gray=0b11010101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1230=0b10011001111 Gray=0b11010101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1231=0b10011010000 Gray=0b11010111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1232=0b10011010001 Gray=0b11010111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1233=0b10011010010 Gray=0b11010111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1234=0b10011010011 Gray=0b11010111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1235=0b10011010100 Gray=0b11010111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1236=0b10011010101 Gray=0b11010111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1237=0b10011010110 Gray=0b11010111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1238=0b10011010111 Gray=0b11010111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1239=0b10011011000 Gray=0b11010110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1240=0b10011011001 Gray=0b11010110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1241=0b10011011010 Gray=0b11010110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1242=0b10011011011 Gray=0b11010110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1243=0b10011011100 Gray=0b11010110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1244=0b10011011101 Gray=0b11010110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1245=0b10011011110 Gray=0b11010110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1246=0b10011011111 Gray=0b11010110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1247=0b10011100000 Gray=0b11010010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1248=0b10011100001 Gray=0b11010010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1249=0b10011100010 Gray=0b11010010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1250=0b10011100011 Gray=0b11010010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1251=0b10011100100 Gray=0b11010010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1252=0b10011100101 Gray=0b11010010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1253=0b10011100110 Gray=0b11010010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1254=0b10011100111 Gray=0b11010010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1255=0b10011101000 Gray=0b11010011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1256=0b10011101001 Gray=0b11010011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1257=0b10011101010 Gray=0b11010011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1258=0b10011101011 Gray=0b11010011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1259=0b10011101100 Gray=0b11010011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1260=0b10011101101 Gray=0b11010011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1261=0b10011101110 Gray=0b11010011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1262=0b10011101111 Gray=0b11010011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1263=0b10011110000 Gray=0b11010001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1264=0b10011110001 Gray=0b11010001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1265=0b10011110010 Gray=0b11010001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1266=0b10011110011 Gray=0b11010001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1267=0b10011110100 Gray=0b11010001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1268=0b10011110101 Gray=0b11010001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1269=0b10011110110 Gray=0b11010001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1270=0b10011110111 Gray=0b11010001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1271=0b10011111000 Gray=0b11010000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1272=0b10011111001 Gray=0b11010000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1273=0b10011111010 Gray=0b11010000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1274=0b10011111011 Gray=0b11010000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1275=0b10011111100 Gray=0b11010000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1276=0b10011111101 Gray=0b11010000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1277=0b10011111110 Gray=0b11010000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1278=0b10011111111 Gray=0b11010000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1279=0b10100000000 Gray=0b11110000000 Rel Eta,Phi=2,3 Expect 4 B$ Linear=1280=0b10100000001 Gray=0b11110000001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1281=0b10100000010 Gray=0b11110000011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1282=0b10100000011 Gray=0b11110000010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1283=0b10100000100 Gray=0b11110000110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1284=0b10100000101 Gray=0b11110000111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1285=0b10100000110 Gray=0b11110000101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1286=0b10100000111 Gray=0b11110000100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1287=0b10100001000 Gray=0b11110001100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1288=0b10100001001 Gray=0b11110001101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1289=0b10100001010 Gray=0b11110001111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1290=0b10100001011 Gray=0b11110001110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1291=0b10100001100 Gray=0b11110001010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1292=0b10100001101 Gray=0b11110001011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1293=0b10100001110 Gray=0b11110001001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1294=0b10100001111 Gray=0b11110001000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1295=0b10100010000 Gray=0b11110011000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1296=0b10100010001 Gray=0b11110011001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1297=0b10100010010 Gray=0b11110011011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1298=0b10100010011 Gray=0b11110011010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1299=0b10100010100 Gray=0b11110011110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1300=0b10100010101 Gray=0b11110011111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1301=0b10100010110 Gray=0b11110011101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1302=0b10100010111 Gray=0b11110011100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1303=0b10100011000 Gray=0b11110010100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1304=0b10100011001 Gray=0b11110010101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1305=0b10100011010 Gray=0b11110010111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1306=0b10100011011 Gray=0b11110010110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1307=0b10100011100 Gray=0b11110010010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1308=0b10100011101 Gray=0b11110010011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1309=0b10100011110 Gray=0b11110010001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1310=0b10100011111 Gray=0b11110010000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1311=0b10100100000 Gray=0b11110110000 Rel Eta,Phi=1,3 Expect 6 B$ Linear=1312=0b10100100001 Gray=0b11110110001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1313=0b10100100010 Gray=0b11110110011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1314=0b10100100011 Gray=0b11110110010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1315=0b10100100100 Gray=0b11110110110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1316=0b10100100101 Gray=0b11110110111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1317=0b10100100110 Gray=0b11110110101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1318=0b10100100111 Gray=0b11110110100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1319=0b10100101000 Gray=0b11110111100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1320=0b10100101001 Gray=0b11110111101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1321=0b10100101010 Gray=0b11110111111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1322=0b10100101011 Gray=0b11110111110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1323=0b10100101100 Gray=0b11110111010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1324=0b10100101101 Gray=0b11110111011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1325=0b10100101110 Gray=0b11110111001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1326=0b10100101111 Gray=0b11110111000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1327=0b10100110000 Gray=0b11110101000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1328=0b10100110001 Gray=0b11110101001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1329=0b10100110010 Gray=0b11110101011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1330=0b10100110011 Gray=0b11110101010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1331=0b10100110100 Gray=0b11110101110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1332=0b10100110101 Gray=0b11110101111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1333=0b10100110110 Gray=0b11110101101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1334=0b10100110111 Gray=0b11110101100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1335=0b10100111000 Gray=0b11110100100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1336=0b10100111001 Gray=0b11110100101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1337=0b10100111010 Gray=0b11110100111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1338=0b10100111011 Gray=0b11110100110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1339=0b10100111100 Gray=0b11110100010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1340=0b10100111101 Gray=0b11110100011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1341=0b10100111110 Gray=0b11110100001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1342=0b10100111111 Gray=0b11110100000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1343=0b10101000000 Gray=0b11111100000 Rel Eta,Phi=1,4 Expect 6 B$ Linear=1344=0b10101000001 Gray=0b11111100001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1345=0b10101000010 Gray=0b11111100011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1346=0b10101000011 Gray=0b11111100010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1347=0b10101000100 Gray=0b11111100110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1348=0b10101000101 Gray=0b11111100111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1349=0b10101000110 Gray=0b11111100101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1350=0b10101000111 Gray=0b11111100100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1351=0b10101001000 Gray=0b11111101100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1352=0b10101001001 Gray=0b11111101101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1353=0b10101001010 Gray=0b11111101111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1354=0b10101001011 Gray=0b11111101110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1355=0b10101001100 Gray=0b11111101010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1356=0b10101001101 Gray=0b11111101011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1357=0b10101001110 Gray=0b11111101001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1358=0b10101001111 Gray=0b11111101000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1359=0b10101010000 Gray=0b11111111000 Rel Eta,Phi=1,2 Expect 8 B$ Linear=1360=0b10101010001 Gray=0b11111111001 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1361=0b10101010010 Gray=0b11111111011 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1362=0b10101010011 Gray=0b11111111010 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1363=0b10101010100 Gray=0b11111111110 Rel Eta,Phi=2,6 Expect 10 B$ Linear=1364=0b10101010101 Gray=0b11111111111 Rel Eta,Phi=1,0 Expect 11 B$ Linear=1365=0b10101010110 Gray=0b11111111101 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1366=0b10101010111 Gray=0b11111111100 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1367=0b10101011000 Gray=0b11111110100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1368=0b10101011001 Gray=0b11111110101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1369=0b10101011010 Gray=0b11111110111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1370=0b10101011011 Gray=0b11111110110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1371=0b10101011100 Gray=0b11111110010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1372=0b10101011101 Gray=0b11111110011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1373=0b10101011110 Gray=0b11111110001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1374=0b10101011111 Gray=0b11111110000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1375=0b10101100000 Gray=0b11111010000 Rel Eta,Phi=1,3 Expect 6 B$ Linear=1376=0b10101100001 Gray=0b11111010001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1377=0b10101100010 Gray=0b11111010011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1378=0b10101100011 Gray=0b11111010010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1379=0b10101100100 Gray=0b11111010110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1380=0b10101100101 Gray=0b11111010111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1381=0b10101100110 Gray=0b11111010101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1382=0b10101100111 Gray=0b11111010100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1383=0b10101101000 Gray=0b11111011100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1384=0b10101101001 Gray=0b11111011101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1385=0b10101101010 Gray=0b11111011111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1386=0b10101101011 Gray=0b11111011110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1387=0b10101101100 Gray=0b11111011010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1388=0b10101101101 Gray=0b11111011011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1389=0b10101101110 Gray=0b11111011001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1390=0b10101101111 Gray=0b11111011000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1391=0b10101110000 Gray=0b11111001000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1392=0b10101110001 Gray=0b11111001001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1393=0b10101110010 Gray=0b11111001011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1394=0b10101110011 Gray=0b11111001010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1395=0b10101110100 Gray=0b11111001110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1396=0b10101110101 Gray=0b11111001111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1397=0b10101110110 Gray=0b11111001101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1398=0b10101110111 Gray=0b11111001100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1399=0b10101111000 Gray=0b11111000100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1400=0b10101111001 Gray=0b11111000101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1401=0b10101111010 Gray=0b11111000111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1402=0b10101111011 Gray=0b11111000110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1403=0b10101111100 Gray=0b11111000010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1404=0b10101111101 Gray=0b11111000011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1405=0b10101111110 Gray=0b11111000001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1406=0b10101111111 Gray=0b11111000000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1407=0b10110000000 Gray=0b11101000000 Rel Eta,Phi=2,4 Expect 4 B$ Linear=1408=0b10110000001 Gray=0b11101000001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1409=0b10110000010 Gray=0b11101000011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1410=0b10110000011 Gray=0b11101000010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1411=0b10110000100 Gray=0b11101000110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1412=0b10110000101 Gray=0b11101000111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1413=0b10110000110 Gray=0b11101000101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1414=0b10110000111 Gray=0b11101000100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1415=0b10110001000 Gray=0b11101001100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1416=0b10110001001 Gray=0b11101001101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1417=0b10110001010 Gray=0b11101001111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1418=0b10110001011 Gray=0b11101001110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1419=0b10110001100 Gray=0b11101001010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1420=0b10110001101 Gray=0b11101001011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1421=0b10110001110 Gray=0b11101001001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1422=0b10110001111 Gray=0b11101001000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1423=0b10110010000 Gray=0b11101011000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1424=0b10110010001 Gray=0b11101011001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1425=0b10110010010 Gray=0b11101011011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1426=0b10110010011 Gray=0b11101011010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1427=0b10110010100 Gray=0b11101011110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1428=0b10110010101 Gray=0b11101011111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1429=0b10110010110 Gray=0b11101011101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1430=0b10110010111 Gray=0b11101011100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1431=0b10110011000 Gray=0b11101010100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1432=0b10110011001 Gray=0b11101010101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1433=0b10110011010 Gray=0b11101010111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1434=0b10110011011 Gray=0b11101010110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1435=0b10110011100 Gray=0b11101010010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1436=0b10110011101 Gray=0b11101010011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1437=0b10110011110 Gray=0b11101010001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1438=0b10110011111 Gray=0b11101010000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1439=0b10110100000 Gray=0b11101110000 Rel Eta,Phi=1,3 Expect 6 B$ Linear=1440=0b10110100001 Gray=0b11101110001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1441=0b10110100010 Gray=0b11101110011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1442=0b10110100011 Gray=0b11101110010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1443=0b10110100100 Gray=0b11101110110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1444=0b10110100101 Gray=0b11101110111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1445=0b10110100110 Gray=0b11101110101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1446=0b10110100111 Gray=0b11101110100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1447=0b10110101000 Gray=0b11101111100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1448=0b10110101001 Gray=0b11101111101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1449=0b10110101010 Gray=0b11101111111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1450=0b10110101011 Gray=0b11101111110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1451=0b10110101100 Gray=0b11101111010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1452=0b10110101101 Gray=0b11101111011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1453=0b10110101110 Gray=0b11101111001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1454=0b10110101111 Gray=0b11101111000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1455=0b10110110000 Gray=0b11101101000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1456=0b10110110001 Gray=0b11101101001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1457=0b10110110010 Gray=0b11101101011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1458=0b10110110011 Gray=0b11101101010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1459=0b10110110100 Gray=0b11101101110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1460=0b10110110101 Gray=0b11101101111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1461=0b10110110110 Gray=0b11101101101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1462=0b10110110111 Gray=0b11101101100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1463=0b10110111000 Gray=0b11101100100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1464=0b10110111001 Gray=0b11101100101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1465=0b10110111010 Gray=0b11101100111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1466=0b10110111011 Gray=0b11101100110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1467=0b10110111100 Gray=0b11101100010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1468=0b10110111101 Gray=0b11101100011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1469=0b10110111110 Gray=0b11101100001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1470=0b10110111111 Gray=0b11101100000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1471=0b10111000000 Gray=0b11100100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1472=0b10111000001 Gray=0b11100100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1473=0b10111000010 Gray=0b11100100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1474=0b10111000011 Gray=0b11100100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1475=0b10111000100 Gray=0b11100100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1476=0b10111000101 Gray=0b11100100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1477=0b10111000110 Gray=0b11100100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1478=0b10111000111 Gray=0b11100100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1479=0b10111001000 Gray=0b11100101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1480=0b10111001001 Gray=0b11100101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1481=0b10111001010 Gray=0b11100101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1482=0b10111001011 Gray=0b11100101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1483=0b10111001100 Gray=0b11100101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1484=0b10111001101 Gray=0b11100101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1485=0b10111001110 Gray=0b11100101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1486=0b10111001111 Gray=0b11100101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1487=0b10111010000 Gray=0b11100111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1488=0b10111010001 Gray=0b11100111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1489=0b10111010010 Gray=0b11100111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1490=0b10111010011 Gray=0b11100111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1491=0b10111010100 Gray=0b11100111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1492=0b10111010101 Gray=0b11100111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1493=0b10111010110 Gray=0b11100111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1494=0b10111010111 Gray=0b11100111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1495=0b10111011000 Gray=0b11100110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1496=0b10111011001 Gray=0b11100110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1497=0b10111011010 Gray=0b11100110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1498=0b10111011011 Gray=0b11100110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1499=0b10111011100 Gray=0b11100110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1500=0b10111011101 Gray=0b11100110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1501=0b10111011110 Gray=0b11100110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1502=0b10111011111 Gray=0b11100110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1503=0b10111100000 Gray=0b11100010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1504=0b10111100001 Gray=0b11100010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1505=0b10111100010 Gray=0b11100010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1506=0b10111100011 Gray=0b11100010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1507=0b10111100100 Gray=0b11100010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1508=0b10111100101 Gray=0b11100010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1509=0b10111100110 Gray=0b11100010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1510=0b10111100111 Gray=0b11100010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1511=0b10111101000 Gray=0b11100011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1512=0b10111101001 Gray=0b11100011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1513=0b10111101010 Gray=0b11100011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1514=0b10111101011 Gray=0b11100011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1515=0b10111101100 Gray=0b11100011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1516=0b10111101101 Gray=0b11100011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1517=0b10111101110 Gray=0b11100011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1518=0b10111101111 Gray=0b11100011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1519=0b10111110000 Gray=0b11100001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1520=0b10111110001 Gray=0b11100001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1521=0b10111110010 Gray=0b11100001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1522=0b10111110011 Gray=0b11100001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1523=0b10111110100 Gray=0b11100001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1524=0b10111110101 Gray=0b11100001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1525=0b10111110110 Gray=0b11100001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1526=0b10111110111 Gray=0b11100001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1527=0b10111111000 Gray=0b11100000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1528=0b10111111001 Gray=0b11100000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1529=0b10111111010 Gray=0b11100000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1530=0b10111111011 Gray=0b11100000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1531=0b10111111100 Gray=0b11100000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1532=0b10111111101 Gray=0b11100000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1533=0b10111111110 Gray=0b11100000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1534=0b10111111111 Gray=0b11100000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1535=0b11000000000 Gray=0b10100000000 Rel Eta,Phi=2,2 Expect 2 B$ Linear=1536=0b11000000001 Gray=0b10100000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1537=0b11000000010 Gray=0b10100000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1538=0b11000000011 Gray=0b10100000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1539=0b11000000100 Gray=0b10100000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1540=0b11000000101 Gray=0b10100000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1541=0b11000000110 Gray=0b10100000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1542=0b11000000111 Gray=0b10100000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1543=0b11000001000 Gray=0b10100001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1544=0b11000001001 Gray=0b10100001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1545=0b11000001010 Gray=0b10100001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1546=0b11000001011 Gray=0b10100001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1547=0b11000001100 Gray=0b10100001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1548=0b11000001101 Gray=0b10100001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1549=0b11000001110 Gray=0b10100001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1550=0b11000001111 Gray=0b10100001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1551=0b11000010000 Gray=0b10100011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1552=0b11000010001 Gray=0b10100011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1553=0b11000010010 Gray=0b10100011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1554=0b11000010011 Gray=0b10100011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1555=0b11000010100 Gray=0b10100011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1556=0b11000010101 Gray=0b10100011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1557=0b11000010110 Gray=0b10100011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1558=0b11000010111 Gray=0b10100011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1559=0b11000011000 Gray=0b10100010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1560=0b11000011001 Gray=0b10100010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1561=0b11000011010 Gray=0b10100010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1562=0b11000011011 Gray=0b10100010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1563=0b11000011100 Gray=0b10100010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1564=0b11000011101 Gray=0b10100010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1565=0b11000011110 Gray=0b10100010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1566=0b11000011111 Gray=0b10100010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1567=0b11000100000 Gray=0b10100110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1568=0b11000100001 Gray=0b10100110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1569=0b11000100010 Gray=0b10100110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1570=0b11000100011 Gray=0b10100110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1571=0b11000100100 Gray=0b10100110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1572=0b11000100101 Gray=0b10100110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1573=0b11000100110 Gray=0b10100110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1574=0b11000100111 Gray=0b10100110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1575=0b11000101000 Gray=0b10100111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1576=0b11000101001 Gray=0b10100111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1577=0b11000101010 Gray=0b10100111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1578=0b11000101011 Gray=0b10100111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1579=0b11000101100 Gray=0b10100111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1580=0b11000101101 Gray=0b10100111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1581=0b11000101110 Gray=0b10100111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1582=0b11000101111 Gray=0b10100111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1583=0b11000110000 Gray=0b10100101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1584=0b11000110001 Gray=0b10100101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1585=0b11000110010 Gray=0b10100101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1586=0b11000110011 Gray=0b10100101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1587=0b11000110100 Gray=0b10100101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1588=0b11000110101 Gray=0b10100101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1589=0b11000110110 Gray=0b10100101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1590=0b11000110111 Gray=0b10100101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1591=0b11000111000 Gray=0b10100100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1592=0b11000111001 Gray=0b10100100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1593=0b11000111010 Gray=0b10100100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1594=0b11000111011 Gray=0b10100100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1595=0b11000111100 Gray=0b10100100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1596=0b11000111101 Gray=0b10100100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1597=0b11000111110 Gray=0b10100100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1598=0b11000111111 Gray=0b10100100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1599=0b11001000000 Gray=0b10101100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1600=0b11001000001 Gray=0b10101100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1601=0b11001000010 Gray=0b10101100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1602=0b11001000011 Gray=0b10101100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1603=0b11001000100 Gray=0b10101100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1604=0b11001000101 Gray=0b10101100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1605=0b11001000110 Gray=0b10101100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1606=0b11001000111 Gray=0b10101100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1607=0b11001001000 Gray=0b10101101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1608=0b11001001001 Gray=0b10101101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1609=0b11001001010 Gray=0b10101101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1610=0b11001001011 Gray=0b10101101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1611=0b11001001100 Gray=0b10101101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1612=0b11001001101 Gray=0b10101101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1613=0b11001001110 Gray=0b10101101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1614=0b11001001111 Gray=0b10101101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1615=0b11001010000 Gray=0b10101111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1616=0b11001010001 Gray=0b10101111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1617=0b11001010010 Gray=0b10101111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1618=0b11001010011 Gray=0b10101111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1619=0b11001010100 Gray=0b10101111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1620=0b11001010101 Gray=0b10101111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1621=0b11001010110 Gray=0b10101111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1622=0b11001010111 Gray=0b10101111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1623=0b11001011000 Gray=0b10101110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1624=0b11001011001 Gray=0b10101110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1625=0b11001011010 Gray=0b10101110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1626=0b11001011011 Gray=0b10101110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1627=0b11001011100 Gray=0b10101110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1628=0b11001011101 Gray=0b10101110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1629=0b11001011110 Gray=0b10101110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1630=0b11001011111 Gray=0b10101110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1631=0b11001100000 Gray=0b10101010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1632=0b11001100001 Gray=0b10101010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1633=0b11001100010 Gray=0b10101010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1634=0b11001100011 Gray=0b10101010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1635=0b11001100100 Gray=0b10101010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1636=0b11001100101 Gray=0b10101010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1637=0b11001100110 Gray=0b10101010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1638=0b11001100111 Gray=0b10101010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1639=0b11001101000 Gray=0b10101011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1640=0b11001101001 Gray=0b10101011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1641=0b11001101010 Gray=0b10101011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1642=0b11001101011 Gray=0b10101011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1643=0b11001101100 Gray=0b10101011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1644=0b11001101101 Gray=0b10101011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1645=0b11001101110 Gray=0b10101011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1646=0b11001101111 Gray=0b10101011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1647=0b11001110000 Gray=0b10101001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1648=0b11001110001 Gray=0b10101001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1649=0b11001110010 Gray=0b10101001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1650=0b11001110011 Gray=0b10101001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1651=0b11001110100 Gray=0b10101001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1652=0b11001110101 Gray=0b10101001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1653=0b11001110110 Gray=0b10101001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1654=0b11001110111 Gray=0b10101001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1655=0b11001111000 Gray=0b10101000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1656=0b11001111001 Gray=0b10101000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1657=0b11001111010 Gray=0b10101000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1658=0b11001111011 Gray=0b10101000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1659=0b11001111100 Gray=0b10101000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1660=0b11001111101 Gray=0b10101000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1661=0b11001111110 Gray=0b10101000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1662=0b11001111111 Gray=0b10101000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1663=0b11010000000 Gray=0b10111000000 Rel Eta,Phi=2,4 Expect 4 B$ Linear=1664=0b11010000001 Gray=0b10111000001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1665=0b11010000010 Gray=0b10111000011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1666=0b11010000011 Gray=0b10111000010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1667=0b11010000100 Gray=0b10111000110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1668=0b11010000101 Gray=0b10111000111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1669=0b11010000110 Gray=0b10111000101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1670=0b11010000111 Gray=0b10111000100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1671=0b11010001000 Gray=0b10111001100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1672=0b11010001001 Gray=0b10111001101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1673=0b11010001010 Gray=0b10111001111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1674=0b11010001011 Gray=0b10111001110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1675=0b11010001100 Gray=0b10111001010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1676=0b11010001101 Gray=0b10111001011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1677=0b11010001110 Gray=0b10111001001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1678=0b11010001111 Gray=0b10111001000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1679=0b11010010000 Gray=0b10111011000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1680=0b11010010001 Gray=0b10111011001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1681=0b11010010010 Gray=0b10111011011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1682=0b11010010011 Gray=0b10111011010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1683=0b11010010100 Gray=0b10111011110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1684=0b11010010101 Gray=0b10111011111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1685=0b11010010110 Gray=0b10111011101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1686=0b11010010111 Gray=0b10111011100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1687=0b11010011000 Gray=0b10111010100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1688=0b11010011001 Gray=0b10111010101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1689=0b11010011010 Gray=0b10111010111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1690=0b11010011011 Gray=0b10111010110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1691=0b11010011100 Gray=0b10111010010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1692=0b11010011101 Gray=0b10111010011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1693=0b11010011110 Gray=0b10111010001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1694=0b11010011111 Gray=0b10111010000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1695=0b11010100000 Gray=0b10111110000 Rel Eta,Phi=1,3 Expect 6 B$ Linear=1696=0b11010100001 Gray=0b10111110001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1697=0b11010100010 Gray=0b10111110011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1698=0b11010100011 Gray=0b10111110010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1699=0b11010100100 Gray=0b10111110110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1700=0b11010100101 Gray=0b10111110111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1701=0b11010100110 Gray=0b10111110101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1702=0b11010100111 Gray=0b10111110100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1703=0b11010101000 Gray=0b10111111100 Rel Eta,Phi=1,1 Expect 8 B$ Linear=1704=0b11010101001 Gray=0b10111111101 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1705=0b11010101010 Gray=0b10111111111 Rel Eta,Phi=2,7 Expect 10 B$ Linear=1706=0b11010101011 Gray=0b10111111110 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1707=0b11010101100 Gray=0b10111111010 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1708=0b11010101101 Gray=0b10111111011 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1709=0b11010101110 Gray=0b10111111001 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1710=0b11010101111 Gray=0b10111111000 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1711=0b11010110000 Gray=0b10111101000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1712=0b11010110001 Gray=0b10111101001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1713=0b11010110010 Gray=0b10111101011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1714=0b11010110011 Gray=0b10111101010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1715=0b11010110100 Gray=0b10111101110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1716=0b11010110101 Gray=0b10111101111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1717=0b11010110110 Gray=0b10111101101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1718=0b11010110111 Gray=0b10111101100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1719=0b11010111000 Gray=0b10111100100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1720=0b11010111001 Gray=0b10111100101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1721=0b11010111010 Gray=0b10111100111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1722=0b11010111011 Gray=0b10111100110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1723=0b11010111100 Gray=0b10111100010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1724=0b11010111101 Gray=0b10111100011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1725=0b11010111110 Gray=0b10111100001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1726=0b11010111111 Gray=0b10111100000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1727=0b11011000000 Gray=0b10110100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1728=0b11011000001 Gray=0b10110100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1729=0b11011000010 Gray=0b10110100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1730=0b11011000011 Gray=0b10110100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1731=0b11011000100 Gray=0b10110100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1732=0b11011000101 Gray=0b10110100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1733=0b11011000110 Gray=0b10110100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1734=0b11011000111 Gray=0b10110100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1735=0b11011001000 Gray=0b10110101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1736=0b11011001001 Gray=0b10110101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1737=0b11011001010 Gray=0b10110101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1738=0b11011001011 Gray=0b10110101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1739=0b11011001100 Gray=0b10110101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1740=0b11011001101 Gray=0b10110101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1741=0b11011001110 Gray=0b10110101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1742=0b11011001111 Gray=0b10110101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1743=0b11011010000 Gray=0b10110111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1744=0b11011010001 Gray=0b10110111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1745=0b11011010010 Gray=0b10110111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1746=0b11011010011 Gray=0b10110111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1747=0b11011010100 Gray=0b10110111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1748=0b11011010101 Gray=0b10110111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1749=0b11011010110 Gray=0b10110111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1750=0b11011010111 Gray=0b10110111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1751=0b11011011000 Gray=0b10110110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1752=0b11011011001 Gray=0b10110110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1753=0b11011011010 Gray=0b10110110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1754=0b11011011011 Gray=0b10110110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1755=0b11011011100 Gray=0b10110110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1756=0b11011011101 Gray=0b10110110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1757=0b11011011110 Gray=0b10110110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1758=0b11011011111 Gray=0b10110110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1759=0b11011100000 Gray=0b10110010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1760=0b11011100001 Gray=0b10110010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1761=0b11011100010 Gray=0b10110010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1762=0b11011100011 Gray=0b10110010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1763=0b11011100100 Gray=0b10110010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1764=0b11011100101 Gray=0b10110010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1765=0b11011100110 Gray=0b10110010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1766=0b11011100111 Gray=0b10110010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1767=0b11011101000 Gray=0b10110011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1768=0b11011101001 Gray=0b10110011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1769=0b11011101010 Gray=0b10110011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1770=0b11011101011 Gray=0b10110011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1771=0b11011101100 Gray=0b10110011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1772=0b11011101101 Gray=0b10110011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1773=0b11011101110 Gray=0b10110011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1774=0b11011101111 Gray=0b10110011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1775=0b11011110000 Gray=0b10110001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1776=0b11011110001 Gray=0b10110001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1777=0b11011110010 Gray=0b10110001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1778=0b11011110011 Gray=0b10110001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1779=0b11011110100 Gray=0b10110001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1780=0b11011110101 Gray=0b10110001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1781=0b11011110110 Gray=0b10110001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1782=0b11011110111 Gray=0b10110001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1783=0b11011111000 Gray=0b10110000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1784=0b11011111001 Gray=0b10110000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1785=0b11011111010 Gray=0b10110000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1786=0b11011111011 Gray=0b10110000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1787=0b11011111100 Gray=0b10110000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1788=0b11011111101 Gray=0b10110000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1789=0b11011111110 Gray=0b10110000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1790=0b11011111111 Gray=0b10110000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1791=0b11100000000 Gray=0b10010000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear=1792=0b11100000001 Gray=0b10010000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1793=0b11100000010 Gray=0b10010000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1794=0b11100000011 Gray=0b10010000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1795=0b11100000100 Gray=0b10010000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1796=0b11100000101 Gray=0b10010000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1797=0b11100000110 Gray=0b10010000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1798=0b11100000111 Gray=0b10010000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1799=0b11100001000 Gray=0b10010001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1800=0b11100001001 Gray=0b10010001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1801=0b11100001010 Gray=0b10010001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1802=0b11100001011 Gray=0b10010001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1803=0b11100001100 Gray=0b10010001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1804=0b11100001101 Gray=0b10010001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1805=0b11100001110 Gray=0b10010001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1806=0b11100001111 Gray=0b10010001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1807=0b11100010000 Gray=0b10010011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1808=0b11100010001 Gray=0b10010011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1809=0b11100010010 Gray=0b10010011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1810=0b11100010011 Gray=0b10010011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1811=0b11100010100 Gray=0b10010011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1812=0b11100010101 Gray=0b10010011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1813=0b11100010110 Gray=0b10010011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1814=0b11100010111 Gray=0b10010011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1815=0b11100011000 Gray=0b10010010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1816=0b11100011001 Gray=0b10010010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1817=0b11100011010 Gray=0b10010010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1818=0b11100011011 Gray=0b10010010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1819=0b11100011100 Gray=0b10010010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1820=0b11100011101 Gray=0b10010010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1821=0b11100011110 Gray=0b10010010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1822=0b11100011111 Gray=0b10010010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1823=0b11100100000 Gray=0b10010110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1824=0b11100100001 Gray=0b10010110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1825=0b11100100010 Gray=0b10010110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1826=0b11100100011 Gray=0b10010110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1827=0b11100100100 Gray=0b10010110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1828=0b11100100101 Gray=0b10010110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1829=0b11100100110 Gray=0b10010110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1830=0b11100100111 Gray=0b10010110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1831=0b11100101000 Gray=0b10010111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1832=0b11100101001 Gray=0b10010111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1833=0b11100101010 Gray=0b10010111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1834=0b11100101011 Gray=0b10010111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1835=0b11100101100 Gray=0b10010111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1836=0b11100101101 Gray=0b10010111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1837=0b11100101110 Gray=0b10010111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1838=0b11100101111 Gray=0b10010111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1839=0b11100110000 Gray=0b10010101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1840=0b11100110001 Gray=0b10010101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1841=0b11100110010 Gray=0b10010101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1842=0b11100110011 Gray=0b10010101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1843=0b11100110100 Gray=0b10010101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1844=0b11100110101 Gray=0b10010101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1845=0b11100110110 Gray=0b10010101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1846=0b11100110111 Gray=0b10010101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1847=0b11100111000 Gray=0b10010100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1848=0b11100111001 Gray=0b10010100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1849=0b11100111010 Gray=0b10010100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1850=0b11100111011 Gray=0b10010100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1851=0b11100111100 Gray=0b10010100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1852=0b11100111101 Gray=0b10010100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1853=0b11100111110 Gray=0b10010100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1854=0b11100111111 Gray=0b10010100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1855=0b11101000000 Gray=0b10011100000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1856=0b11101000001 Gray=0b10011100001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1857=0b11101000010 Gray=0b10011100011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1858=0b11101000011 Gray=0b10011100010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1859=0b11101000100 Gray=0b10011100110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1860=0b11101000101 Gray=0b10011100111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1861=0b11101000110 Gray=0b10011100101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1862=0b11101000111 Gray=0b10011100100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1863=0b11101001000 Gray=0b10011101100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1864=0b11101001001 Gray=0b10011101101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1865=0b11101001010 Gray=0b10011101111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1866=0b11101001011 Gray=0b10011101110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1867=0b11101001100 Gray=0b10011101010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1868=0b11101001101 Gray=0b10011101011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1869=0b11101001110 Gray=0b10011101001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1870=0b11101001111 Gray=0b10011101000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1871=0b11101010000 Gray=0b10011111000 Rel Eta,Phi=1,2 Expect 6 B$ Linear=1872=0b11101010001 Gray=0b10011111001 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1873=0b11101010010 Gray=0b10011111011 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1874=0b11101010011 Gray=0b10011111010 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1875=0b11101010100 Gray=0b10011111110 Rel Eta,Phi=2,6 Expect 8 B$ Linear=1876=0b11101010101 Gray=0b10011111111 Rel Eta,Phi=1,0 Expect 9 B$ Linear=1877=0b11101010110 Gray=0b10011111101 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1878=0b11101010111 Gray=0b10011111100 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1879=0b11101011000 Gray=0b10011110100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1880=0b11101011001 Gray=0b10011110101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1881=0b11101011010 Gray=0b10011110111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1882=0b11101011011 Gray=0b10011110110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1883=0b11101011100 Gray=0b10011110010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1884=0b11101011101 Gray=0b10011110011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1885=0b11101011110 Gray=0b10011110001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1886=0b11101011111 Gray=0b10011110000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1887=0b11101100000 Gray=0b10011010000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1888=0b11101100001 Gray=0b10011010001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1889=0b11101100010 Gray=0b10011010011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1890=0b11101100011 Gray=0b10011010010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1891=0b11101100100 Gray=0b10011010110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1892=0b11101100101 Gray=0b10011010111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1893=0b11101100110 Gray=0b10011010101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1894=0b11101100111 Gray=0b10011010100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1895=0b11101101000 Gray=0b10011011100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1896=0b11101101001 Gray=0b10011011101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1897=0b11101101010 Gray=0b10011011111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1898=0b11101101011 Gray=0b10011011110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1899=0b11101101100 Gray=0b10011011010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1900=0b11101101101 Gray=0b10011011011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1901=0b11101101110 Gray=0b10011011001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1902=0b11101101111 Gray=0b10011011000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1903=0b11101110000 Gray=0b10011001000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1904=0b11101110001 Gray=0b10011001001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1905=0b11101110010 Gray=0b10011001011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1906=0b11101110011 Gray=0b10011001010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1907=0b11101110100 Gray=0b10011001110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1908=0b11101110101 Gray=0b10011001111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1909=0b11101110110 Gray=0b10011001101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1910=0b11101110111 Gray=0b10011001100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1911=0b11101111000 Gray=0b10011000100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1912=0b11101111001 Gray=0b10011000101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1913=0b11101111010 Gray=0b10011000111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1914=0b11101111011 Gray=0b10011000110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1915=0b11101111100 Gray=0b10011000010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1916=0b11101111101 Gray=0b10011000011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1917=0b11101111110 Gray=0b10011000001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1918=0b11101111111 Gray=0b10011000000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1919=0b11110000000 Gray=0b10001000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear=1920=0b11110000001 Gray=0b10001000001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1921=0b11110000010 Gray=0b10001000011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1922=0b11110000011 Gray=0b10001000010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1923=0b11110000100 Gray=0b10001000110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1924=0b11110000101 Gray=0b10001000111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1925=0b11110000110 Gray=0b10001000101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1926=0b11110000111 Gray=0b10001000100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1927=0b11110001000 Gray=0b10001001100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1928=0b11110001001 Gray=0b10001001101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1929=0b11110001010 Gray=0b10001001111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1930=0b11110001011 Gray=0b10001001110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1931=0b11110001100 Gray=0b10001001010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1932=0b11110001101 Gray=0b10001001011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1933=0b11110001110 Gray=0b10001001001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1934=0b11110001111 Gray=0b10001001000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1935=0b11110010000 Gray=0b10001011000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1936=0b11110010001 Gray=0b10001011001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1937=0b11110010010 Gray=0b10001011011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1938=0b11110010011 Gray=0b10001011010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1939=0b11110010100 Gray=0b10001011110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1940=0b11110010101 Gray=0b10001011111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1941=0b11110010110 Gray=0b10001011101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1942=0b11110010111 Gray=0b10001011100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1943=0b11110011000 Gray=0b10001010100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1944=0b11110011001 Gray=0b10001010101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1945=0b11110011010 Gray=0b10001010111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1946=0b11110011011 Gray=0b10001010110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1947=0b11110011100 Gray=0b10001010010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1948=0b11110011101 Gray=0b10001010011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1949=0b11110011110 Gray=0b10001010001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1950=0b11110011111 Gray=0b10001010000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1951=0b11110100000 Gray=0b10001110000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1952=0b11110100001 Gray=0b10001110001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1953=0b11110100010 Gray=0b10001110011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1954=0b11110100011 Gray=0b10001110010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1955=0b11110100100 Gray=0b10001110110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1956=0b11110100101 Gray=0b10001110111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1957=0b11110100110 Gray=0b10001110101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1958=0b11110100111 Gray=0b10001110100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1959=0b11110101000 Gray=0b10001111100 Rel Eta,Phi=1,1 Expect 6 B$ Linear=1960=0b11110101001 Gray=0b10001111101 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1961=0b11110101010 Gray=0b10001111111 Rel Eta,Phi=2,7 Expect 8 B$ Linear=1962=0b11110101011 Gray=0b10001111110 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1963=0b11110101100 Gray=0b10001111010 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1964=0b11110101101 Gray=0b10001111011 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1965=0b11110101110 Gray=0b10001111001 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1966=0b11110101111 Gray=0b10001111000 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1967=0b11110110000 Gray=0b10001101000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=1968=0b11110110001 Gray=0b10001101001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1969=0b11110110010 Gray=0b10001101011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1970=0b11110110011 Gray=0b10001101010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1971=0b11110110100 Gray=0b10001101110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=1972=0b11110110101 Gray=0b10001101111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=1973=0b11110110110 Gray=0b10001101101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1974=0b11110110111 Gray=0b10001101100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1975=0b11110111000 Gray=0b10001100100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1976=0b11110111001 Gray=0b10001100101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1977=0b11110111010 Gray=0b10001100111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1978=0b11110111011 Gray=0b10001100110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1979=0b11110111100 Gray=0b10001100010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1980=0b11110111101 Gray=0b10001100011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1981=0b11110111110 Gray=0b10001100001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1982=0b11110111111 Gray=0b10001100000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1983=0b11111000000 Gray=0b10000100000 Rel Eta,Phi=1,4 Expect 2 B$ Linear=1984=0b11111000001 Gray=0b10000100001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1985=0b11111000010 Gray=0b10000100011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1986=0b11111000011 Gray=0b10000100010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1987=0b11111000100 Gray=0b10000100110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1988=0b11111000101 Gray=0b10000100111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1989=0b11111000110 Gray=0b10000100101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1990=0b11111000111 Gray=0b10000100100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1991=0b11111001000 Gray=0b10000101100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1992=0b11111001001 Gray=0b10000101101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1993=0b11111001010 Gray=0b10000101111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=1994=0b11111001011 Gray=0b10000101110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1995=0b11111001100 Gray=0b10000101010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=1996=0b11111001101 Gray=0b10000101011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=1997=0b11111001110 Gray=0b10000101001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=1998=0b11111001111 Gray=0b10000101000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=1999=0b11111010000 Gray=0b10000111000 Rel Eta,Phi=1,2 Expect 4 B$ Linear=2000=0b11111010001 Gray=0b10000111001 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2001=0b11111010010 Gray=0b10000111011 Rel Eta,Phi=2,7 Expect 6 B$ Linear=2002=0b11111010011 Gray=0b10000111010 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2003=0b11111010100 Gray=0b10000111110 Rel Eta,Phi=2,6 Expect 6 B$ Linear=2004=0b11111010101 Gray=0b10000111111 Rel Eta,Phi=1,0 Expect 7 B$ Linear=2005=0b11111010110 Gray=0b10000111101 Rel Eta,Phi=2,7 Expect 6 B$ Linear=2006=0b11111010111 Gray=0b10000111100 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2007=0b11111011000 Gray=0b10000110100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=2008=0b11111011001 Gray=0b10000110101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2009=0b11111011010 Gray=0b10000110111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=2010=0b11111011011 Gray=0b10000110110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2011=0b11111011100 Gray=0b10000110010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=2012=0b11111011101 Gray=0b10000110011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2013=0b11111011110 Gray=0b10000110001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2014=0b11111011111 Gray=0b10000110000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2015=0b11111100000 Gray=0b10000010000 Rel Eta,Phi=1,3 Expect 2 B$ Linear=2016=0b11111100001 Gray=0b10000010001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2017=0b11111100010 Gray=0b10000010011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2018=0b11111100011 Gray=0b10000010010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2019=0b11111100100 Gray=0b10000010110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=2020=0b11111100101 Gray=0b10000010111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2021=0b11111100110 Gray=0b10000010101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2022=0b11111100111 Gray=0b10000010100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2023=0b11111101000 Gray=0b10000011100 Rel Eta,Phi=1,1 Expect 4 B$ Linear=2024=0b11111101001 Gray=0b10000011101 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2025=0b11111101010 Gray=0b10000011111 Rel Eta,Phi=2,7 Expect 6 B$ Linear=2026=0b11111101011 Gray=0b10000011110 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2027=0b11111101100 Gray=0b10000011010 Rel Eta,Phi=2,6 Expect 4 B$ Linear=2028=0b11111101101 Gray=0b10000011011 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2029=0b11111101110 Gray=0b10000011001 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2030=0b11111101111 Gray=0b10000011000 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2031=0b11111110000 Gray=0b10000001000 Rel Eta,Phi=1,2 Expect 2 B$ Linear=2032=0b11111110001 Gray=0b10000001001 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2033=0b11111110010 Gray=0b10000001011 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2034=0b11111110011 Gray=0b10000001010 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2035=0b11111110100 Gray=0b10000001110 Rel Eta,Phi=2,6 Expect 4 B$ Linear=2036=0b11111110101 Gray=0b10000001111 Rel Eta,Phi=1,0 Expect 5 B$ Linear=2037=0b11111110110 Gray=0b10000001101 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2038=0b11111110111 Gray=0b10000001100 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2039=0b11111111000 Gray=0b10000000100 Rel Eta,Phi=1,1 Expect 2 B$ Linear=2040=0b11111111001 Gray=0b10000000101 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2041=0b11111111010 Gray=0b10000000111 Rel Eta,Phi=2,7 Expect 4 B$ Linear=2042=0b11111111011 Gray=0b10000000110 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2043=0b11111111100 Gray=0b10000000010 Rel Eta,Phi=2,6 Expect 2 B$ Linear=2044=0b11111111101 Gray=0b10000000011 Rel Eta,Phi=1,0 Expect 3 B$ Linear=2045=0b11111111110 Gray=0b10000000001 Rel Eta,Phi=2,7 Expect 2 B$ Linear=2046=0b11111111111 Gray=0b10000000000 Rel Eta,Phi=1,0 Expect 1 B$ Linear=2047=0b10000000000 Gray=0b00000000000 Rel Eta,Phi=2,5 Expect 0 I$ Scanning First Pass Prom # 2 B$ Linear= 0=0b00000000001 Gray=0b00000000001 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 1=0b00000000010 Gray=0b00000000011 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 2=0b00000000011 Gray=0b00000000010 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 3=0b00000000100 Gray=0b00000000110 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 4=0b00000000101 Gray=0b00000000111 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 5=0b00000000110 Gray=0b00000000101 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 6=0b00000000111 Gray=0b00000000100 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 7=0b00000001000 Gray=0b00000001100 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 8=0b00000001001 Gray=0b00000001101 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 9=0b00000001010 Gray=0b00000001111 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 10=0b00000001011 Gray=0b00000001110 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 11=0b00000001100 Gray=0b00000001010 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 12=0b00000001101 Gray=0b00000001011 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 13=0b00000001110 Gray=0b00000001001 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 14=0b00000001111 Gray=0b00000001000 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 15=0b00000010000 Gray=0b00000011000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 16=0b00000010001 Gray=0b00000011001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 17=0b00000010010 Gray=0b00000011011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 18=0b00000010011 Gray=0b00000011010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 19=0b00000010100 Gray=0b00000011110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 20=0b00000010101 Gray=0b00000011111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 21=0b00000010110 Gray=0b00000011101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 22=0b00000010111 Gray=0b00000011100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 23=0b00000011000 Gray=0b00000010100 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 24=0b00000011001 Gray=0b00000010101 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 25=0b00000011010 Gray=0b00000010111 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 26=0b00000011011 Gray=0b00000010110 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 27=0b00000011100 Gray=0b00000010010 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 28=0b00000011101 Gray=0b00000010011 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 29=0b00000011110 Gray=0b00000010001 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 30=0b00000011111 Gray=0b00000010000 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 31=0b00000100000 Gray=0b00000110000 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 32=0b00000100001 Gray=0b00000110001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 33=0b00000100010 Gray=0b00000110011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 34=0b00000100011 Gray=0b00000110010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 35=0b00000100100 Gray=0b00000110110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 36=0b00000100101 Gray=0b00000110111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 37=0b00000100110 Gray=0b00000110101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 38=0b00000100111 Gray=0b00000110100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 39=0b00000101000 Gray=0b00000111100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 40=0b00000101001 Gray=0b00000111101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 41=0b00000101010 Gray=0b00000111111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 42=0b00000101011 Gray=0b00000111110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 43=0b00000101100 Gray=0b00000111010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 44=0b00000101101 Gray=0b00000111011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 45=0b00000101110 Gray=0b00000111001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 46=0b00000101111 Gray=0b00000111000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 47=0b00000110000 Gray=0b00000101000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 48=0b00000110001 Gray=0b00000101001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 49=0b00000110010 Gray=0b00000101011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 50=0b00000110011 Gray=0b00000101010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 51=0b00000110100 Gray=0b00000101110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 52=0b00000110101 Gray=0b00000101111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 53=0b00000110110 Gray=0b00000101101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 54=0b00000110111 Gray=0b00000101100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 55=0b00000111000 Gray=0b00000100100 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 56=0b00000111001 Gray=0b00000100101 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 57=0b00000111010 Gray=0b00000100111 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 58=0b00000111011 Gray=0b00000100110 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 59=0b00000111100 Gray=0b00000100010 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 60=0b00000111101 Gray=0b00000100011 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 61=0b00000111110 Gray=0b00000100001 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 62=0b00000111111 Gray=0b00000100000 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 63=0b00001000000 Gray=0b00001100000 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 64=0b00001000001 Gray=0b00001100001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 65=0b00001000010 Gray=0b00001100011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 66=0b00001000011 Gray=0b00001100010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 67=0b00001000100 Gray=0b00001100110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 68=0b00001000101 Gray=0b00001100111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 69=0b00001000110 Gray=0b00001100101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 70=0b00001000111 Gray=0b00001100100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 71=0b00001001000 Gray=0b00001101100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 72=0b00001001001 Gray=0b00001101101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 73=0b00001001010 Gray=0b00001101111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 74=0b00001001011 Gray=0b00001101110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 75=0b00001001100 Gray=0b00001101010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 76=0b00001001101 Gray=0b00001101011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 77=0b00001001110 Gray=0b00001101001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 78=0b00001001111 Gray=0b00001101000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 79=0b00001010000 Gray=0b00001111000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 80=0b00001010001 Gray=0b00001111001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 81=0b00001010010 Gray=0b00001111011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 82=0b00001010011 Gray=0b00001111010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 83=0b00001010100 Gray=0b00001111110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 84=0b00001010101 Gray=0b00001111111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 85=0b00001010110 Gray=0b00001111101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 86=0b00001010111 Gray=0b00001111100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 87=0b00001011000 Gray=0b00001110100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 88=0b00001011001 Gray=0b00001110101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 89=0b00001011010 Gray=0b00001110111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 90=0b00001011011 Gray=0b00001110110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 91=0b00001011100 Gray=0b00001110010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 92=0b00001011101 Gray=0b00001110011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 93=0b00001011110 Gray=0b00001110001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 94=0b00001011111 Gray=0b00001110000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 95=0b00001100000 Gray=0b00001010000 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 96=0b00001100001 Gray=0b00001010001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 97=0b00001100010 Gray=0b00001010011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 98=0b00001100011 Gray=0b00001010010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 99=0b00001100100 Gray=0b00001010110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 100=0b00001100101 Gray=0b00001010111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 101=0b00001100110 Gray=0b00001010101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 102=0b00001100111 Gray=0b00001010100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 103=0b00001101000 Gray=0b00001011100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 104=0b00001101001 Gray=0b00001011101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 105=0b00001101010 Gray=0b00001011111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 106=0b00001101011 Gray=0b00001011110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 107=0b00001101100 Gray=0b00001011010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 108=0b00001101101 Gray=0b00001011011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 109=0b00001101110 Gray=0b00001011001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 110=0b00001101111 Gray=0b00001011000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 111=0b00001110000 Gray=0b00001001000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 112=0b00001110001 Gray=0b00001001001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 113=0b00001110010 Gray=0b00001001011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 114=0b00001110011 Gray=0b00001001010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 115=0b00001110100 Gray=0b00001001110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 116=0b00001110101 Gray=0b00001001111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 117=0b00001110110 Gray=0b00001001101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 118=0b00001110111 Gray=0b00001001100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 119=0b00001111000 Gray=0b00001000100 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 120=0b00001111001 Gray=0b00001000101 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 121=0b00001111010 Gray=0b00001000111 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 122=0b00001111011 Gray=0b00001000110 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 123=0b00001111100 Gray=0b00001000010 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 124=0b00001111101 Gray=0b00001000011 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 125=0b00001111110 Gray=0b00001000001 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 126=0b00001111111 Gray=0b00001000000 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 127=0b00010000000 Gray=0b00011000000 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 128=0b00010000001 Gray=0b00011000001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 129=0b00010000010 Gray=0b00011000011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 130=0b00010000011 Gray=0b00011000010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 131=0b00010000100 Gray=0b00011000110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 132=0b00010000101 Gray=0b00011000111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 133=0b00010000110 Gray=0b00011000101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 134=0b00010000111 Gray=0b00011000100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 135=0b00010001000 Gray=0b00011001100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 136=0b00010001001 Gray=0b00011001101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 137=0b00010001010 Gray=0b00011001111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 138=0b00010001011 Gray=0b00011001110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 139=0b00010001100 Gray=0b00011001010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 140=0b00010001101 Gray=0b00011001011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 141=0b00010001110 Gray=0b00011001001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 142=0b00010001111 Gray=0b00011001000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 143=0b00010010000 Gray=0b00011011000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 144=0b00010010001 Gray=0b00011011001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 145=0b00010010010 Gray=0b00011011011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 146=0b00010010011 Gray=0b00011011010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 147=0b00010010100 Gray=0b00011011110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 148=0b00010010101 Gray=0b00011011111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 149=0b00010010110 Gray=0b00011011101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 150=0b00010010111 Gray=0b00011011100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 151=0b00010011000 Gray=0b00011010100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 152=0b00010011001 Gray=0b00011010101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 153=0b00010011010 Gray=0b00011010111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 154=0b00010011011 Gray=0b00011010110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 155=0b00010011100 Gray=0b00011010010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 156=0b00010011101 Gray=0b00011010011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 157=0b00010011110 Gray=0b00011010001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 158=0b00010011111 Gray=0b00011010000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 159=0b00010100000 Gray=0b00011110000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 160=0b00010100001 Gray=0b00011110001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 161=0b00010100010 Gray=0b00011110011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 162=0b00010100011 Gray=0b00011110010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 163=0b00010100100 Gray=0b00011110110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 164=0b00010100101 Gray=0b00011110111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 165=0b00010100110 Gray=0b00011110101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 166=0b00010100111 Gray=0b00011110100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 167=0b00010101000 Gray=0b00011111100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 168=0b00010101001 Gray=0b00011111101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 169=0b00010101010 Gray=0b00011111111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 170=0b00010101011 Gray=0b00011111110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 171=0b00010101100 Gray=0b00011111010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 172=0b00010101101 Gray=0b00011111011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 173=0b00010101110 Gray=0b00011111001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 174=0b00010101111 Gray=0b00011111000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 175=0b00010110000 Gray=0b00011101000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 176=0b00010110001 Gray=0b00011101001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 177=0b00010110010 Gray=0b00011101011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 178=0b00010110011 Gray=0b00011101010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 179=0b00010110100 Gray=0b00011101110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 180=0b00010110101 Gray=0b00011101111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 181=0b00010110110 Gray=0b00011101101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 182=0b00010110111 Gray=0b00011101100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 183=0b00010111000 Gray=0b00011100100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 184=0b00010111001 Gray=0b00011100101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 185=0b00010111010 Gray=0b00011100111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 186=0b00010111011 Gray=0b00011100110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 187=0b00010111100 Gray=0b00011100010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 188=0b00010111101 Gray=0b00011100011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 189=0b00010111110 Gray=0b00011100001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 190=0b00010111111 Gray=0b00011100000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 191=0b00011000000 Gray=0b00010100000 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 192=0b00011000001 Gray=0b00010100001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 193=0b00011000010 Gray=0b00010100011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 194=0b00011000011 Gray=0b00010100010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 195=0b00011000100 Gray=0b00010100110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 196=0b00011000101 Gray=0b00010100111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 197=0b00011000110 Gray=0b00010100101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 198=0b00011000111 Gray=0b00010100100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 199=0b00011001000 Gray=0b00010101100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 200=0b00011001001 Gray=0b00010101101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 201=0b00011001010 Gray=0b00010101111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 202=0b00011001011 Gray=0b00010101110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 203=0b00011001100 Gray=0b00010101010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 204=0b00011001101 Gray=0b00010101011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 205=0b00011001110 Gray=0b00010101001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 206=0b00011001111 Gray=0b00010101000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 207=0b00011010000 Gray=0b00010111000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 208=0b00011010001 Gray=0b00010111001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 209=0b00011010010 Gray=0b00010111011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 210=0b00011010011 Gray=0b00010111010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 211=0b00011010100 Gray=0b00010111110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 212=0b00011010101 Gray=0b00010111111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 213=0b00011010110 Gray=0b00010111101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 214=0b00011010111 Gray=0b00010111100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 215=0b00011011000 Gray=0b00010110100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 216=0b00011011001 Gray=0b00010110101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 217=0b00011011010 Gray=0b00010110111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 218=0b00011011011 Gray=0b00010110110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 219=0b00011011100 Gray=0b00010110010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 220=0b00011011101 Gray=0b00010110011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 221=0b00011011110 Gray=0b00010110001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 222=0b00011011111 Gray=0b00010110000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 223=0b00011100000 Gray=0b00010010000 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 224=0b00011100001 Gray=0b00010010001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 225=0b00011100010 Gray=0b00010010011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 226=0b00011100011 Gray=0b00010010010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 227=0b00011100100 Gray=0b00010010110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 228=0b00011100101 Gray=0b00010010111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 229=0b00011100110 Gray=0b00010010101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 230=0b00011100111 Gray=0b00010010100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 231=0b00011101000 Gray=0b00010011100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 232=0b00011101001 Gray=0b00010011101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 233=0b00011101010 Gray=0b00010011111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 234=0b00011101011 Gray=0b00010011110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 235=0b00011101100 Gray=0b00010011010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 236=0b00011101101 Gray=0b00010011011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 237=0b00011101110 Gray=0b00010011001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 238=0b00011101111 Gray=0b00010011000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 239=0b00011110000 Gray=0b00010001000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 240=0b00011110001 Gray=0b00010001001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 241=0b00011110010 Gray=0b00010001011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 242=0b00011110011 Gray=0b00010001010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 243=0b00011110100 Gray=0b00010001110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 244=0b00011110101 Gray=0b00010001111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 245=0b00011110110 Gray=0b00010001101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 246=0b00011110111 Gray=0b00010001100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 247=0b00011111000 Gray=0b00010000100 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 248=0b00011111001 Gray=0b00010000101 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 249=0b00011111010 Gray=0b00010000111 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 250=0b00011111011 Gray=0b00010000110 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 251=0b00011111100 Gray=0b00010000010 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 252=0b00011111101 Gray=0b00010000011 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 253=0b00011111110 Gray=0b00010000001 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 254=0b00011111111 Gray=0b00010000000 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 255=0b00100000000 Gray=0b00110000000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 256=0b00100000001 Gray=0b00110000001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 257=0b00100000010 Gray=0b00110000011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 258=0b00100000011 Gray=0b00110000010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 259=0b00100000100 Gray=0b00110000110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 260=0b00100000101 Gray=0b00110000111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 261=0b00100000110 Gray=0b00110000101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 262=0b00100000111 Gray=0b00110000100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 263=0b00100001000 Gray=0b00110001100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 264=0b00100001001 Gray=0b00110001101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 265=0b00100001010 Gray=0b00110001111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 266=0b00100001011 Gray=0b00110001110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 267=0b00100001100 Gray=0b00110001010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 268=0b00100001101 Gray=0b00110001011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 269=0b00100001110 Gray=0b00110001001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 270=0b00100001111 Gray=0b00110001000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 271=0b00100010000 Gray=0b00110011000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 272=0b00100010001 Gray=0b00110011001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 273=0b00100010010 Gray=0b00110011011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 274=0b00100010011 Gray=0b00110011010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 275=0b00100010100 Gray=0b00110011110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 276=0b00100010101 Gray=0b00110011111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 277=0b00100010110 Gray=0b00110011101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 278=0b00100010111 Gray=0b00110011100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 279=0b00100011000 Gray=0b00110010100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 280=0b00100011001 Gray=0b00110010101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 281=0b00100011010 Gray=0b00110010111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 282=0b00100011011 Gray=0b00110010110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 283=0b00100011100 Gray=0b00110010010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 284=0b00100011101 Gray=0b00110010011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 285=0b00100011110 Gray=0b00110010001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 286=0b00100011111 Gray=0b00110010000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 287=0b00100100000 Gray=0b00110110000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 288=0b00100100001 Gray=0b00110110001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 289=0b00100100010 Gray=0b00110110011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 290=0b00100100011 Gray=0b00110110010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 291=0b00100100100 Gray=0b00110110110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 292=0b00100100101 Gray=0b00110110111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 293=0b00100100110 Gray=0b00110110101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 294=0b00100100111 Gray=0b00110110100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 295=0b00100101000 Gray=0b00110111100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 296=0b00100101001 Gray=0b00110111101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 297=0b00100101010 Gray=0b00110111111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 298=0b00100101011 Gray=0b00110111110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 299=0b00100101100 Gray=0b00110111010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 300=0b00100101101 Gray=0b00110111011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 301=0b00100101110 Gray=0b00110111001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 302=0b00100101111 Gray=0b00110111000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 303=0b00100110000 Gray=0b00110101000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 304=0b00100110001 Gray=0b00110101001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 305=0b00100110010 Gray=0b00110101011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 306=0b00100110011 Gray=0b00110101010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 307=0b00100110100 Gray=0b00110101110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 308=0b00100110101 Gray=0b00110101111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 309=0b00100110110 Gray=0b00110101101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 310=0b00100110111 Gray=0b00110101100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 311=0b00100111000 Gray=0b00110100100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 312=0b00100111001 Gray=0b00110100101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 313=0b00100111010 Gray=0b00110100111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 314=0b00100111011 Gray=0b00110100110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 315=0b00100111100 Gray=0b00110100010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 316=0b00100111101 Gray=0b00110100011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 317=0b00100111110 Gray=0b00110100001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 318=0b00100111111 Gray=0b00110100000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 319=0b00101000000 Gray=0b00111100000 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 320=0b00101000001 Gray=0b00111100001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 321=0b00101000010 Gray=0b00111100011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 322=0b00101000011 Gray=0b00111100010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 323=0b00101000100 Gray=0b00111100110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 324=0b00101000101 Gray=0b00111100111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 325=0b00101000110 Gray=0b00111100101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 326=0b00101000111 Gray=0b00111100100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 327=0b00101001000 Gray=0b00111101100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 328=0b00101001001 Gray=0b00111101101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 329=0b00101001010 Gray=0b00111101111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 330=0b00101001011 Gray=0b00111101110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 331=0b00101001100 Gray=0b00111101010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 332=0b00101001101 Gray=0b00111101011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 333=0b00101001110 Gray=0b00111101001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 334=0b00101001111 Gray=0b00111101000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 335=0b00101010000 Gray=0b00111111000 Rel Eta,Phi=3,7 Expect 6 B$ Linear= 336=0b00101010001 Gray=0b00111111001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 337=0b00101010010 Gray=0b00111111011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 338=0b00101010011 Gray=0b00111111010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 339=0b00101010100 Gray=0b00111111110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 340=0b00101010101 Gray=0b00111111111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 341=0b00101010110 Gray=0b00111111101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 342=0b00101010111 Gray=0b00111111100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 343=0b00101011000 Gray=0b00111110100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 344=0b00101011001 Gray=0b00111110101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 345=0b00101011010 Gray=0b00111110111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 346=0b00101011011 Gray=0b00111110110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 347=0b00101011100 Gray=0b00111110010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 348=0b00101011101 Gray=0b00111110011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 349=0b00101011110 Gray=0b00111110001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 350=0b00101011111 Gray=0b00111110000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 351=0b00101100000 Gray=0b00111010000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 352=0b00101100001 Gray=0b00111010001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 353=0b00101100010 Gray=0b00111010011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 354=0b00101100011 Gray=0b00111010010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 355=0b00101100100 Gray=0b00111010110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 356=0b00101100101 Gray=0b00111010111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 357=0b00101100110 Gray=0b00111010101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 358=0b00101100111 Gray=0b00111010100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 359=0b00101101000 Gray=0b00111011100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 360=0b00101101001 Gray=0b00111011101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 361=0b00101101010 Gray=0b00111011111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 362=0b00101101011 Gray=0b00111011110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 363=0b00101101100 Gray=0b00111011010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 364=0b00101101101 Gray=0b00111011011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 365=0b00101101110 Gray=0b00111011001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 366=0b00101101111 Gray=0b00111011000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 367=0b00101110000 Gray=0b00111001000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 368=0b00101110001 Gray=0b00111001001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 369=0b00101110010 Gray=0b00111001011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 370=0b00101110011 Gray=0b00111001010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 371=0b00101110100 Gray=0b00111001110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 372=0b00101110101 Gray=0b00111001111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 373=0b00101110110 Gray=0b00111001101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 374=0b00101110111 Gray=0b00111001100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 375=0b00101111000 Gray=0b00111000100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 376=0b00101111001 Gray=0b00111000101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 377=0b00101111010 Gray=0b00111000111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 378=0b00101111011 Gray=0b00111000110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 379=0b00101111100 Gray=0b00111000010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 380=0b00101111101 Gray=0b00111000011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 381=0b00101111110 Gray=0b00111000001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 382=0b00101111111 Gray=0b00111000000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 383=0b00110000000 Gray=0b00101000000 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 384=0b00110000001 Gray=0b00101000001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 385=0b00110000010 Gray=0b00101000011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 386=0b00110000011 Gray=0b00101000010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 387=0b00110000100 Gray=0b00101000110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 388=0b00110000101 Gray=0b00101000111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 389=0b00110000110 Gray=0b00101000101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 390=0b00110000111 Gray=0b00101000100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 391=0b00110001000 Gray=0b00101001100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 392=0b00110001001 Gray=0b00101001101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 393=0b00110001010 Gray=0b00101001111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 394=0b00110001011 Gray=0b00101001110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 395=0b00110001100 Gray=0b00101001010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 396=0b00110001101 Gray=0b00101001011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 397=0b00110001110 Gray=0b00101001001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 398=0b00110001111 Gray=0b00101001000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 399=0b00110010000 Gray=0b00101011000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 400=0b00110010001 Gray=0b00101011001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 401=0b00110010010 Gray=0b00101011011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 402=0b00110010011 Gray=0b00101011010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 403=0b00110010100 Gray=0b00101011110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 404=0b00110010101 Gray=0b00101011111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 405=0b00110010110 Gray=0b00101011101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 406=0b00110010111 Gray=0b00101011100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 407=0b00110011000 Gray=0b00101010100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 408=0b00110011001 Gray=0b00101010101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 409=0b00110011010 Gray=0b00101010111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 410=0b00110011011 Gray=0b00101010110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 411=0b00110011100 Gray=0b00101010010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 412=0b00110011101 Gray=0b00101010011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 413=0b00110011110 Gray=0b00101010001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 414=0b00110011111 Gray=0b00101010000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 415=0b00110100000 Gray=0b00101110000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 416=0b00110100001 Gray=0b00101110001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 417=0b00110100010 Gray=0b00101110011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 418=0b00110100011 Gray=0b00101110010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 419=0b00110100100 Gray=0b00101110110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 420=0b00110100101 Gray=0b00101110111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 421=0b00110100110 Gray=0b00101110101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 422=0b00110100111 Gray=0b00101110100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 423=0b00110101000 Gray=0b00101111100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 424=0b00110101001 Gray=0b00101111101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 425=0b00110101010 Gray=0b00101111111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 426=0b00110101011 Gray=0b00101111110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 427=0b00110101100 Gray=0b00101111010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 428=0b00110101101 Gray=0b00101111011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 429=0b00110101110 Gray=0b00101111001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 430=0b00110101111 Gray=0b00101111000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 431=0b00110110000 Gray=0b00101101000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 432=0b00110110001 Gray=0b00101101001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 433=0b00110110010 Gray=0b00101101011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 434=0b00110110011 Gray=0b00101101010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 435=0b00110110100 Gray=0b00101101110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 436=0b00110110101 Gray=0b00101101111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 437=0b00110110110 Gray=0b00101101101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 438=0b00110110111 Gray=0b00101101100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 439=0b00110111000 Gray=0b00101100100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 440=0b00110111001 Gray=0b00101100101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 441=0b00110111010 Gray=0b00101100111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 442=0b00110111011 Gray=0b00101100110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 443=0b00110111100 Gray=0b00101100010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 444=0b00110111101 Gray=0b00101100011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 445=0b00110111110 Gray=0b00101100001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 446=0b00110111111 Gray=0b00101100000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 447=0b00111000000 Gray=0b00100100000 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 448=0b00111000001 Gray=0b00100100001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 449=0b00111000010 Gray=0b00100100011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 450=0b00111000011 Gray=0b00100100010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 451=0b00111000100 Gray=0b00100100110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 452=0b00111000101 Gray=0b00100100111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 453=0b00111000110 Gray=0b00100100101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 454=0b00111000111 Gray=0b00100100100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 455=0b00111001000 Gray=0b00100101100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 456=0b00111001001 Gray=0b00100101101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 457=0b00111001010 Gray=0b00100101111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 458=0b00111001011 Gray=0b00100101110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 459=0b00111001100 Gray=0b00100101010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 460=0b00111001101 Gray=0b00100101011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 461=0b00111001110 Gray=0b00100101001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 462=0b00111001111 Gray=0b00100101000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 463=0b00111010000 Gray=0b00100111000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 464=0b00111010001 Gray=0b00100111001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 465=0b00111010010 Gray=0b00100111011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 466=0b00111010011 Gray=0b00100111010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 467=0b00111010100 Gray=0b00100111110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 468=0b00111010101 Gray=0b00100111111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 469=0b00111010110 Gray=0b00100111101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 470=0b00111010111 Gray=0b00100111100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 471=0b00111011000 Gray=0b00100110100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 472=0b00111011001 Gray=0b00100110101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 473=0b00111011010 Gray=0b00100110111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 474=0b00111011011 Gray=0b00100110110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 475=0b00111011100 Gray=0b00100110010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 476=0b00111011101 Gray=0b00100110011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 477=0b00111011110 Gray=0b00100110001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 478=0b00111011111 Gray=0b00100110000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 479=0b00111100000 Gray=0b00100010000 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 480=0b00111100001 Gray=0b00100010001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 481=0b00111100010 Gray=0b00100010011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 482=0b00111100011 Gray=0b00100010010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 483=0b00111100100 Gray=0b00100010110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 484=0b00111100101 Gray=0b00100010111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 485=0b00111100110 Gray=0b00100010101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 486=0b00111100111 Gray=0b00100010100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 487=0b00111101000 Gray=0b00100011100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 488=0b00111101001 Gray=0b00100011101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 489=0b00111101010 Gray=0b00100011111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 490=0b00111101011 Gray=0b00100011110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 491=0b00111101100 Gray=0b00100011010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 492=0b00111101101 Gray=0b00100011011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 493=0b00111101110 Gray=0b00100011001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 494=0b00111101111 Gray=0b00100011000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 495=0b00111110000 Gray=0b00100001000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 496=0b00111110001 Gray=0b00100001001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 497=0b00111110010 Gray=0b00100001011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 498=0b00111110011 Gray=0b00100001010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 499=0b00111110100 Gray=0b00100001110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 500=0b00111110101 Gray=0b00100001111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 501=0b00111110110 Gray=0b00100001101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 502=0b00111110111 Gray=0b00100001100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 503=0b00111111000 Gray=0b00100000100 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 504=0b00111111001 Gray=0b00100000101 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 505=0b00111111010 Gray=0b00100000111 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 506=0b00111111011 Gray=0b00100000110 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 507=0b00111111100 Gray=0b00100000010 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 508=0b00111111101 Gray=0b00100000011 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 509=0b00111111110 Gray=0b00100000001 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 510=0b00111111111 Gray=0b00100000000 Rel Eta,Phi=3,5 Expect 1 B$ Linear= 511=0b10000000000 Gray=0b10100000000 Rel Eta,Phi=3,2 Expect 2 B$ Linear= 512=0b10000000001 Gray=0b10100000001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 513=0b10000000010 Gray=0b10100000011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 514=0b10000000011 Gray=0b10100000010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 515=0b10000000100 Gray=0b10100000110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 516=0b10000000101 Gray=0b10100000111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 517=0b10000000110 Gray=0b10100000101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 518=0b10000000111 Gray=0b10100000100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 519=0b10000001000 Gray=0b10100001100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 520=0b10000001001 Gray=0b10100001101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 521=0b10000001010 Gray=0b10100001111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 522=0b10000001011 Gray=0b10100001110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 523=0b10000001100 Gray=0b10100001010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 524=0b10000001101 Gray=0b10100001011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 525=0b10000001110 Gray=0b10100001001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 526=0b10000001111 Gray=0b10100001000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 527=0b10000010000 Gray=0b10100011000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 528=0b10000010001 Gray=0b10100011001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 529=0b10000010010 Gray=0b10100011011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 530=0b10000010011 Gray=0b10100011010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 531=0b10000010100 Gray=0b10100011110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 532=0b10000010101 Gray=0b10100011111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 533=0b10000010110 Gray=0b10100011101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 534=0b10000010111 Gray=0b10100011100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 535=0b10000011000 Gray=0b10100010100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 536=0b10000011001 Gray=0b10100010101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 537=0b10000011010 Gray=0b10100010111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 538=0b10000011011 Gray=0b10100010110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 539=0b10000011100 Gray=0b10100010010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 540=0b10000011101 Gray=0b10100010011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 541=0b10000011110 Gray=0b10100010001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 542=0b10000011111 Gray=0b10100010000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 543=0b10000100000 Gray=0b10100110000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 544=0b10000100001 Gray=0b10100110001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 545=0b10000100010 Gray=0b10100110011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 546=0b10000100011 Gray=0b10100110010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 547=0b10000100100 Gray=0b10100110110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 548=0b10000100101 Gray=0b10100110111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 549=0b10000100110 Gray=0b10100110101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 550=0b10000100111 Gray=0b10100110100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 551=0b10000101000 Gray=0b10100111100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 552=0b10000101001 Gray=0b10100111101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 553=0b10000101010 Gray=0b10100111111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 554=0b10000101011 Gray=0b10100111110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 555=0b10000101100 Gray=0b10100111010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 556=0b10000101101 Gray=0b10100111011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 557=0b10000101110 Gray=0b10100111001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 558=0b10000101111 Gray=0b10100111000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 559=0b10000110000 Gray=0b10100101000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 560=0b10000110001 Gray=0b10100101001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 561=0b10000110010 Gray=0b10100101011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 562=0b10000110011 Gray=0b10100101010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 563=0b10000110100 Gray=0b10100101110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 564=0b10000110101 Gray=0b10100101111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 565=0b10000110110 Gray=0b10100101101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 566=0b10000110111 Gray=0b10100101100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 567=0b10000111000 Gray=0b10100100100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 568=0b10000111001 Gray=0b10100100101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 569=0b10000111010 Gray=0b10100100111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 570=0b10000111011 Gray=0b10100100110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 571=0b10000111100 Gray=0b10100100010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 572=0b10000111101 Gray=0b10100100011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 573=0b10000111110 Gray=0b10100100001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 574=0b10000111111 Gray=0b10100100000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 575=0b10001000000 Gray=0b10101100000 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 576=0b10001000001 Gray=0b10101100001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 577=0b10001000010 Gray=0b10101100011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 578=0b10001000011 Gray=0b10101100010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 579=0b10001000100 Gray=0b10101100110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 580=0b10001000101 Gray=0b10101100111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 581=0b10001000110 Gray=0b10101100101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 582=0b10001000111 Gray=0b10101100100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 583=0b10001001000 Gray=0b10101101100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 584=0b10001001001 Gray=0b10101101101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 585=0b10001001010 Gray=0b10101101111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 586=0b10001001011 Gray=0b10101101110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 587=0b10001001100 Gray=0b10101101010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 588=0b10001001101 Gray=0b10101101011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 589=0b10001001110 Gray=0b10101101001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 590=0b10001001111 Gray=0b10101101000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 591=0b10001010000 Gray=0b10101111000 Rel Eta,Phi=3,7 Expect 6 B$ Linear= 592=0b10001010001 Gray=0b10101111001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 593=0b10001010010 Gray=0b10101111011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 594=0b10001010011 Gray=0b10101111010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 595=0b10001010100 Gray=0b10101111110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 596=0b10001010101 Gray=0b10101111111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 597=0b10001010110 Gray=0b10101111101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 598=0b10001010111 Gray=0b10101111100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 599=0b10001011000 Gray=0b10101110100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 600=0b10001011001 Gray=0b10101110101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 601=0b10001011010 Gray=0b10101110111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 602=0b10001011011 Gray=0b10101110110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 603=0b10001011100 Gray=0b10101110010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 604=0b10001011101 Gray=0b10101110011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 605=0b10001011110 Gray=0b10101110001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 606=0b10001011111 Gray=0b10101110000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 607=0b10001100000 Gray=0b10101010000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 608=0b10001100001 Gray=0b10101010001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 609=0b10001100010 Gray=0b10101010011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 610=0b10001100011 Gray=0b10101010010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 611=0b10001100100 Gray=0b10101010110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 612=0b10001100101 Gray=0b10101010111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 613=0b10001100110 Gray=0b10101010101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 614=0b10001100111 Gray=0b10101010100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 615=0b10001101000 Gray=0b10101011100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 616=0b10001101001 Gray=0b10101011101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 617=0b10001101010 Gray=0b10101011111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 618=0b10001101011 Gray=0b10101011110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 619=0b10001101100 Gray=0b10101011010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 620=0b10001101101 Gray=0b10101011011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 621=0b10001101110 Gray=0b10101011001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 622=0b10001101111 Gray=0b10101011000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 623=0b10001110000 Gray=0b10101001000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 624=0b10001110001 Gray=0b10101001001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 625=0b10001110010 Gray=0b10101001011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 626=0b10001110011 Gray=0b10101001010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 627=0b10001110100 Gray=0b10101001110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 628=0b10001110101 Gray=0b10101001111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 629=0b10001110110 Gray=0b10101001101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 630=0b10001110111 Gray=0b10101001100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 631=0b10001111000 Gray=0b10101000100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 632=0b10001111001 Gray=0b10101000101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 633=0b10001111010 Gray=0b10101000111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 634=0b10001111011 Gray=0b10101000110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 635=0b10001111100 Gray=0b10101000010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 636=0b10001111101 Gray=0b10101000011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 637=0b10001111110 Gray=0b10101000001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 638=0b10001111111 Gray=0b10101000000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 639=0b10010000000 Gray=0b10111000000 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 640=0b10010000001 Gray=0b10111000001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 641=0b10010000010 Gray=0b10111000011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 642=0b10010000011 Gray=0b10111000010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 643=0b10010000100 Gray=0b10111000110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 644=0b10010000101 Gray=0b10111000111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 645=0b10010000110 Gray=0b10111000101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 646=0b10010000111 Gray=0b10111000100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 647=0b10010001000 Gray=0b10111001100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 648=0b10010001001 Gray=0b10111001101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 649=0b10010001010 Gray=0b10111001111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 650=0b10010001011 Gray=0b10111001110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 651=0b10010001100 Gray=0b10111001010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 652=0b10010001101 Gray=0b10111001011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 653=0b10010001110 Gray=0b10111001001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 654=0b10010001111 Gray=0b10111001000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 655=0b10010010000 Gray=0b10111011000 Rel Eta,Phi=3,7 Expect 6 B$ Linear= 656=0b10010010001 Gray=0b10111011001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 657=0b10010010010 Gray=0b10111011011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 658=0b10010010011 Gray=0b10111011010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 659=0b10010010100 Gray=0b10111011110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 660=0b10010010101 Gray=0b10111011111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 661=0b10010010110 Gray=0b10111011101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 662=0b10010010111 Gray=0b10111011100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 663=0b10010011000 Gray=0b10111010100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 664=0b10010011001 Gray=0b10111010101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 665=0b10010011010 Gray=0b10111010111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 666=0b10010011011 Gray=0b10111010110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 667=0b10010011100 Gray=0b10111010010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 668=0b10010011101 Gray=0b10111010011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 669=0b10010011110 Gray=0b10111010001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 670=0b10010011111 Gray=0b10111010000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 671=0b10010100000 Gray=0b10111110000 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 672=0b10010100001 Gray=0b10111110001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 673=0b10010100010 Gray=0b10111110011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 674=0b10010100011 Gray=0b10111110010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 675=0b10010100100 Gray=0b10111110110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 676=0b10010100101 Gray=0b10111110111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 677=0b10010100110 Gray=0b10111110101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 678=0b10010100111 Gray=0b10111110100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 679=0b10010101000 Gray=0b10111111100 Rel Eta,Phi=3,6 Expect 8 B$ Linear= 680=0b10010101001 Gray=0b10111111101 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 681=0b10010101010 Gray=0b10111111111 Rel Eta,Phi=3,4 Expect 10 B$ Linear= 682=0b10010101011 Gray=0b10111111110 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 683=0b10010101100 Gray=0b10111111010 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 684=0b10010101101 Gray=0b10111111011 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 685=0b10010101110 Gray=0b10111111001 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 686=0b10010101111 Gray=0b10111111000 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 687=0b10010110000 Gray=0b10111101000 Rel Eta,Phi=3,7 Expect 6 B$ Linear= 688=0b10010110001 Gray=0b10111101001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 689=0b10010110010 Gray=0b10111101011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 690=0b10010110011 Gray=0b10111101010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 691=0b10010110100 Gray=0b10111101110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 692=0b10010110101 Gray=0b10111101111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 693=0b10010110110 Gray=0b10111101101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 694=0b10010110111 Gray=0b10111101100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 695=0b10010111000 Gray=0b10111100100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 696=0b10010111001 Gray=0b10111100101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 697=0b10010111010 Gray=0b10111100111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 698=0b10010111011 Gray=0b10111100110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 699=0b10010111100 Gray=0b10111100010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 700=0b10010111101 Gray=0b10111100011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 701=0b10010111110 Gray=0b10111100001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 702=0b10010111111 Gray=0b10111100000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 703=0b10011000000 Gray=0b10110100000 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 704=0b10011000001 Gray=0b10110100001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 705=0b10011000010 Gray=0b10110100011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 706=0b10011000011 Gray=0b10110100010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 707=0b10011000100 Gray=0b10110100110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 708=0b10011000101 Gray=0b10110100111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 709=0b10011000110 Gray=0b10110100101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 710=0b10011000111 Gray=0b10110100100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 711=0b10011001000 Gray=0b10110101100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 712=0b10011001001 Gray=0b10110101101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 713=0b10011001010 Gray=0b10110101111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 714=0b10011001011 Gray=0b10110101110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 715=0b10011001100 Gray=0b10110101010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 716=0b10011001101 Gray=0b10110101011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 717=0b10011001110 Gray=0b10110101001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 718=0b10011001111 Gray=0b10110101000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 719=0b10011010000 Gray=0b10110111000 Rel Eta,Phi=3,7 Expect 6 B$ Linear= 720=0b10011010001 Gray=0b10110111001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 721=0b10011010010 Gray=0b10110111011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 722=0b10011010011 Gray=0b10110111010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 723=0b10011010100 Gray=0b10110111110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 724=0b10011010101 Gray=0b10110111111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 725=0b10011010110 Gray=0b10110111101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 726=0b10011010111 Gray=0b10110111100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 727=0b10011011000 Gray=0b10110110100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 728=0b10011011001 Gray=0b10110110101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 729=0b10011011010 Gray=0b10110110111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 730=0b10011011011 Gray=0b10110110110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 731=0b10011011100 Gray=0b10110110010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 732=0b10011011101 Gray=0b10110110011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 733=0b10011011110 Gray=0b10110110001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 734=0b10011011111 Gray=0b10110110000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 735=0b10011100000 Gray=0b10110010000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 736=0b10011100001 Gray=0b10110010001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 737=0b10011100010 Gray=0b10110010011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 738=0b10011100011 Gray=0b10110010010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 739=0b10011100100 Gray=0b10110010110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 740=0b10011100101 Gray=0b10110010111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 741=0b10011100110 Gray=0b10110010101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 742=0b10011100111 Gray=0b10110010100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 743=0b10011101000 Gray=0b10110011100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 744=0b10011101001 Gray=0b10110011101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 745=0b10011101010 Gray=0b10110011111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 746=0b10011101011 Gray=0b10110011110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 747=0b10011101100 Gray=0b10110011010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 748=0b10011101101 Gray=0b10110011011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 749=0b10011101110 Gray=0b10110011001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 750=0b10011101111 Gray=0b10110011000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 751=0b10011110000 Gray=0b10110001000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 752=0b10011110001 Gray=0b10110001001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 753=0b10011110010 Gray=0b10110001011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 754=0b10011110011 Gray=0b10110001010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 755=0b10011110100 Gray=0b10110001110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 756=0b10011110101 Gray=0b10110001111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 757=0b10011110110 Gray=0b10110001101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 758=0b10011110111 Gray=0b10110001100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 759=0b10011111000 Gray=0b10110000100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 760=0b10011111001 Gray=0b10110000101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 761=0b10011111010 Gray=0b10110000111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 762=0b10011111011 Gray=0b10110000110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 763=0b10011111100 Gray=0b10110000010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 764=0b10011111101 Gray=0b10110000011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 765=0b10011111110 Gray=0b10110000001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 766=0b10011111111 Gray=0b10110000000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 767=0b10100000000 Gray=0b10010000000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 768=0b10100000001 Gray=0b10010000001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 769=0b10100000010 Gray=0b10010000011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 770=0b10100000011 Gray=0b10010000010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 771=0b10100000100 Gray=0b10010000110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 772=0b10100000101 Gray=0b10010000111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 773=0b10100000110 Gray=0b10010000101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 774=0b10100000111 Gray=0b10010000100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 775=0b10100001000 Gray=0b10010001100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 776=0b10100001001 Gray=0b10010001101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 777=0b10100001010 Gray=0b10010001111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 778=0b10100001011 Gray=0b10010001110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 779=0b10100001100 Gray=0b10010001010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 780=0b10100001101 Gray=0b10010001011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 781=0b10100001110 Gray=0b10010001001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 782=0b10100001111 Gray=0b10010001000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 783=0b10100010000 Gray=0b10010011000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 784=0b10100010001 Gray=0b10010011001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 785=0b10100010010 Gray=0b10010011011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 786=0b10100010011 Gray=0b10010011010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 787=0b10100010100 Gray=0b10010011110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 788=0b10100010101 Gray=0b10010011111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 789=0b10100010110 Gray=0b10010011101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 790=0b10100010111 Gray=0b10010011100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 791=0b10100011000 Gray=0b10010010100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 792=0b10100011001 Gray=0b10010010101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 793=0b10100011010 Gray=0b10010010111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 794=0b10100011011 Gray=0b10010010110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 795=0b10100011100 Gray=0b10010010010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 796=0b10100011101 Gray=0b10010010011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 797=0b10100011110 Gray=0b10010010001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 798=0b10100011111 Gray=0b10010010000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 799=0b10100100000 Gray=0b10010110000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 800=0b10100100001 Gray=0b10010110001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 801=0b10100100010 Gray=0b10010110011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 802=0b10100100011 Gray=0b10010110010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 803=0b10100100100 Gray=0b10010110110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 804=0b10100100101 Gray=0b10010110111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 805=0b10100100110 Gray=0b10010110101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 806=0b10100100111 Gray=0b10010110100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 807=0b10100101000 Gray=0b10010111100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 808=0b10100101001 Gray=0b10010111101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 809=0b10100101010 Gray=0b10010111111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 810=0b10100101011 Gray=0b10010111110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 811=0b10100101100 Gray=0b10010111010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 812=0b10100101101 Gray=0b10010111011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 813=0b10100101110 Gray=0b10010111001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 814=0b10100101111 Gray=0b10010111000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 815=0b10100110000 Gray=0b10010101000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 816=0b10100110001 Gray=0b10010101001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 817=0b10100110010 Gray=0b10010101011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 818=0b10100110011 Gray=0b10010101010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 819=0b10100110100 Gray=0b10010101110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 820=0b10100110101 Gray=0b10010101111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 821=0b10100110110 Gray=0b10010101101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 822=0b10100110111 Gray=0b10010101100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 823=0b10100111000 Gray=0b10010100100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 824=0b10100111001 Gray=0b10010100101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 825=0b10100111010 Gray=0b10010100111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 826=0b10100111011 Gray=0b10010100110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 827=0b10100111100 Gray=0b10010100010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 828=0b10100111101 Gray=0b10010100011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 829=0b10100111110 Gray=0b10010100001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 830=0b10100111111 Gray=0b10010100000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 831=0b10101000000 Gray=0b10011100000 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 832=0b10101000001 Gray=0b10011100001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 833=0b10101000010 Gray=0b10011100011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 834=0b10101000011 Gray=0b10011100010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 835=0b10101000100 Gray=0b10011100110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 836=0b10101000101 Gray=0b10011100111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 837=0b10101000110 Gray=0b10011100101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 838=0b10101000111 Gray=0b10011100100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 839=0b10101001000 Gray=0b10011101100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 840=0b10101001001 Gray=0b10011101101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 841=0b10101001010 Gray=0b10011101111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 842=0b10101001011 Gray=0b10011101110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 843=0b10101001100 Gray=0b10011101010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 844=0b10101001101 Gray=0b10011101011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 845=0b10101001110 Gray=0b10011101001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 846=0b10101001111 Gray=0b10011101000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 847=0b10101010000 Gray=0b10011111000 Rel Eta,Phi=3,7 Expect 6 B$ Linear= 848=0b10101010001 Gray=0b10011111001 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 849=0b10101010010 Gray=0b10011111011 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 850=0b10101010011 Gray=0b10011111010 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 851=0b10101010100 Gray=0b10011111110 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 852=0b10101010101 Gray=0b10011111111 Rel Eta,Phi=3,5 Expect 9 B$ Linear= 853=0b10101010110 Gray=0b10011111101 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 854=0b10101010111 Gray=0b10011111100 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 855=0b10101011000 Gray=0b10011110100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 856=0b10101011001 Gray=0b10011110101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 857=0b10101011010 Gray=0b10011110111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 858=0b10101011011 Gray=0b10011110110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 859=0b10101011100 Gray=0b10011110010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 860=0b10101011101 Gray=0b10011110011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 861=0b10101011110 Gray=0b10011110001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 862=0b10101011111 Gray=0b10011110000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 863=0b10101100000 Gray=0b10011010000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 864=0b10101100001 Gray=0b10011010001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 865=0b10101100010 Gray=0b10011010011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 866=0b10101100011 Gray=0b10011010010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 867=0b10101100100 Gray=0b10011010110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 868=0b10101100101 Gray=0b10011010111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 869=0b10101100110 Gray=0b10011010101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 870=0b10101100111 Gray=0b10011010100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 871=0b10101101000 Gray=0b10011011100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 872=0b10101101001 Gray=0b10011011101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 873=0b10101101010 Gray=0b10011011111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 874=0b10101101011 Gray=0b10011011110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 875=0b10101101100 Gray=0b10011011010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 876=0b10101101101 Gray=0b10011011011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 877=0b10101101110 Gray=0b10011011001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 878=0b10101101111 Gray=0b10011011000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 879=0b10101110000 Gray=0b10011001000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 880=0b10101110001 Gray=0b10011001001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 881=0b10101110010 Gray=0b10011001011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 882=0b10101110011 Gray=0b10011001010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 883=0b10101110100 Gray=0b10011001110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 884=0b10101110101 Gray=0b10011001111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 885=0b10101110110 Gray=0b10011001101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 886=0b10101110111 Gray=0b10011001100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 887=0b10101111000 Gray=0b10011000100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 888=0b10101111001 Gray=0b10011000101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 889=0b10101111010 Gray=0b10011000111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 890=0b10101111011 Gray=0b10011000110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 891=0b10101111100 Gray=0b10011000010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 892=0b10101111101 Gray=0b10011000011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 893=0b10101111110 Gray=0b10011000001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 894=0b10101111111 Gray=0b10011000000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 895=0b10110000000 Gray=0b10001000000 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 896=0b10110000001 Gray=0b10001000001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 897=0b10110000010 Gray=0b10001000011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 898=0b10110000011 Gray=0b10001000010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 899=0b10110000100 Gray=0b10001000110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 900=0b10110000101 Gray=0b10001000111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 901=0b10110000110 Gray=0b10001000101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 902=0b10110000111 Gray=0b10001000100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 903=0b10110001000 Gray=0b10001001100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 904=0b10110001001 Gray=0b10001001101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 905=0b10110001010 Gray=0b10001001111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 906=0b10110001011 Gray=0b10001001110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 907=0b10110001100 Gray=0b10001001010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 908=0b10110001101 Gray=0b10001001011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 909=0b10110001110 Gray=0b10001001001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 910=0b10110001111 Gray=0b10001001000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 911=0b10110010000 Gray=0b10001011000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 912=0b10110010001 Gray=0b10001011001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 913=0b10110010010 Gray=0b10001011011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 914=0b10110010011 Gray=0b10001011010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 915=0b10110010100 Gray=0b10001011110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 916=0b10110010101 Gray=0b10001011111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 917=0b10110010110 Gray=0b10001011101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 918=0b10110010111 Gray=0b10001011100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 919=0b10110011000 Gray=0b10001010100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 920=0b10110011001 Gray=0b10001010101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 921=0b10110011010 Gray=0b10001010111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 922=0b10110011011 Gray=0b10001010110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 923=0b10110011100 Gray=0b10001010010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 924=0b10110011101 Gray=0b10001010011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 925=0b10110011110 Gray=0b10001010001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 926=0b10110011111 Gray=0b10001010000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 927=0b10110100000 Gray=0b10001110000 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 928=0b10110100001 Gray=0b10001110001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 929=0b10110100010 Gray=0b10001110011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 930=0b10110100011 Gray=0b10001110010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 931=0b10110100100 Gray=0b10001110110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 932=0b10110100101 Gray=0b10001110111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 933=0b10110100110 Gray=0b10001110101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 934=0b10110100111 Gray=0b10001110100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 935=0b10110101000 Gray=0b10001111100 Rel Eta,Phi=3,6 Expect 6 B$ Linear= 936=0b10110101001 Gray=0b10001111101 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 937=0b10110101010 Gray=0b10001111111 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 938=0b10110101011 Gray=0b10001111110 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 939=0b10110101100 Gray=0b10001111010 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 940=0b10110101101 Gray=0b10001111011 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 941=0b10110101110 Gray=0b10001111001 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 942=0b10110101111 Gray=0b10001111000 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 943=0b10110110000 Gray=0b10001101000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 944=0b10110110001 Gray=0b10001101001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 945=0b10110110010 Gray=0b10001101011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 946=0b10110110011 Gray=0b10001101010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 947=0b10110110100 Gray=0b10001101110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 948=0b10110110101 Gray=0b10001101111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 949=0b10110110110 Gray=0b10001101101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 950=0b10110110111 Gray=0b10001101100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 951=0b10110111000 Gray=0b10001100100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 952=0b10110111001 Gray=0b10001100101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 953=0b10110111010 Gray=0b10001100111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 954=0b10110111011 Gray=0b10001100110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 955=0b10110111100 Gray=0b10001100010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 956=0b10110111101 Gray=0b10001100011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 957=0b10110111110 Gray=0b10001100001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 958=0b10110111111 Gray=0b10001100000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 959=0b10111000000 Gray=0b10000100000 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 960=0b10111000001 Gray=0b10000100001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 961=0b10111000010 Gray=0b10000100011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 962=0b10111000011 Gray=0b10000100010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 963=0b10111000100 Gray=0b10000100110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 964=0b10111000101 Gray=0b10000100111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 965=0b10111000110 Gray=0b10000100101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 966=0b10111000111 Gray=0b10000100100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 967=0b10111001000 Gray=0b10000101100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 968=0b10111001001 Gray=0b10000101101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 969=0b10111001010 Gray=0b10000101111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 970=0b10111001011 Gray=0b10000101110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 971=0b10111001100 Gray=0b10000101010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 972=0b10111001101 Gray=0b10000101011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 973=0b10111001110 Gray=0b10000101001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 974=0b10111001111 Gray=0b10000101000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 975=0b10111010000 Gray=0b10000111000 Rel Eta,Phi=3,7 Expect 4 B$ Linear= 976=0b10111010001 Gray=0b10000111001 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 977=0b10111010010 Gray=0b10000111011 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 978=0b10111010011 Gray=0b10000111010 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 979=0b10111010100 Gray=0b10000111110 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 980=0b10111010101 Gray=0b10000111111 Rel Eta,Phi=3,5 Expect 7 B$ Linear= 981=0b10111010110 Gray=0b10000111101 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 982=0b10111010111 Gray=0b10000111100 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 983=0b10111011000 Gray=0b10000110100 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 984=0b10111011001 Gray=0b10000110101 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 985=0b10111011010 Gray=0b10000110111 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 986=0b10111011011 Gray=0b10000110110 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 987=0b10111011100 Gray=0b10000110010 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 988=0b10111011101 Gray=0b10000110011 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 989=0b10111011110 Gray=0b10000110001 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 990=0b10111011111 Gray=0b10000110000 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 991=0b10111100000 Gray=0b10000010000 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 992=0b10111100001 Gray=0b10000010001 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 993=0b10111100010 Gray=0b10000010011 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 994=0b10111100011 Gray=0b10000010010 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 995=0b10111100100 Gray=0b10000010110 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 996=0b10111100101 Gray=0b10000010111 Rel Eta,Phi=3,5 Expect 5 B$ Linear= 997=0b10111100110 Gray=0b10000010101 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 998=0b10111100111 Gray=0b10000010100 Rel Eta,Phi=3,5 Expect 3 B$ Linear= 999=0b10111101000 Gray=0b10000011100 Rel Eta,Phi=3,6 Expect 4 B$ Linear=1000=0b10111101001 Gray=0b10000011101 Rel Eta,Phi=3,5 Expect 5 B$ Linear=1001=0b10111101010 Gray=0b10000011111 Rel Eta,Phi=3,4 Expect 6 B$ Linear=1002=0b10111101011 Gray=0b10000011110 Rel Eta,Phi=3,5 Expect 5 B$ Linear=1003=0b10111101100 Gray=0b10000011010 Rel Eta,Phi=3,3 Expect 4 B$ Linear=1004=0b10111101101 Gray=0b10000011011 Rel Eta,Phi=3,5 Expect 5 B$ Linear=1005=0b10111101110 Gray=0b10000011001 Rel Eta,Phi=3,4 Expect 4 B$ Linear=1006=0b10111101111 Gray=0b10000011000 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1007=0b10111110000 Gray=0b10000001000 Rel Eta,Phi=3,7 Expect 2 B$ Linear=1008=0b10111110001 Gray=0b10000001001 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1009=0b10111110010 Gray=0b10000001011 Rel Eta,Phi=3,4 Expect 4 B$ Linear=1010=0b10111110011 Gray=0b10000001010 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1011=0b10111110100 Gray=0b10000001110 Rel Eta,Phi=3,3 Expect 4 B$ Linear=1012=0b10111110101 Gray=0b10000001111 Rel Eta,Phi=3,5 Expect 5 B$ Linear=1013=0b10111110110 Gray=0b10000001101 Rel Eta,Phi=3,4 Expect 4 B$ Linear=1014=0b10111110111 Gray=0b10000001100 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1015=0b10111111000 Gray=0b10000000100 Rel Eta,Phi=3,6 Expect 2 B$ Linear=1016=0b10111111001 Gray=0b10000000101 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1017=0b10111111010 Gray=0b10000000111 Rel Eta,Phi=3,4 Expect 4 B$ Linear=1018=0b10111111011 Gray=0b10000000110 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1019=0b10111111100 Gray=0b10000000010 Rel Eta,Phi=3,3 Expect 2 B$ Linear=1020=0b10111111101 Gray=0b10000000011 Rel Eta,Phi=3,5 Expect 3 B$ Linear=1021=0b10111111110 Gray=0b10000000001 Rel Eta,Phi=3,4 Expect 2 B$ Linear=1022=0b10111111111 Gray=0b10000000000 Rel Eta,Phi=3,5 Expect 1 B$ Linear=1023=0b10000000000 Gray=0b00000000000 Rel Eta,Phi=3,2 Expect 0 I$ Scanning Second Pass Prom B$ Linear= 0/ 0/ 1 Gray= 0/ 0/ 1 Rel Eta,Phi=0,7 Expect 1 B$ Linear= 0/ 0/ 2 Gray= 0/ 0/ 2 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 0/ 0/ 3 Gray= 0/ 0/ 3 Rel Eta,Phi=0,5 Expect 3 B$ Linear= 0/ 0/ 4 Gray= 0/ 0/ 4 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 0/ 0/ 5 Gray= 0/ 0/ 5 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 0/ 0/ 6 Gray= 0/ 0/ 6 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 0/ 0/ 7 Gray= 0/ 0/ 7 Rel Eta,Phi=0,1 Expect 7 B$ Linear= 0/ 0/ 8 Gray= 0/ 0/ 8 Rel Eta,Phi=0,0 Expect 8 B$ Linear= 0/ 0/ 9 Gray= 0/ 0/ 9 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 0/ 0/10 Gray= 0/ 0/10 Rel Eta,Phi=1,6 Expect 10 B$ Linear= 0/ 0/11 Gray= 0/ 0/11 Rel Eta,Phi=1,5 Expect 11 B$ Linear= 0/ 1/ 0 Gray= 0/ 1/11 Rel Eta,Phi=1,4 Expect 12 B$ Linear= 0/ 1/ 1 Gray= 0/ 1/10 Rel Eta,Phi=1,5 Expect 11 B$ Linear= 0/ 1/ 2 Gray= 0/ 1/ 9 Rel Eta,Phi=1,6 Expect 10 B$ Linear= 0/ 1/ 3 Gray= 0/ 1/ 8 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 0/ 1/ 4 Gray= 0/ 1/ 7 Rel Eta,Phi=0,0 Expect 8 B$ Linear= 0/ 1/ 5 Gray= 0/ 1/ 6 Rel Eta,Phi=0,1 Expect 7 B$ Linear= 0/ 1/ 6 Gray= 0/ 1/ 5 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 0/ 1/ 7 Gray= 0/ 1/ 4 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 0/ 1/ 8 Gray= 0/ 1/ 3 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 0/ 1/ 9 Gray= 0/ 1/ 2 Rel Eta,Phi=0,5 Expect 3 B$ Linear= 0/ 1/10 Gray= 0/ 1/ 1 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 0/ 1/11 Gray= 0/ 1/ 0 Rel Eta,Phi=0,7 Expect 1 B$ Linear= 0/ 2/ 0 Gray= 0/ 2/ 0 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 0/ 2/ 1 Gray= 0/ 2/ 1 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 0/ 2/ 2 Gray= 0/ 2/ 2 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 0/ 2/ 3 Gray= 0/ 2/ 3 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 0/ 2/ 4 Gray= 0/ 2/ 4 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 0/ 2/ 5 Gray= 0/ 2/ 5 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 0/ 2/ 6 Gray= 0/ 2/ 6 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 0/ 2/ 7 Gray= 0/ 2/ 7 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 0/ 2/ 8 Gray= 0/ 2/ 8 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 0/ 2/ 9 Gray= 0/ 2/ 9 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 0/ 2/10 Gray= 0/ 2/10 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 0/ 2/11 Gray= 0/ 2/11 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 0/ 3/ 0 Gray= 0/ 3/11 Rel Eta,Phi=1,2 Expect 14 B$ Linear= 0/ 3/ 1 Gray= 0/ 3/10 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 0/ 3/ 2 Gray= 0/ 3/ 9 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 0/ 3/ 3 Gray= 0/ 3/ 8 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 0/ 3/ 4 Gray= 0/ 3/ 7 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 0/ 3/ 5 Gray= 0/ 3/ 6 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 0/ 3/ 6 Gray= 0/ 3/ 5 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 0/ 3/ 7 Gray= 0/ 3/ 4 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 0/ 3/ 8 Gray= 0/ 3/ 3 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 0/ 3/ 9 Gray= 0/ 3/ 2 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 0/ 3/10 Gray= 0/ 3/ 1 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 0/ 3/11 Gray= 0/ 3/ 0 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 0/ 4/ 0 Gray= 0/ 4/ 0 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 0/ 4/ 1 Gray= 0/ 4/ 1 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 0/ 4/ 2 Gray= 0/ 4/ 2 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 0/ 4/ 3 Gray= 0/ 4/ 3 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 0/ 4/ 4 Gray= 0/ 4/ 4 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 0/ 4/ 5 Gray= 0/ 4/ 5 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 0/ 4/ 6 Gray= 0/ 4/ 6 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 0/ 4/ 7 Gray= 0/ 4/ 7 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 0/ 4/ 8 Gray= 0/ 4/ 8 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 0/ 4/ 9 Gray= 0/ 4/ 9 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 0/ 4/10 Gray= 0/ 4/10 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 0/ 4/11 Gray= 0/ 4/11 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 0/ 5/ 0 Gray= 0/ 5/11 Rel Eta,Phi=1,0 Expect 16 B$ Linear= 0/ 5/ 1 Gray= 0/ 5/10 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 0/ 5/ 2 Gray= 0/ 5/ 9 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 0/ 5/ 3 Gray= 0/ 5/ 8 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 0/ 5/ 4 Gray= 0/ 5/ 7 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 0/ 5/ 5 Gray= 0/ 5/ 6 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 0/ 5/ 6 Gray= 0/ 5/ 5 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 0/ 5/ 7 Gray= 0/ 5/ 4 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 0/ 5/ 8 Gray= 0/ 5/ 3 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 0/ 5/ 9 Gray= 0/ 5/ 2 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 0/ 5/10 Gray= 0/ 5/ 1 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 0/ 5/11 Gray= 0/ 5/ 0 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 0/ 6/ 0 Gray= 0/ 6/ 0 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 0/ 6/ 1 Gray= 0/ 6/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 0/ 6/ 2 Gray= 0/ 6/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 0/ 6/ 3 Gray= 0/ 6/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 0/ 6/ 4 Gray= 0/ 6/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 0/ 6/ 5 Gray= 0/ 6/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 0/ 6/ 6 Gray= 0/ 6/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 0/ 6/ 7 Gray= 0/ 6/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 0/ 6/ 8 Gray= 0/ 6/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 0/ 6/ 9 Gray= 0/ 6/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 0/ 6/10 Gray= 0/ 6/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 0/ 6/11 Gray= 0/ 6/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 0/ 7/ 0 Gray= 0/ 7/11 Rel Eta,Phi=2,6 Expect 18 B$ Linear= 0/ 7/ 1 Gray= 0/ 7/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 0/ 7/ 2 Gray= 0/ 7/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 0/ 7/ 3 Gray= 0/ 7/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 0/ 7/ 4 Gray= 0/ 7/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 0/ 7/ 5 Gray= 0/ 7/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 0/ 7/ 6 Gray= 0/ 7/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 0/ 7/ 7 Gray= 0/ 7/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 0/ 7/ 8 Gray= 0/ 7/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 0/ 7/ 9 Gray= 0/ 7/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 0/ 7/10 Gray= 0/ 7/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 0/ 7/11 Gray= 0/ 7/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 0/ 8/ 0 Gray= 0/ 8/ 0 Rel Eta,Phi=2,5 Expect 8 B$ Linear= 0/ 8/ 1 Gray= 0/ 8/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 0/ 8/ 2 Gray= 0/ 8/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 0/ 8/ 3 Gray= 0/ 8/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 0/ 8/ 4 Gray= 0/ 8/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 0/ 8/ 5 Gray= 0/ 8/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 0/ 8/ 6 Gray= 0/ 8/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 0/ 8/ 7 Gray= 0/ 8/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 0/ 8/ 8 Gray= 0/ 8/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 0/ 8/ 9 Gray= 0/ 8/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 0/ 8/10 Gray= 0/ 8/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 0/ 8/11 Gray= 0/ 8/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 0/ 9/ 0 Gray= 0/ 9/11 Rel Eta,Phi=2,4 Expect 20 B$ Linear= 0/ 9/ 1 Gray= 0/ 9/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 0/ 9/ 2 Gray= 0/ 9/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 0/ 9/ 3 Gray= 0/ 9/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 0/ 9/ 4 Gray= 0/ 9/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 0/ 9/ 5 Gray= 0/ 9/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 0/ 9/ 6 Gray= 0/ 9/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 0/ 9/ 7 Gray= 0/ 9/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 0/ 9/ 8 Gray= 0/ 9/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 0/ 9/ 9 Gray= 0/ 9/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 0/ 9/10 Gray= 0/ 9/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 0/ 9/11 Gray= 0/ 9/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 0/10/ 0 Gray= 0/10/ 0 Rel Eta,Phi=2,3 Expect 10 B$ Linear= 0/10/ 1 Gray= 0/10/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 0/10/ 2 Gray= 0/10/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 0/10/ 3 Gray= 0/10/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 0/10/ 4 Gray= 0/10/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 0/10/ 5 Gray= 0/10/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 0/10/ 6 Gray= 0/10/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 0/10/ 7 Gray= 0/10/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 0/10/ 8 Gray= 0/10/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 0/10/ 9 Gray= 0/10/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 0/10/10 Gray= 0/10/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 0/10/11 Gray= 0/10/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 0/11/ 0 Gray= 0/11/11 Rel Eta,Phi=2,2 Expect 22 B$ Linear= 0/11/ 1 Gray= 0/11/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 0/11/ 2 Gray= 0/11/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 0/11/ 3 Gray= 0/11/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 0/11/ 4 Gray= 0/11/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 0/11/ 5 Gray= 0/11/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 0/11/ 6 Gray= 0/11/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 0/11/ 7 Gray= 0/11/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 0/11/ 8 Gray= 0/11/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 0/11/ 9 Gray= 0/11/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 0/11/10 Gray= 0/11/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 0/11/11 Gray= 0/11/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 1/ 0/ 0 Gray= 1/11/ 0 Rel Eta,Phi=2,1 Expect 12 B$ Linear= 1/ 0/ 1 Gray= 1/11/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 1/ 0/ 2 Gray= 1/11/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 1/ 0/ 3 Gray= 1/11/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 1/ 0/ 4 Gray= 1/11/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 1/ 0/ 5 Gray= 1/11/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 1/ 0/ 6 Gray= 1/11/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 1/ 0/ 7 Gray= 1/11/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 1/ 0/ 8 Gray= 1/11/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 1/ 0/ 9 Gray= 1/11/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 1/ 0/10 Gray= 1/11/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 1/ 0/11 Gray= 1/11/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 1/ 1/ 0 Gray= 1/10/11 Rel Eta,Phi=2,2 Expect 22 B$ Linear= 1/ 1/ 1 Gray= 1/10/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 1/ 1/ 2 Gray= 1/10/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 1/ 1/ 3 Gray= 1/10/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 1/ 1/ 4 Gray= 1/10/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 1/ 1/ 5 Gray= 1/10/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 1/ 1/ 6 Gray= 1/10/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 1/ 1/ 7 Gray= 1/10/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 1/ 1/ 8 Gray= 1/10/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 1/ 1/ 9 Gray= 1/10/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 1/ 1/10 Gray= 1/10/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 1/ 1/11 Gray= 1/10/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 1/ 2/ 0 Gray= 1/ 9/ 0 Rel Eta,Phi=2,3 Expect 10 B$ Linear= 1/ 2/ 1 Gray= 1/ 9/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 1/ 2/ 2 Gray= 1/ 9/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 1/ 2/ 3 Gray= 1/ 9/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 1/ 2/ 4 Gray= 1/ 9/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 1/ 2/ 5 Gray= 1/ 9/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 1/ 2/ 6 Gray= 1/ 9/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 1/ 2/ 7 Gray= 1/ 9/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 1/ 2/ 8 Gray= 1/ 9/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 1/ 2/ 9 Gray= 1/ 9/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 1/ 2/10 Gray= 1/ 9/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 1/ 2/11 Gray= 1/ 9/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 1/ 3/ 0 Gray= 1/ 8/11 Rel Eta,Phi=2,4 Expect 20 B$ Linear= 1/ 3/ 1 Gray= 1/ 8/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 1/ 3/ 2 Gray= 1/ 8/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 1/ 3/ 3 Gray= 1/ 8/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 1/ 3/ 4 Gray= 1/ 8/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 1/ 3/ 5 Gray= 1/ 8/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 1/ 3/ 6 Gray= 1/ 8/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 1/ 3/ 7 Gray= 1/ 8/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 1/ 3/ 8 Gray= 1/ 8/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 1/ 3/ 9 Gray= 1/ 8/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 1/ 3/10 Gray= 1/ 8/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 1/ 3/11 Gray= 1/ 8/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 1/ 4/ 0 Gray= 1/ 7/ 0 Rel Eta,Phi=2,5 Expect 8 B$ Linear= 1/ 4/ 1 Gray= 1/ 7/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 1/ 4/ 2 Gray= 1/ 7/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 1/ 4/ 3 Gray= 1/ 7/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 1/ 4/ 4 Gray= 1/ 7/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 1/ 4/ 5 Gray= 1/ 7/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 1/ 4/ 6 Gray= 1/ 7/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 1/ 4/ 7 Gray= 1/ 7/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 1/ 4/ 8 Gray= 1/ 7/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 1/ 4/ 9 Gray= 1/ 7/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 1/ 4/10 Gray= 1/ 7/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 1/ 4/11 Gray= 1/ 7/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 1/ 5/ 0 Gray= 1/ 6/11 Rel Eta,Phi=2,6 Expect 18 B$ Linear= 1/ 5/ 1 Gray= 1/ 6/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 1/ 5/ 2 Gray= 1/ 6/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 1/ 5/ 3 Gray= 1/ 6/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 1/ 5/ 4 Gray= 1/ 6/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 1/ 5/ 5 Gray= 1/ 6/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 1/ 5/ 6 Gray= 1/ 6/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 1/ 5/ 7 Gray= 1/ 6/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 1/ 5/ 8 Gray= 1/ 6/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 1/ 5/ 9 Gray= 1/ 6/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 1/ 5/10 Gray= 1/ 6/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 1/ 5/11 Gray= 1/ 6/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 1/ 6/ 0 Gray= 1/ 5/ 0 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 1/ 6/ 1 Gray= 1/ 5/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 1/ 6/ 2 Gray= 1/ 5/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 1/ 6/ 3 Gray= 1/ 5/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 1/ 6/ 4 Gray= 1/ 5/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 1/ 6/ 5 Gray= 1/ 5/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 1/ 6/ 6 Gray= 1/ 5/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 1/ 6/ 7 Gray= 1/ 5/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 1/ 6/ 8 Gray= 1/ 5/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 1/ 6/ 9 Gray= 1/ 5/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 1/ 6/10 Gray= 1/ 5/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 1/ 6/11 Gray= 1/ 5/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 1/ 7/ 0 Gray= 1/ 4/11 Rel Eta,Phi=1,0 Expect 16 B$ Linear= 1/ 7/ 1 Gray= 1/ 4/10 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 1/ 7/ 2 Gray= 1/ 4/ 9 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 1/ 7/ 3 Gray= 1/ 4/ 8 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 1/ 7/ 4 Gray= 1/ 4/ 7 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 1/ 7/ 5 Gray= 1/ 4/ 6 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 1/ 7/ 6 Gray= 1/ 4/ 5 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 1/ 7/ 7 Gray= 1/ 4/ 4 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 1/ 7/ 8 Gray= 1/ 4/ 3 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 1/ 7/ 9 Gray= 1/ 4/ 2 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 1/ 7/10 Gray= 1/ 4/ 1 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 1/ 7/11 Gray= 1/ 4/ 0 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 1/ 8/ 0 Gray= 1/ 3/ 0 Rel Eta,Phi=1,1 Expect 4 B$ Linear= 1/ 8/ 1 Gray= 1/ 3/ 1 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 1/ 8/ 2 Gray= 1/ 3/ 2 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 1/ 8/ 3 Gray= 1/ 3/ 3 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 1/ 8/ 4 Gray= 1/ 3/ 4 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 1/ 8/ 5 Gray= 1/ 3/ 5 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 1/ 8/ 6 Gray= 1/ 3/ 6 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 1/ 8/ 7 Gray= 1/ 3/ 7 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 1/ 8/ 8 Gray= 1/ 3/ 8 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 1/ 8/ 9 Gray= 1/ 3/ 9 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 1/ 8/10 Gray= 1/ 3/10 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 1/ 8/11 Gray= 1/ 3/11 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 1/ 9/ 0 Gray= 1/ 2/11 Rel Eta,Phi=1,2 Expect 14 B$ Linear= 1/ 9/ 1 Gray= 1/ 2/10 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 1/ 9/ 2 Gray= 1/ 2/ 9 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 1/ 9/ 3 Gray= 1/ 2/ 8 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 1/ 9/ 4 Gray= 1/ 2/ 7 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 1/ 9/ 5 Gray= 1/ 2/ 6 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 1/ 9/ 6 Gray= 1/ 2/ 5 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 1/ 9/ 7 Gray= 1/ 2/ 4 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 1/ 9/ 8 Gray= 1/ 2/ 3 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 1/ 9/ 9 Gray= 1/ 2/ 2 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 1/ 9/10 Gray= 1/ 2/ 1 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 1/ 9/11 Gray= 1/ 2/ 0 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 1/10/ 0 Gray= 1/ 1/ 0 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 1/10/ 1 Gray= 1/ 1/ 1 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 1/10/ 2 Gray= 1/ 1/ 2 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 1/10/ 3 Gray= 1/ 1/ 3 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 1/10/ 4 Gray= 1/ 1/ 4 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 1/10/ 5 Gray= 1/ 1/ 5 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 1/10/ 6 Gray= 1/ 1/ 6 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 1/10/ 7 Gray= 1/ 1/ 7 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 1/10/ 8 Gray= 1/ 1/ 8 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 1/10/ 9 Gray= 1/ 1/ 9 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 1/10/10 Gray= 1/ 1/10 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 1/10/11 Gray= 1/ 1/11 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 1/11/ 0 Gray= 1/ 0/11 Rel Eta,Phi=1,4 Expect 12 B$ Linear= 1/11/ 1 Gray= 1/ 0/10 Rel Eta,Phi=1,5 Expect 11 B$ Linear= 1/11/ 2 Gray= 1/ 0/ 9 Rel Eta,Phi=1,6 Expect 10 B$ Linear= 1/11/ 3 Gray= 1/ 0/ 8 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 1/11/ 4 Gray= 1/ 0/ 7 Rel Eta,Phi=0,0 Expect 8 B$ Linear= 1/11/ 5 Gray= 1/ 0/ 6 Rel Eta,Phi=0,1 Expect 7 B$ Linear= 1/11/ 6 Gray= 1/ 0/ 5 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 1/11/ 7 Gray= 1/ 0/ 4 Rel Eta,Phi=0,3 Expect 5 B$ Linear= 1/11/ 8 Gray= 1/ 0/ 3 Rel Eta,Phi=0,4 Expect 4 B$ Linear= 1/11/ 9 Gray= 1/ 0/ 2 Rel Eta,Phi=0,5 Expect 3 B$ Linear= 1/11/10 Gray= 1/ 0/ 1 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 1/11/11 Gray= 1/ 0/ 0 Rel Eta,Phi=0,7 Expect 1 B$ Linear= 2/ 0/ 0 Gray= 2/ 0/ 0 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 2/ 0/ 1 Gray= 2/ 0/ 1 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 2/ 0/ 2 Gray= 2/ 0/ 2 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 2/ 0/ 3 Gray= 2/ 0/ 3 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 2/ 0/ 4 Gray= 2/ 0/ 4 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 2/ 0/ 5 Gray= 2/ 0/ 5 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 2/ 0/ 6 Gray= 2/ 0/ 6 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 2/ 0/ 7 Gray= 2/ 0/ 7 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 2/ 0/ 8 Gray= 2/ 0/ 8 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 2/ 0/ 9 Gray= 2/ 0/ 9 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 2/ 0/10 Gray= 2/ 0/10 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 2/ 0/11 Gray= 2/ 0/11 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 2/ 1/ 0 Gray= 2/ 1/11 Rel Eta,Phi=1,4 Expect 14 B$ Linear= 2/ 1/ 1 Gray= 2/ 1/10 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 2/ 1/ 2 Gray= 2/ 1/ 9 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 2/ 1/ 3 Gray= 2/ 1/ 8 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 2/ 1/ 4 Gray= 2/ 1/ 7 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 2/ 1/ 5 Gray= 2/ 1/ 6 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 2/ 1/ 6 Gray= 2/ 1/ 5 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 2/ 1/ 7 Gray= 2/ 1/ 4 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 2/ 1/ 8 Gray= 2/ 1/ 3 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 2/ 1/ 9 Gray= 2/ 1/ 2 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 2/ 1/10 Gray= 2/ 1/ 1 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 2/ 1/11 Gray= 2/ 1/ 0 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 2/ 2/ 0 Gray= 2/ 2/ 0 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 2/ 2/ 1 Gray= 2/ 2/ 1 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 2/ 2/ 2 Gray= 2/ 2/ 2 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 2/ 2/ 3 Gray= 2/ 2/ 3 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 2/ 2/ 4 Gray= 2/ 2/ 4 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 2/ 2/ 5 Gray= 2/ 2/ 5 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 2/ 2/ 6 Gray= 2/ 2/ 6 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 2/ 2/ 7 Gray= 2/ 2/ 7 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 2/ 2/ 8 Gray= 2/ 2/ 8 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 2/ 2/ 9 Gray= 2/ 2/ 9 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 2/ 2/10 Gray= 2/ 2/10 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 2/ 2/11 Gray= 2/ 2/11 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 2/ 3/ 0 Gray= 2/ 3/11 Rel Eta,Phi=1,2 Expect 16 B$ Linear= 2/ 3/ 1 Gray= 2/ 3/10 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 2/ 3/ 2 Gray= 2/ 3/ 9 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 2/ 3/ 3 Gray= 2/ 3/ 8 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 2/ 3/ 4 Gray= 2/ 3/ 7 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 2/ 3/ 5 Gray= 2/ 3/ 6 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 2/ 3/ 6 Gray= 2/ 3/ 5 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 2/ 3/ 7 Gray= 2/ 3/ 4 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 2/ 3/ 8 Gray= 2/ 3/ 3 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 2/ 3/ 9 Gray= 2/ 3/ 2 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 2/ 3/10 Gray= 2/ 3/ 1 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 2/ 3/11 Gray= 2/ 3/ 0 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 2/ 4/ 0 Gray= 2/ 4/ 0 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 2/ 4/ 1 Gray= 2/ 4/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 2/ 4/ 2 Gray= 2/ 4/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 2/ 4/ 3 Gray= 2/ 4/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 2/ 4/ 4 Gray= 2/ 4/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 2/ 4/ 5 Gray= 2/ 4/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 2/ 4/ 6 Gray= 2/ 4/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 2/ 4/ 7 Gray= 2/ 4/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 2/ 4/ 8 Gray= 2/ 4/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 2/ 4/ 9 Gray= 2/ 4/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 2/ 4/10 Gray= 2/ 4/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 2/ 4/11 Gray= 2/ 4/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 2/ 5/ 0 Gray= 2/ 5/11 Rel Eta,Phi=1,0 Expect 18 B$ Linear= 2/ 5/ 1 Gray= 2/ 5/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 2/ 5/ 2 Gray= 2/ 5/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 2/ 5/ 3 Gray= 2/ 5/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 2/ 5/ 4 Gray= 2/ 5/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 2/ 5/ 5 Gray= 2/ 5/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 2/ 5/ 6 Gray= 2/ 5/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 2/ 5/ 7 Gray= 2/ 5/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 2/ 5/ 8 Gray= 2/ 5/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 2/ 5/ 9 Gray= 2/ 5/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 2/ 5/10 Gray= 2/ 5/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 2/ 5/11 Gray= 2/ 5/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 2/ 6/ 0 Gray= 2/ 6/ 0 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 2/ 6/ 1 Gray= 2/ 6/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 2/ 6/ 2 Gray= 2/ 6/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 2/ 6/ 3 Gray= 2/ 6/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 2/ 6/ 4 Gray= 2/ 6/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 2/ 6/ 5 Gray= 2/ 6/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 2/ 6/ 6 Gray= 2/ 6/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 2/ 6/ 7 Gray= 2/ 6/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 2/ 6/ 8 Gray= 2/ 6/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 2/ 6/ 9 Gray= 2/ 6/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 2/ 6/10 Gray= 2/ 6/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 2/ 6/11 Gray= 2/ 6/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 2/ 7/ 0 Gray= 2/ 7/11 Rel Eta,Phi=2,6 Expect 20 B$ Linear= 2/ 7/ 1 Gray= 2/ 7/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 2/ 7/ 2 Gray= 2/ 7/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 2/ 7/ 3 Gray= 2/ 7/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 2/ 7/ 4 Gray= 2/ 7/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 2/ 7/ 5 Gray= 2/ 7/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 2/ 7/ 6 Gray= 2/ 7/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 2/ 7/ 7 Gray= 2/ 7/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 2/ 7/ 8 Gray= 2/ 7/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 2/ 7/ 9 Gray= 2/ 7/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 2/ 7/10 Gray= 2/ 7/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 2/ 7/11 Gray= 2/ 7/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 2/ 8/ 0 Gray= 2/ 8/ 0 Rel Eta,Phi=2,5 Expect 10 B$ Linear= 2/ 8/ 1 Gray= 2/ 8/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 2/ 8/ 2 Gray= 2/ 8/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 2/ 8/ 3 Gray= 2/ 8/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 2/ 8/ 4 Gray= 2/ 8/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 2/ 8/ 5 Gray= 2/ 8/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 2/ 8/ 6 Gray= 2/ 8/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 2/ 8/ 7 Gray= 2/ 8/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 2/ 8/ 8 Gray= 2/ 8/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 2/ 8/ 9 Gray= 2/ 8/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 2/ 8/10 Gray= 2/ 8/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 2/ 8/11 Gray= 2/ 8/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 2/ 9/ 0 Gray= 2/ 9/11 Rel Eta,Phi=2,4 Expect 22 B$ Linear= 2/ 9/ 1 Gray= 2/ 9/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 2/ 9/ 2 Gray= 2/ 9/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 2/ 9/ 3 Gray= 2/ 9/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 2/ 9/ 4 Gray= 2/ 9/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 2/ 9/ 5 Gray= 2/ 9/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 2/ 9/ 6 Gray= 2/ 9/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 2/ 9/ 7 Gray= 2/ 9/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 2/ 9/ 8 Gray= 2/ 9/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 2/ 9/ 9 Gray= 2/ 9/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 2/ 9/10 Gray= 2/ 9/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 2/ 9/11 Gray= 2/ 9/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 2/10/ 0 Gray= 2/10/ 0 Rel Eta,Phi=2,3 Expect 12 B$ Linear= 2/10/ 1 Gray= 2/10/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 2/10/ 2 Gray= 2/10/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 2/10/ 3 Gray= 2/10/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 2/10/ 4 Gray= 2/10/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 2/10/ 5 Gray= 2/10/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 2/10/ 6 Gray= 2/10/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 2/10/ 7 Gray= 2/10/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 2/10/ 8 Gray= 2/10/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 2/10/ 9 Gray= 2/10/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 2/10/10 Gray= 2/10/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 2/10/11 Gray= 2/10/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 2/11/ 0 Gray= 2/11/11 Rel Eta,Phi=2,2 Expect 24 B$ Linear= 2/11/ 1 Gray= 2/11/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 2/11/ 2 Gray= 2/11/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 2/11/ 3 Gray= 2/11/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 2/11/ 4 Gray= 2/11/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 2/11/ 5 Gray= 2/11/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 2/11/ 6 Gray= 2/11/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 2/11/ 7 Gray= 2/11/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 2/11/ 8 Gray= 2/11/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 2/11/ 9 Gray= 2/11/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 2/11/10 Gray= 2/11/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 2/11/11 Gray= 2/11/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 3/ 0/ 0 Gray= 3/11/ 0 Rel Eta,Phi=3,7 Expect 14 B$ Linear= 3/ 0/ 1 Gray= 3/11/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 3/ 0/ 2 Gray= 3/11/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 3/ 0/ 3 Gray= 3/11/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 3/ 0/ 4 Gray= 3/11/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 3/ 0/ 5 Gray= 3/11/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 3/ 0/ 6 Gray= 3/11/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 3/ 0/ 7 Gray= 3/11/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 3/ 0/ 8 Gray= 3/11/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 3/ 0/ 9 Gray= 3/11/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 3/ 0/10 Gray= 3/11/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 3/ 0/11 Gray= 3/11/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 3/ 1/ 0 Gray= 3/10/11 Rel Eta,Phi=2,2 Expect 24 B$ Linear= 3/ 1/ 1 Gray= 3/10/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 3/ 1/ 2 Gray= 3/10/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 3/ 1/ 3 Gray= 3/10/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 3/ 1/ 4 Gray= 3/10/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 3/ 1/ 5 Gray= 3/10/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 3/ 1/ 6 Gray= 3/10/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 3/ 1/ 7 Gray= 3/10/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 3/ 1/ 8 Gray= 3/10/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 3/ 1/ 9 Gray= 3/10/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 3/ 1/10 Gray= 3/10/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 3/ 1/11 Gray= 3/10/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 3/ 2/ 0 Gray= 3/ 9/ 0 Rel Eta,Phi=2,3 Expect 12 B$ Linear= 3/ 2/ 1 Gray= 3/ 9/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 3/ 2/ 2 Gray= 3/ 9/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 3/ 2/ 3 Gray= 3/ 9/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 3/ 2/ 4 Gray= 3/ 9/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 3/ 2/ 5 Gray= 3/ 9/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 3/ 2/ 6 Gray= 3/ 9/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 3/ 2/ 7 Gray= 3/ 9/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 3/ 2/ 8 Gray= 3/ 9/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 3/ 2/ 9 Gray= 3/ 9/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 3/ 2/10 Gray= 3/ 9/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 3/ 2/11 Gray= 3/ 9/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 3/ 3/ 0 Gray= 3/ 8/11 Rel Eta,Phi=2,4 Expect 22 B$ Linear= 3/ 3/ 1 Gray= 3/ 8/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 3/ 3/ 2 Gray= 3/ 8/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 3/ 3/ 3 Gray= 3/ 8/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 3/ 3/ 4 Gray= 3/ 8/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 3/ 3/ 5 Gray= 3/ 8/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 3/ 3/ 6 Gray= 3/ 8/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 3/ 3/ 7 Gray= 3/ 8/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 3/ 3/ 8 Gray= 3/ 8/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 3/ 3/ 9 Gray= 3/ 8/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 3/ 3/10 Gray= 3/ 8/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 3/ 3/11 Gray= 3/ 8/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 3/ 4/ 0 Gray= 3/ 7/ 0 Rel Eta,Phi=2,5 Expect 10 B$ Linear= 3/ 4/ 1 Gray= 3/ 7/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 3/ 4/ 2 Gray= 3/ 7/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 3/ 4/ 3 Gray= 3/ 7/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 3/ 4/ 4 Gray= 3/ 7/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 3/ 4/ 5 Gray= 3/ 7/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 3/ 4/ 6 Gray= 3/ 7/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 3/ 4/ 7 Gray= 3/ 7/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 3/ 4/ 8 Gray= 3/ 7/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 3/ 4/ 9 Gray= 3/ 7/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 3/ 4/10 Gray= 3/ 7/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 3/ 4/11 Gray= 3/ 7/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 3/ 5/ 0 Gray= 3/ 6/11 Rel Eta,Phi=2,6 Expect 20 B$ Linear= 3/ 5/ 1 Gray= 3/ 6/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 3/ 5/ 2 Gray= 3/ 6/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 3/ 5/ 3 Gray= 3/ 6/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 3/ 5/ 4 Gray= 3/ 6/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 3/ 5/ 5 Gray= 3/ 6/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 3/ 5/ 6 Gray= 3/ 6/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 3/ 5/ 7 Gray= 3/ 6/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 3/ 5/ 8 Gray= 3/ 6/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 3/ 5/ 9 Gray= 3/ 6/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 3/ 5/10 Gray= 3/ 6/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 3/ 5/11 Gray= 3/ 6/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 3/ 6/ 0 Gray= 3/ 5/ 0 Rel Eta,Phi=2,7 Expect 8 B$ Linear= 3/ 6/ 1 Gray= 3/ 5/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 3/ 6/ 2 Gray= 3/ 5/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 3/ 6/ 3 Gray= 3/ 5/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 3/ 6/ 4 Gray= 3/ 5/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 3/ 6/ 5 Gray= 3/ 5/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 3/ 6/ 6 Gray= 3/ 5/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 3/ 6/ 7 Gray= 3/ 5/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 3/ 6/ 8 Gray= 3/ 5/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 3/ 6/ 9 Gray= 3/ 5/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 3/ 6/10 Gray= 3/ 5/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 3/ 6/11 Gray= 3/ 5/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 3/ 7/ 0 Gray= 3/ 4/11 Rel Eta,Phi=1,0 Expect 18 B$ Linear= 3/ 7/ 1 Gray= 3/ 4/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 3/ 7/ 2 Gray= 3/ 4/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 3/ 7/ 3 Gray= 3/ 4/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 3/ 7/ 4 Gray= 3/ 4/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 3/ 7/ 5 Gray= 3/ 4/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 3/ 7/ 6 Gray= 3/ 4/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 3/ 7/ 7 Gray= 3/ 4/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 3/ 7/ 8 Gray= 3/ 4/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 3/ 7/ 9 Gray= 3/ 4/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 3/ 7/10 Gray= 3/ 4/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 3/ 7/11 Gray= 3/ 4/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 3/ 8/ 0 Gray= 3/ 3/ 0 Rel Eta,Phi=1,1 Expect 6 B$ Linear= 3/ 8/ 1 Gray= 3/ 3/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 3/ 8/ 2 Gray= 3/ 3/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 3/ 8/ 3 Gray= 3/ 3/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 3/ 8/ 4 Gray= 3/ 3/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 3/ 8/ 5 Gray= 3/ 3/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 3/ 8/ 6 Gray= 3/ 3/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 3/ 8/ 7 Gray= 3/ 3/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 3/ 8/ 8 Gray= 3/ 3/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 3/ 8/ 9 Gray= 3/ 3/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 3/ 8/10 Gray= 3/ 3/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 3/ 8/11 Gray= 3/ 3/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 3/ 9/ 0 Gray= 3/ 2/11 Rel Eta,Phi=1,2 Expect 16 B$ Linear= 3/ 9/ 1 Gray= 3/ 2/10 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 3/ 9/ 2 Gray= 3/ 2/ 9 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 3/ 9/ 3 Gray= 3/ 2/ 8 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 3/ 9/ 4 Gray= 3/ 2/ 7 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 3/ 9/ 5 Gray= 3/ 2/ 6 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 3/ 9/ 6 Gray= 3/ 2/ 5 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 3/ 9/ 7 Gray= 3/ 2/ 4 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 3/ 9/ 8 Gray= 3/ 2/ 3 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 3/ 9/ 9 Gray= 3/ 2/ 2 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 3/ 9/10 Gray= 3/ 2/ 1 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 3/ 9/11 Gray= 3/ 2/ 0 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 3/10/ 0 Gray= 3/ 1/ 0 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 3/10/ 1 Gray= 3/ 1/ 1 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 3/10/ 2 Gray= 3/ 1/ 2 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 3/10/ 3 Gray= 3/ 1/ 3 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 3/10/ 4 Gray= 3/ 1/ 4 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 3/10/ 5 Gray= 3/ 1/ 5 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 3/10/ 6 Gray= 3/ 1/ 6 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 3/10/ 7 Gray= 3/ 1/ 7 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 3/10/ 8 Gray= 3/ 1/ 8 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 3/10/ 9 Gray= 3/ 1/ 9 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 3/10/10 Gray= 3/ 1/10 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 3/10/11 Gray= 3/ 1/11 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 3/11/ 0 Gray= 3/ 0/11 Rel Eta,Phi=1,4 Expect 14 B$ Linear= 3/11/ 1 Gray= 3/ 0/10 Rel Eta,Phi=1,5 Expect 13 B$ Linear= 3/11/ 2 Gray= 3/ 0/ 9 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 3/11/ 3 Gray= 3/ 0/ 8 Rel Eta,Phi=1,7 Expect 11 B$ Linear= 3/11/ 4 Gray= 3/ 0/ 7 Rel Eta,Phi=0,0 Expect 10 B$ Linear= 3/11/ 5 Gray= 3/ 0/ 6 Rel Eta,Phi=0,1 Expect 9 B$ Linear= 3/11/ 6 Gray= 3/ 0/ 5 Rel Eta,Phi=0,2 Expect 8 B$ Linear= 3/11/ 7 Gray= 3/ 0/ 4 Rel Eta,Phi=0,3 Expect 7 B$ Linear= 3/11/ 8 Gray= 3/ 0/ 3 Rel Eta,Phi=0,4 Expect 6 B$ Linear= 3/11/ 9 Gray= 3/ 0/ 2 Rel Eta,Phi=0,5 Expect 5 B$ Linear= 3/11/10 Gray= 3/ 0/ 1 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 3/11/11 Gray= 3/ 0/ 0 Rel Eta,Phi=0,7 Expect 3 B$ Linear= 4/ 0/ 0 Gray= 4/ 0/ 0 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 4/ 0/ 1 Gray= 4/ 0/ 1 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 4/ 0/ 2 Gray= 4/ 0/ 2 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 4/ 0/ 3 Gray= 4/ 0/ 3 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 4/ 0/ 4 Gray= 4/ 0/ 4 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 4/ 0/ 5 Gray= 4/ 0/ 5 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 4/ 0/ 6 Gray= 4/ 0/ 6 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 4/ 0/ 7 Gray= 4/ 0/ 7 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 4/ 0/ 8 Gray= 4/ 0/ 8 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 4/ 0/ 9 Gray= 4/ 0/ 9 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 4/ 0/10 Gray= 4/ 0/10 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 4/ 0/11 Gray= 4/ 0/11 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 4/ 1/ 0 Gray= 4/ 1/11 Rel Eta,Phi=1,4 Expect 16 B$ Linear= 4/ 1/ 1 Gray= 4/ 1/10 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 4/ 1/ 2 Gray= 4/ 1/ 9 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 4/ 1/ 3 Gray= 4/ 1/ 8 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 4/ 1/ 4 Gray= 4/ 1/ 7 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 4/ 1/ 5 Gray= 4/ 1/ 6 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 4/ 1/ 6 Gray= 4/ 1/ 5 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 4/ 1/ 7 Gray= 4/ 1/ 4 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 4/ 1/ 8 Gray= 4/ 1/ 3 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 4/ 1/ 9 Gray= 4/ 1/ 2 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 4/ 1/10 Gray= 4/ 1/ 1 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 4/ 1/11 Gray= 4/ 1/ 0 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 4/ 2/ 0 Gray= 4/ 2/ 0 Rel Eta,Phi=1,3 Expect 6 B$ Linear= 4/ 2/ 1 Gray= 4/ 2/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 4/ 2/ 2 Gray= 4/ 2/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 4/ 2/ 3 Gray= 4/ 2/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 4/ 2/ 4 Gray= 4/ 2/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 4/ 2/ 5 Gray= 4/ 2/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 4/ 2/ 6 Gray= 4/ 2/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 4/ 2/ 7 Gray= 4/ 2/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 4/ 2/ 8 Gray= 4/ 2/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 4/ 2/ 9 Gray= 4/ 2/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 4/ 2/10 Gray= 4/ 2/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 4/ 2/11 Gray= 4/ 2/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 4/ 3/ 0 Gray= 4/ 3/11 Rel Eta,Phi=1,2 Expect 18 B$ Linear= 4/ 3/ 1 Gray= 4/ 3/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 4/ 3/ 2 Gray= 4/ 3/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 4/ 3/ 3 Gray= 4/ 3/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 4/ 3/ 4 Gray= 4/ 3/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 4/ 3/ 5 Gray= 4/ 3/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 4/ 3/ 6 Gray= 4/ 3/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 4/ 3/ 7 Gray= 4/ 3/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 4/ 3/ 8 Gray= 4/ 3/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 4/ 3/ 9 Gray= 4/ 3/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 4/ 3/10 Gray= 4/ 3/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 4/ 3/11 Gray= 4/ 3/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 4/ 4/ 0 Gray= 4/ 4/ 0 Rel Eta,Phi=1,1 Expect 8 B$ Linear= 4/ 4/ 1 Gray= 4/ 4/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 4/ 4/ 2 Gray= 4/ 4/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 4/ 4/ 3 Gray= 4/ 4/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 4/ 4/ 4 Gray= 4/ 4/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 4/ 4/ 5 Gray= 4/ 4/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 4/ 4/ 6 Gray= 4/ 4/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 4/ 4/ 7 Gray= 4/ 4/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 4/ 4/ 8 Gray= 4/ 4/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 4/ 4/ 9 Gray= 4/ 4/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 4/ 4/10 Gray= 4/ 4/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 4/ 4/11 Gray= 4/ 4/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 4/ 5/ 0 Gray= 4/ 5/11 Rel Eta,Phi=1,0 Expect 20 B$ Linear= 4/ 5/ 1 Gray= 4/ 5/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 4/ 5/ 2 Gray= 4/ 5/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 4/ 5/ 3 Gray= 4/ 5/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 4/ 5/ 4 Gray= 4/ 5/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 4/ 5/ 5 Gray= 4/ 5/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 4/ 5/ 6 Gray= 4/ 5/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 4/ 5/ 7 Gray= 4/ 5/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 4/ 5/ 8 Gray= 4/ 5/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 4/ 5/ 9 Gray= 4/ 5/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 4/ 5/10 Gray= 4/ 5/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 4/ 5/11 Gray= 4/ 5/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 4/ 6/ 0 Gray= 4/ 6/ 0 Rel Eta,Phi=2,7 Expect 10 B$ Linear= 4/ 6/ 1 Gray= 4/ 6/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 4/ 6/ 2 Gray= 4/ 6/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 4/ 6/ 3 Gray= 4/ 6/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 4/ 6/ 4 Gray= 4/ 6/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 4/ 6/ 5 Gray= 4/ 6/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 4/ 6/ 6 Gray= 4/ 6/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 4/ 6/ 7 Gray= 4/ 6/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 4/ 6/ 8 Gray= 4/ 6/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 4/ 6/ 9 Gray= 4/ 6/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 4/ 6/10 Gray= 4/ 6/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 4/ 6/11 Gray= 4/ 6/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 4/ 7/ 0 Gray= 4/ 7/11 Rel Eta,Phi=2,6 Expect 22 B$ Linear= 4/ 7/ 1 Gray= 4/ 7/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 4/ 7/ 2 Gray= 4/ 7/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 4/ 7/ 3 Gray= 4/ 7/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 4/ 7/ 4 Gray= 4/ 7/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 4/ 7/ 5 Gray= 4/ 7/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 4/ 7/ 6 Gray= 4/ 7/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 4/ 7/ 7 Gray= 4/ 7/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 4/ 7/ 8 Gray= 4/ 7/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 4/ 7/ 9 Gray= 4/ 7/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 4/ 7/10 Gray= 4/ 7/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 4/ 7/11 Gray= 4/ 7/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 4/ 8/ 0 Gray= 4/ 8/ 0 Rel Eta,Phi=2,5 Expect 12 B$ Linear= 4/ 8/ 1 Gray= 4/ 8/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 4/ 8/ 2 Gray= 4/ 8/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 4/ 8/ 3 Gray= 4/ 8/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 4/ 8/ 4 Gray= 4/ 8/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 4/ 8/ 5 Gray= 4/ 8/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 4/ 8/ 6 Gray= 4/ 8/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 4/ 8/ 7 Gray= 4/ 8/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 4/ 8/ 8 Gray= 4/ 8/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 4/ 8/ 9 Gray= 4/ 8/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 4/ 8/10 Gray= 4/ 8/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 4/ 8/11 Gray= 4/ 8/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 4/ 9/ 0 Gray= 4/ 9/11 Rel Eta,Phi=2,4 Expect 24 B$ Linear= 4/ 9/ 1 Gray= 4/ 9/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 4/ 9/ 2 Gray= 4/ 9/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 4/ 9/ 3 Gray= 4/ 9/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 4/ 9/ 4 Gray= 4/ 9/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 4/ 9/ 5 Gray= 4/ 9/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 4/ 9/ 6 Gray= 4/ 9/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 4/ 9/ 7 Gray= 4/ 9/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 4/ 9/ 8 Gray= 4/ 9/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 4/ 9/ 9 Gray= 4/ 9/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 4/ 9/10 Gray= 4/ 9/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 4/ 9/11 Gray= 4/ 9/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 4/10/ 0 Gray= 4/10/ 0 Rel Eta,Phi=2,3 Expect 14 B$ Linear= 4/10/ 1 Gray= 4/10/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 4/10/ 2 Gray= 4/10/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 4/10/ 3 Gray= 4/10/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 4/10/ 4 Gray= 4/10/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 4/10/ 5 Gray= 4/10/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 4/10/ 6 Gray= 4/10/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 4/10/ 7 Gray= 4/10/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 4/10/ 8 Gray= 4/10/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 4/10/ 9 Gray= 4/10/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 4/10/10 Gray= 4/10/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 4/10/11 Gray= 4/10/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 4/11/ 0 Gray= 4/11/11 Rel Eta,Phi=2,2 Expect 26 B$ Linear= 4/11/ 1 Gray= 4/11/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 4/11/ 2 Gray= 4/11/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 4/11/ 3 Gray= 4/11/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 4/11/ 4 Gray= 4/11/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 4/11/ 5 Gray= 4/11/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 4/11/ 6 Gray= 4/11/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 4/11/ 7 Gray= 4/11/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 4/11/ 8 Gray= 4/11/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 4/11/ 9 Gray= 4/11/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 4/11/10 Gray= 4/11/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 4/11/11 Gray= 4/11/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 5/ 0/ 0 Gray= 5/11/ 0 Rel Eta,Phi=3,5 Expect 16 B$ Linear= 5/ 0/ 1 Gray= 5/11/ 1 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 5/ 0/ 2 Gray= 5/11/ 2 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 5/ 0/ 3 Gray= 5/11/ 3 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 5/ 0/ 4 Gray= 5/11/ 4 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 5/ 0/ 5 Gray= 5/11/ 5 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 5/ 0/ 6 Gray= 5/11/ 6 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 5/ 0/ 7 Gray= 5/11/ 7 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 5/ 0/ 8 Gray= 5/11/ 8 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 5/ 0/ 9 Gray= 5/11/ 9 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 5/ 0/10 Gray= 5/11/10 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 5/ 0/11 Gray= 5/11/11 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 5/ 1/ 0 Gray= 5/10/11 Rel Eta,Phi=2,2 Expect 26 B$ Linear= 5/ 1/ 1 Gray= 5/10/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 5/ 1/ 2 Gray= 5/10/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 5/ 1/ 3 Gray= 5/10/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 5/ 1/ 4 Gray= 5/10/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 5/ 1/ 5 Gray= 5/10/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 5/ 1/ 6 Gray= 5/10/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 5/ 1/ 7 Gray= 5/10/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 5/ 1/ 8 Gray= 5/10/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 5/ 1/ 9 Gray= 5/10/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 5/ 1/10 Gray= 5/10/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 5/ 1/11 Gray= 5/10/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 5/ 2/ 0 Gray= 5/ 9/ 0 Rel Eta,Phi=2,3 Expect 14 B$ Linear= 5/ 2/ 1 Gray= 5/ 9/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 5/ 2/ 2 Gray= 5/ 9/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 5/ 2/ 3 Gray= 5/ 9/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 5/ 2/ 4 Gray= 5/ 9/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 5/ 2/ 5 Gray= 5/ 9/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 5/ 2/ 6 Gray= 5/ 9/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 5/ 2/ 7 Gray= 5/ 9/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 5/ 2/ 8 Gray= 5/ 9/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 5/ 2/ 9 Gray= 5/ 9/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 5/ 2/10 Gray= 5/ 9/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 5/ 2/11 Gray= 5/ 9/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 5/ 3/ 0 Gray= 5/ 8/11 Rel Eta,Phi=2,4 Expect 24 B$ Linear= 5/ 3/ 1 Gray= 5/ 8/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 5/ 3/ 2 Gray= 5/ 8/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 5/ 3/ 3 Gray= 5/ 8/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 5/ 3/ 4 Gray= 5/ 8/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 5/ 3/ 5 Gray= 5/ 8/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 5/ 3/ 6 Gray= 5/ 8/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 5/ 3/ 7 Gray= 5/ 8/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 5/ 3/ 8 Gray= 5/ 8/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 5/ 3/ 9 Gray= 5/ 8/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 5/ 3/10 Gray= 5/ 8/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 5/ 3/11 Gray= 5/ 8/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 5/ 4/ 0 Gray= 5/ 7/ 0 Rel Eta,Phi=2,5 Expect 12 B$ Linear= 5/ 4/ 1 Gray= 5/ 7/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 5/ 4/ 2 Gray= 5/ 7/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 5/ 4/ 3 Gray= 5/ 7/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 5/ 4/ 4 Gray= 5/ 7/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 5/ 4/ 5 Gray= 5/ 7/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 5/ 4/ 6 Gray= 5/ 7/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 5/ 4/ 7 Gray= 5/ 7/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 5/ 4/ 8 Gray= 5/ 7/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 5/ 4/ 9 Gray= 5/ 7/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 5/ 4/10 Gray= 5/ 7/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 5/ 4/11 Gray= 5/ 7/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 5/ 5/ 0 Gray= 5/ 6/11 Rel Eta,Phi=2,6 Expect 22 B$ Linear= 5/ 5/ 1 Gray= 5/ 6/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 5/ 5/ 2 Gray= 5/ 6/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 5/ 5/ 3 Gray= 5/ 6/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 5/ 5/ 4 Gray= 5/ 6/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 5/ 5/ 5 Gray= 5/ 6/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 5/ 5/ 6 Gray= 5/ 6/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 5/ 5/ 7 Gray= 5/ 6/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 5/ 5/ 8 Gray= 5/ 6/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 5/ 5/ 9 Gray= 5/ 6/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 5/ 5/10 Gray= 5/ 6/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 5/ 5/11 Gray= 5/ 6/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 5/ 6/ 0 Gray= 5/ 5/ 0 Rel Eta,Phi=2,7 Expect 10 B$ Linear= 5/ 6/ 1 Gray= 5/ 5/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 5/ 6/ 2 Gray= 5/ 5/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 5/ 6/ 3 Gray= 5/ 5/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 5/ 6/ 4 Gray= 5/ 5/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 5/ 6/ 5 Gray= 5/ 5/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 5/ 6/ 6 Gray= 5/ 5/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 5/ 6/ 7 Gray= 5/ 5/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 5/ 6/ 8 Gray= 5/ 5/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 5/ 6/ 9 Gray= 5/ 5/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 5/ 6/10 Gray= 5/ 5/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 5/ 6/11 Gray= 5/ 5/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 5/ 7/ 0 Gray= 5/ 4/11 Rel Eta,Phi=1,0 Expect 20 B$ Linear= 5/ 7/ 1 Gray= 5/ 4/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 5/ 7/ 2 Gray= 5/ 4/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 5/ 7/ 3 Gray= 5/ 4/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 5/ 7/ 4 Gray= 5/ 4/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 5/ 7/ 5 Gray= 5/ 4/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 5/ 7/ 6 Gray= 5/ 4/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 5/ 7/ 7 Gray= 5/ 4/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 5/ 7/ 8 Gray= 5/ 4/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 5/ 7/ 9 Gray= 5/ 4/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 5/ 7/10 Gray= 5/ 4/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 5/ 7/11 Gray= 5/ 4/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 5/ 8/ 0 Gray= 5/ 3/ 0 Rel Eta,Phi=1,1 Expect 8 B$ Linear= 5/ 8/ 1 Gray= 5/ 3/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 5/ 8/ 2 Gray= 5/ 3/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 5/ 8/ 3 Gray= 5/ 3/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 5/ 8/ 4 Gray= 5/ 3/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 5/ 8/ 5 Gray= 5/ 3/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 5/ 8/ 6 Gray= 5/ 3/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 5/ 8/ 7 Gray= 5/ 3/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 5/ 8/ 8 Gray= 5/ 3/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 5/ 8/ 9 Gray= 5/ 3/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 5/ 8/10 Gray= 5/ 3/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 5/ 8/11 Gray= 5/ 3/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 5/ 9/ 0 Gray= 5/ 2/11 Rel Eta,Phi=1,2 Expect 18 B$ Linear= 5/ 9/ 1 Gray= 5/ 2/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 5/ 9/ 2 Gray= 5/ 2/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 5/ 9/ 3 Gray= 5/ 2/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 5/ 9/ 4 Gray= 5/ 2/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 5/ 9/ 5 Gray= 5/ 2/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 5/ 9/ 6 Gray= 5/ 2/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 5/ 9/ 7 Gray= 5/ 2/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 5/ 9/ 8 Gray= 5/ 2/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 5/ 9/ 9 Gray= 5/ 2/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 5/ 9/10 Gray= 5/ 2/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 5/ 9/11 Gray= 5/ 2/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 5/10/ 0 Gray= 5/ 1/ 0 Rel Eta,Phi=1,3 Expect 6 B$ Linear= 5/10/ 1 Gray= 5/ 1/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 5/10/ 2 Gray= 5/ 1/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 5/10/ 3 Gray= 5/ 1/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 5/10/ 4 Gray= 5/ 1/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 5/10/ 5 Gray= 5/ 1/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 5/10/ 6 Gray= 5/ 1/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 5/10/ 7 Gray= 5/ 1/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 5/10/ 8 Gray= 5/ 1/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 5/10/ 9 Gray= 5/ 1/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 5/10/10 Gray= 5/ 1/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 5/10/11 Gray= 5/ 1/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 5/11/ 0 Gray= 5/ 0/11 Rel Eta,Phi=1,4 Expect 16 B$ Linear= 5/11/ 1 Gray= 5/ 0/10 Rel Eta,Phi=1,5 Expect 15 B$ Linear= 5/11/ 2 Gray= 5/ 0/ 9 Rel Eta,Phi=1,6 Expect 14 B$ Linear= 5/11/ 3 Gray= 5/ 0/ 8 Rel Eta,Phi=1,7 Expect 13 B$ Linear= 5/11/ 4 Gray= 5/ 0/ 7 Rel Eta,Phi=0,0 Expect 12 B$ Linear= 5/11/ 5 Gray= 5/ 0/ 6 Rel Eta,Phi=0,1 Expect 11 B$ Linear= 5/11/ 6 Gray= 5/ 0/ 5 Rel Eta,Phi=0,2 Expect 10 B$ Linear= 5/11/ 7 Gray= 5/ 0/ 4 Rel Eta,Phi=0,3 Expect 9 B$ Linear= 5/11/ 8 Gray= 5/ 0/ 3 Rel Eta,Phi=0,4 Expect 8 B$ Linear= 5/11/ 9 Gray= 5/ 0/ 2 Rel Eta,Phi=0,5 Expect 7 B$ Linear= 5/11/10 Gray= 5/ 0/ 1 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 5/11/11 Gray= 5/ 0/ 0 Rel Eta,Phi=0,7 Expect 5 B$ Linear= 6/ 0/ 0 Gray= 6/ 0/ 0 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 6/ 0/ 1 Gray= 6/ 0/ 1 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 6/ 0/ 2 Gray= 6/ 0/ 2 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 6/ 0/ 3 Gray= 6/ 0/ 3 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 6/ 0/ 4 Gray= 6/ 0/ 4 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 6/ 0/ 5 Gray= 6/ 0/ 5 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 6/ 0/ 6 Gray= 6/ 0/ 6 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 6/ 0/ 7 Gray= 6/ 0/ 7 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 6/ 0/ 8 Gray= 6/ 0/ 8 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 6/ 0/ 9 Gray= 6/ 0/ 9 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 6/ 0/10 Gray= 6/ 0/10 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 6/ 0/11 Gray= 6/ 0/11 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 6/ 1/ 0 Gray= 6/ 1/11 Rel Eta,Phi=1,4 Expect 18 B$ Linear= 6/ 1/ 1 Gray= 6/ 1/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 6/ 1/ 2 Gray= 6/ 1/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 6/ 1/ 3 Gray= 6/ 1/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 6/ 1/ 4 Gray= 6/ 1/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 6/ 1/ 5 Gray= 6/ 1/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 6/ 1/ 6 Gray= 6/ 1/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 6/ 1/ 7 Gray= 6/ 1/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 6/ 1/ 8 Gray= 6/ 1/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 6/ 1/ 9 Gray= 6/ 1/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 6/ 1/10 Gray= 6/ 1/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 6/ 1/11 Gray= 6/ 1/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 6/ 2/ 0 Gray= 6/ 2/ 0 Rel Eta,Phi=1,3 Expect 8 B$ Linear= 6/ 2/ 1 Gray= 6/ 2/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 6/ 2/ 2 Gray= 6/ 2/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 6/ 2/ 3 Gray= 6/ 2/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 6/ 2/ 4 Gray= 6/ 2/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 6/ 2/ 5 Gray= 6/ 2/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 6/ 2/ 6 Gray= 6/ 2/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 6/ 2/ 7 Gray= 6/ 2/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 6/ 2/ 8 Gray= 6/ 2/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 6/ 2/ 9 Gray= 6/ 2/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 6/ 2/10 Gray= 6/ 2/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 6/ 2/11 Gray= 6/ 2/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 6/ 3/ 0 Gray= 6/ 3/11 Rel Eta,Phi=1,2 Expect 20 B$ Linear= 6/ 3/ 1 Gray= 6/ 3/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 6/ 3/ 2 Gray= 6/ 3/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 6/ 3/ 3 Gray= 6/ 3/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 6/ 3/ 4 Gray= 6/ 3/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 6/ 3/ 5 Gray= 6/ 3/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 6/ 3/ 6 Gray= 6/ 3/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 6/ 3/ 7 Gray= 6/ 3/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 6/ 3/ 8 Gray= 6/ 3/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 6/ 3/ 9 Gray= 6/ 3/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 6/ 3/10 Gray= 6/ 3/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 6/ 3/11 Gray= 6/ 3/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 6/ 4/ 0 Gray= 6/ 4/ 0 Rel Eta,Phi=1,1 Expect 10 B$ Linear= 6/ 4/ 1 Gray= 6/ 4/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 6/ 4/ 2 Gray= 6/ 4/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 6/ 4/ 3 Gray= 6/ 4/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 6/ 4/ 4 Gray= 6/ 4/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 6/ 4/ 5 Gray= 6/ 4/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 6/ 4/ 6 Gray= 6/ 4/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 6/ 4/ 7 Gray= 6/ 4/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 6/ 4/ 8 Gray= 6/ 4/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 6/ 4/ 9 Gray= 6/ 4/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 6/ 4/10 Gray= 6/ 4/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 6/ 4/11 Gray= 6/ 4/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 6/ 5/ 0 Gray= 6/ 5/11 Rel Eta,Phi=1,0 Expect 22 B$ Linear= 6/ 5/ 1 Gray= 6/ 5/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 6/ 5/ 2 Gray= 6/ 5/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 6/ 5/ 3 Gray= 6/ 5/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 6/ 5/ 4 Gray= 6/ 5/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 6/ 5/ 5 Gray= 6/ 5/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 6/ 5/ 6 Gray= 6/ 5/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 6/ 5/ 7 Gray= 6/ 5/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 6/ 5/ 8 Gray= 6/ 5/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 6/ 5/ 9 Gray= 6/ 5/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 6/ 5/10 Gray= 6/ 5/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 6/ 5/11 Gray= 6/ 5/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 6/ 6/ 0 Gray= 6/ 6/ 0 Rel Eta,Phi=2,7 Expect 12 B$ Linear= 6/ 6/ 1 Gray= 6/ 6/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 6/ 6/ 2 Gray= 6/ 6/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 6/ 6/ 3 Gray= 6/ 6/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 6/ 6/ 4 Gray= 6/ 6/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 6/ 6/ 5 Gray= 6/ 6/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 6/ 6/ 6 Gray= 6/ 6/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 6/ 6/ 7 Gray= 6/ 6/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 6/ 6/ 8 Gray= 6/ 6/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 6/ 6/ 9 Gray= 6/ 6/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 6/ 6/10 Gray= 6/ 6/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 6/ 6/11 Gray= 6/ 6/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 6/ 7/ 0 Gray= 6/ 7/11 Rel Eta,Phi=2,6 Expect 24 B$ Linear= 6/ 7/ 1 Gray= 6/ 7/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 6/ 7/ 2 Gray= 6/ 7/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 6/ 7/ 3 Gray= 6/ 7/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 6/ 7/ 4 Gray= 6/ 7/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 6/ 7/ 5 Gray= 6/ 7/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 6/ 7/ 6 Gray= 6/ 7/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 6/ 7/ 7 Gray= 6/ 7/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 6/ 7/ 8 Gray= 6/ 7/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 6/ 7/ 9 Gray= 6/ 7/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 6/ 7/10 Gray= 6/ 7/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 6/ 7/11 Gray= 6/ 7/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 6/ 8/ 0 Gray= 6/ 8/ 0 Rel Eta,Phi=2,5 Expect 14 B$ Linear= 6/ 8/ 1 Gray= 6/ 8/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 6/ 8/ 2 Gray= 6/ 8/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 6/ 8/ 3 Gray= 6/ 8/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 6/ 8/ 4 Gray= 6/ 8/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 6/ 8/ 5 Gray= 6/ 8/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 6/ 8/ 6 Gray= 6/ 8/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 6/ 8/ 7 Gray= 6/ 8/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 6/ 8/ 8 Gray= 6/ 8/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 6/ 8/ 9 Gray= 6/ 8/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 6/ 8/10 Gray= 6/ 8/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 6/ 8/11 Gray= 6/ 8/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 6/ 9/ 0 Gray= 6/ 9/11 Rel Eta,Phi=2,4 Expect 26 B$ Linear= 6/ 9/ 1 Gray= 6/ 9/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 6/ 9/ 2 Gray= 6/ 9/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 6/ 9/ 3 Gray= 6/ 9/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 6/ 9/ 4 Gray= 6/ 9/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 6/ 9/ 5 Gray= 6/ 9/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 6/ 9/ 6 Gray= 6/ 9/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 6/ 9/ 7 Gray= 6/ 9/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 6/ 9/ 8 Gray= 6/ 9/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 6/ 9/ 9 Gray= 6/ 9/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 6/ 9/10 Gray= 6/ 9/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 6/ 9/11 Gray= 6/ 9/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 6/10/ 0 Gray= 6/10/ 0 Rel Eta,Phi=2,3 Expect 16 B$ Linear= 6/10/ 1 Gray= 6/10/ 1 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 6/10/ 2 Gray= 6/10/ 2 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 6/10/ 3 Gray= 6/10/ 3 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 6/10/ 4 Gray= 6/10/ 4 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 6/10/ 5 Gray= 6/10/ 5 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 6/10/ 6 Gray= 6/10/ 6 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 6/10/ 7 Gray= 6/10/ 7 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 6/10/ 8 Gray= 6/10/ 8 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 6/10/ 9 Gray= 6/10/ 9 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 6/10/10 Gray= 6/10/10 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 6/10/11 Gray= 6/10/11 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 6/11/ 0 Gray= 6/11/11 Rel Eta,Phi=2,2 Expect 28 B$ Linear= 6/11/ 1 Gray= 6/11/10 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 6/11/ 2 Gray= 6/11/ 9 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 6/11/ 3 Gray= 6/11/ 8 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 6/11/ 4 Gray= 6/11/ 7 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 6/11/ 5 Gray= 6/11/ 6 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 6/11/ 6 Gray= 6/11/ 5 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 6/11/ 7 Gray= 6/11/ 4 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 6/11/ 8 Gray= 6/11/ 3 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 6/11/ 9 Gray= 6/11/ 2 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 6/11/10 Gray= 6/11/ 1 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 6/11/11 Gray= 6/11/ 0 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 7/ 0/ 0 Gray= 7/11/ 0 Rel Eta,Phi=3,3 Expect 18 B$ Linear= 7/ 0/ 1 Gray= 7/11/ 1 Rel Eta,Phi=0,7 Expect 19 B$ Linear= 7/ 0/ 2 Gray= 7/11/ 2 Rel Eta,Phi=0,6 Expect 20 B$ Linear= 7/ 0/ 3 Gray= 7/11/ 3 Rel Eta,Phi=0,5 Expect 21 B$ Linear= 7/ 0/ 4 Gray= 7/11/ 4 Rel Eta,Phi=0,4 Expect 22 B$ Linear= 7/ 0/ 5 Gray= 7/11/ 5 Rel Eta,Phi=0,3 Expect 23 B$ Linear= 7/ 0/ 6 Gray= 7/11/ 6 Rel Eta,Phi=0,2 Expect 24 B$ Linear= 7/ 0/ 7 Gray= 7/11/ 7 Rel Eta,Phi=0,1 Expect 25 B$ Linear= 7/ 0/ 8 Gray= 7/11/ 8 Rel Eta,Phi=0,0 Expect 26 B$ Linear= 7/ 0/ 9 Gray= 7/11/ 9 Rel Eta,Phi=1,7 Expect 27 B$ Linear= 7/ 0/10 Gray= 7/11/10 Rel Eta,Phi=1,6 Expect 28 B$ Linear= 7/ 0/11 Gray= 7/11/11 Rel Eta,Phi=1,5 Expect 29 B$ Linear= 7/ 1/ 0 Gray= 7/10/11 Rel Eta,Phi=2,2 Expect 28 B$ Linear= 7/ 1/ 1 Gray= 7/10/10 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 7/ 1/ 2 Gray= 7/10/ 9 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 7/ 1/ 3 Gray= 7/10/ 8 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 7/ 1/ 4 Gray= 7/10/ 7 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 7/ 1/ 5 Gray= 7/10/ 6 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 7/ 1/ 6 Gray= 7/10/ 5 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 7/ 1/ 7 Gray= 7/10/ 4 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 7/ 1/ 8 Gray= 7/10/ 3 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 7/ 1/ 9 Gray= 7/10/ 2 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 7/ 1/10 Gray= 7/10/ 1 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 7/ 1/11 Gray= 7/10/ 0 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 7/ 2/ 0 Gray= 7/ 9/ 0 Rel Eta,Phi=2,3 Expect 16 B$ Linear= 7/ 2/ 1 Gray= 7/ 9/ 1 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 7/ 2/ 2 Gray= 7/ 9/ 2 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 7/ 2/ 3 Gray= 7/ 9/ 3 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 7/ 2/ 4 Gray= 7/ 9/ 4 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 7/ 2/ 5 Gray= 7/ 9/ 5 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 7/ 2/ 6 Gray= 7/ 9/ 6 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 7/ 2/ 7 Gray= 7/ 9/ 7 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 7/ 2/ 8 Gray= 7/ 9/ 8 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 7/ 2/ 9 Gray= 7/ 9/ 9 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 7/ 2/10 Gray= 7/ 9/10 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 7/ 2/11 Gray= 7/ 9/11 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 7/ 3/ 0 Gray= 7/ 8/11 Rel Eta,Phi=2,4 Expect 26 B$ Linear= 7/ 3/ 1 Gray= 7/ 8/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 7/ 3/ 2 Gray= 7/ 8/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 7/ 3/ 3 Gray= 7/ 8/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 7/ 3/ 4 Gray= 7/ 8/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 7/ 3/ 5 Gray= 7/ 8/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 7/ 3/ 6 Gray= 7/ 8/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 7/ 3/ 7 Gray= 7/ 8/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 7/ 3/ 8 Gray= 7/ 8/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 7/ 3/ 9 Gray= 7/ 8/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 7/ 3/10 Gray= 7/ 8/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 7/ 3/11 Gray= 7/ 8/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 7/ 4/ 0 Gray= 7/ 7/ 0 Rel Eta,Phi=2,5 Expect 14 B$ Linear= 7/ 4/ 1 Gray= 7/ 7/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 7/ 4/ 2 Gray= 7/ 7/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 7/ 4/ 3 Gray= 7/ 7/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 7/ 4/ 4 Gray= 7/ 7/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 7/ 4/ 5 Gray= 7/ 7/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 7/ 4/ 6 Gray= 7/ 7/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 7/ 4/ 7 Gray= 7/ 7/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 7/ 4/ 8 Gray= 7/ 7/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 7/ 4/ 9 Gray= 7/ 7/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 7/ 4/10 Gray= 7/ 7/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 7/ 4/11 Gray= 7/ 7/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 7/ 5/ 0 Gray= 7/ 6/11 Rel Eta,Phi=2,6 Expect 24 B$ Linear= 7/ 5/ 1 Gray= 7/ 6/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 7/ 5/ 2 Gray= 7/ 6/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 7/ 5/ 3 Gray= 7/ 6/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 7/ 5/ 4 Gray= 7/ 6/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 7/ 5/ 5 Gray= 7/ 6/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 7/ 5/ 6 Gray= 7/ 6/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 7/ 5/ 7 Gray= 7/ 6/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 7/ 5/ 8 Gray= 7/ 6/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 7/ 5/ 9 Gray= 7/ 6/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 7/ 5/10 Gray= 7/ 6/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 7/ 5/11 Gray= 7/ 6/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 7/ 6/ 0 Gray= 7/ 5/ 0 Rel Eta,Phi=2,7 Expect 12 B$ Linear= 7/ 6/ 1 Gray= 7/ 5/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 7/ 6/ 2 Gray= 7/ 5/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 7/ 6/ 3 Gray= 7/ 5/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 7/ 6/ 4 Gray= 7/ 5/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 7/ 6/ 5 Gray= 7/ 5/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 7/ 6/ 6 Gray= 7/ 5/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 7/ 6/ 7 Gray= 7/ 5/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 7/ 6/ 8 Gray= 7/ 5/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 7/ 6/ 9 Gray= 7/ 5/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 7/ 6/10 Gray= 7/ 5/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 7/ 6/11 Gray= 7/ 5/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 7/ 7/ 0 Gray= 7/ 4/11 Rel Eta,Phi=1,0 Expect 22 B$ Linear= 7/ 7/ 1 Gray= 7/ 4/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 7/ 7/ 2 Gray= 7/ 4/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 7/ 7/ 3 Gray= 7/ 4/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 7/ 7/ 4 Gray= 7/ 4/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 7/ 7/ 5 Gray= 7/ 4/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 7/ 7/ 6 Gray= 7/ 4/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 7/ 7/ 7 Gray= 7/ 4/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 7/ 7/ 8 Gray= 7/ 4/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 7/ 7/ 9 Gray= 7/ 4/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 7/ 7/10 Gray= 7/ 4/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 7/ 7/11 Gray= 7/ 4/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 7/ 8/ 0 Gray= 7/ 3/ 0 Rel Eta,Phi=1,1 Expect 10 B$ Linear= 7/ 8/ 1 Gray= 7/ 3/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 7/ 8/ 2 Gray= 7/ 3/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 7/ 8/ 3 Gray= 7/ 3/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 7/ 8/ 4 Gray= 7/ 3/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 7/ 8/ 5 Gray= 7/ 3/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 7/ 8/ 6 Gray= 7/ 3/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 7/ 8/ 7 Gray= 7/ 3/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 7/ 8/ 8 Gray= 7/ 3/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 7/ 8/ 9 Gray= 7/ 3/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 7/ 8/10 Gray= 7/ 3/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 7/ 8/11 Gray= 7/ 3/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 7/ 9/ 0 Gray= 7/ 2/11 Rel Eta,Phi=1,2 Expect 20 B$ Linear= 7/ 9/ 1 Gray= 7/ 2/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 7/ 9/ 2 Gray= 7/ 2/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 7/ 9/ 3 Gray= 7/ 2/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 7/ 9/ 4 Gray= 7/ 2/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 7/ 9/ 5 Gray= 7/ 2/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 7/ 9/ 6 Gray= 7/ 2/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 7/ 9/ 7 Gray= 7/ 2/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 7/ 9/ 8 Gray= 7/ 2/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 7/ 9/ 9 Gray= 7/ 2/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 7/ 9/10 Gray= 7/ 2/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 7/ 9/11 Gray= 7/ 2/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 7/10/ 0 Gray= 7/ 1/ 0 Rel Eta,Phi=1,3 Expect 8 B$ Linear= 7/10/ 1 Gray= 7/ 1/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 7/10/ 2 Gray= 7/ 1/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 7/10/ 3 Gray= 7/ 1/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 7/10/ 4 Gray= 7/ 1/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 7/10/ 5 Gray= 7/ 1/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 7/10/ 6 Gray= 7/ 1/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 7/10/ 7 Gray= 7/ 1/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 7/10/ 8 Gray= 7/ 1/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 7/10/ 9 Gray= 7/ 1/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 7/10/10 Gray= 7/ 1/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 7/10/11 Gray= 7/ 1/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 7/11/ 0 Gray= 7/ 0/11 Rel Eta,Phi=1,4 Expect 18 B$ Linear= 7/11/ 1 Gray= 7/ 0/10 Rel Eta,Phi=1,5 Expect 17 B$ Linear= 7/11/ 2 Gray= 7/ 0/ 9 Rel Eta,Phi=1,6 Expect 16 B$ Linear= 7/11/ 3 Gray= 7/ 0/ 8 Rel Eta,Phi=1,7 Expect 15 B$ Linear= 7/11/ 4 Gray= 7/ 0/ 7 Rel Eta,Phi=0,0 Expect 14 B$ Linear= 7/11/ 5 Gray= 7/ 0/ 6 Rel Eta,Phi=0,1 Expect 13 B$ Linear= 7/11/ 6 Gray= 7/ 0/ 5 Rel Eta,Phi=0,2 Expect 12 B$ Linear= 7/11/ 7 Gray= 7/ 0/ 4 Rel Eta,Phi=0,3 Expect 11 B$ Linear= 7/11/ 8 Gray= 7/ 0/ 3 Rel Eta,Phi=0,4 Expect 10 B$ Linear= 7/11/ 9 Gray= 7/ 0/ 2 Rel Eta,Phi=0,5 Expect 9 B$ Linear= 7/11/10 Gray= 7/ 0/ 1 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 7/11/11 Gray= 7/ 0/ 0 Rel Eta,Phi=0,7 Expect 7 B$ Linear= 8/ 0/ 0 Gray= 8/ 0/ 0 Rel Eta,Phi=3,2 Expect 8 B$ Linear= 8/ 0/ 1 Gray= 8/ 0/ 1 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 8/ 0/ 2 Gray= 8/ 0/ 2 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 8/ 0/ 3 Gray= 8/ 0/ 3 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 8/ 0/ 4 Gray= 8/ 0/ 4 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 8/ 0/ 5 Gray= 8/ 0/ 5 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 8/ 0/ 6 Gray= 8/ 0/ 6 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 8/ 0/ 7 Gray= 8/ 0/ 7 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 8/ 0/ 8 Gray= 8/ 0/ 8 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 8/ 0/ 9 Gray= 8/ 0/ 9 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 8/ 0/10 Gray= 8/ 0/10 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 8/ 0/11 Gray= 8/ 0/11 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 8/ 1/ 0 Gray= 8/ 1/11 Rel Eta,Phi=1,4 Expect 20 B$ Linear= 8/ 1/ 1 Gray= 8/ 1/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 8/ 1/ 2 Gray= 8/ 1/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 8/ 1/ 3 Gray= 8/ 1/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 8/ 1/ 4 Gray= 8/ 1/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 8/ 1/ 5 Gray= 8/ 1/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 8/ 1/ 6 Gray= 8/ 1/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 8/ 1/ 7 Gray= 8/ 1/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 8/ 1/ 8 Gray= 8/ 1/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 8/ 1/ 9 Gray= 8/ 1/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 8/ 1/10 Gray= 8/ 1/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 8/ 1/11 Gray= 8/ 1/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear= 8/ 2/ 0 Gray= 8/ 2/ 0 Rel Eta,Phi=1,3 Expect 10 B$ Linear= 8/ 2/ 1 Gray= 8/ 2/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 8/ 2/ 2 Gray= 8/ 2/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 8/ 2/ 3 Gray= 8/ 2/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 8/ 2/ 4 Gray= 8/ 2/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 8/ 2/ 5 Gray= 8/ 2/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 8/ 2/ 6 Gray= 8/ 2/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 8/ 2/ 7 Gray= 8/ 2/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 8/ 2/ 8 Gray= 8/ 2/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 8/ 2/ 9 Gray= 8/ 2/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 8/ 2/10 Gray= 8/ 2/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 8/ 2/11 Gray= 8/ 2/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 8/ 3/ 0 Gray= 8/ 3/11 Rel Eta,Phi=1,2 Expect 22 B$ Linear= 8/ 3/ 1 Gray= 8/ 3/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 8/ 3/ 2 Gray= 8/ 3/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 8/ 3/ 3 Gray= 8/ 3/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 8/ 3/ 4 Gray= 8/ 3/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 8/ 3/ 5 Gray= 8/ 3/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 8/ 3/ 6 Gray= 8/ 3/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 8/ 3/ 7 Gray= 8/ 3/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 8/ 3/ 8 Gray= 8/ 3/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 8/ 3/ 9 Gray= 8/ 3/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 8/ 3/10 Gray= 8/ 3/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 8/ 3/11 Gray= 8/ 3/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 8/ 4/ 0 Gray= 8/ 4/ 0 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 8/ 4/ 1 Gray= 8/ 4/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 8/ 4/ 2 Gray= 8/ 4/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 8/ 4/ 3 Gray= 8/ 4/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 8/ 4/ 4 Gray= 8/ 4/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 8/ 4/ 5 Gray= 8/ 4/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 8/ 4/ 6 Gray= 8/ 4/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 8/ 4/ 7 Gray= 8/ 4/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 8/ 4/ 8 Gray= 8/ 4/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 8/ 4/ 9 Gray= 8/ 4/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 8/ 4/10 Gray= 8/ 4/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 8/ 4/11 Gray= 8/ 4/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 8/ 5/ 0 Gray= 8/ 5/11 Rel Eta,Phi=1,0 Expect 24 B$ Linear= 8/ 5/ 1 Gray= 8/ 5/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 8/ 5/ 2 Gray= 8/ 5/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 8/ 5/ 3 Gray= 8/ 5/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 8/ 5/ 4 Gray= 8/ 5/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 8/ 5/ 5 Gray= 8/ 5/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 8/ 5/ 6 Gray= 8/ 5/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 8/ 5/ 7 Gray= 8/ 5/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 8/ 5/ 8 Gray= 8/ 5/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 8/ 5/ 9 Gray= 8/ 5/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 8/ 5/10 Gray= 8/ 5/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 8/ 5/11 Gray= 8/ 5/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 8/ 6/ 0 Gray= 8/ 6/ 0 Rel Eta,Phi=2,7 Expect 14 B$ Linear= 8/ 6/ 1 Gray= 8/ 6/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 8/ 6/ 2 Gray= 8/ 6/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 8/ 6/ 3 Gray= 8/ 6/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 8/ 6/ 4 Gray= 8/ 6/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 8/ 6/ 5 Gray= 8/ 6/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 8/ 6/ 6 Gray= 8/ 6/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 8/ 6/ 7 Gray= 8/ 6/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 8/ 6/ 8 Gray= 8/ 6/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 8/ 6/ 9 Gray= 8/ 6/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 8/ 6/10 Gray= 8/ 6/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 8/ 6/11 Gray= 8/ 6/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 8/ 7/ 0 Gray= 8/ 7/11 Rel Eta,Phi=2,6 Expect 26 B$ Linear= 8/ 7/ 1 Gray= 8/ 7/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 8/ 7/ 2 Gray= 8/ 7/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 8/ 7/ 3 Gray= 8/ 7/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 8/ 7/ 4 Gray= 8/ 7/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 8/ 7/ 5 Gray= 8/ 7/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 8/ 7/ 6 Gray= 8/ 7/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 8/ 7/ 7 Gray= 8/ 7/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 8/ 7/ 8 Gray= 8/ 7/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 8/ 7/ 9 Gray= 8/ 7/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 8/ 7/10 Gray= 8/ 7/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 8/ 7/11 Gray= 8/ 7/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 8/ 8/ 0 Gray= 8/ 8/ 0 Rel Eta,Phi=2,5 Expect 16 B$ Linear= 8/ 8/ 1 Gray= 8/ 8/ 1 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 8/ 8/ 2 Gray= 8/ 8/ 2 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 8/ 8/ 3 Gray= 8/ 8/ 3 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 8/ 8/ 4 Gray= 8/ 8/ 4 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 8/ 8/ 5 Gray= 8/ 8/ 5 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 8/ 8/ 6 Gray= 8/ 8/ 6 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 8/ 8/ 7 Gray= 8/ 8/ 7 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 8/ 8/ 8 Gray= 8/ 8/ 8 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 8/ 8/ 9 Gray= 8/ 8/ 9 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 8/ 8/10 Gray= 8/ 8/10 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 8/ 8/11 Gray= 8/ 8/11 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 8/ 9/ 0 Gray= 8/ 9/11 Rel Eta,Phi=2,4 Expect 28 B$ Linear= 8/ 9/ 1 Gray= 8/ 9/10 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 8/ 9/ 2 Gray= 8/ 9/ 9 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 8/ 9/ 3 Gray= 8/ 9/ 8 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 8/ 9/ 4 Gray= 8/ 9/ 7 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 8/ 9/ 5 Gray= 8/ 9/ 6 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 8/ 9/ 6 Gray= 8/ 9/ 5 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 8/ 9/ 7 Gray= 8/ 9/ 4 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 8/ 9/ 8 Gray= 8/ 9/ 3 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 8/ 9/ 9 Gray= 8/ 9/ 2 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 8/ 9/10 Gray= 8/ 9/ 1 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 8/ 9/11 Gray= 8/ 9/ 0 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 8/10/ 0 Gray= 8/10/ 0 Rel Eta,Phi=2,3 Expect 18 B$ Linear= 8/10/ 1 Gray= 8/10/ 1 Rel Eta,Phi=0,7 Expect 19 B$ Linear= 8/10/ 2 Gray= 8/10/ 2 Rel Eta,Phi=0,6 Expect 20 B$ Linear= 8/10/ 3 Gray= 8/10/ 3 Rel Eta,Phi=0,5 Expect 21 B$ Linear= 8/10/ 4 Gray= 8/10/ 4 Rel Eta,Phi=0,4 Expect 22 B$ Linear= 8/10/ 5 Gray= 8/10/ 5 Rel Eta,Phi=0,3 Expect 23 B$ Linear= 8/10/ 6 Gray= 8/10/ 6 Rel Eta,Phi=0,2 Expect 24 B$ Linear= 8/10/ 7 Gray= 8/10/ 7 Rel Eta,Phi=0,1 Expect 25 B$ Linear= 8/10/ 8 Gray= 8/10/ 8 Rel Eta,Phi=0,0 Expect 26 B$ Linear= 8/10/ 9 Gray= 8/10/ 9 Rel Eta,Phi=1,7 Expect 27 B$ Linear= 8/10/10 Gray= 8/10/10 Rel Eta,Phi=1,6 Expect 28 B$ Linear= 8/10/11 Gray= 8/10/11 Rel Eta,Phi=1,5 Expect 29 B$ Linear= 8/11/ 0 Gray= 8/11/11 Rel Eta,Phi=2,2 Expect 30 B$ Linear= 8/11/ 1 Gray= 8/11/10 Rel Eta,Phi=1,5 Expect 29 B$ Linear= 8/11/ 2 Gray= 8/11/ 9 Rel Eta,Phi=1,6 Expect 28 B$ Linear= 8/11/ 3 Gray= 8/11/ 8 Rel Eta,Phi=1,7 Expect 27 B$ Linear= 8/11/ 4 Gray= 8/11/ 7 Rel Eta,Phi=0,0 Expect 26 B$ Linear= 8/11/ 5 Gray= 8/11/ 6 Rel Eta,Phi=0,1 Expect 25 B$ Linear= 8/11/ 6 Gray= 8/11/ 5 Rel Eta,Phi=0,2 Expect 24 B$ Linear= 8/11/ 7 Gray= 8/11/ 4 Rel Eta,Phi=0,3 Expect 23 B$ Linear= 8/11/ 8 Gray= 8/11/ 3 Rel Eta,Phi=0,4 Expect 22 B$ Linear= 8/11/ 9 Gray= 8/11/ 2 Rel Eta,Phi=0,5 Expect 21 B$ Linear= 8/11/10 Gray= 8/11/ 1 Rel Eta,Phi=0,6 Expect 20 B$ Linear= 8/11/11 Gray= 8/11/ 0 Rel Eta,Phi=0,7 Expect 19 B$ Linear= 9/ 0/ 0 Gray= 9/11/ 0 Rel Eta,Phi=3,1 Expect 20 B$ Linear= 9/ 0/ 1 Gray= 9/11/ 1 Rel Eta,Phi=0,7 Expect 21 B$ Linear= 9/ 0/ 2 Gray= 9/11/ 2 Rel Eta,Phi=0,6 Expect 22 B$ Linear= 9/ 0/ 3 Gray= 9/11/ 3 Rel Eta,Phi=0,5 Expect 23 B$ Linear= 9/ 0/ 4 Gray= 9/11/ 4 Rel Eta,Phi=0,4 Expect 24 B$ Linear= 9/ 0/ 5 Gray= 9/11/ 5 Rel Eta,Phi=0,3 Expect 25 B$ Linear= 9/ 0/ 6 Gray= 9/11/ 6 Rel Eta,Phi=0,2 Expect 26 B$ Linear= 9/ 0/ 7 Gray= 9/11/ 7 Rel Eta,Phi=0,1 Expect 27 B$ Linear= 9/ 0/ 8 Gray= 9/11/ 8 Rel Eta,Phi=0,0 Expect 28 B$ Linear= 9/ 0/ 9 Gray= 9/11/ 9 Rel Eta,Phi=1,7 Expect 29 B$ Linear= 9/ 0/10 Gray= 9/11/10 Rel Eta,Phi=1,6 Expect 30 B$ Linear= 9/ 0/11 Gray= 9/11/11 Rel Eta,Phi=1,5 Expect 31 B$ Linear= 9/ 1/ 0 Gray= 9/10/11 Rel Eta,Phi=2,2 Expect 30 B$ Linear= 9/ 1/ 1 Gray= 9/10/10 Rel Eta,Phi=1,5 Expect 29 B$ Linear= 9/ 1/ 2 Gray= 9/10/ 9 Rel Eta,Phi=1,6 Expect 28 B$ Linear= 9/ 1/ 3 Gray= 9/10/ 8 Rel Eta,Phi=1,7 Expect 27 B$ Linear= 9/ 1/ 4 Gray= 9/10/ 7 Rel Eta,Phi=0,0 Expect 26 B$ Linear= 9/ 1/ 5 Gray= 9/10/ 6 Rel Eta,Phi=0,1 Expect 25 B$ Linear= 9/ 1/ 6 Gray= 9/10/ 5 Rel Eta,Phi=0,2 Expect 24 B$ Linear= 9/ 1/ 7 Gray= 9/10/ 4 Rel Eta,Phi=0,3 Expect 23 B$ Linear= 9/ 1/ 8 Gray= 9/10/ 3 Rel Eta,Phi=0,4 Expect 22 B$ Linear= 9/ 1/ 9 Gray= 9/10/ 2 Rel Eta,Phi=0,5 Expect 21 B$ Linear= 9/ 1/10 Gray= 9/10/ 1 Rel Eta,Phi=0,6 Expect 20 B$ Linear= 9/ 1/11 Gray= 9/10/ 0 Rel Eta,Phi=0,7 Expect 19 B$ Linear= 9/ 2/ 0 Gray= 9/ 9/ 0 Rel Eta,Phi=2,3 Expect 18 B$ Linear= 9/ 2/ 1 Gray= 9/ 9/ 1 Rel Eta,Phi=0,7 Expect 19 B$ Linear= 9/ 2/ 2 Gray= 9/ 9/ 2 Rel Eta,Phi=0,6 Expect 20 B$ Linear= 9/ 2/ 3 Gray= 9/ 9/ 3 Rel Eta,Phi=0,5 Expect 21 B$ Linear= 9/ 2/ 4 Gray= 9/ 9/ 4 Rel Eta,Phi=0,4 Expect 22 B$ Linear= 9/ 2/ 5 Gray= 9/ 9/ 5 Rel Eta,Phi=0,3 Expect 23 B$ Linear= 9/ 2/ 6 Gray= 9/ 9/ 6 Rel Eta,Phi=0,2 Expect 24 B$ Linear= 9/ 2/ 7 Gray= 9/ 9/ 7 Rel Eta,Phi=0,1 Expect 25 B$ Linear= 9/ 2/ 8 Gray= 9/ 9/ 8 Rel Eta,Phi=0,0 Expect 26 B$ Linear= 9/ 2/ 9 Gray= 9/ 9/ 9 Rel Eta,Phi=1,7 Expect 27 B$ Linear= 9/ 2/10 Gray= 9/ 9/10 Rel Eta,Phi=1,6 Expect 28 B$ Linear= 9/ 2/11 Gray= 9/ 9/11 Rel Eta,Phi=1,5 Expect 29 B$ Linear= 9/ 3/ 0 Gray= 9/ 8/11 Rel Eta,Phi=2,4 Expect 28 B$ Linear= 9/ 3/ 1 Gray= 9/ 8/10 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 9/ 3/ 2 Gray= 9/ 8/ 9 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 9/ 3/ 3 Gray= 9/ 8/ 8 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 9/ 3/ 4 Gray= 9/ 8/ 7 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 9/ 3/ 5 Gray= 9/ 8/ 6 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 9/ 3/ 6 Gray= 9/ 8/ 5 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 9/ 3/ 7 Gray= 9/ 8/ 4 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 9/ 3/ 8 Gray= 9/ 8/ 3 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 9/ 3/ 9 Gray= 9/ 8/ 2 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 9/ 3/10 Gray= 9/ 8/ 1 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 9/ 3/11 Gray= 9/ 8/ 0 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 9/ 4/ 0 Gray= 9/ 7/ 0 Rel Eta,Phi=2,5 Expect 16 B$ Linear= 9/ 4/ 1 Gray= 9/ 7/ 1 Rel Eta,Phi=0,7 Expect 17 B$ Linear= 9/ 4/ 2 Gray= 9/ 7/ 2 Rel Eta,Phi=0,6 Expect 18 B$ Linear= 9/ 4/ 3 Gray= 9/ 7/ 3 Rel Eta,Phi=0,5 Expect 19 B$ Linear= 9/ 4/ 4 Gray= 9/ 7/ 4 Rel Eta,Phi=0,4 Expect 20 B$ Linear= 9/ 4/ 5 Gray= 9/ 7/ 5 Rel Eta,Phi=0,3 Expect 21 B$ Linear= 9/ 4/ 6 Gray= 9/ 7/ 6 Rel Eta,Phi=0,2 Expect 22 B$ Linear= 9/ 4/ 7 Gray= 9/ 7/ 7 Rel Eta,Phi=0,1 Expect 23 B$ Linear= 9/ 4/ 8 Gray= 9/ 7/ 8 Rel Eta,Phi=0,0 Expect 24 B$ Linear= 9/ 4/ 9 Gray= 9/ 7/ 9 Rel Eta,Phi=1,7 Expect 25 B$ Linear= 9/ 4/10 Gray= 9/ 7/10 Rel Eta,Phi=1,6 Expect 26 B$ Linear= 9/ 4/11 Gray= 9/ 7/11 Rel Eta,Phi=1,5 Expect 27 B$ Linear= 9/ 5/ 0 Gray= 9/ 6/11 Rel Eta,Phi=2,6 Expect 26 B$ Linear= 9/ 5/ 1 Gray= 9/ 6/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 9/ 5/ 2 Gray= 9/ 6/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 9/ 5/ 3 Gray= 9/ 6/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 9/ 5/ 4 Gray= 9/ 6/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 9/ 5/ 5 Gray= 9/ 6/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 9/ 5/ 6 Gray= 9/ 6/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 9/ 5/ 7 Gray= 9/ 6/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 9/ 5/ 8 Gray= 9/ 6/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 9/ 5/ 9 Gray= 9/ 6/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 9/ 5/10 Gray= 9/ 6/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 9/ 5/11 Gray= 9/ 6/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 9/ 6/ 0 Gray= 9/ 5/ 0 Rel Eta,Phi=2,7 Expect 14 B$ Linear= 9/ 6/ 1 Gray= 9/ 5/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear= 9/ 6/ 2 Gray= 9/ 5/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear= 9/ 6/ 3 Gray= 9/ 5/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear= 9/ 6/ 4 Gray= 9/ 5/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear= 9/ 6/ 5 Gray= 9/ 5/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear= 9/ 6/ 6 Gray= 9/ 5/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear= 9/ 6/ 7 Gray= 9/ 5/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear= 9/ 6/ 8 Gray= 9/ 5/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear= 9/ 6/ 9 Gray= 9/ 5/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear= 9/ 6/10 Gray= 9/ 5/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear= 9/ 6/11 Gray= 9/ 5/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear= 9/ 7/ 0 Gray= 9/ 4/11 Rel Eta,Phi=1,0 Expect 24 B$ Linear= 9/ 7/ 1 Gray= 9/ 4/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 9/ 7/ 2 Gray= 9/ 4/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 9/ 7/ 3 Gray= 9/ 4/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 9/ 7/ 4 Gray= 9/ 4/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 9/ 7/ 5 Gray= 9/ 4/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 9/ 7/ 6 Gray= 9/ 4/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 9/ 7/ 7 Gray= 9/ 4/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 9/ 7/ 8 Gray= 9/ 4/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 9/ 7/ 9 Gray= 9/ 4/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 9/ 7/10 Gray= 9/ 4/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 9/ 7/11 Gray= 9/ 4/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 9/ 8/ 0 Gray= 9/ 3/ 0 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 9/ 8/ 1 Gray= 9/ 3/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear= 9/ 8/ 2 Gray= 9/ 3/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear= 9/ 8/ 3 Gray= 9/ 3/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear= 9/ 8/ 4 Gray= 9/ 3/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear= 9/ 8/ 5 Gray= 9/ 3/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear= 9/ 8/ 6 Gray= 9/ 3/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear= 9/ 8/ 7 Gray= 9/ 3/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear= 9/ 8/ 8 Gray= 9/ 3/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear= 9/ 8/ 9 Gray= 9/ 3/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear= 9/ 8/10 Gray= 9/ 3/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear= 9/ 8/11 Gray= 9/ 3/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear= 9/ 9/ 0 Gray= 9/ 2/11 Rel Eta,Phi=1,2 Expect 22 B$ Linear= 9/ 9/ 1 Gray= 9/ 2/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 9/ 9/ 2 Gray= 9/ 2/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 9/ 9/ 3 Gray= 9/ 2/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 9/ 9/ 4 Gray= 9/ 2/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 9/ 9/ 5 Gray= 9/ 2/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 9/ 9/ 6 Gray= 9/ 2/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 9/ 9/ 7 Gray= 9/ 2/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 9/ 9/ 8 Gray= 9/ 2/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 9/ 9/ 9 Gray= 9/ 2/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 9/ 9/10 Gray= 9/ 2/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 9/ 9/11 Gray= 9/ 2/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 9/10/ 0 Gray= 9/ 1/ 0 Rel Eta,Phi=1,3 Expect 10 B$ Linear= 9/10/ 1 Gray= 9/ 1/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear= 9/10/ 2 Gray= 9/ 1/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear= 9/10/ 3 Gray= 9/ 1/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear= 9/10/ 4 Gray= 9/ 1/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear= 9/10/ 5 Gray= 9/ 1/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear= 9/10/ 6 Gray= 9/ 1/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear= 9/10/ 7 Gray= 9/ 1/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear= 9/10/ 8 Gray= 9/ 1/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear= 9/10/ 9 Gray= 9/ 1/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear= 9/10/10 Gray= 9/ 1/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear= 9/10/11 Gray= 9/ 1/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear= 9/11/ 0 Gray= 9/ 0/11 Rel Eta,Phi=1,4 Expect 20 B$ Linear= 9/11/ 1 Gray= 9/ 0/10 Rel Eta,Phi=1,5 Expect 19 B$ Linear= 9/11/ 2 Gray= 9/ 0/ 9 Rel Eta,Phi=1,6 Expect 18 B$ Linear= 9/11/ 3 Gray= 9/ 0/ 8 Rel Eta,Phi=1,7 Expect 17 B$ Linear= 9/11/ 4 Gray= 9/ 0/ 7 Rel Eta,Phi=0,0 Expect 16 B$ Linear= 9/11/ 5 Gray= 9/ 0/ 6 Rel Eta,Phi=0,1 Expect 15 B$ Linear= 9/11/ 6 Gray= 9/ 0/ 5 Rel Eta,Phi=0,2 Expect 14 B$ Linear= 9/11/ 7 Gray= 9/ 0/ 4 Rel Eta,Phi=0,3 Expect 13 B$ Linear= 9/11/ 8 Gray= 9/ 0/ 3 Rel Eta,Phi=0,4 Expect 12 B$ Linear= 9/11/ 9 Gray= 9/ 0/ 2 Rel Eta,Phi=0,5 Expect 11 B$ Linear= 9/11/10 Gray= 9/ 0/ 1 Rel Eta,Phi=0,6 Expect 10 B$ Linear= 9/11/11 Gray= 9/ 0/ 0 Rel Eta,Phi=0,7 Expect 9 B$ Linear=10/ 0/ 0 Gray=10/ 0/ 0 Rel Eta,Phi=3,0 Expect 10 B$ Linear=10/ 0/ 1 Gray=10/ 0/ 1 Rel Eta,Phi=0,7 Expect 11 B$ Linear=10/ 0/ 2 Gray=10/ 0/ 2 Rel Eta,Phi=0,6 Expect 12 B$ Linear=10/ 0/ 3 Gray=10/ 0/ 3 Rel Eta,Phi=0,5 Expect 13 B$ Linear=10/ 0/ 4 Gray=10/ 0/ 4 Rel Eta,Phi=0,4 Expect 14 B$ Linear=10/ 0/ 5 Gray=10/ 0/ 5 Rel Eta,Phi=0,3 Expect 15 B$ Linear=10/ 0/ 6 Gray=10/ 0/ 6 Rel Eta,Phi=0,2 Expect 16 B$ Linear=10/ 0/ 7 Gray=10/ 0/ 7 Rel Eta,Phi=0,1 Expect 17 B$ Linear=10/ 0/ 8 Gray=10/ 0/ 8 Rel Eta,Phi=0,0 Expect 18 B$ Linear=10/ 0/ 9 Gray=10/ 0/ 9 Rel Eta,Phi=1,7 Expect 19 B$ Linear=10/ 0/10 Gray=10/ 0/10 Rel Eta,Phi=1,6 Expect 20 B$ Linear=10/ 0/11 Gray=10/ 0/11 Rel Eta,Phi=1,5 Expect 21 B$ Linear=10/ 1/ 0 Gray=10/ 1/11 Rel Eta,Phi=1,4 Expect 22 B$ Linear=10/ 1/ 1 Gray=10/ 1/10 Rel Eta,Phi=1,5 Expect 21 B$ Linear=10/ 1/ 2 Gray=10/ 1/ 9 Rel Eta,Phi=1,6 Expect 20 B$ Linear=10/ 1/ 3 Gray=10/ 1/ 8 Rel Eta,Phi=1,7 Expect 19 B$ Linear=10/ 1/ 4 Gray=10/ 1/ 7 Rel Eta,Phi=0,0 Expect 18 B$ Linear=10/ 1/ 5 Gray=10/ 1/ 6 Rel Eta,Phi=0,1 Expect 17 B$ Linear=10/ 1/ 6 Gray=10/ 1/ 5 Rel Eta,Phi=0,2 Expect 16 B$ Linear=10/ 1/ 7 Gray=10/ 1/ 4 Rel Eta,Phi=0,3 Expect 15 B$ Linear=10/ 1/ 8 Gray=10/ 1/ 3 Rel Eta,Phi=0,4 Expect 14 B$ Linear=10/ 1/ 9 Gray=10/ 1/ 2 Rel Eta,Phi=0,5 Expect 13 B$ Linear=10/ 1/10 Gray=10/ 1/ 1 Rel Eta,Phi=0,6 Expect 12 B$ Linear=10/ 1/11 Gray=10/ 1/ 0 Rel Eta,Phi=0,7 Expect 11 B$ Linear=10/ 2/ 0 Gray=10/ 2/ 0 Rel Eta,Phi=1,3 Expect 12 B$ Linear=10/ 2/ 1 Gray=10/ 2/ 1 Rel Eta,Phi=0,7 Expect 13 B$ Linear=10/ 2/ 2 Gray=10/ 2/ 2 Rel Eta,Phi=0,6 Expect 14 B$ Linear=10/ 2/ 3 Gray=10/ 2/ 3 Rel Eta,Phi=0,5 Expect 15 B$ Linear=10/ 2/ 4 Gray=10/ 2/ 4 Rel Eta,Phi=0,4 Expect 16 B$ Linear=10/ 2/ 5 Gray=10/ 2/ 5 Rel Eta,Phi=0,3 Expect 17 B$ Linear=10/ 2/ 6 Gray=10/ 2/ 6 Rel Eta,Phi=0,2 Expect 18 B$ Linear=10/ 2/ 7 Gray=10/ 2/ 7 Rel Eta,Phi=0,1 Expect 19 B$ Linear=10/ 2/ 8 Gray=10/ 2/ 8 Rel Eta,Phi=0,0 Expect 20 B$ Linear=10/ 2/ 9 Gray=10/ 2/ 9 Rel Eta,Phi=1,7 Expect 21 B$ Linear=10/ 2/10 Gray=10/ 2/10 Rel Eta,Phi=1,6 Expect 22 B$ Linear=10/ 2/11 Gray=10/ 2/11 Rel Eta,Phi=1,5 Expect 23 B$ Linear=10/ 3/ 0 Gray=10/ 3/11 Rel Eta,Phi=1,2 Expect 24 B$ Linear=10/ 3/ 1 Gray=10/ 3/10 Rel Eta,Phi=1,5 Expect 23 B$ Linear=10/ 3/ 2 Gray=10/ 3/ 9 Rel Eta,Phi=1,6 Expect 22 B$ Linear=10/ 3/ 3 Gray=10/ 3/ 8 Rel Eta,Phi=1,7 Expect 21 B$ Linear=10/ 3/ 4 Gray=10/ 3/ 7 Rel Eta,Phi=0,0 Expect 20 B$ Linear=10/ 3/ 5 Gray=10/ 3/ 6 Rel Eta,Phi=0,1 Expect 19 B$ Linear=10/ 3/ 6 Gray=10/ 3/ 5 Rel Eta,Phi=0,2 Expect 18 B$ Linear=10/ 3/ 7 Gray=10/ 3/ 4 Rel Eta,Phi=0,3 Expect 17 B$ Linear=10/ 3/ 8 Gray=10/ 3/ 3 Rel Eta,Phi=0,4 Expect 16 B$ Linear=10/ 3/ 9 Gray=10/ 3/ 2 Rel Eta,Phi=0,5 Expect 15 B$ Linear=10/ 3/10 Gray=10/ 3/ 1 Rel Eta,Phi=0,6 Expect 14 B$ Linear=10/ 3/11 Gray=10/ 3/ 0 Rel Eta,Phi=0,7 Expect 13 B$ Linear=10/ 4/ 0 Gray=10/ 4/ 0 Rel Eta,Phi=1,1 Expect 14 B$ Linear=10/ 4/ 1 Gray=10/ 4/ 1 Rel Eta,Phi=0,7 Expect 15 B$ Linear=10/ 4/ 2 Gray=10/ 4/ 2 Rel Eta,Phi=0,6 Expect 16 B$ Linear=10/ 4/ 3 Gray=10/ 4/ 3 Rel Eta,Phi=0,5 Expect 17 B$ Linear=10/ 4/ 4 Gray=10/ 4/ 4 Rel Eta,Phi=0,4 Expect 18 B$ Linear=10/ 4/ 5 Gray=10/ 4/ 5 Rel Eta,Phi=0,3 Expect 19 B$ Linear=10/ 4/ 6 Gray=10/ 4/ 6 Rel Eta,Phi=0,2 Expect 20 B$ Linear=10/ 4/ 7 Gray=10/ 4/ 7 Rel Eta,Phi=0,1 Expect 21 B$ Linear=10/ 4/ 8 Gray=10/ 4/ 8 Rel Eta,Phi=0,0 Expect 22 B$ Linear=10/ 4/ 9 Gray=10/ 4/ 9 Rel Eta,Phi=1,7 Expect 23 B$ Linear=10/ 4/10 Gray=10/ 4/10 Rel Eta,Phi=1,6 Expect 24 B$ Linear=10/ 4/11 Gray=10/ 4/11 Rel Eta,Phi=1,5 Expect 25 B$ Linear=10/ 5/ 0 Gray=10/ 5/11 Rel Eta,Phi=1,0 Expect 26 B$ Linear=10/ 5/ 1 Gray=10/ 5/10 Rel Eta,Phi=1,5 Expect 25 B$ Linear=10/ 5/ 2 Gray=10/ 5/ 9 Rel Eta,Phi=1,6 Expect 24 B$ Linear=10/ 5/ 3 Gray=10/ 5/ 8 Rel Eta,Phi=1,7 Expect 23 B$ Linear=10/ 5/ 4 Gray=10/ 5/ 7 Rel Eta,Phi=0,0 Expect 22 B$ Linear=10/ 5/ 5 Gray=10/ 5/ 6 Rel Eta,Phi=0,1 Expect 21 B$ Linear=10/ 5/ 6 Gray=10/ 5/ 5 Rel Eta,Phi=0,2 Expect 20 B$ Linear=10/ 5/ 7 Gray=10/ 5/ 4 Rel Eta,Phi=0,3 Expect 19 B$ Linear=10/ 5/ 8 Gray=10/ 5/ 3 Rel Eta,Phi=0,4 Expect 18 B$ Linear=10/ 5/ 9 Gray=10/ 5/ 2 Rel Eta,Phi=0,5 Expect 17 B$ Linear=10/ 5/10 Gray=10/ 5/ 1 Rel Eta,Phi=0,6 Expect 16 B$ Linear=10/ 5/11 Gray=10/ 5/ 0 Rel Eta,Phi=0,7 Expect 15 B$ Linear=10/ 6/ 0 Gray=10/ 6/ 0 Rel Eta,Phi=2,7 Expect 16 B$ Linear=10/ 6/ 1 Gray=10/ 6/ 1 Rel Eta,Phi=0,7 Expect 17 B$ Linear=10/ 6/ 2 Gray=10/ 6/ 2 Rel Eta,Phi=0,6 Expect 18 B$ Linear=10/ 6/ 3 Gray=10/ 6/ 3 Rel Eta,Phi=0,5 Expect 19 B$ Linear=10/ 6/ 4 Gray=10/ 6/ 4 Rel Eta,Phi=0,4 Expect 20 B$ Linear=10/ 6/ 5 Gray=10/ 6/ 5 Rel Eta,Phi=0,3 Expect 21 B$ Linear=10/ 6/ 6 Gray=10/ 6/ 6 Rel Eta,Phi=0,2 Expect 22 B$ Linear=10/ 6/ 7 Gray=10/ 6/ 7 Rel Eta,Phi=0,1 Expect 23 B$ Linear=10/ 6/ 8 Gray=10/ 6/ 8 Rel Eta,Phi=0,0 Expect 24 B$ Linear=10/ 6/ 9 Gray=10/ 6/ 9 Rel Eta,Phi=1,7 Expect 25 B$ Linear=10/ 6/10 Gray=10/ 6/10 Rel Eta,Phi=1,6 Expect 26 B$ Linear=10/ 6/11 Gray=10/ 6/11 Rel Eta,Phi=1,5 Expect 27 B$ Linear=10/ 7/ 0 Gray=10/ 7/11 Rel Eta,Phi=2,6 Expect 28 B$ Linear=10/ 7/ 1 Gray=10/ 7/10 Rel Eta,Phi=1,5 Expect 27 B$ Linear=10/ 7/ 2 Gray=10/ 7/ 9 Rel Eta,Phi=1,6 Expect 26 B$ Linear=10/ 7/ 3 Gray=10/ 7/ 8 Rel Eta,Phi=1,7 Expect 25 B$ Linear=10/ 7/ 4 Gray=10/ 7/ 7 Rel Eta,Phi=0,0 Expect 24 B$ Linear=10/ 7/ 5 Gray=10/ 7/ 6 Rel Eta,Phi=0,1 Expect 23 B$ Linear=10/ 7/ 6 Gray=10/ 7/ 5 Rel Eta,Phi=0,2 Expect 22 B$ Linear=10/ 7/ 7 Gray=10/ 7/ 4 Rel Eta,Phi=0,3 Expect 21 B$ Linear=10/ 7/ 8 Gray=10/ 7/ 3 Rel Eta,Phi=0,4 Expect 20 B$ Linear=10/ 7/ 9 Gray=10/ 7/ 2 Rel Eta,Phi=0,5 Expect 19 B$ Linear=10/ 7/10 Gray=10/ 7/ 1 Rel Eta,Phi=0,6 Expect 18 B$ Linear=10/ 7/11 Gray=10/ 7/ 0 Rel Eta,Phi=0,7 Expect 17 B$ Linear=10/ 8/ 0 Gray=10/ 8/ 0 Rel Eta,Phi=2,5 Expect 18 B$ Linear=10/ 8/ 1 Gray=10/ 8/ 1 Rel Eta,Phi=0,7 Expect 19 B$ Linear=10/ 8/ 2 Gray=10/ 8/ 2 Rel Eta,Phi=0,6 Expect 20 B$ Linear=10/ 8/ 3 Gray=10/ 8/ 3 Rel Eta,Phi=0,5 Expect 21 B$ Linear=10/ 8/ 4 Gray=10/ 8/ 4 Rel Eta,Phi=0,4 Expect 22 B$ Linear=10/ 8/ 5 Gray=10/ 8/ 5 Rel Eta,Phi=0,3 Expect 23 B$ Linear=10/ 8/ 6 Gray=10/ 8/ 6 Rel Eta,Phi=0,2 Expect 24 B$ Linear=10/ 8/ 7 Gray=10/ 8/ 7 Rel Eta,Phi=0,1 Expect 25 B$ Linear=10/ 8/ 8 Gray=10/ 8/ 8 Rel Eta,Phi=0,0 Expect 26 B$ Linear=10/ 8/ 9 Gray=10/ 8/ 9 Rel Eta,Phi=1,7 Expect 27 B$ Linear=10/ 8/10 Gray=10/ 8/10 Rel Eta,Phi=1,6 Expect 28 B$ Linear=10/ 8/11 Gray=10/ 8/11 Rel Eta,Phi=1,5 Expect 29 B$ Linear=10/ 9/ 0 Gray=10/ 9/11 Rel Eta,Phi=2,4 Expect 30 B$ Linear=10/ 9/ 1 Gray=10/ 9/10 Rel Eta,Phi=1,5 Expect 29 B$ Linear=10/ 9/ 2 Gray=10/ 9/ 9 Rel Eta,Phi=1,6 Expect 28 B$ Linear=10/ 9/ 3 Gray=10/ 9/ 8 Rel Eta,Phi=1,7 Expect 27 B$ Linear=10/ 9/ 4 Gray=10/ 9/ 7 Rel Eta,Phi=0,0 Expect 26 B$ Linear=10/ 9/ 5 Gray=10/ 9/ 6 Rel Eta,Phi=0,1 Expect 25 B$ Linear=10/ 9/ 6 Gray=10/ 9/ 5 Rel Eta,Phi=0,2 Expect 24 B$ Linear=10/ 9/ 7 Gray=10/ 9/ 4 Rel Eta,Phi=0,3 Expect 23 B$ Linear=10/ 9/ 8 Gray=10/ 9/ 3 Rel Eta,Phi=0,4 Expect 22 B$ Linear=10/ 9/ 9 Gray=10/ 9/ 2 Rel Eta,Phi=0,5 Expect 21 B$ Linear=10/ 9/10 Gray=10/ 9/ 1 Rel Eta,Phi=0,6 Expect 20 B$ Linear=10/ 9/11 Gray=10/ 9/ 0 Rel Eta,Phi=0,7 Expect 19 B$ Linear=10/10/ 0 Gray=10/10/ 0 Rel Eta,Phi=2,3 Expect 20 B$ Linear=10/10/ 1 Gray=10/10/ 1 Rel Eta,Phi=0,7 Expect 21 B$ Linear=10/10/ 2 Gray=10/10/ 2 Rel Eta,Phi=0,6 Expect 22 B$ Linear=10/10/ 3 Gray=10/10/ 3 Rel Eta,Phi=0,5 Expect 23 B$ Linear=10/10/ 4 Gray=10/10/ 4 Rel Eta,Phi=0,4 Expect 24 B$ Linear=10/10/ 5 Gray=10/10/ 5 Rel Eta,Phi=0,3 Expect 25 B$ Linear=10/10/ 6 Gray=10/10/ 6 Rel Eta,Phi=0,2 Expect 26 B$ Linear=10/10/ 7 Gray=10/10/ 7 Rel Eta,Phi=0,1 Expect 27 B$ Linear=10/10/ 8 Gray=10/10/ 8 Rel Eta,Phi=0,0 Expect 28 B$ Linear=10/10/ 9 Gray=10/10/ 9 Rel Eta,Phi=1,7 Expect 29 B$ Linear=10/10/10 Gray=10/10/10 Rel Eta,Phi=1,6 Expect 30 B$ Linear=10/10/11 Gray=10/10/11 Rel Eta,Phi=1,5 Expect 31 B$ Linear=10/11/ 0 Gray=10/11/11 Rel Eta,Phi=2,2 Expect 32 B$ Linear=10/11/ 1 Gray=10/11/10 Rel Eta,Phi=1,5 Expect 31 B$ Linear=10/11/ 2 Gray=10/11/ 9 Rel Eta,Phi=1,6 Expect 30 B$ Linear=10/11/ 3 Gray=10/11/ 8 Rel Eta,Phi=1,7 Expect 29 B$ Linear=10/11/ 4 Gray=10/11/ 7 Rel Eta,Phi=0,0 Expect 28 B$ Linear=10/11/ 5 Gray=10/11/ 6 Rel Eta,Phi=0,1 Expect 27 B$ Linear=10/11/ 6 Gray=10/11/ 5 Rel Eta,Phi=0,2 Expect 26 B$ Linear=10/11/ 7 Gray=10/11/ 4 Rel Eta,Phi=0,3 Expect 25 B$ Linear=10/11/ 8 Gray=10/11/ 3 Rel Eta,Phi=0,4 Expect 24 B$ Linear=10/11/ 9 Gray=10/11/ 2 Rel Eta,Phi=0,5 Expect 23 B$ Linear=10/11/10 Gray=10/11/ 1 Rel Eta,Phi=0,6 Expect 22 B$ Linear=10/11/11 Gray=10/11/ 0 Rel Eta,Phi=0,7 Expect 21 I$ Chan # 1 of 2 - Failed = 0 ... I$ Checking Tot RefSet #0 Proms on CHTCR for Eta(+1:+4),Phi(1:8) I$ Using Tier #2 Tot Et Ref Set #0 CAT2 for Eta(1:4) Op#0 @MBA#153/CA#22/FA# 0 I$ Scanning First Pass Prom # 0 B$ Linear= 0=0b00000000001 Gray=0b00000000001 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 1=0b00000000010 Gray=0b00000000011 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 2=0b00000000011 Gray=0b00000000010 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 3=0b00000000100 Gray=0b00000000110 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 4=0b00000000101 Gray=0b00000000111 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 5=0b00000000110 Gray=0b00000000101 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 6=0b00000000111 Gray=0b00000000100 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 7=0b00000001000 Gray=0b00000001100 Rel Eta,Phi=0,3 Expect 2 B$ Linear= 8=0b00000001001 Gray=0b00000001101 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 9=0b00000001010 Gray=0b00000001111 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 10=0b00000001011 Gray=0b00000001110 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 11=0b00000001100 Gray=0b00000001010 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 12=0b00000001101 Gray=0b00000001011 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 13=0b00000001110 Gray=0b00000001001 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 14=0b00000001111 Gray=0b00000001000 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 15=0b00000010000 Gray=0b00000011000 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 16=0b00000010001 Gray=0b00000011001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 17=0b00000010010 Gray=0b00000011011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 18=0b00000010011 Gray=0b00000011010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 19=0b00000010100 Gray=0b00000011110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 20=0b00000010101 Gray=0b00000011111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 21=0b00000010110 Gray=0b00000011101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 22=0b00000010111 Gray=0b00000011100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 23=0b00000011000 Gray=0b00000010100 Rel Eta,Phi=0,3 Expect 2 B$ Linear= 24=0b00000011001 Gray=0b00000010101 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 25=0b00000011010 Gray=0b00000010111 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 26=0b00000011011 Gray=0b00000010110 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 27=0b00000011100 Gray=0b00000010010 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 28=0b00000011101 Gray=0b00000010011 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 29=0b00000011110 Gray=0b00000010001 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 30=0b00000011111 Gray=0b00000010000 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 31=0b00000100000 Gray=0b00000110000 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 32=0b00000100001 Gray=0b00000110001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 33=0b00000100010 Gray=0b00000110011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 34=0b00000100011 Gray=0b00000110010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 35=0b00000100100 Gray=0b00000110110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 36=0b00000100101 Gray=0b00000110111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 37=0b00000100110 Gray=0b00000110101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 38=0b00000100111 Gray=0b00000110100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 39=0b00000101000 Gray=0b00000111100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 40=0b00000101001 Gray=0b00000111101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 41=0b00000101010 Gray=0b00000111111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 42=0b00000101011 Gray=0b00000111110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 43=0b00000101100 Gray=0b00000111010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 44=0b00000101101 Gray=0b00000111011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 45=0b00000101110 Gray=0b00000111001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 46=0b00000101111 Gray=0b00000111000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 47=0b00000110000 Gray=0b00000101000 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 48=0b00000110001 Gray=0b00000101001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 49=0b00000110010 Gray=0b00000101011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 50=0b00000110011 Gray=0b00000101010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 51=0b00000110100 Gray=0b00000101110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 52=0b00000110101 Gray=0b00000101111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 53=0b00000110110 Gray=0b00000101101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 54=0b00000110111 Gray=0b00000101100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 55=0b00000111000 Gray=0b00000100100 Rel Eta,Phi=0,3 Expect 2 B$ Linear= 56=0b00000111001 Gray=0b00000100101 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 57=0b00000111010 Gray=0b00000100111 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 58=0b00000111011 Gray=0b00000100110 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 59=0b00000111100 Gray=0b00000100010 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 60=0b00000111101 Gray=0b00000100011 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 61=0b00000111110 Gray=0b00000100001 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 62=0b00000111111 Gray=0b00000100000 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 63=0b00001000000 Gray=0b00001100000 Rel Eta,Phi=0,0 Expect 2 B$ Linear= 64=0b00001000001 Gray=0b00001100001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 65=0b00001000010 Gray=0b00001100011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 66=0b00001000011 Gray=0b00001100010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 67=0b00001000100 Gray=0b00001100110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 68=0b00001000101 Gray=0b00001100111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 69=0b00001000110 Gray=0b00001100101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 70=0b00001000111 Gray=0b00001100100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 71=0b00001001000 Gray=0b00001101100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 72=0b00001001001 Gray=0b00001101101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 73=0b00001001010 Gray=0b00001101111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 74=0b00001001011 Gray=0b00001101110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 75=0b00001001100 Gray=0b00001101010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 76=0b00001001101 Gray=0b00001101011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 77=0b00001001110 Gray=0b00001101001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 78=0b00001001111 Gray=0b00001101000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 79=0b00001010000 Gray=0b00001111000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 80=0b00001010001 Gray=0b00001111001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 81=0b00001010010 Gray=0b00001111011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 82=0b00001010011 Gray=0b00001111010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 83=0b00001010100 Gray=0b00001111110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 84=0b00001010101 Gray=0b00001111111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 85=0b00001010110 Gray=0b00001111101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 86=0b00001010111 Gray=0b00001111100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 87=0b00001011000 Gray=0b00001110100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 88=0b00001011001 Gray=0b00001110101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 89=0b00001011010 Gray=0b00001110111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 90=0b00001011011 Gray=0b00001110110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 91=0b00001011100 Gray=0b00001110010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 92=0b00001011101 Gray=0b00001110011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 93=0b00001011110 Gray=0b00001110001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 94=0b00001011111 Gray=0b00001110000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 95=0b00001100000 Gray=0b00001010000 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 96=0b00001100001 Gray=0b00001010001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 97=0b00001100010 Gray=0b00001010011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 98=0b00001100011 Gray=0b00001010010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 99=0b00001100100 Gray=0b00001010110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 100=0b00001100101 Gray=0b00001010111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 101=0b00001100110 Gray=0b00001010101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 102=0b00001100111 Gray=0b00001010100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 103=0b00001101000 Gray=0b00001011100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 104=0b00001101001 Gray=0b00001011101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 105=0b00001101010 Gray=0b00001011111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 106=0b00001101011 Gray=0b00001011110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 107=0b00001101100 Gray=0b00001011010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 108=0b00001101101 Gray=0b00001011011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 109=0b00001101110 Gray=0b00001011001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 110=0b00001101111 Gray=0b00001011000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 111=0b00001110000 Gray=0b00001001000 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 112=0b00001110001 Gray=0b00001001001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 113=0b00001110010 Gray=0b00001001011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 114=0b00001110011 Gray=0b00001001010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 115=0b00001110100 Gray=0b00001001110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 116=0b00001110101 Gray=0b00001001111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 117=0b00001110110 Gray=0b00001001101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 118=0b00001110111 Gray=0b00001001100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 119=0b00001111000 Gray=0b00001000100 Rel Eta,Phi=0,3 Expect 2 B$ Linear= 120=0b00001111001 Gray=0b00001000101 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 121=0b00001111010 Gray=0b00001000111 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 122=0b00001111011 Gray=0b00001000110 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 123=0b00001111100 Gray=0b00001000010 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 124=0b00001111101 Gray=0b00001000011 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 125=0b00001111110 Gray=0b00001000001 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 126=0b00001111111 Gray=0b00001000000 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 127=0b00010000000 Gray=0b00011000000 Rel Eta,Phi=1,0 Expect 2 B$ Linear= 128=0b00010000001 Gray=0b00011000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 129=0b00010000010 Gray=0b00011000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 130=0b00010000011 Gray=0b00011000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 131=0b00010000100 Gray=0b00011000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 132=0b00010000101 Gray=0b00011000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 133=0b00010000110 Gray=0b00011000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 134=0b00010000111 Gray=0b00011000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 135=0b00010001000 Gray=0b00011001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 136=0b00010001001 Gray=0b00011001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 137=0b00010001010 Gray=0b00011001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 138=0b00010001011 Gray=0b00011001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 139=0b00010001100 Gray=0b00011001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 140=0b00010001101 Gray=0b00011001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 141=0b00010001110 Gray=0b00011001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 142=0b00010001111 Gray=0b00011001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 143=0b00010010000 Gray=0b00011011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 144=0b00010010001 Gray=0b00011011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 145=0b00010010010 Gray=0b00011011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 146=0b00010010011 Gray=0b00011011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 147=0b00010010100 Gray=0b00011011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 148=0b00010010101 Gray=0b00011011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 149=0b00010010110 Gray=0b00011011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 150=0b00010010111 Gray=0b00011011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 151=0b00010011000 Gray=0b00011010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 152=0b00010011001 Gray=0b00011010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 153=0b00010011010 Gray=0b00011010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 154=0b00010011011 Gray=0b00011010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 155=0b00010011100 Gray=0b00011010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 156=0b00010011101 Gray=0b00011010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 157=0b00010011110 Gray=0b00011010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 158=0b00010011111 Gray=0b00011010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 159=0b00010100000 Gray=0b00011110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 160=0b00010100001 Gray=0b00011110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 161=0b00010100010 Gray=0b00011110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 162=0b00010100011 Gray=0b00011110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 163=0b00010100100 Gray=0b00011110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 164=0b00010100101 Gray=0b00011110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 165=0b00010100110 Gray=0b00011110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 166=0b00010100111 Gray=0b00011110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 167=0b00010101000 Gray=0b00011111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 168=0b00010101001 Gray=0b00011111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 169=0b00010101010 Gray=0b00011111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 170=0b00010101011 Gray=0b00011111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 171=0b00010101100 Gray=0b00011111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 172=0b00010101101 Gray=0b00011111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 173=0b00010101110 Gray=0b00011111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 174=0b00010101111 Gray=0b00011111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 175=0b00010110000 Gray=0b00011101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 176=0b00010110001 Gray=0b00011101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 177=0b00010110010 Gray=0b00011101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 178=0b00010110011 Gray=0b00011101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 179=0b00010110100 Gray=0b00011101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 180=0b00010110101 Gray=0b00011101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 181=0b00010110110 Gray=0b00011101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 182=0b00010110111 Gray=0b00011101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 183=0b00010111000 Gray=0b00011100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 184=0b00010111001 Gray=0b00011100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 185=0b00010111010 Gray=0b00011100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 186=0b00010111011 Gray=0b00011100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 187=0b00010111100 Gray=0b00011100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 188=0b00010111101 Gray=0b00011100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 189=0b00010111110 Gray=0b00011100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 190=0b00010111111 Gray=0b00011100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 191=0b00011000000 Gray=0b00010100000 Rel Eta,Phi=0,0 Expect 2 B$ Linear= 192=0b00011000001 Gray=0b00010100001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 193=0b00011000010 Gray=0b00010100011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 194=0b00011000011 Gray=0b00010100010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 195=0b00011000100 Gray=0b00010100110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 196=0b00011000101 Gray=0b00010100111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 197=0b00011000110 Gray=0b00010100101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 198=0b00011000111 Gray=0b00010100100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 199=0b00011001000 Gray=0b00010101100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 200=0b00011001001 Gray=0b00010101101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 201=0b00011001010 Gray=0b00010101111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 202=0b00011001011 Gray=0b00010101110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 203=0b00011001100 Gray=0b00010101010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 204=0b00011001101 Gray=0b00010101011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 205=0b00011001110 Gray=0b00010101001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 206=0b00011001111 Gray=0b00010101000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 207=0b00011010000 Gray=0b00010111000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 208=0b00011010001 Gray=0b00010111001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 209=0b00011010010 Gray=0b00010111011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 210=0b00011010011 Gray=0b00010111010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 211=0b00011010100 Gray=0b00010111110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 212=0b00011010101 Gray=0b00010111111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 213=0b00011010110 Gray=0b00010111101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 214=0b00011010111 Gray=0b00010111100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 215=0b00011011000 Gray=0b00010110100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 216=0b00011011001 Gray=0b00010110101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 217=0b00011011010 Gray=0b00010110111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 218=0b00011011011 Gray=0b00010110110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 219=0b00011011100 Gray=0b00010110010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 220=0b00011011101 Gray=0b00010110011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 221=0b00011011110 Gray=0b00010110001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 222=0b00011011111 Gray=0b00010110000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 223=0b00011100000 Gray=0b00010010000 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 224=0b00011100001 Gray=0b00010010001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 225=0b00011100010 Gray=0b00010010011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 226=0b00011100011 Gray=0b00010010010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 227=0b00011100100 Gray=0b00010010110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 228=0b00011100101 Gray=0b00010010111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 229=0b00011100110 Gray=0b00010010101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 230=0b00011100111 Gray=0b00010010100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 231=0b00011101000 Gray=0b00010011100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 232=0b00011101001 Gray=0b00010011101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 233=0b00011101010 Gray=0b00010011111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 234=0b00011101011 Gray=0b00010011110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 235=0b00011101100 Gray=0b00010011010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 236=0b00011101101 Gray=0b00010011011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 237=0b00011101110 Gray=0b00010011001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 238=0b00011101111 Gray=0b00010011000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 239=0b00011110000 Gray=0b00010001000 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 240=0b00011110001 Gray=0b00010001001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 241=0b00011110010 Gray=0b00010001011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 242=0b00011110011 Gray=0b00010001010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 243=0b00011110100 Gray=0b00010001110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 244=0b00011110101 Gray=0b00010001111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 245=0b00011110110 Gray=0b00010001101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 246=0b00011110111 Gray=0b00010001100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 247=0b00011111000 Gray=0b00010000100 Rel Eta,Phi=0,3 Expect 2 B$ Linear= 248=0b00011111001 Gray=0b00010000101 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 249=0b00011111010 Gray=0b00010000111 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 250=0b00011111011 Gray=0b00010000110 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 251=0b00011111100 Gray=0b00010000010 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 252=0b00011111101 Gray=0b00010000011 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 253=0b00011111110 Gray=0b00010000001 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 254=0b00011111111 Gray=0b00010000000 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 255=0b00100000000 Gray=0b00110000000 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 256=0b00100000001 Gray=0b00110000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 257=0b00100000010 Gray=0b00110000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 258=0b00100000011 Gray=0b00110000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 259=0b00100000100 Gray=0b00110000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 260=0b00100000101 Gray=0b00110000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 261=0b00100000110 Gray=0b00110000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 262=0b00100000111 Gray=0b00110000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 263=0b00100001000 Gray=0b00110001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 264=0b00100001001 Gray=0b00110001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 265=0b00100001010 Gray=0b00110001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 266=0b00100001011 Gray=0b00110001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 267=0b00100001100 Gray=0b00110001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 268=0b00100001101 Gray=0b00110001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 269=0b00100001110 Gray=0b00110001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 270=0b00100001111 Gray=0b00110001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 271=0b00100010000 Gray=0b00110011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 272=0b00100010001 Gray=0b00110011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 273=0b00100010010 Gray=0b00110011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 274=0b00100010011 Gray=0b00110011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 275=0b00100010100 Gray=0b00110011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 276=0b00100010101 Gray=0b00110011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 277=0b00100010110 Gray=0b00110011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 278=0b00100010111 Gray=0b00110011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 279=0b00100011000 Gray=0b00110010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 280=0b00100011001 Gray=0b00110010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 281=0b00100011010 Gray=0b00110010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 282=0b00100011011 Gray=0b00110010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 283=0b00100011100 Gray=0b00110010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 284=0b00100011101 Gray=0b00110010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 285=0b00100011110 Gray=0b00110010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 286=0b00100011111 Gray=0b00110010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 287=0b00100100000 Gray=0b00110110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 288=0b00100100001 Gray=0b00110110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 289=0b00100100010 Gray=0b00110110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 290=0b00100100011 Gray=0b00110110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 291=0b00100100100 Gray=0b00110110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 292=0b00100100101 Gray=0b00110110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 293=0b00100100110 Gray=0b00110110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 294=0b00100100111 Gray=0b00110110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 295=0b00100101000 Gray=0b00110111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 296=0b00100101001 Gray=0b00110111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 297=0b00100101010 Gray=0b00110111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 298=0b00100101011 Gray=0b00110111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 299=0b00100101100 Gray=0b00110111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 300=0b00100101101 Gray=0b00110111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 301=0b00100101110 Gray=0b00110111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 302=0b00100101111 Gray=0b00110111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 303=0b00100110000 Gray=0b00110101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 304=0b00100110001 Gray=0b00110101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 305=0b00100110010 Gray=0b00110101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 306=0b00100110011 Gray=0b00110101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 307=0b00100110100 Gray=0b00110101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 308=0b00100110101 Gray=0b00110101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 309=0b00100110110 Gray=0b00110101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 310=0b00100110111 Gray=0b00110101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 311=0b00100111000 Gray=0b00110100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 312=0b00100111001 Gray=0b00110100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 313=0b00100111010 Gray=0b00110100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 314=0b00100111011 Gray=0b00110100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 315=0b00100111100 Gray=0b00110100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 316=0b00100111101 Gray=0b00110100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 317=0b00100111110 Gray=0b00110100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 318=0b00100111111 Gray=0b00110100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 319=0b00101000000 Gray=0b00111100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear= 320=0b00101000001 Gray=0b00111100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 321=0b00101000010 Gray=0b00111100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 322=0b00101000011 Gray=0b00111100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 323=0b00101000100 Gray=0b00111100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 324=0b00101000101 Gray=0b00111100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 325=0b00101000110 Gray=0b00111100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 326=0b00101000111 Gray=0b00111100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 327=0b00101001000 Gray=0b00111101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 328=0b00101001001 Gray=0b00111101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 329=0b00101001010 Gray=0b00111101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 330=0b00101001011 Gray=0b00111101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 331=0b00101001100 Gray=0b00111101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 332=0b00101001101 Gray=0b00111101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 333=0b00101001110 Gray=0b00111101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 334=0b00101001111 Gray=0b00111101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 335=0b00101010000 Gray=0b00111111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 336=0b00101010001 Gray=0b00111111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 337=0b00101010010 Gray=0b00111111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 338=0b00101010011 Gray=0b00111111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 339=0b00101010100 Gray=0b00111111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 340=0b00101010101 Gray=0b00111111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 341=0b00101010110 Gray=0b00111111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 342=0b00101010111 Gray=0b00111111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 343=0b00101011000 Gray=0b00111110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 344=0b00101011001 Gray=0b00111110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 345=0b00101011010 Gray=0b00111110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 346=0b00101011011 Gray=0b00111110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 347=0b00101011100 Gray=0b00111110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 348=0b00101011101 Gray=0b00111110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 349=0b00101011110 Gray=0b00111110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 350=0b00101011111 Gray=0b00111110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 351=0b00101100000 Gray=0b00111010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 352=0b00101100001 Gray=0b00111010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 353=0b00101100010 Gray=0b00111010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 354=0b00101100011 Gray=0b00111010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 355=0b00101100100 Gray=0b00111010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 356=0b00101100101 Gray=0b00111010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 357=0b00101100110 Gray=0b00111010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 358=0b00101100111 Gray=0b00111010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 359=0b00101101000 Gray=0b00111011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 360=0b00101101001 Gray=0b00111011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 361=0b00101101010 Gray=0b00111011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 362=0b00101101011 Gray=0b00111011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 363=0b00101101100 Gray=0b00111011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 364=0b00101101101 Gray=0b00111011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 365=0b00101101110 Gray=0b00111011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 366=0b00101101111 Gray=0b00111011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 367=0b00101110000 Gray=0b00111001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 368=0b00101110001 Gray=0b00111001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 369=0b00101110010 Gray=0b00111001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 370=0b00101110011 Gray=0b00111001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 371=0b00101110100 Gray=0b00111001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 372=0b00101110101 Gray=0b00111001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 373=0b00101110110 Gray=0b00111001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 374=0b00101110111 Gray=0b00111001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 375=0b00101111000 Gray=0b00111000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 376=0b00101111001 Gray=0b00111000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 377=0b00101111010 Gray=0b00111000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 378=0b00101111011 Gray=0b00111000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 379=0b00101111100 Gray=0b00111000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 380=0b00101111101 Gray=0b00111000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 381=0b00101111110 Gray=0b00111000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 382=0b00101111111 Gray=0b00111000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 383=0b00110000000 Gray=0b00101000000 Rel Eta,Phi=1,0 Expect 2 B$ Linear= 384=0b00110000001 Gray=0b00101000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 385=0b00110000010 Gray=0b00101000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 386=0b00110000011 Gray=0b00101000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 387=0b00110000100 Gray=0b00101000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 388=0b00110000101 Gray=0b00101000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 389=0b00110000110 Gray=0b00101000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 390=0b00110000111 Gray=0b00101000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 391=0b00110001000 Gray=0b00101001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 392=0b00110001001 Gray=0b00101001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 393=0b00110001010 Gray=0b00101001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 394=0b00110001011 Gray=0b00101001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 395=0b00110001100 Gray=0b00101001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 396=0b00110001101 Gray=0b00101001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 397=0b00110001110 Gray=0b00101001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 398=0b00110001111 Gray=0b00101001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 399=0b00110010000 Gray=0b00101011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 400=0b00110010001 Gray=0b00101011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 401=0b00110010010 Gray=0b00101011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 402=0b00110010011 Gray=0b00101011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 403=0b00110010100 Gray=0b00101011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 404=0b00110010101 Gray=0b00101011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 405=0b00110010110 Gray=0b00101011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 406=0b00110010111 Gray=0b00101011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 407=0b00110011000 Gray=0b00101010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 408=0b00110011001 Gray=0b00101010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 409=0b00110011010 Gray=0b00101010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 410=0b00110011011 Gray=0b00101010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 411=0b00110011100 Gray=0b00101010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 412=0b00110011101 Gray=0b00101010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 413=0b00110011110 Gray=0b00101010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 414=0b00110011111 Gray=0b00101010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 415=0b00110100000 Gray=0b00101110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 416=0b00110100001 Gray=0b00101110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 417=0b00110100010 Gray=0b00101110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 418=0b00110100011 Gray=0b00101110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 419=0b00110100100 Gray=0b00101110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 420=0b00110100101 Gray=0b00101110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 421=0b00110100110 Gray=0b00101110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 422=0b00110100111 Gray=0b00101110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 423=0b00110101000 Gray=0b00101111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 424=0b00110101001 Gray=0b00101111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 425=0b00110101010 Gray=0b00101111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 426=0b00110101011 Gray=0b00101111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 427=0b00110101100 Gray=0b00101111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 428=0b00110101101 Gray=0b00101111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 429=0b00110101110 Gray=0b00101111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 430=0b00110101111 Gray=0b00101111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 431=0b00110110000 Gray=0b00101101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 432=0b00110110001 Gray=0b00101101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 433=0b00110110010 Gray=0b00101101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 434=0b00110110011 Gray=0b00101101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 435=0b00110110100 Gray=0b00101101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 436=0b00110110101 Gray=0b00101101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 437=0b00110110110 Gray=0b00101101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 438=0b00110110111 Gray=0b00101101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 439=0b00110111000 Gray=0b00101100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 440=0b00110111001 Gray=0b00101100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 441=0b00110111010 Gray=0b00101100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 442=0b00110111011 Gray=0b00101100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 443=0b00110111100 Gray=0b00101100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 444=0b00110111101 Gray=0b00101100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 445=0b00110111110 Gray=0b00101100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 446=0b00110111111 Gray=0b00101100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 447=0b00111000000 Gray=0b00100100000 Rel Eta,Phi=0,0 Expect 2 B$ Linear= 448=0b00111000001 Gray=0b00100100001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 449=0b00111000010 Gray=0b00100100011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 450=0b00111000011 Gray=0b00100100010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 451=0b00111000100 Gray=0b00100100110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 452=0b00111000101 Gray=0b00100100111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 453=0b00111000110 Gray=0b00100100101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 454=0b00111000111 Gray=0b00100100100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 455=0b00111001000 Gray=0b00100101100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 456=0b00111001001 Gray=0b00100101101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 457=0b00111001010 Gray=0b00100101111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 458=0b00111001011 Gray=0b00100101110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 459=0b00111001100 Gray=0b00100101010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 460=0b00111001101 Gray=0b00100101011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 461=0b00111001110 Gray=0b00100101001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 462=0b00111001111 Gray=0b00100101000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 463=0b00111010000 Gray=0b00100111000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 464=0b00111010001 Gray=0b00100111001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 465=0b00111010010 Gray=0b00100111011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 466=0b00111010011 Gray=0b00100111010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 467=0b00111010100 Gray=0b00100111110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 468=0b00111010101 Gray=0b00100111111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 469=0b00111010110 Gray=0b00100111101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 470=0b00111010111 Gray=0b00100111100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 471=0b00111011000 Gray=0b00100110100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 472=0b00111011001 Gray=0b00100110101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 473=0b00111011010 Gray=0b00100110111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 474=0b00111011011 Gray=0b00100110110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 475=0b00111011100 Gray=0b00100110010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 476=0b00111011101 Gray=0b00100110011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 477=0b00111011110 Gray=0b00100110001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 478=0b00111011111 Gray=0b00100110000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 479=0b00111100000 Gray=0b00100010000 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 480=0b00111100001 Gray=0b00100010001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 481=0b00111100010 Gray=0b00100010011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 482=0b00111100011 Gray=0b00100010010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 483=0b00111100100 Gray=0b00100010110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 484=0b00111100101 Gray=0b00100010111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 485=0b00111100110 Gray=0b00100010101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 486=0b00111100111 Gray=0b00100010100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 487=0b00111101000 Gray=0b00100011100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 488=0b00111101001 Gray=0b00100011101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 489=0b00111101010 Gray=0b00100011111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 490=0b00111101011 Gray=0b00100011110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 491=0b00111101100 Gray=0b00100011010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 492=0b00111101101 Gray=0b00100011011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 493=0b00111101110 Gray=0b00100011001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 494=0b00111101111 Gray=0b00100011000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 495=0b00111110000 Gray=0b00100001000 Rel Eta,Phi=0,2 Expect 2 B$ Linear= 496=0b00111110001 Gray=0b00100001001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 497=0b00111110010 Gray=0b00100001011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 498=0b00111110011 Gray=0b00100001010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 499=0b00111110100 Gray=0b00100001110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 500=0b00111110101 Gray=0b00100001111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 501=0b00111110110 Gray=0b00100001101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 502=0b00111110111 Gray=0b00100001100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 503=0b00111111000 Gray=0b00100000100 Rel Eta,Phi=0,3 Expect 2 B$ Linear= 504=0b00111111001 Gray=0b00100000101 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 505=0b00111111010 Gray=0b00100000111 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 506=0b00111111011 Gray=0b00100000110 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 507=0b00111111100 Gray=0b00100000010 Rel Eta,Phi=0,6 Expect 2 B$ Linear= 508=0b00111111101 Gray=0b00100000011 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 509=0b00111111110 Gray=0b00100000001 Rel Eta,Phi=0,5 Expect 2 B$ Linear= 510=0b00111111111 Gray=0b00100000000 Rel Eta,Phi=0,4 Expect 1 B$ Linear= 511=0b01000000000 Gray=0b01100000000 Rel Eta,Phi=1,2 Expect 2 B$ Linear= 512=0b01000000001 Gray=0b01100000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 513=0b01000000010 Gray=0b01100000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 514=0b01000000011 Gray=0b01100000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 515=0b01000000100 Gray=0b01100000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 516=0b01000000101 Gray=0b01100000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 517=0b01000000110 Gray=0b01100000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 518=0b01000000111 Gray=0b01100000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 519=0b01000001000 Gray=0b01100001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 520=0b01000001001 Gray=0b01100001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 521=0b01000001010 Gray=0b01100001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 522=0b01000001011 Gray=0b01100001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 523=0b01000001100 Gray=0b01100001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 524=0b01000001101 Gray=0b01100001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 525=0b01000001110 Gray=0b01100001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 526=0b01000001111 Gray=0b01100001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 527=0b01000010000 Gray=0b01100011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 528=0b01000010001 Gray=0b01100011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 529=0b01000010010 Gray=0b01100011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 530=0b01000010011 Gray=0b01100011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 531=0b01000010100 Gray=0b01100011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 532=0b01000010101 Gray=0b01100011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 533=0b01000010110 Gray=0b01100011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 534=0b01000010111 Gray=0b01100011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 535=0b01000011000 Gray=0b01100010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 536=0b01000011001 Gray=0b01100010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 537=0b01000011010 Gray=0b01100010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 538=0b01000011011 Gray=0b01100010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 539=0b01000011100 Gray=0b01100010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 540=0b01000011101 Gray=0b01100010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 541=0b01000011110 Gray=0b01100010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 542=0b01000011111 Gray=0b01100010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 543=0b01000100000 Gray=0b01100110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 544=0b01000100001 Gray=0b01100110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 545=0b01000100010 Gray=0b01100110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 546=0b01000100011 Gray=0b01100110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 547=0b01000100100 Gray=0b01100110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 548=0b01000100101 Gray=0b01100110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 549=0b01000100110 Gray=0b01100110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 550=0b01000100111 Gray=0b01100110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 551=0b01000101000 Gray=0b01100111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 552=0b01000101001 Gray=0b01100111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 553=0b01000101010 Gray=0b01100111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 554=0b01000101011 Gray=0b01100111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 555=0b01000101100 Gray=0b01100111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 556=0b01000101101 Gray=0b01100111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 557=0b01000101110 Gray=0b01100111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 558=0b01000101111 Gray=0b01100111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 559=0b01000110000 Gray=0b01100101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 560=0b01000110001 Gray=0b01100101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 561=0b01000110010 Gray=0b01100101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 562=0b01000110011 Gray=0b01100101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 563=0b01000110100 Gray=0b01100101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 564=0b01000110101 Gray=0b01100101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 565=0b01000110110 Gray=0b01100101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 566=0b01000110111 Gray=0b01100101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 567=0b01000111000 Gray=0b01100100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 568=0b01000111001 Gray=0b01100100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 569=0b01000111010 Gray=0b01100100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 570=0b01000111011 Gray=0b01100100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 571=0b01000111100 Gray=0b01100100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 572=0b01000111101 Gray=0b01100100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 573=0b01000111110 Gray=0b01100100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 574=0b01000111111 Gray=0b01100100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 575=0b01001000000 Gray=0b01101100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear= 576=0b01001000001 Gray=0b01101100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 577=0b01001000010 Gray=0b01101100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 578=0b01001000011 Gray=0b01101100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 579=0b01001000100 Gray=0b01101100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 580=0b01001000101 Gray=0b01101100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 581=0b01001000110 Gray=0b01101100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 582=0b01001000111 Gray=0b01101100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 583=0b01001001000 Gray=0b01101101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 584=0b01001001001 Gray=0b01101101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 585=0b01001001010 Gray=0b01101101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 586=0b01001001011 Gray=0b01101101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 587=0b01001001100 Gray=0b01101101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 588=0b01001001101 Gray=0b01101101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 589=0b01001001110 Gray=0b01101101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 590=0b01001001111 Gray=0b01101101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 591=0b01001010000 Gray=0b01101111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 592=0b01001010001 Gray=0b01101111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 593=0b01001010010 Gray=0b01101111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 594=0b01001010011 Gray=0b01101111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 595=0b01001010100 Gray=0b01101111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 596=0b01001010101 Gray=0b01101111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 597=0b01001010110 Gray=0b01101111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 598=0b01001010111 Gray=0b01101111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 599=0b01001011000 Gray=0b01101110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 600=0b01001011001 Gray=0b01101110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 601=0b01001011010 Gray=0b01101110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 602=0b01001011011 Gray=0b01101110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 603=0b01001011100 Gray=0b01101110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 604=0b01001011101 Gray=0b01101110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 605=0b01001011110 Gray=0b01101110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 606=0b01001011111 Gray=0b01101110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 607=0b01001100000 Gray=0b01101010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 608=0b01001100001 Gray=0b01101010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 609=0b01001100010 Gray=0b01101010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 610=0b01001100011 Gray=0b01101010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 611=0b01001100100 Gray=0b01101010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 612=0b01001100101 Gray=0b01101010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 613=0b01001100110 Gray=0b01101010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 614=0b01001100111 Gray=0b01101010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 615=0b01001101000 Gray=0b01101011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 616=0b01001101001 Gray=0b01101011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 617=0b01001101010 Gray=0b01101011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 618=0b01001101011 Gray=0b01101011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 619=0b01001101100 Gray=0b01101011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 620=0b01001101101 Gray=0b01101011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 621=0b01001101110 Gray=0b01101011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 622=0b01001101111 Gray=0b01101011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 623=0b01001110000 Gray=0b01101001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 624=0b01001110001 Gray=0b01101001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 625=0b01001110010 Gray=0b01101001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 626=0b01001110011 Gray=0b01101001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 627=0b01001110100 Gray=0b01101001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 628=0b01001110101 Gray=0b01101001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 629=0b01001110110 Gray=0b01101001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 630=0b01001110111 Gray=0b01101001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 631=0b01001111000 Gray=0b01101000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 632=0b01001111001 Gray=0b01101000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 633=0b01001111010 Gray=0b01101000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 634=0b01001111011 Gray=0b01101000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 635=0b01001111100 Gray=0b01101000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 636=0b01001111101 Gray=0b01101000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 637=0b01001111110 Gray=0b01101000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 638=0b01001111111 Gray=0b01101000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 639=0b01010000000 Gray=0b01111000000 Rel Eta,Phi=1,0 Expect 4 B$ Linear= 640=0b01010000001 Gray=0b01111000001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 641=0b01010000010 Gray=0b01111000011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 642=0b01010000011 Gray=0b01111000010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 643=0b01010000100 Gray=0b01111000110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 644=0b01010000101 Gray=0b01111000111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 645=0b01010000110 Gray=0b01111000101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 646=0b01010000111 Gray=0b01111000100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 647=0b01010001000 Gray=0b01111001100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 648=0b01010001001 Gray=0b01111001101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 649=0b01010001010 Gray=0b01111001111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 650=0b01010001011 Gray=0b01111001110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 651=0b01010001100 Gray=0b01111001010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 652=0b01010001101 Gray=0b01111001011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 653=0b01010001110 Gray=0b01111001001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 654=0b01010001111 Gray=0b01111001000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 655=0b01010010000 Gray=0b01111011000 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 656=0b01010010001 Gray=0b01111011001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 657=0b01010010010 Gray=0b01111011011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 658=0b01010010011 Gray=0b01111011010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 659=0b01010010100 Gray=0b01111011110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 660=0b01010010101 Gray=0b01111011111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 661=0b01010010110 Gray=0b01111011101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 662=0b01010010111 Gray=0b01111011100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 663=0b01010011000 Gray=0b01111010100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 664=0b01010011001 Gray=0b01111010101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 665=0b01010011010 Gray=0b01111010111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 666=0b01010011011 Gray=0b01111010110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 667=0b01010011100 Gray=0b01111010010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 668=0b01010011101 Gray=0b01111010011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 669=0b01010011110 Gray=0b01111010001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 670=0b01010011111 Gray=0b01111010000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 671=0b01010100000 Gray=0b01111110000 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 672=0b01010100001 Gray=0b01111110001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 673=0b01010100010 Gray=0b01111110011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 674=0b01010100011 Gray=0b01111110010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 675=0b01010100100 Gray=0b01111110110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 676=0b01010100101 Gray=0b01111110111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 677=0b01010100110 Gray=0b01111110101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 678=0b01010100111 Gray=0b01111110100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 679=0b01010101000 Gray=0b01111111100 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 680=0b01010101001 Gray=0b01111111101 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 681=0b01010101010 Gray=0b01111111111 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 682=0b01010101011 Gray=0b01111111110 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 683=0b01010101100 Gray=0b01111111010 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 684=0b01010101101 Gray=0b01111111011 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 685=0b01010101110 Gray=0b01111111001 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 686=0b01010101111 Gray=0b01111111000 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 687=0b01010110000 Gray=0b01111101000 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 688=0b01010110001 Gray=0b01111101001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 689=0b01010110010 Gray=0b01111101011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 690=0b01010110011 Gray=0b01111101010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 691=0b01010110100 Gray=0b01111101110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 692=0b01010110101 Gray=0b01111101111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 693=0b01010110110 Gray=0b01111101101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 694=0b01010110111 Gray=0b01111101100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 695=0b01010111000 Gray=0b01111100100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 696=0b01010111001 Gray=0b01111100101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 697=0b01010111010 Gray=0b01111100111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 698=0b01010111011 Gray=0b01111100110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 699=0b01010111100 Gray=0b01111100010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 700=0b01010111101 Gray=0b01111100011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 701=0b01010111110 Gray=0b01111100001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 702=0b01010111111 Gray=0b01111100000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 703=0b01011000000 Gray=0b01110100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear= 704=0b01011000001 Gray=0b01110100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 705=0b01011000010 Gray=0b01110100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 706=0b01011000011 Gray=0b01110100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 707=0b01011000100 Gray=0b01110100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 708=0b01011000101 Gray=0b01110100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 709=0b01011000110 Gray=0b01110100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 710=0b01011000111 Gray=0b01110100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 711=0b01011001000 Gray=0b01110101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 712=0b01011001001 Gray=0b01110101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 713=0b01011001010 Gray=0b01110101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 714=0b01011001011 Gray=0b01110101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 715=0b01011001100 Gray=0b01110101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 716=0b01011001101 Gray=0b01110101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 717=0b01011001110 Gray=0b01110101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 718=0b01011001111 Gray=0b01110101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 719=0b01011010000 Gray=0b01110111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 720=0b01011010001 Gray=0b01110111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 721=0b01011010010 Gray=0b01110111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 722=0b01011010011 Gray=0b01110111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 723=0b01011010100 Gray=0b01110111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 724=0b01011010101 Gray=0b01110111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 725=0b01011010110 Gray=0b01110111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 726=0b01011010111 Gray=0b01110111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 727=0b01011011000 Gray=0b01110110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 728=0b01011011001 Gray=0b01110110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 729=0b01011011010 Gray=0b01110110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 730=0b01011011011 Gray=0b01110110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 731=0b01011011100 Gray=0b01110110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 732=0b01011011101 Gray=0b01110110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 733=0b01011011110 Gray=0b01110110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 734=0b01011011111 Gray=0b01110110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 735=0b01011100000 Gray=0b01110010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 736=0b01011100001 Gray=0b01110010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 737=0b01011100010 Gray=0b01110010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 738=0b01011100011 Gray=0b01110010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 739=0b01011100100 Gray=0b01110010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 740=0b01011100101 Gray=0b01110010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 741=0b01011100110 Gray=0b01110010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 742=0b01011100111 Gray=0b01110010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 743=0b01011101000 Gray=0b01110011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 744=0b01011101001 Gray=0b01110011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 745=0b01011101010 Gray=0b01110011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 746=0b01011101011 Gray=0b01110011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 747=0b01011101100 Gray=0b01110011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 748=0b01011101101 Gray=0b01110011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 749=0b01011101110 Gray=0b01110011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 750=0b01011101111 Gray=0b01110011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 751=0b01011110000 Gray=0b01110001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 752=0b01011110001 Gray=0b01110001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 753=0b01011110010 Gray=0b01110001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 754=0b01011110011 Gray=0b01110001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 755=0b01011110100 Gray=0b01110001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 756=0b01011110101 Gray=0b01110001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 757=0b01011110110 Gray=0b01110001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 758=0b01011110111 Gray=0b01110001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 759=0b01011111000 Gray=0b01110000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 760=0b01011111001 Gray=0b01110000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 761=0b01011111010 Gray=0b01110000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 762=0b01011111011 Gray=0b01110000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 763=0b01011111100 Gray=0b01110000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 764=0b01011111101 Gray=0b01110000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 765=0b01011111110 Gray=0b01110000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 766=0b01011111111 Gray=0b01110000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 767=0b01100000000 Gray=0b01010000000 Rel Eta,Phi=1,1 Expect 2 B$ Linear= 768=0b01100000001 Gray=0b01010000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 769=0b01100000010 Gray=0b01010000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 770=0b01100000011 Gray=0b01010000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 771=0b01100000100 Gray=0b01010000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 772=0b01100000101 Gray=0b01010000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 773=0b01100000110 Gray=0b01010000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 774=0b01100000111 Gray=0b01010000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 775=0b01100001000 Gray=0b01010001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 776=0b01100001001 Gray=0b01010001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 777=0b01100001010 Gray=0b01010001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 778=0b01100001011 Gray=0b01010001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 779=0b01100001100 Gray=0b01010001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 780=0b01100001101 Gray=0b01010001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 781=0b01100001110 Gray=0b01010001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 782=0b01100001111 Gray=0b01010001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 783=0b01100010000 Gray=0b01010011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 784=0b01100010001 Gray=0b01010011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 785=0b01100010010 Gray=0b01010011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 786=0b01100010011 Gray=0b01010011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 787=0b01100010100 Gray=0b01010011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 788=0b01100010101 Gray=0b01010011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 789=0b01100010110 Gray=0b01010011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 790=0b01100010111 Gray=0b01010011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 791=0b01100011000 Gray=0b01010010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 792=0b01100011001 Gray=0b01010010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 793=0b01100011010 Gray=0b01010010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 794=0b01100011011 Gray=0b01010010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 795=0b01100011100 Gray=0b01010010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 796=0b01100011101 Gray=0b01010010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 797=0b01100011110 Gray=0b01010010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 798=0b01100011111 Gray=0b01010010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 799=0b01100100000 Gray=0b01010110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 800=0b01100100001 Gray=0b01010110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 801=0b01100100010 Gray=0b01010110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 802=0b01100100011 Gray=0b01010110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 803=0b01100100100 Gray=0b01010110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 804=0b01100100101 Gray=0b01010110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 805=0b01100100110 Gray=0b01010110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 806=0b01100100111 Gray=0b01010110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 807=0b01100101000 Gray=0b01010111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 808=0b01100101001 Gray=0b01010111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 809=0b01100101010 Gray=0b01010111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 810=0b01100101011 Gray=0b01010111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 811=0b01100101100 Gray=0b01010111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 812=0b01100101101 Gray=0b01010111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 813=0b01100101110 Gray=0b01010111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 814=0b01100101111 Gray=0b01010111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 815=0b01100110000 Gray=0b01010101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 816=0b01100110001 Gray=0b01010101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 817=0b01100110010 Gray=0b01010101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 818=0b01100110011 Gray=0b01010101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 819=0b01100110100 Gray=0b01010101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 820=0b01100110101 Gray=0b01010101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 821=0b01100110110 Gray=0b01010101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 822=0b01100110111 Gray=0b01010101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 823=0b01100111000 Gray=0b01010100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 824=0b01100111001 Gray=0b01010100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 825=0b01100111010 Gray=0b01010100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 826=0b01100111011 Gray=0b01010100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 827=0b01100111100 Gray=0b01010100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 828=0b01100111101 Gray=0b01010100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 829=0b01100111110 Gray=0b01010100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 830=0b01100111111 Gray=0b01010100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 831=0b01101000000 Gray=0b01011100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear= 832=0b01101000001 Gray=0b01011100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 833=0b01101000010 Gray=0b01011100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 834=0b01101000011 Gray=0b01011100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 835=0b01101000100 Gray=0b01011100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 836=0b01101000101 Gray=0b01011100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 837=0b01101000110 Gray=0b01011100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 838=0b01101000111 Gray=0b01011100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 839=0b01101001000 Gray=0b01011101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 840=0b01101001001 Gray=0b01011101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 841=0b01101001010 Gray=0b01011101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 842=0b01101001011 Gray=0b01011101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 843=0b01101001100 Gray=0b01011101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 844=0b01101001101 Gray=0b01011101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 845=0b01101001110 Gray=0b01011101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 846=0b01101001111 Gray=0b01011101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 847=0b01101010000 Gray=0b01011111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear= 848=0b01101010001 Gray=0b01011111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 849=0b01101010010 Gray=0b01011111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 850=0b01101010011 Gray=0b01011111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 851=0b01101010100 Gray=0b01011111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear= 852=0b01101010101 Gray=0b01011111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 853=0b01101010110 Gray=0b01011111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 854=0b01101010111 Gray=0b01011111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 855=0b01101011000 Gray=0b01011110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 856=0b01101011001 Gray=0b01011110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 857=0b01101011010 Gray=0b01011110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 858=0b01101011011 Gray=0b01011110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 859=0b01101011100 Gray=0b01011110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 860=0b01101011101 Gray=0b01011110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 861=0b01101011110 Gray=0b01011110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 862=0b01101011111 Gray=0b01011110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 863=0b01101100000 Gray=0b01011010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 864=0b01101100001 Gray=0b01011010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 865=0b01101100010 Gray=0b01011010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 866=0b01101100011 Gray=0b01011010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 867=0b01101100100 Gray=0b01011010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 868=0b01101100101 Gray=0b01011010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 869=0b01101100110 Gray=0b01011010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 870=0b01101100111 Gray=0b01011010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 871=0b01101101000 Gray=0b01011011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 872=0b01101101001 Gray=0b01011011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 873=0b01101101010 Gray=0b01011011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 874=0b01101101011 Gray=0b01011011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 875=0b01101101100 Gray=0b01011011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 876=0b01101101101 Gray=0b01011011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 877=0b01101101110 Gray=0b01011011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 878=0b01101101111 Gray=0b01011011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 879=0b01101110000 Gray=0b01011001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 880=0b01101110001 Gray=0b01011001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 881=0b01101110010 Gray=0b01011001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 882=0b01101110011 Gray=0b01011001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 883=0b01101110100 Gray=0b01011001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 884=0b01101110101 Gray=0b01011001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 885=0b01101110110 Gray=0b01011001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 886=0b01101110111 Gray=0b01011001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 887=0b01101111000 Gray=0b01011000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 888=0b01101111001 Gray=0b01011000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 889=0b01101111010 Gray=0b01011000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 890=0b01101111011 Gray=0b01011000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 891=0b01101111100 Gray=0b01011000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 892=0b01101111101 Gray=0b01011000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 893=0b01101111110 Gray=0b01011000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 894=0b01101111111 Gray=0b01011000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 895=0b01110000000 Gray=0b01001000000 Rel Eta,Phi=1,0 Expect 2 B$ Linear= 896=0b01110000001 Gray=0b01001000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 897=0b01110000010 Gray=0b01001000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 898=0b01110000011 Gray=0b01001000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 899=0b01110000100 Gray=0b01001000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 900=0b01110000101 Gray=0b01001000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 901=0b01110000110 Gray=0b01001000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 902=0b01110000111 Gray=0b01001000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 903=0b01110001000 Gray=0b01001001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 904=0b01110001001 Gray=0b01001001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 905=0b01110001010 Gray=0b01001001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 906=0b01110001011 Gray=0b01001001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 907=0b01110001100 Gray=0b01001001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 908=0b01110001101 Gray=0b01001001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 909=0b01110001110 Gray=0b01001001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 910=0b01110001111 Gray=0b01001001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 911=0b01110010000 Gray=0b01001011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 912=0b01110010001 Gray=0b01001011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 913=0b01110010010 Gray=0b01001011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 914=0b01110010011 Gray=0b01001011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 915=0b01110010100 Gray=0b01001011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 916=0b01110010101 Gray=0b01001011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 917=0b01110010110 Gray=0b01001011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 918=0b01110010111 Gray=0b01001011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 919=0b01110011000 Gray=0b01001010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 920=0b01110011001 Gray=0b01001010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 921=0b01110011010 Gray=0b01001010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 922=0b01110011011 Gray=0b01001010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 923=0b01110011100 Gray=0b01001010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 924=0b01110011101 Gray=0b01001010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 925=0b01110011110 Gray=0b01001010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 926=0b01110011111 Gray=0b01001010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 927=0b01110100000 Gray=0b01001110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 928=0b01110100001 Gray=0b01001110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 929=0b01110100010 Gray=0b01001110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 930=0b01110100011 Gray=0b01001110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 931=0b01110100100 Gray=0b01001110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 932=0b01110100101 Gray=0b01001110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 933=0b01110100110 Gray=0b01001110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 934=0b01110100111 Gray=0b01001110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 935=0b01110101000 Gray=0b01001111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 936=0b01110101001 Gray=0b01001111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 937=0b01110101010 Gray=0b01001111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 938=0b01110101011 Gray=0b01001111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 939=0b01110101100 Gray=0b01001111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 940=0b01110101101 Gray=0b01001111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 941=0b01110101110 Gray=0b01001111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 942=0b01110101111 Gray=0b01001111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 943=0b01110110000 Gray=0b01001101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 944=0b01110110001 Gray=0b01001101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 945=0b01110110010 Gray=0b01001101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 946=0b01110110011 Gray=0b01001101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 947=0b01110110100 Gray=0b01001101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 948=0b01110110101 Gray=0b01001101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 949=0b01110110110 Gray=0b01001101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 950=0b01110110111 Gray=0b01001101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 951=0b01110111000 Gray=0b01001100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 952=0b01110111001 Gray=0b01001100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 953=0b01110111010 Gray=0b01001100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 954=0b01110111011 Gray=0b01001100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 955=0b01110111100 Gray=0b01001100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 956=0b01110111101 Gray=0b01001100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 957=0b01110111110 Gray=0b01001100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 958=0b01110111111 Gray=0b01001100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 959=0b01111000000 Gray=0b01000100000 Rel Eta,Phi=0,0 Expect 2 B$ Linear= 960=0b01111000001 Gray=0b01000100001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 961=0b01111000010 Gray=0b01000100011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 962=0b01111000011 Gray=0b01000100010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 963=0b01111000100 Gray=0b01000100110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 964=0b01111000101 Gray=0b01000100111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 965=0b01111000110 Gray=0b01000100101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 966=0b01111000111 Gray=0b01000100100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 967=0b01111001000 Gray=0b01000101100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 968=0b01111001001 Gray=0b01000101101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 969=0b01111001010 Gray=0b01000101111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 970=0b01111001011 Gray=0b01000101110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 971=0b01111001100 Gray=0b01000101010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 972=0b01111001101 Gray=0b01000101011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 973=0b01111001110 Gray=0b01000101001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 974=0b01111001111 Gray=0b01000101000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 975=0b01111010000 Gray=0b01000111000 Rel Eta,Phi=0,2 Expect 4 B$ Linear= 976=0b01111010001 Gray=0b01000111001 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 977=0b01111010010 Gray=0b01000111011 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 978=0b01111010011 Gray=0b01000111010 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 979=0b01111010100 Gray=0b01000111110 Rel Eta,Phi=0,6 Expect 6 B$ Linear= 980=0b01111010101 Gray=0b01000111111 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 981=0b01111010110 Gray=0b01000111101 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 982=0b01111010111 Gray=0b01000111100 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 983=0b01111011000 Gray=0b01000110100 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 984=0b01111011001 Gray=0b01000110101 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 985=0b01111011010 Gray=0b01000110111 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 986=0b01111011011 Gray=0b01000110110 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 987=0b01111011100 Gray=0b01000110010 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 988=0b01111011101 Gray=0b01000110011 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 989=0b01111011110 Gray=0b01000110001 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 990=0b01111011111 Gray=0b01000110000 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 991=0b01111100000 Gray=0b01000010000 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 992=0b01111100001 Gray=0b01000010001 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 993=0b01111100010 Gray=0b01000010011 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 994=0b01111100011 Gray=0b01000010010 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 995=0b01111100100 Gray=0b01000010110 Rel Eta,Phi=0,6 Expect 4 B$ Linear= 996=0b01111100101 Gray=0b01000010111 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 997=0b01111100110 Gray=0b01000010101 Rel Eta,Phi=0,5 Expect 4 B$ Linear= 998=0b01111100111 Gray=0b01000010100 Rel Eta,Phi=0,4 Expect 3 B$ Linear= 999=0b01111101000 Gray=0b01000011100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1000=0b01111101001 Gray=0b01000011101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1001=0b01111101010 Gray=0b01000011111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1002=0b01111101011 Gray=0b01000011110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1003=0b01111101100 Gray=0b01000011010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1004=0b01111101101 Gray=0b01000011011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1005=0b01111101110 Gray=0b01000011001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1006=0b01111101111 Gray=0b01000011000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1007=0b01111110000 Gray=0b01000001000 Rel Eta,Phi=0,2 Expect 2 B$ Linear=1008=0b01111110001 Gray=0b01000001001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1009=0b01111110010 Gray=0b01000001011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1010=0b01111110011 Gray=0b01000001010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1011=0b01111110100 Gray=0b01000001110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1012=0b01111110101 Gray=0b01000001111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1013=0b01111110110 Gray=0b01000001101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1014=0b01111110111 Gray=0b01000001100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1015=0b01111111000 Gray=0b01000000100 Rel Eta,Phi=0,3 Expect 2 B$ Linear=1016=0b01111111001 Gray=0b01000000101 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1017=0b01111111010 Gray=0b01000000111 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1018=0b01111111011 Gray=0b01000000110 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1019=0b01111111100 Gray=0b01000000010 Rel Eta,Phi=0,6 Expect 2 B$ Linear=1020=0b01111111101 Gray=0b01000000011 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1021=0b01111111110 Gray=0b01000000001 Rel Eta,Phi=0,5 Expect 2 B$ Linear=1022=0b01111111111 Gray=0b01000000000 Rel Eta,Phi=0,4 Expect 1 B$ Linear=1023=0b10000000000 Gray=0b11000000000 Rel Eta,Phi=0,7 Expect 2 B$ Linear=1024=0b10000000001 Gray=0b11000000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1025=0b10000000010 Gray=0b11000000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1026=0b10000000011 Gray=0b11000000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1027=0b10000000100 Gray=0b11000000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1028=0b10000000101 Gray=0b11000000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1029=0b10000000110 Gray=0b11000000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1030=0b10000000111 Gray=0b11000000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1031=0b10000001000 Gray=0b11000001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1032=0b10000001001 Gray=0b11000001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1033=0b10000001010 Gray=0b11000001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1034=0b10000001011 Gray=0b11000001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1035=0b10000001100 Gray=0b11000001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1036=0b10000001101 Gray=0b11000001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1037=0b10000001110 Gray=0b11000001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1038=0b10000001111 Gray=0b11000001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1039=0b10000010000 Gray=0b11000011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1040=0b10000010001 Gray=0b11000011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1041=0b10000010010 Gray=0b11000011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1042=0b10000010011 Gray=0b11000011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1043=0b10000010100 Gray=0b11000011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1044=0b10000010101 Gray=0b11000011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1045=0b10000010110 Gray=0b11000011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1046=0b10000010111 Gray=0b11000011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1047=0b10000011000 Gray=0b11000010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1048=0b10000011001 Gray=0b11000010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1049=0b10000011010 Gray=0b11000010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1050=0b10000011011 Gray=0b11000010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1051=0b10000011100 Gray=0b11000010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1052=0b10000011101 Gray=0b11000010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1053=0b10000011110 Gray=0b11000010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1054=0b10000011111 Gray=0b11000010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1055=0b10000100000 Gray=0b11000110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1056=0b10000100001 Gray=0b11000110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1057=0b10000100010 Gray=0b11000110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1058=0b10000100011 Gray=0b11000110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1059=0b10000100100 Gray=0b11000110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1060=0b10000100101 Gray=0b11000110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1061=0b10000100110 Gray=0b11000110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1062=0b10000100111 Gray=0b11000110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1063=0b10000101000 Gray=0b11000111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1064=0b10000101001 Gray=0b11000111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1065=0b10000101010 Gray=0b11000111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1066=0b10000101011 Gray=0b11000111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1067=0b10000101100 Gray=0b11000111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1068=0b10000101101 Gray=0b11000111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1069=0b10000101110 Gray=0b11000111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1070=0b10000101111 Gray=0b11000111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1071=0b10000110000 Gray=0b11000101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1072=0b10000110001 Gray=0b11000101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1073=0b10000110010 Gray=0b11000101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1074=0b10000110011 Gray=0b11000101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1075=0b10000110100 Gray=0b11000101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1076=0b10000110101 Gray=0b11000101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1077=0b10000110110 Gray=0b11000101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1078=0b10000110111 Gray=0b11000101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1079=0b10000111000 Gray=0b11000100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1080=0b10000111001 Gray=0b11000100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1081=0b10000111010 Gray=0b11000100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1082=0b10000111011 Gray=0b11000100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1083=0b10000111100 Gray=0b11000100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1084=0b10000111101 Gray=0b11000100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1085=0b10000111110 Gray=0b11000100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1086=0b10000111111 Gray=0b11000100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1087=0b10001000000 Gray=0b11001100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear=1088=0b10001000001 Gray=0b11001100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1089=0b10001000010 Gray=0b11001100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1090=0b10001000011 Gray=0b11001100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1091=0b10001000100 Gray=0b11001100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1092=0b10001000101 Gray=0b11001100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1093=0b10001000110 Gray=0b11001100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1094=0b10001000111 Gray=0b11001100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1095=0b10001001000 Gray=0b11001101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1096=0b10001001001 Gray=0b11001101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1097=0b10001001010 Gray=0b11001101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1098=0b10001001011 Gray=0b11001101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1099=0b10001001100 Gray=0b11001101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1100=0b10001001101 Gray=0b11001101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1101=0b10001001110 Gray=0b11001101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1102=0b10001001111 Gray=0b11001101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1103=0b10001010000 Gray=0b11001111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1104=0b10001010001 Gray=0b11001111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1105=0b10001010010 Gray=0b11001111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1106=0b10001010011 Gray=0b11001111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1107=0b10001010100 Gray=0b11001111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1108=0b10001010101 Gray=0b11001111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1109=0b10001010110 Gray=0b11001111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1110=0b10001010111 Gray=0b11001111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1111=0b10001011000 Gray=0b11001110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1112=0b10001011001 Gray=0b11001110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1113=0b10001011010 Gray=0b11001110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1114=0b10001011011 Gray=0b11001110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1115=0b10001011100 Gray=0b11001110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1116=0b10001011101 Gray=0b11001110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1117=0b10001011110 Gray=0b11001110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1118=0b10001011111 Gray=0b11001110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1119=0b10001100000 Gray=0b11001010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1120=0b10001100001 Gray=0b11001010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1121=0b10001100010 Gray=0b11001010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1122=0b10001100011 Gray=0b11001010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1123=0b10001100100 Gray=0b11001010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1124=0b10001100101 Gray=0b11001010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1125=0b10001100110 Gray=0b11001010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1126=0b10001100111 Gray=0b11001010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1127=0b10001101000 Gray=0b11001011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1128=0b10001101001 Gray=0b11001011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1129=0b10001101010 Gray=0b11001011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1130=0b10001101011 Gray=0b11001011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1131=0b10001101100 Gray=0b11001011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1132=0b10001101101 Gray=0b11001011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1133=0b10001101110 Gray=0b11001011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1134=0b10001101111 Gray=0b11001011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1135=0b10001110000 Gray=0b11001001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1136=0b10001110001 Gray=0b11001001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1137=0b10001110010 Gray=0b11001001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1138=0b10001110011 Gray=0b11001001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1139=0b10001110100 Gray=0b11001001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1140=0b10001110101 Gray=0b11001001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1141=0b10001110110 Gray=0b11001001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1142=0b10001110111 Gray=0b11001001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1143=0b10001111000 Gray=0b11001000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1144=0b10001111001 Gray=0b11001000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1145=0b10001111010 Gray=0b11001000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1146=0b10001111011 Gray=0b11001000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1147=0b10001111100 Gray=0b11001000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1148=0b10001111101 Gray=0b11001000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1149=0b10001111110 Gray=0b11001000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1150=0b10001111111 Gray=0b11001000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1151=0b10010000000 Gray=0b11011000000 Rel Eta,Phi=1,0 Expect 4 B$ Linear=1152=0b10010000001 Gray=0b11011000001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1153=0b10010000010 Gray=0b11011000011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1154=0b10010000011 Gray=0b11011000010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1155=0b10010000100 Gray=0b11011000110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1156=0b10010000101 Gray=0b11011000111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1157=0b10010000110 Gray=0b11011000101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1158=0b10010000111 Gray=0b11011000100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1159=0b10010001000 Gray=0b11011001100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1160=0b10010001001 Gray=0b11011001101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1161=0b10010001010 Gray=0b11011001111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1162=0b10010001011 Gray=0b11011001110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1163=0b10010001100 Gray=0b11011001010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1164=0b10010001101 Gray=0b11011001011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1165=0b10010001110 Gray=0b11011001001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1166=0b10010001111 Gray=0b11011001000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1167=0b10010010000 Gray=0b11011011000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1168=0b10010010001 Gray=0b11011011001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1169=0b10010010010 Gray=0b11011011011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1170=0b10010010011 Gray=0b11011011010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1171=0b10010010100 Gray=0b11011011110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1172=0b10010010101 Gray=0b11011011111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1173=0b10010010110 Gray=0b11011011101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1174=0b10010010111 Gray=0b11011011100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1175=0b10010011000 Gray=0b11011010100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1176=0b10010011001 Gray=0b11011010101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1177=0b10010011010 Gray=0b11011010111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1178=0b10010011011 Gray=0b11011010110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1179=0b10010011100 Gray=0b11011010010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1180=0b10010011101 Gray=0b11011010011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1181=0b10010011110 Gray=0b11011010001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1182=0b10010011111 Gray=0b11011010000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1183=0b10010100000 Gray=0b11011110000 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1184=0b10010100001 Gray=0b11011110001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1185=0b10010100010 Gray=0b11011110011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1186=0b10010100011 Gray=0b11011110010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1187=0b10010100100 Gray=0b11011110110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1188=0b10010100101 Gray=0b11011110111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1189=0b10010100110 Gray=0b11011110101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1190=0b10010100111 Gray=0b11011110100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1191=0b10010101000 Gray=0b11011111100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1192=0b10010101001 Gray=0b11011111101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1193=0b10010101010 Gray=0b11011111111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1194=0b10010101011 Gray=0b11011111110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1195=0b10010101100 Gray=0b11011111010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1196=0b10010101101 Gray=0b11011111011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1197=0b10010101110 Gray=0b11011111001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1198=0b10010101111 Gray=0b11011111000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1199=0b10010110000 Gray=0b11011101000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1200=0b10010110001 Gray=0b11011101001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1201=0b10010110010 Gray=0b11011101011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1202=0b10010110011 Gray=0b11011101010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1203=0b10010110100 Gray=0b11011101110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1204=0b10010110101 Gray=0b11011101111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1205=0b10010110110 Gray=0b11011101101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1206=0b10010110111 Gray=0b11011101100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1207=0b10010111000 Gray=0b11011100100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1208=0b10010111001 Gray=0b11011100101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1209=0b10010111010 Gray=0b11011100111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1210=0b10010111011 Gray=0b11011100110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1211=0b10010111100 Gray=0b11011100010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1212=0b10010111101 Gray=0b11011100011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1213=0b10010111110 Gray=0b11011100001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1214=0b10010111111 Gray=0b11011100000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1215=0b10011000000 Gray=0b11010100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear=1216=0b10011000001 Gray=0b11010100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1217=0b10011000010 Gray=0b11010100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1218=0b10011000011 Gray=0b11010100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1219=0b10011000100 Gray=0b11010100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1220=0b10011000101 Gray=0b11010100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1221=0b10011000110 Gray=0b11010100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1222=0b10011000111 Gray=0b11010100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1223=0b10011001000 Gray=0b11010101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1224=0b10011001001 Gray=0b11010101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1225=0b10011001010 Gray=0b11010101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1226=0b10011001011 Gray=0b11010101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1227=0b10011001100 Gray=0b11010101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1228=0b10011001101 Gray=0b11010101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1229=0b10011001110 Gray=0b11010101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1230=0b10011001111 Gray=0b11010101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1231=0b10011010000 Gray=0b11010111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1232=0b10011010001 Gray=0b11010111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1233=0b10011010010 Gray=0b11010111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1234=0b10011010011 Gray=0b11010111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1235=0b10011010100 Gray=0b11010111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1236=0b10011010101 Gray=0b11010111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1237=0b10011010110 Gray=0b11010111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1238=0b10011010111 Gray=0b11010111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1239=0b10011011000 Gray=0b11010110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1240=0b10011011001 Gray=0b11010110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1241=0b10011011010 Gray=0b11010110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1242=0b10011011011 Gray=0b11010110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1243=0b10011011100 Gray=0b11010110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1244=0b10011011101 Gray=0b11010110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1245=0b10011011110 Gray=0b11010110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1246=0b10011011111 Gray=0b11010110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1247=0b10011100000 Gray=0b11010010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1248=0b10011100001 Gray=0b11010010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1249=0b10011100010 Gray=0b11010010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1250=0b10011100011 Gray=0b11010010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1251=0b10011100100 Gray=0b11010010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1252=0b10011100101 Gray=0b11010010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1253=0b10011100110 Gray=0b11010010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1254=0b10011100111 Gray=0b11010010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1255=0b10011101000 Gray=0b11010011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1256=0b10011101001 Gray=0b11010011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1257=0b10011101010 Gray=0b11010011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1258=0b10011101011 Gray=0b11010011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1259=0b10011101100 Gray=0b11010011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1260=0b10011101101 Gray=0b11010011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1261=0b10011101110 Gray=0b11010011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1262=0b10011101111 Gray=0b11010011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1263=0b10011110000 Gray=0b11010001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1264=0b10011110001 Gray=0b11010001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1265=0b10011110010 Gray=0b11010001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1266=0b10011110011 Gray=0b11010001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1267=0b10011110100 Gray=0b11010001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1268=0b10011110101 Gray=0b11010001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1269=0b10011110110 Gray=0b11010001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1270=0b10011110111 Gray=0b11010001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1271=0b10011111000 Gray=0b11010000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1272=0b10011111001 Gray=0b11010000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1273=0b10011111010 Gray=0b11010000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1274=0b10011111011 Gray=0b11010000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1275=0b10011111100 Gray=0b11010000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1276=0b10011111101 Gray=0b11010000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1277=0b10011111110 Gray=0b11010000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1278=0b10011111111 Gray=0b11010000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1279=0b10100000000 Gray=0b11110000000 Rel Eta,Phi=1,1 Expect 4 B$ Linear=1280=0b10100000001 Gray=0b11110000001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1281=0b10100000010 Gray=0b11110000011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1282=0b10100000011 Gray=0b11110000010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1283=0b10100000100 Gray=0b11110000110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1284=0b10100000101 Gray=0b11110000111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1285=0b10100000110 Gray=0b11110000101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1286=0b10100000111 Gray=0b11110000100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1287=0b10100001000 Gray=0b11110001100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1288=0b10100001001 Gray=0b11110001101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1289=0b10100001010 Gray=0b11110001111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1290=0b10100001011 Gray=0b11110001110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1291=0b10100001100 Gray=0b11110001010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1292=0b10100001101 Gray=0b11110001011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1293=0b10100001110 Gray=0b11110001001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1294=0b10100001111 Gray=0b11110001000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1295=0b10100010000 Gray=0b11110011000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1296=0b10100010001 Gray=0b11110011001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1297=0b10100010010 Gray=0b11110011011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1298=0b10100010011 Gray=0b11110011010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1299=0b10100010100 Gray=0b11110011110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1300=0b10100010101 Gray=0b11110011111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1301=0b10100010110 Gray=0b11110011101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1302=0b10100010111 Gray=0b11110011100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1303=0b10100011000 Gray=0b11110010100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1304=0b10100011001 Gray=0b11110010101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1305=0b10100011010 Gray=0b11110010111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1306=0b10100011011 Gray=0b11110010110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1307=0b10100011100 Gray=0b11110010010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1308=0b10100011101 Gray=0b11110010011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1309=0b10100011110 Gray=0b11110010001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1310=0b10100011111 Gray=0b11110010000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1311=0b10100100000 Gray=0b11110110000 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1312=0b10100100001 Gray=0b11110110001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1313=0b10100100010 Gray=0b11110110011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1314=0b10100100011 Gray=0b11110110010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1315=0b10100100100 Gray=0b11110110110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1316=0b10100100101 Gray=0b11110110111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1317=0b10100100110 Gray=0b11110110101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1318=0b10100100111 Gray=0b11110110100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1319=0b10100101000 Gray=0b11110111100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1320=0b10100101001 Gray=0b11110111101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1321=0b10100101010 Gray=0b11110111111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1322=0b10100101011 Gray=0b11110111110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1323=0b10100101100 Gray=0b11110111010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1324=0b10100101101 Gray=0b11110111011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1325=0b10100101110 Gray=0b11110111001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1326=0b10100101111 Gray=0b11110111000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1327=0b10100110000 Gray=0b11110101000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1328=0b10100110001 Gray=0b11110101001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1329=0b10100110010 Gray=0b11110101011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1330=0b10100110011 Gray=0b11110101010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1331=0b10100110100 Gray=0b11110101110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1332=0b10100110101 Gray=0b11110101111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1333=0b10100110110 Gray=0b11110101101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1334=0b10100110111 Gray=0b11110101100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1335=0b10100111000 Gray=0b11110100100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1336=0b10100111001 Gray=0b11110100101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1337=0b10100111010 Gray=0b11110100111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1338=0b10100111011 Gray=0b11110100110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1339=0b10100111100 Gray=0b11110100010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1340=0b10100111101 Gray=0b11110100011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1341=0b10100111110 Gray=0b11110100001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1342=0b10100111111 Gray=0b11110100000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1343=0b10101000000 Gray=0b11111100000 Rel Eta,Phi=0,0 Expect 6 B$ Linear=1344=0b10101000001 Gray=0b11111100001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1345=0b10101000010 Gray=0b11111100011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1346=0b10101000011 Gray=0b11111100010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1347=0b10101000100 Gray=0b11111100110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1348=0b10101000101 Gray=0b11111100111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1349=0b10101000110 Gray=0b11111100101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1350=0b10101000111 Gray=0b11111100100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1351=0b10101001000 Gray=0b11111101100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1352=0b10101001001 Gray=0b11111101101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1353=0b10101001010 Gray=0b11111101111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1354=0b10101001011 Gray=0b11111101110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1355=0b10101001100 Gray=0b11111101010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1356=0b10101001101 Gray=0b11111101011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1357=0b10101001110 Gray=0b11111101001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1358=0b10101001111 Gray=0b11111101000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1359=0b10101010000 Gray=0b11111111000 Rel Eta,Phi=0,2 Expect 8 B$ Linear=1360=0b10101010001 Gray=0b11111111001 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1361=0b10101010010 Gray=0b11111111011 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1362=0b10101010011 Gray=0b11111111010 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1363=0b10101010100 Gray=0b11111111110 Rel Eta,Phi=0,6 Expect 10 B$ Linear=1364=0b10101010101 Gray=0b11111111111 Rel Eta,Phi=0,4 Expect 11 B$ Linear=1365=0b10101010110 Gray=0b11111111101 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1366=0b10101010111 Gray=0b11111111100 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1367=0b10101011000 Gray=0b11111110100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1368=0b10101011001 Gray=0b11111110101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1369=0b10101011010 Gray=0b11111110111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1370=0b10101011011 Gray=0b11111110110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1371=0b10101011100 Gray=0b11111110010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1372=0b10101011101 Gray=0b11111110011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1373=0b10101011110 Gray=0b11111110001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1374=0b10101011111 Gray=0b11111110000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1375=0b10101100000 Gray=0b11111010000 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1376=0b10101100001 Gray=0b11111010001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1377=0b10101100010 Gray=0b11111010011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1378=0b10101100011 Gray=0b11111010010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1379=0b10101100100 Gray=0b11111010110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1380=0b10101100101 Gray=0b11111010111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1381=0b10101100110 Gray=0b11111010101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1382=0b10101100111 Gray=0b11111010100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1383=0b10101101000 Gray=0b11111011100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1384=0b10101101001 Gray=0b11111011101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1385=0b10101101010 Gray=0b11111011111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1386=0b10101101011 Gray=0b11111011110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1387=0b10101101100 Gray=0b11111011010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1388=0b10101101101 Gray=0b11111011011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1389=0b10101101110 Gray=0b11111011001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1390=0b10101101111 Gray=0b11111011000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1391=0b10101110000 Gray=0b11111001000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1392=0b10101110001 Gray=0b11111001001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1393=0b10101110010 Gray=0b11111001011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1394=0b10101110011 Gray=0b11111001010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1395=0b10101110100 Gray=0b11111001110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1396=0b10101110101 Gray=0b11111001111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1397=0b10101110110 Gray=0b11111001101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1398=0b10101110111 Gray=0b11111001100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1399=0b10101111000 Gray=0b11111000100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1400=0b10101111001 Gray=0b11111000101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1401=0b10101111010 Gray=0b11111000111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1402=0b10101111011 Gray=0b11111000110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1403=0b10101111100 Gray=0b11111000010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1404=0b10101111101 Gray=0b11111000011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1405=0b10101111110 Gray=0b11111000001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1406=0b10101111111 Gray=0b11111000000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1407=0b10110000000 Gray=0b11101000000 Rel Eta,Phi=1,0 Expect 4 B$ Linear=1408=0b10110000001 Gray=0b11101000001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1409=0b10110000010 Gray=0b11101000011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1410=0b10110000011 Gray=0b11101000010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1411=0b10110000100 Gray=0b11101000110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1412=0b10110000101 Gray=0b11101000111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1413=0b10110000110 Gray=0b11101000101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1414=0b10110000111 Gray=0b11101000100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1415=0b10110001000 Gray=0b11101001100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1416=0b10110001001 Gray=0b11101001101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1417=0b10110001010 Gray=0b11101001111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1418=0b10110001011 Gray=0b11101001110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1419=0b10110001100 Gray=0b11101001010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1420=0b10110001101 Gray=0b11101001011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1421=0b10110001110 Gray=0b11101001001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1422=0b10110001111 Gray=0b11101001000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1423=0b10110010000 Gray=0b11101011000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1424=0b10110010001 Gray=0b11101011001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1425=0b10110010010 Gray=0b11101011011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1426=0b10110010011 Gray=0b11101011010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1427=0b10110010100 Gray=0b11101011110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1428=0b10110010101 Gray=0b11101011111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1429=0b10110010110 Gray=0b11101011101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1430=0b10110010111 Gray=0b11101011100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1431=0b10110011000 Gray=0b11101010100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1432=0b10110011001 Gray=0b11101010101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1433=0b10110011010 Gray=0b11101010111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1434=0b10110011011 Gray=0b11101010110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1435=0b10110011100 Gray=0b11101010010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1436=0b10110011101 Gray=0b11101010011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1437=0b10110011110 Gray=0b11101010001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1438=0b10110011111 Gray=0b11101010000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1439=0b10110100000 Gray=0b11101110000 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1440=0b10110100001 Gray=0b11101110001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1441=0b10110100010 Gray=0b11101110011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1442=0b10110100011 Gray=0b11101110010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1443=0b10110100100 Gray=0b11101110110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1444=0b10110100101 Gray=0b11101110111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1445=0b10110100110 Gray=0b11101110101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1446=0b10110100111 Gray=0b11101110100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1447=0b10110101000 Gray=0b11101111100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1448=0b10110101001 Gray=0b11101111101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1449=0b10110101010 Gray=0b11101111111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1450=0b10110101011 Gray=0b11101111110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1451=0b10110101100 Gray=0b11101111010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1452=0b10110101101 Gray=0b11101111011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1453=0b10110101110 Gray=0b11101111001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1454=0b10110101111 Gray=0b11101111000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1455=0b10110110000 Gray=0b11101101000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1456=0b10110110001 Gray=0b11101101001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1457=0b10110110010 Gray=0b11101101011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1458=0b10110110011 Gray=0b11101101010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1459=0b10110110100 Gray=0b11101101110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1460=0b10110110101 Gray=0b11101101111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1461=0b10110110110 Gray=0b11101101101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1462=0b10110110111 Gray=0b11101101100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1463=0b10110111000 Gray=0b11101100100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1464=0b10110111001 Gray=0b11101100101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1465=0b10110111010 Gray=0b11101100111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1466=0b10110111011 Gray=0b11101100110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1467=0b10110111100 Gray=0b11101100010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1468=0b10110111101 Gray=0b11101100011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1469=0b10110111110 Gray=0b11101100001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1470=0b10110111111 Gray=0b11101100000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1471=0b10111000000 Gray=0b11100100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear=1472=0b10111000001 Gray=0b11100100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1473=0b10111000010 Gray=0b11100100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1474=0b10111000011 Gray=0b11100100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1475=0b10111000100 Gray=0b11100100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1476=0b10111000101 Gray=0b11100100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1477=0b10111000110 Gray=0b11100100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1478=0b10111000111 Gray=0b11100100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1479=0b10111001000 Gray=0b11100101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1480=0b10111001001 Gray=0b11100101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1481=0b10111001010 Gray=0b11100101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1482=0b10111001011 Gray=0b11100101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1483=0b10111001100 Gray=0b11100101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1484=0b10111001101 Gray=0b11100101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1485=0b10111001110 Gray=0b11100101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1486=0b10111001111 Gray=0b11100101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1487=0b10111010000 Gray=0b11100111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1488=0b10111010001 Gray=0b11100111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1489=0b10111010010 Gray=0b11100111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1490=0b10111010011 Gray=0b11100111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1491=0b10111010100 Gray=0b11100111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1492=0b10111010101 Gray=0b11100111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1493=0b10111010110 Gray=0b11100111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1494=0b10111010111 Gray=0b11100111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1495=0b10111011000 Gray=0b11100110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1496=0b10111011001 Gray=0b11100110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1497=0b10111011010 Gray=0b11100110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1498=0b10111011011 Gray=0b11100110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1499=0b10111011100 Gray=0b11100110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1500=0b10111011101 Gray=0b11100110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1501=0b10111011110 Gray=0b11100110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1502=0b10111011111 Gray=0b11100110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1503=0b10111100000 Gray=0b11100010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1504=0b10111100001 Gray=0b11100010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1505=0b10111100010 Gray=0b11100010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1506=0b10111100011 Gray=0b11100010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1507=0b10111100100 Gray=0b11100010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1508=0b10111100101 Gray=0b11100010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1509=0b10111100110 Gray=0b11100010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1510=0b10111100111 Gray=0b11100010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1511=0b10111101000 Gray=0b11100011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1512=0b10111101001 Gray=0b11100011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1513=0b10111101010 Gray=0b11100011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1514=0b10111101011 Gray=0b11100011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1515=0b10111101100 Gray=0b11100011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1516=0b10111101101 Gray=0b11100011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1517=0b10111101110 Gray=0b11100011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1518=0b10111101111 Gray=0b11100011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1519=0b10111110000 Gray=0b11100001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1520=0b10111110001 Gray=0b11100001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1521=0b10111110010 Gray=0b11100001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1522=0b10111110011 Gray=0b11100001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1523=0b10111110100 Gray=0b11100001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1524=0b10111110101 Gray=0b11100001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1525=0b10111110110 Gray=0b11100001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1526=0b10111110111 Gray=0b11100001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1527=0b10111111000 Gray=0b11100000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1528=0b10111111001 Gray=0b11100000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1529=0b10111111010 Gray=0b11100000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1530=0b10111111011 Gray=0b11100000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1531=0b10111111100 Gray=0b11100000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1532=0b10111111101 Gray=0b11100000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1533=0b10111111110 Gray=0b11100000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1534=0b10111111111 Gray=0b11100000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1535=0b11000000000 Gray=0b10100000000 Rel Eta,Phi=1,2 Expect 2 B$ Linear=1536=0b11000000001 Gray=0b10100000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1537=0b11000000010 Gray=0b10100000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1538=0b11000000011 Gray=0b10100000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1539=0b11000000100 Gray=0b10100000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1540=0b11000000101 Gray=0b10100000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1541=0b11000000110 Gray=0b10100000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1542=0b11000000111 Gray=0b10100000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1543=0b11000001000 Gray=0b10100001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1544=0b11000001001 Gray=0b10100001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1545=0b11000001010 Gray=0b10100001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1546=0b11000001011 Gray=0b10100001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1547=0b11000001100 Gray=0b10100001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1548=0b11000001101 Gray=0b10100001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1549=0b11000001110 Gray=0b10100001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1550=0b11000001111 Gray=0b10100001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1551=0b11000010000 Gray=0b10100011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1552=0b11000010001 Gray=0b10100011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1553=0b11000010010 Gray=0b10100011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1554=0b11000010011 Gray=0b10100011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1555=0b11000010100 Gray=0b10100011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1556=0b11000010101 Gray=0b10100011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1557=0b11000010110 Gray=0b10100011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1558=0b11000010111 Gray=0b10100011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1559=0b11000011000 Gray=0b10100010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1560=0b11000011001 Gray=0b10100010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1561=0b11000011010 Gray=0b10100010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1562=0b11000011011 Gray=0b10100010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1563=0b11000011100 Gray=0b10100010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1564=0b11000011101 Gray=0b10100010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1565=0b11000011110 Gray=0b10100010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1566=0b11000011111 Gray=0b10100010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1567=0b11000100000 Gray=0b10100110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1568=0b11000100001 Gray=0b10100110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1569=0b11000100010 Gray=0b10100110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1570=0b11000100011 Gray=0b10100110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1571=0b11000100100 Gray=0b10100110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1572=0b11000100101 Gray=0b10100110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1573=0b11000100110 Gray=0b10100110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1574=0b11000100111 Gray=0b10100110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1575=0b11000101000 Gray=0b10100111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1576=0b11000101001 Gray=0b10100111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1577=0b11000101010 Gray=0b10100111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1578=0b11000101011 Gray=0b10100111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1579=0b11000101100 Gray=0b10100111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1580=0b11000101101 Gray=0b10100111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1581=0b11000101110 Gray=0b10100111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1582=0b11000101111 Gray=0b10100111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1583=0b11000110000 Gray=0b10100101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1584=0b11000110001 Gray=0b10100101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1585=0b11000110010 Gray=0b10100101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1586=0b11000110011 Gray=0b10100101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1587=0b11000110100 Gray=0b10100101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1588=0b11000110101 Gray=0b10100101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1589=0b11000110110 Gray=0b10100101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1590=0b11000110111 Gray=0b10100101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1591=0b11000111000 Gray=0b10100100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1592=0b11000111001 Gray=0b10100100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1593=0b11000111010 Gray=0b10100100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1594=0b11000111011 Gray=0b10100100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1595=0b11000111100 Gray=0b10100100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1596=0b11000111101 Gray=0b10100100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1597=0b11000111110 Gray=0b10100100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1598=0b11000111111 Gray=0b10100100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1599=0b11001000000 Gray=0b10101100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear=1600=0b11001000001 Gray=0b10101100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1601=0b11001000010 Gray=0b10101100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1602=0b11001000011 Gray=0b10101100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1603=0b11001000100 Gray=0b10101100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1604=0b11001000101 Gray=0b10101100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1605=0b11001000110 Gray=0b10101100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1606=0b11001000111 Gray=0b10101100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1607=0b11001001000 Gray=0b10101101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1608=0b11001001001 Gray=0b10101101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1609=0b11001001010 Gray=0b10101101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1610=0b11001001011 Gray=0b10101101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1611=0b11001001100 Gray=0b10101101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1612=0b11001001101 Gray=0b10101101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1613=0b11001001110 Gray=0b10101101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1614=0b11001001111 Gray=0b10101101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1615=0b11001010000 Gray=0b10101111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1616=0b11001010001 Gray=0b10101111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1617=0b11001010010 Gray=0b10101111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1618=0b11001010011 Gray=0b10101111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1619=0b11001010100 Gray=0b10101111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1620=0b11001010101 Gray=0b10101111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1621=0b11001010110 Gray=0b10101111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1622=0b11001010111 Gray=0b10101111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1623=0b11001011000 Gray=0b10101110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1624=0b11001011001 Gray=0b10101110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1625=0b11001011010 Gray=0b10101110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1626=0b11001011011 Gray=0b10101110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1627=0b11001011100 Gray=0b10101110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1628=0b11001011101 Gray=0b10101110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1629=0b11001011110 Gray=0b10101110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1630=0b11001011111 Gray=0b10101110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1631=0b11001100000 Gray=0b10101010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1632=0b11001100001 Gray=0b10101010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1633=0b11001100010 Gray=0b10101010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1634=0b11001100011 Gray=0b10101010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1635=0b11001100100 Gray=0b10101010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1636=0b11001100101 Gray=0b10101010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1637=0b11001100110 Gray=0b10101010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1638=0b11001100111 Gray=0b10101010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1639=0b11001101000 Gray=0b10101011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1640=0b11001101001 Gray=0b10101011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1641=0b11001101010 Gray=0b10101011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1642=0b11001101011 Gray=0b10101011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1643=0b11001101100 Gray=0b10101011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1644=0b11001101101 Gray=0b10101011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1645=0b11001101110 Gray=0b10101011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1646=0b11001101111 Gray=0b10101011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1647=0b11001110000 Gray=0b10101001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1648=0b11001110001 Gray=0b10101001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1649=0b11001110010 Gray=0b10101001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1650=0b11001110011 Gray=0b10101001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1651=0b11001110100 Gray=0b10101001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1652=0b11001110101 Gray=0b10101001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1653=0b11001110110 Gray=0b10101001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1654=0b11001110111 Gray=0b10101001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1655=0b11001111000 Gray=0b10101000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1656=0b11001111001 Gray=0b10101000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1657=0b11001111010 Gray=0b10101000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1658=0b11001111011 Gray=0b10101000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1659=0b11001111100 Gray=0b10101000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1660=0b11001111101 Gray=0b10101000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1661=0b11001111110 Gray=0b10101000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1662=0b11001111111 Gray=0b10101000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1663=0b11010000000 Gray=0b10111000000 Rel Eta,Phi=1,0 Expect 4 B$ Linear=1664=0b11010000001 Gray=0b10111000001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1665=0b11010000010 Gray=0b10111000011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1666=0b11010000011 Gray=0b10111000010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1667=0b11010000100 Gray=0b10111000110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1668=0b11010000101 Gray=0b10111000111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1669=0b11010000110 Gray=0b10111000101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1670=0b11010000111 Gray=0b10111000100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1671=0b11010001000 Gray=0b10111001100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1672=0b11010001001 Gray=0b10111001101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1673=0b11010001010 Gray=0b10111001111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1674=0b11010001011 Gray=0b10111001110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1675=0b11010001100 Gray=0b10111001010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1676=0b11010001101 Gray=0b10111001011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1677=0b11010001110 Gray=0b10111001001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1678=0b11010001111 Gray=0b10111001000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1679=0b11010010000 Gray=0b10111011000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1680=0b11010010001 Gray=0b10111011001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1681=0b11010010010 Gray=0b10111011011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1682=0b11010010011 Gray=0b10111011010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1683=0b11010010100 Gray=0b10111011110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1684=0b11010010101 Gray=0b10111011111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1685=0b11010010110 Gray=0b10111011101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1686=0b11010010111 Gray=0b10111011100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1687=0b11010011000 Gray=0b10111010100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1688=0b11010011001 Gray=0b10111010101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1689=0b11010011010 Gray=0b10111010111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1690=0b11010011011 Gray=0b10111010110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1691=0b11010011100 Gray=0b10111010010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1692=0b11010011101 Gray=0b10111010011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1693=0b11010011110 Gray=0b10111010001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1694=0b11010011111 Gray=0b10111010000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1695=0b11010100000 Gray=0b10111110000 Rel Eta,Phi=0,1 Expect 6 B$ Linear=1696=0b11010100001 Gray=0b10111110001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1697=0b11010100010 Gray=0b10111110011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1698=0b11010100011 Gray=0b10111110010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1699=0b11010100100 Gray=0b10111110110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1700=0b11010100101 Gray=0b10111110111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1701=0b11010100110 Gray=0b10111110101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1702=0b11010100111 Gray=0b10111110100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1703=0b11010101000 Gray=0b10111111100 Rel Eta,Phi=0,3 Expect 8 B$ Linear=1704=0b11010101001 Gray=0b10111111101 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1705=0b11010101010 Gray=0b10111111111 Rel Eta,Phi=0,5 Expect 10 B$ Linear=1706=0b11010101011 Gray=0b10111111110 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1707=0b11010101100 Gray=0b10111111010 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1708=0b11010101101 Gray=0b10111111011 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1709=0b11010101110 Gray=0b10111111001 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1710=0b11010101111 Gray=0b10111111000 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1711=0b11010110000 Gray=0b10111101000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1712=0b11010110001 Gray=0b10111101001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1713=0b11010110010 Gray=0b10111101011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1714=0b11010110011 Gray=0b10111101010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1715=0b11010110100 Gray=0b10111101110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1716=0b11010110101 Gray=0b10111101111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1717=0b11010110110 Gray=0b10111101101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1718=0b11010110111 Gray=0b10111101100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1719=0b11010111000 Gray=0b10111100100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1720=0b11010111001 Gray=0b10111100101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1721=0b11010111010 Gray=0b10111100111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1722=0b11010111011 Gray=0b10111100110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1723=0b11010111100 Gray=0b10111100010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1724=0b11010111101 Gray=0b10111100011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1725=0b11010111110 Gray=0b10111100001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1726=0b11010111111 Gray=0b10111100000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1727=0b11011000000 Gray=0b10110100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear=1728=0b11011000001 Gray=0b10110100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1729=0b11011000010 Gray=0b10110100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1730=0b11011000011 Gray=0b10110100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1731=0b11011000100 Gray=0b10110100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1732=0b11011000101 Gray=0b10110100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1733=0b11011000110 Gray=0b10110100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1734=0b11011000111 Gray=0b10110100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1735=0b11011001000 Gray=0b10110101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1736=0b11011001001 Gray=0b10110101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1737=0b11011001010 Gray=0b10110101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1738=0b11011001011 Gray=0b10110101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1739=0b11011001100 Gray=0b10110101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1740=0b11011001101 Gray=0b10110101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1741=0b11011001110 Gray=0b10110101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1742=0b11011001111 Gray=0b10110101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1743=0b11011010000 Gray=0b10110111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1744=0b11011010001 Gray=0b10110111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1745=0b11011010010 Gray=0b10110111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1746=0b11011010011 Gray=0b10110111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1747=0b11011010100 Gray=0b10110111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1748=0b11011010101 Gray=0b10110111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1749=0b11011010110 Gray=0b10110111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1750=0b11011010111 Gray=0b10110111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1751=0b11011011000 Gray=0b10110110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1752=0b11011011001 Gray=0b10110110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1753=0b11011011010 Gray=0b10110110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1754=0b11011011011 Gray=0b10110110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1755=0b11011011100 Gray=0b10110110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1756=0b11011011101 Gray=0b10110110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1757=0b11011011110 Gray=0b10110110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1758=0b11011011111 Gray=0b10110110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1759=0b11011100000 Gray=0b10110010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1760=0b11011100001 Gray=0b10110010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1761=0b11011100010 Gray=0b10110010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1762=0b11011100011 Gray=0b10110010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1763=0b11011100100 Gray=0b10110010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1764=0b11011100101 Gray=0b10110010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1765=0b11011100110 Gray=0b10110010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1766=0b11011100111 Gray=0b10110010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1767=0b11011101000 Gray=0b10110011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1768=0b11011101001 Gray=0b10110011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1769=0b11011101010 Gray=0b10110011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1770=0b11011101011 Gray=0b10110011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1771=0b11011101100 Gray=0b10110011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1772=0b11011101101 Gray=0b10110011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1773=0b11011101110 Gray=0b10110011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1774=0b11011101111 Gray=0b10110011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1775=0b11011110000 Gray=0b10110001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1776=0b11011110001 Gray=0b10110001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1777=0b11011110010 Gray=0b10110001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1778=0b11011110011 Gray=0b10110001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1779=0b11011110100 Gray=0b10110001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1780=0b11011110101 Gray=0b10110001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1781=0b11011110110 Gray=0b10110001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1782=0b11011110111 Gray=0b10110001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1783=0b11011111000 Gray=0b10110000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1784=0b11011111001 Gray=0b10110000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1785=0b11011111010 Gray=0b10110000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1786=0b11011111011 Gray=0b10110000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1787=0b11011111100 Gray=0b10110000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1788=0b11011111101 Gray=0b10110000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1789=0b11011111110 Gray=0b10110000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1790=0b11011111111 Gray=0b10110000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1791=0b11100000000 Gray=0b10010000000 Rel Eta,Phi=1,1 Expect 2 B$ Linear=1792=0b11100000001 Gray=0b10010000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1793=0b11100000010 Gray=0b10010000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1794=0b11100000011 Gray=0b10010000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1795=0b11100000100 Gray=0b10010000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1796=0b11100000101 Gray=0b10010000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1797=0b11100000110 Gray=0b10010000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1798=0b11100000111 Gray=0b10010000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1799=0b11100001000 Gray=0b10010001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1800=0b11100001001 Gray=0b10010001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1801=0b11100001010 Gray=0b10010001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1802=0b11100001011 Gray=0b10010001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1803=0b11100001100 Gray=0b10010001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1804=0b11100001101 Gray=0b10010001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1805=0b11100001110 Gray=0b10010001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1806=0b11100001111 Gray=0b10010001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1807=0b11100010000 Gray=0b10010011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1808=0b11100010001 Gray=0b10010011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1809=0b11100010010 Gray=0b10010011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1810=0b11100010011 Gray=0b10010011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1811=0b11100010100 Gray=0b10010011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1812=0b11100010101 Gray=0b10010011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1813=0b11100010110 Gray=0b10010011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1814=0b11100010111 Gray=0b10010011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1815=0b11100011000 Gray=0b10010010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1816=0b11100011001 Gray=0b10010010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1817=0b11100011010 Gray=0b10010010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1818=0b11100011011 Gray=0b10010010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1819=0b11100011100 Gray=0b10010010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1820=0b11100011101 Gray=0b10010010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1821=0b11100011110 Gray=0b10010010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1822=0b11100011111 Gray=0b10010010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1823=0b11100100000 Gray=0b10010110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1824=0b11100100001 Gray=0b10010110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1825=0b11100100010 Gray=0b10010110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1826=0b11100100011 Gray=0b10010110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1827=0b11100100100 Gray=0b10010110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1828=0b11100100101 Gray=0b10010110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1829=0b11100100110 Gray=0b10010110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1830=0b11100100111 Gray=0b10010110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1831=0b11100101000 Gray=0b10010111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1832=0b11100101001 Gray=0b10010111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1833=0b11100101010 Gray=0b10010111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1834=0b11100101011 Gray=0b10010111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1835=0b11100101100 Gray=0b10010111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1836=0b11100101101 Gray=0b10010111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1837=0b11100101110 Gray=0b10010111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1838=0b11100101111 Gray=0b10010111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1839=0b11100110000 Gray=0b10010101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1840=0b11100110001 Gray=0b10010101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1841=0b11100110010 Gray=0b10010101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1842=0b11100110011 Gray=0b10010101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1843=0b11100110100 Gray=0b10010101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1844=0b11100110101 Gray=0b10010101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1845=0b11100110110 Gray=0b10010101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1846=0b11100110111 Gray=0b10010101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1847=0b11100111000 Gray=0b10010100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1848=0b11100111001 Gray=0b10010100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1849=0b11100111010 Gray=0b10010100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1850=0b11100111011 Gray=0b10010100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1851=0b11100111100 Gray=0b10010100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1852=0b11100111101 Gray=0b10010100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1853=0b11100111110 Gray=0b10010100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1854=0b11100111111 Gray=0b10010100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1855=0b11101000000 Gray=0b10011100000 Rel Eta,Phi=0,0 Expect 4 B$ Linear=1856=0b11101000001 Gray=0b10011100001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1857=0b11101000010 Gray=0b10011100011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1858=0b11101000011 Gray=0b10011100010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1859=0b11101000100 Gray=0b10011100110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1860=0b11101000101 Gray=0b10011100111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1861=0b11101000110 Gray=0b10011100101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1862=0b11101000111 Gray=0b10011100100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1863=0b11101001000 Gray=0b10011101100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1864=0b11101001001 Gray=0b10011101101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1865=0b11101001010 Gray=0b10011101111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1866=0b11101001011 Gray=0b10011101110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1867=0b11101001100 Gray=0b10011101010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1868=0b11101001101 Gray=0b10011101011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1869=0b11101001110 Gray=0b10011101001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1870=0b11101001111 Gray=0b10011101000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1871=0b11101010000 Gray=0b10011111000 Rel Eta,Phi=0,2 Expect 6 B$ Linear=1872=0b11101010001 Gray=0b10011111001 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1873=0b11101010010 Gray=0b10011111011 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1874=0b11101010011 Gray=0b10011111010 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1875=0b11101010100 Gray=0b10011111110 Rel Eta,Phi=0,6 Expect 8 B$ Linear=1876=0b11101010101 Gray=0b10011111111 Rel Eta,Phi=0,4 Expect 9 B$ Linear=1877=0b11101010110 Gray=0b10011111101 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1878=0b11101010111 Gray=0b10011111100 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1879=0b11101011000 Gray=0b10011110100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1880=0b11101011001 Gray=0b10011110101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1881=0b11101011010 Gray=0b10011110111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1882=0b11101011011 Gray=0b10011110110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1883=0b11101011100 Gray=0b10011110010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1884=0b11101011101 Gray=0b10011110011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1885=0b11101011110 Gray=0b10011110001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1886=0b11101011111 Gray=0b10011110000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1887=0b11101100000 Gray=0b10011010000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1888=0b11101100001 Gray=0b10011010001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1889=0b11101100010 Gray=0b10011010011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1890=0b11101100011 Gray=0b10011010010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1891=0b11101100100 Gray=0b10011010110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1892=0b11101100101 Gray=0b10011010111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1893=0b11101100110 Gray=0b10011010101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1894=0b11101100111 Gray=0b10011010100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1895=0b11101101000 Gray=0b10011011100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1896=0b11101101001 Gray=0b10011011101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1897=0b11101101010 Gray=0b10011011111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1898=0b11101101011 Gray=0b10011011110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1899=0b11101101100 Gray=0b10011011010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1900=0b11101101101 Gray=0b10011011011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1901=0b11101101110 Gray=0b10011011001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1902=0b11101101111 Gray=0b10011011000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1903=0b11101110000 Gray=0b10011001000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1904=0b11101110001 Gray=0b10011001001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1905=0b11101110010 Gray=0b10011001011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1906=0b11101110011 Gray=0b10011001010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1907=0b11101110100 Gray=0b10011001110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1908=0b11101110101 Gray=0b10011001111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1909=0b11101110110 Gray=0b10011001101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1910=0b11101110111 Gray=0b10011001100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1911=0b11101111000 Gray=0b10011000100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1912=0b11101111001 Gray=0b10011000101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1913=0b11101111010 Gray=0b10011000111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1914=0b11101111011 Gray=0b10011000110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1915=0b11101111100 Gray=0b10011000010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1916=0b11101111101 Gray=0b10011000011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1917=0b11101111110 Gray=0b10011000001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1918=0b11101111111 Gray=0b10011000000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1919=0b11110000000 Gray=0b10001000000 Rel Eta,Phi=1,0 Expect 2 B$ Linear=1920=0b11110000001 Gray=0b10001000001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1921=0b11110000010 Gray=0b10001000011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1922=0b11110000011 Gray=0b10001000010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1923=0b11110000100 Gray=0b10001000110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1924=0b11110000101 Gray=0b10001000111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1925=0b11110000110 Gray=0b10001000101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1926=0b11110000111 Gray=0b10001000100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1927=0b11110001000 Gray=0b10001001100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1928=0b11110001001 Gray=0b10001001101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1929=0b11110001010 Gray=0b10001001111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1930=0b11110001011 Gray=0b10001001110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1931=0b11110001100 Gray=0b10001001010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1932=0b11110001101 Gray=0b10001001011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1933=0b11110001110 Gray=0b10001001001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1934=0b11110001111 Gray=0b10001001000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1935=0b11110010000 Gray=0b10001011000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1936=0b11110010001 Gray=0b10001011001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1937=0b11110010010 Gray=0b10001011011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1938=0b11110010011 Gray=0b10001011010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1939=0b11110010100 Gray=0b10001011110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1940=0b11110010101 Gray=0b10001011111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1941=0b11110010110 Gray=0b10001011101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1942=0b11110010111 Gray=0b10001011100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1943=0b11110011000 Gray=0b10001010100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1944=0b11110011001 Gray=0b10001010101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1945=0b11110011010 Gray=0b10001010111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1946=0b11110011011 Gray=0b10001010110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1947=0b11110011100 Gray=0b10001010010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1948=0b11110011101 Gray=0b10001010011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1949=0b11110011110 Gray=0b10001010001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1950=0b11110011111 Gray=0b10001010000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1951=0b11110100000 Gray=0b10001110000 Rel Eta,Phi=0,1 Expect 4 B$ Linear=1952=0b11110100001 Gray=0b10001110001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1953=0b11110100010 Gray=0b10001110011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1954=0b11110100011 Gray=0b10001110010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1955=0b11110100100 Gray=0b10001110110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1956=0b11110100101 Gray=0b10001110111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1957=0b11110100110 Gray=0b10001110101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1958=0b11110100111 Gray=0b10001110100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1959=0b11110101000 Gray=0b10001111100 Rel Eta,Phi=0,3 Expect 6 B$ Linear=1960=0b11110101001 Gray=0b10001111101 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1961=0b11110101010 Gray=0b10001111111 Rel Eta,Phi=0,5 Expect 8 B$ Linear=1962=0b11110101011 Gray=0b10001111110 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1963=0b11110101100 Gray=0b10001111010 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1964=0b11110101101 Gray=0b10001111011 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1965=0b11110101110 Gray=0b10001111001 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1966=0b11110101111 Gray=0b10001111000 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1967=0b11110110000 Gray=0b10001101000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=1968=0b11110110001 Gray=0b10001101001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1969=0b11110110010 Gray=0b10001101011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1970=0b11110110011 Gray=0b10001101010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1971=0b11110110100 Gray=0b10001101110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=1972=0b11110110101 Gray=0b10001101111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=1973=0b11110110110 Gray=0b10001101101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1974=0b11110110111 Gray=0b10001101100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1975=0b11110111000 Gray=0b10001100100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1976=0b11110111001 Gray=0b10001100101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1977=0b11110111010 Gray=0b10001100111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1978=0b11110111011 Gray=0b10001100110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1979=0b11110111100 Gray=0b10001100010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1980=0b11110111101 Gray=0b10001100011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1981=0b11110111110 Gray=0b10001100001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1982=0b11110111111 Gray=0b10001100000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1983=0b11111000000 Gray=0b10000100000 Rel Eta,Phi=0,0 Expect 2 B$ Linear=1984=0b11111000001 Gray=0b10000100001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1985=0b11111000010 Gray=0b10000100011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1986=0b11111000011 Gray=0b10000100010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1987=0b11111000100 Gray=0b10000100110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1988=0b11111000101 Gray=0b10000100111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1989=0b11111000110 Gray=0b10000100101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1990=0b11111000111 Gray=0b10000100100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1991=0b11111001000 Gray=0b10000101100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=1992=0b11111001001 Gray=0b10000101101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1993=0b11111001010 Gray=0b10000101111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=1994=0b11111001011 Gray=0b10000101110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1995=0b11111001100 Gray=0b10000101010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=1996=0b11111001101 Gray=0b10000101011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=1997=0b11111001110 Gray=0b10000101001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=1998=0b11111001111 Gray=0b10000101000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=1999=0b11111010000 Gray=0b10000111000 Rel Eta,Phi=0,2 Expect 4 B$ Linear=2000=0b11111010001 Gray=0b10000111001 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2001=0b11111010010 Gray=0b10000111011 Rel Eta,Phi=0,5 Expect 6 B$ Linear=2002=0b11111010011 Gray=0b10000111010 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2003=0b11111010100 Gray=0b10000111110 Rel Eta,Phi=0,6 Expect 6 B$ Linear=2004=0b11111010101 Gray=0b10000111111 Rel Eta,Phi=0,4 Expect 7 B$ Linear=2005=0b11111010110 Gray=0b10000111101 Rel Eta,Phi=0,5 Expect 6 B$ Linear=2006=0b11111010111 Gray=0b10000111100 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2007=0b11111011000 Gray=0b10000110100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=2008=0b11111011001 Gray=0b10000110101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2009=0b11111011010 Gray=0b10000110111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=2010=0b11111011011 Gray=0b10000110110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2011=0b11111011100 Gray=0b10000110010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=2012=0b11111011101 Gray=0b10000110011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2013=0b11111011110 Gray=0b10000110001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2014=0b11111011111 Gray=0b10000110000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2015=0b11111100000 Gray=0b10000010000 Rel Eta,Phi=0,1 Expect 2 B$ Linear=2016=0b11111100001 Gray=0b10000010001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2017=0b11111100010 Gray=0b10000010011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2018=0b11111100011 Gray=0b10000010010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2019=0b11111100100 Gray=0b10000010110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=2020=0b11111100101 Gray=0b10000010111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2021=0b11111100110 Gray=0b10000010101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2022=0b11111100111 Gray=0b10000010100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2023=0b11111101000 Gray=0b10000011100 Rel Eta,Phi=0,3 Expect 4 B$ Linear=2024=0b11111101001 Gray=0b10000011101 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2025=0b11111101010 Gray=0b10000011111 Rel Eta,Phi=0,5 Expect 6 B$ Linear=2026=0b11111101011 Gray=0b10000011110 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2027=0b11111101100 Gray=0b10000011010 Rel Eta,Phi=0,6 Expect 4 B$ Linear=2028=0b11111101101 Gray=0b10000011011 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2029=0b11111101110 Gray=0b10000011001 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2030=0b11111101111 Gray=0b10000011000 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2031=0b11111110000 Gray=0b10000001000 Rel Eta,Phi=0,2 Expect 2 B$ Linear=2032=0b11111110001 Gray=0b10000001001 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2033=0b11111110010 Gray=0b10000001011 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2034=0b11111110011 Gray=0b10000001010 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2035=0b11111110100 Gray=0b10000001110 Rel Eta,Phi=0,6 Expect 4 B$ Linear=2036=0b11111110101 Gray=0b10000001111 Rel Eta,Phi=0,4 Expect 5 B$ Linear=2037=0b11111110110 Gray=0b10000001101 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2038=0b11111110111 Gray=0b10000001100 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2039=0b11111111000 Gray=0b10000000100 Rel Eta,Phi=0,3 Expect 2 B$ Linear=2040=0b11111111001 Gray=0b10000000101 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2041=0b11111111010 Gray=0b10000000111 Rel Eta,Phi=0,5 Expect 4 B$ Linear=2042=0b11111111011 Gray=0b10000000110 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2043=0b11111111100 Gray=0b10000000010 Rel Eta,Phi=0,6 Expect 2 B$ Linear=2044=0b11111111101 Gray=0b10000000011 Rel Eta,Phi=0,4 Expect 3 B$ Linear=2045=0b11111111110 Gray=0b10000000001 Rel Eta,Phi=0,5 Expect 2 B$ Linear=2046=0b11111111111 Gray=0b10000000000 Rel Eta,Phi=0,4 Expect 1 B$ Linear=2047=0b10000000000 Gray=0b00000000000 Rel Eta,Phi=0,7 Expect 0 I$ Scanning First Pass Prom # 1 B$ Linear= 0=0b00000000001 Gray=0b00000000001 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 1=0b00000000010 Gray=0b00000000011 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 2=0b00000000011 Gray=0b00000000010 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 3=0b00000000100 Gray=0b00000000110 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 4=0b00000000101 Gray=0b00000000111 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 5=0b00000000110 Gray=0b00000000101 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 6=0b00000000111 Gray=0b00000000100 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 7=0b00000001000 Gray=0b00000001100 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 8=0b00000001001 Gray=0b00000001101 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 9=0b00000001010 Gray=0b00000001111 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 10=0b00000001011 Gray=0b00000001110 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 11=0b00000001100 Gray=0b00000001010 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 12=0b00000001101 Gray=0b00000001011 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 13=0b00000001110 Gray=0b00000001001 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 14=0b00000001111 Gray=0b00000001000 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 15=0b00000010000 Gray=0b00000011000 Rel Eta,Phi=1,5 Expect 2 B$ Linear= 16=0b00000010001 Gray=0b00000011001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 17=0b00000010010 Gray=0b00000011011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 18=0b00000010011 Gray=0b00000011010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 19=0b00000010100 Gray=0b00000011110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 20=0b00000010101 Gray=0b00000011111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 21=0b00000010110 Gray=0b00000011101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 22=0b00000010111 Gray=0b00000011100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 23=0b00000011000 Gray=0b00000010100 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 24=0b00000011001 Gray=0b00000010101 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 25=0b00000011010 Gray=0b00000010111 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 26=0b00000011011 Gray=0b00000010110 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 27=0b00000011100 Gray=0b00000010010 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 28=0b00000011101 Gray=0b00000010011 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 29=0b00000011110 Gray=0b00000010001 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 30=0b00000011111 Gray=0b00000010000 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 31=0b00000100000 Gray=0b00000110000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 32=0b00000100001 Gray=0b00000110001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 33=0b00000100010 Gray=0b00000110011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 34=0b00000100011 Gray=0b00000110010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 35=0b00000100100 Gray=0b00000110110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 36=0b00000100101 Gray=0b00000110111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 37=0b00000100110 Gray=0b00000110101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 38=0b00000100111 Gray=0b00000110100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 39=0b00000101000 Gray=0b00000111100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 40=0b00000101001 Gray=0b00000111101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 41=0b00000101010 Gray=0b00000111111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 42=0b00000101011 Gray=0b00000111110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 43=0b00000101100 Gray=0b00000111010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 44=0b00000101101 Gray=0b00000111011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 45=0b00000101110 Gray=0b00000111001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 46=0b00000101111 Gray=0b00000111000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 47=0b00000110000 Gray=0b00000101000 Rel Eta,Phi=1,5 Expect 2 B$ Linear= 48=0b00000110001 Gray=0b00000101001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 49=0b00000110010 Gray=0b00000101011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 50=0b00000110011 Gray=0b00000101010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 51=0b00000110100 Gray=0b00000101110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 52=0b00000110101 Gray=0b00000101111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 53=0b00000110110 Gray=0b00000101101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 54=0b00000110111 Gray=0b00000101100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 55=0b00000111000 Gray=0b00000100100 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 56=0b00000111001 Gray=0b00000100101 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 57=0b00000111010 Gray=0b00000100111 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 58=0b00000111011 Gray=0b00000100110 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 59=0b00000111100 Gray=0b00000100010 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 60=0b00000111101 Gray=0b00000100011 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 61=0b00000111110 Gray=0b00000100001 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 62=0b00000111111 Gray=0b00000100000 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 63=0b00001000000 Gray=0b00001100000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 64=0b00001000001 Gray=0b00001100001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 65=0b00001000010 Gray=0b00001100011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 66=0b00001000011 Gray=0b00001100010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 67=0b00001000100 Gray=0b00001100110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 68=0b00001000101 Gray=0b00001100111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 69=0b00001000110 Gray=0b00001100101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 70=0b00001000111 Gray=0b00001100100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 71=0b00001001000 Gray=0b00001101100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 72=0b00001001001 Gray=0b00001101101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 73=0b00001001010 Gray=0b00001101111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 74=0b00001001011 Gray=0b00001101110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 75=0b00001001100 Gray=0b00001101010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 76=0b00001001101 Gray=0b00001101011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 77=0b00001001110 Gray=0b00001101001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 78=0b00001001111 Gray=0b00001101000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 79=0b00001010000 Gray=0b00001111000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 80=0b00001010001 Gray=0b00001111001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 81=0b00001010010 Gray=0b00001111011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 82=0b00001010011 Gray=0b00001111010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 83=0b00001010100 Gray=0b00001111110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 84=0b00001010101 Gray=0b00001111111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 85=0b00001010110 Gray=0b00001111101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 86=0b00001010111 Gray=0b00001111100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 87=0b00001011000 Gray=0b00001110100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 88=0b00001011001 Gray=0b00001110101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 89=0b00001011010 Gray=0b00001110111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 90=0b00001011011 Gray=0b00001110110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 91=0b00001011100 Gray=0b00001110010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 92=0b00001011101 Gray=0b00001110011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 93=0b00001011110 Gray=0b00001110001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 94=0b00001011111 Gray=0b00001110000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 95=0b00001100000 Gray=0b00001010000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 96=0b00001100001 Gray=0b00001010001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 97=0b00001100010 Gray=0b00001010011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 98=0b00001100011 Gray=0b00001010010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 99=0b00001100100 Gray=0b00001010110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 100=0b00001100101 Gray=0b00001010111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 101=0b00001100110 Gray=0b00001010101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 102=0b00001100111 Gray=0b00001010100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 103=0b00001101000 Gray=0b00001011100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 104=0b00001101001 Gray=0b00001011101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 105=0b00001101010 Gray=0b00001011111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 106=0b00001101011 Gray=0b00001011110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 107=0b00001101100 Gray=0b00001011010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 108=0b00001101101 Gray=0b00001011011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 109=0b00001101110 Gray=0b00001011001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 110=0b00001101111 Gray=0b00001011000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 111=0b00001110000 Gray=0b00001001000 Rel Eta,Phi=1,5 Expect 2 B$ Linear= 112=0b00001110001 Gray=0b00001001001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 113=0b00001110010 Gray=0b00001001011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 114=0b00001110011 Gray=0b00001001010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 115=0b00001110100 Gray=0b00001001110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 116=0b00001110101 Gray=0b00001001111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 117=0b00001110110 Gray=0b00001001101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 118=0b00001110111 Gray=0b00001001100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 119=0b00001111000 Gray=0b00001000100 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 120=0b00001111001 Gray=0b00001000101 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 121=0b00001111010 Gray=0b00001000111 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 122=0b00001111011 Gray=0b00001000110 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 123=0b00001111100 Gray=0b00001000010 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 124=0b00001111101 Gray=0b00001000011 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 125=0b00001111110 Gray=0b00001000001 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 126=0b00001111111 Gray=0b00001000000 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 127=0b00010000000 Gray=0b00011000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear= 128=0b00010000001 Gray=0b00011000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 129=0b00010000010 Gray=0b00011000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 130=0b00010000011 Gray=0b00011000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 131=0b00010000100 Gray=0b00011000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 132=0b00010000101 Gray=0b00011000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 133=0b00010000110 Gray=0b00011000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 134=0b00010000111 Gray=0b00011000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 135=0b00010001000 Gray=0b00011001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 136=0b00010001001 Gray=0b00011001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 137=0b00010001010 Gray=0b00011001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 138=0b00010001011 Gray=0b00011001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 139=0b00010001100 Gray=0b00011001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 140=0b00010001101 Gray=0b00011001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 141=0b00010001110 Gray=0b00011001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 142=0b00010001111 Gray=0b00011001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 143=0b00010010000 Gray=0b00011011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 144=0b00010010001 Gray=0b00011011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 145=0b00010010010 Gray=0b00011011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 146=0b00010010011 Gray=0b00011011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 147=0b00010010100 Gray=0b00011011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 148=0b00010010101 Gray=0b00011011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 149=0b00010010110 Gray=0b00011011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 150=0b00010010111 Gray=0b00011011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 151=0b00010011000 Gray=0b00011010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 152=0b00010011001 Gray=0b00011010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 153=0b00010011010 Gray=0b00011010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 154=0b00010011011 Gray=0b00011010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 155=0b00010011100 Gray=0b00011010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 156=0b00010011101 Gray=0b00011010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 157=0b00010011110 Gray=0b00011010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 158=0b00010011111 Gray=0b00011010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 159=0b00010100000 Gray=0b00011110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 160=0b00010100001 Gray=0b00011110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 161=0b00010100010 Gray=0b00011110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 162=0b00010100011 Gray=0b00011110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 163=0b00010100100 Gray=0b00011110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 164=0b00010100101 Gray=0b00011110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 165=0b00010100110 Gray=0b00011110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 166=0b00010100111 Gray=0b00011110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 167=0b00010101000 Gray=0b00011111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 168=0b00010101001 Gray=0b00011111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 169=0b00010101010 Gray=0b00011111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 170=0b00010101011 Gray=0b00011111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 171=0b00010101100 Gray=0b00011111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 172=0b00010101101 Gray=0b00011111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 173=0b00010101110 Gray=0b00011111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 174=0b00010101111 Gray=0b00011111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 175=0b00010110000 Gray=0b00011101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 176=0b00010110001 Gray=0b00011101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 177=0b00010110010 Gray=0b00011101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 178=0b00010110011 Gray=0b00011101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 179=0b00010110100 Gray=0b00011101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 180=0b00010110101 Gray=0b00011101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 181=0b00010110110 Gray=0b00011101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 182=0b00010110111 Gray=0b00011101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 183=0b00010111000 Gray=0b00011100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 184=0b00010111001 Gray=0b00011100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 185=0b00010111010 Gray=0b00011100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 186=0b00010111011 Gray=0b00011100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 187=0b00010111100 Gray=0b00011100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 188=0b00010111101 Gray=0b00011100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 189=0b00010111110 Gray=0b00011100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 190=0b00010111111 Gray=0b00011100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 191=0b00011000000 Gray=0b00010100000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 192=0b00011000001 Gray=0b00010100001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 193=0b00011000010 Gray=0b00010100011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 194=0b00011000011 Gray=0b00010100010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 195=0b00011000100 Gray=0b00010100110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 196=0b00011000101 Gray=0b00010100111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 197=0b00011000110 Gray=0b00010100101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 198=0b00011000111 Gray=0b00010100100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 199=0b00011001000 Gray=0b00010101100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 200=0b00011001001 Gray=0b00010101101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 201=0b00011001010 Gray=0b00010101111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 202=0b00011001011 Gray=0b00010101110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 203=0b00011001100 Gray=0b00010101010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 204=0b00011001101 Gray=0b00010101011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 205=0b00011001110 Gray=0b00010101001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 206=0b00011001111 Gray=0b00010101000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 207=0b00011010000 Gray=0b00010111000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 208=0b00011010001 Gray=0b00010111001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 209=0b00011010010 Gray=0b00010111011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 210=0b00011010011 Gray=0b00010111010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 211=0b00011010100 Gray=0b00010111110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 212=0b00011010101 Gray=0b00010111111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 213=0b00011010110 Gray=0b00010111101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 214=0b00011010111 Gray=0b00010111100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 215=0b00011011000 Gray=0b00010110100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 216=0b00011011001 Gray=0b00010110101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 217=0b00011011010 Gray=0b00010110111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 218=0b00011011011 Gray=0b00010110110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 219=0b00011011100 Gray=0b00010110010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 220=0b00011011101 Gray=0b00010110011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 221=0b00011011110 Gray=0b00010110001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 222=0b00011011111 Gray=0b00010110000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 223=0b00011100000 Gray=0b00010010000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 224=0b00011100001 Gray=0b00010010001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 225=0b00011100010 Gray=0b00010010011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 226=0b00011100011 Gray=0b00010010010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 227=0b00011100100 Gray=0b00010010110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 228=0b00011100101 Gray=0b00010010111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 229=0b00011100110 Gray=0b00010010101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 230=0b00011100111 Gray=0b00010010100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 231=0b00011101000 Gray=0b00010011100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 232=0b00011101001 Gray=0b00010011101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 233=0b00011101010 Gray=0b00010011111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 234=0b00011101011 Gray=0b00010011110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 235=0b00011101100 Gray=0b00010011010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 236=0b00011101101 Gray=0b00010011011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 237=0b00011101110 Gray=0b00010011001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 238=0b00011101111 Gray=0b00010011000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 239=0b00011110000 Gray=0b00010001000 Rel Eta,Phi=1,5 Expect 2 B$ Linear= 240=0b00011110001 Gray=0b00010001001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 241=0b00011110010 Gray=0b00010001011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 242=0b00011110011 Gray=0b00010001010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 243=0b00011110100 Gray=0b00010001110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 244=0b00011110101 Gray=0b00010001111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 245=0b00011110110 Gray=0b00010001101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 246=0b00011110111 Gray=0b00010001100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 247=0b00011111000 Gray=0b00010000100 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 248=0b00011111001 Gray=0b00010000101 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 249=0b00011111010 Gray=0b00010000111 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 250=0b00011111011 Gray=0b00010000110 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 251=0b00011111100 Gray=0b00010000010 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 252=0b00011111101 Gray=0b00010000011 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 253=0b00011111110 Gray=0b00010000001 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 254=0b00011111111 Gray=0b00010000000 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 255=0b00100000000 Gray=0b00110000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear= 256=0b00100000001 Gray=0b00110000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 257=0b00100000010 Gray=0b00110000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 258=0b00100000011 Gray=0b00110000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 259=0b00100000100 Gray=0b00110000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 260=0b00100000101 Gray=0b00110000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 261=0b00100000110 Gray=0b00110000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 262=0b00100000111 Gray=0b00110000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 263=0b00100001000 Gray=0b00110001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 264=0b00100001001 Gray=0b00110001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 265=0b00100001010 Gray=0b00110001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 266=0b00100001011 Gray=0b00110001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 267=0b00100001100 Gray=0b00110001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 268=0b00100001101 Gray=0b00110001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 269=0b00100001110 Gray=0b00110001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 270=0b00100001111 Gray=0b00110001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 271=0b00100010000 Gray=0b00110011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 272=0b00100010001 Gray=0b00110011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 273=0b00100010010 Gray=0b00110011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 274=0b00100010011 Gray=0b00110011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 275=0b00100010100 Gray=0b00110011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 276=0b00100010101 Gray=0b00110011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 277=0b00100010110 Gray=0b00110011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 278=0b00100010111 Gray=0b00110011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 279=0b00100011000 Gray=0b00110010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 280=0b00100011001 Gray=0b00110010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 281=0b00100011010 Gray=0b00110010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 282=0b00100011011 Gray=0b00110010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 283=0b00100011100 Gray=0b00110010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 284=0b00100011101 Gray=0b00110010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 285=0b00100011110 Gray=0b00110010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 286=0b00100011111 Gray=0b00110010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 287=0b00100100000 Gray=0b00110110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 288=0b00100100001 Gray=0b00110110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 289=0b00100100010 Gray=0b00110110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 290=0b00100100011 Gray=0b00110110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 291=0b00100100100 Gray=0b00110110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 292=0b00100100101 Gray=0b00110110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 293=0b00100100110 Gray=0b00110110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 294=0b00100100111 Gray=0b00110110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 295=0b00100101000 Gray=0b00110111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 296=0b00100101001 Gray=0b00110111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 297=0b00100101010 Gray=0b00110111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 298=0b00100101011 Gray=0b00110111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 299=0b00100101100 Gray=0b00110111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 300=0b00100101101 Gray=0b00110111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 301=0b00100101110 Gray=0b00110111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 302=0b00100101111 Gray=0b00110111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 303=0b00100110000 Gray=0b00110101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 304=0b00100110001 Gray=0b00110101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 305=0b00100110010 Gray=0b00110101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 306=0b00100110011 Gray=0b00110101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 307=0b00100110100 Gray=0b00110101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 308=0b00100110101 Gray=0b00110101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 309=0b00100110110 Gray=0b00110101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 310=0b00100110111 Gray=0b00110101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 311=0b00100111000 Gray=0b00110100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 312=0b00100111001 Gray=0b00110100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 313=0b00100111010 Gray=0b00110100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 314=0b00100111011 Gray=0b00110100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 315=0b00100111100 Gray=0b00110100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 316=0b00100111101 Gray=0b00110100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 317=0b00100111110 Gray=0b00110100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 318=0b00100111111 Gray=0b00110100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 319=0b00101000000 Gray=0b00111100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 320=0b00101000001 Gray=0b00111100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 321=0b00101000010 Gray=0b00111100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 322=0b00101000011 Gray=0b00111100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 323=0b00101000100 Gray=0b00111100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 324=0b00101000101 Gray=0b00111100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 325=0b00101000110 Gray=0b00111100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 326=0b00101000111 Gray=0b00111100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 327=0b00101001000 Gray=0b00111101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 328=0b00101001001 Gray=0b00111101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 329=0b00101001010 Gray=0b00111101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 330=0b00101001011 Gray=0b00111101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 331=0b00101001100 Gray=0b00111101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 332=0b00101001101 Gray=0b00111101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 333=0b00101001110 Gray=0b00111101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 334=0b00101001111 Gray=0b00111101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 335=0b00101010000 Gray=0b00111111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear= 336=0b00101010001 Gray=0b00111111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 337=0b00101010010 Gray=0b00111111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 338=0b00101010011 Gray=0b00111111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 339=0b00101010100 Gray=0b00111111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 340=0b00101010101 Gray=0b00111111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 341=0b00101010110 Gray=0b00111111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 342=0b00101010111 Gray=0b00111111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 343=0b00101011000 Gray=0b00111110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 344=0b00101011001 Gray=0b00111110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 345=0b00101011010 Gray=0b00111110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 346=0b00101011011 Gray=0b00111110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 347=0b00101011100 Gray=0b00111110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 348=0b00101011101 Gray=0b00111110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 349=0b00101011110 Gray=0b00111110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 350=0b00101011111 Gray=0b00111110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 351=0b00101100000 Gray=0b00111010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 352=0b00101100001 Gray=0b00111010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 353=0b00101100010 Gray=0b00111010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 354=0b00101100011 Gray=0b00111010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 355=0b00101100100 Gray=0b00111010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 356=0b00101100101 Gray=0b00111010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 357=0b00101100110 Gray=0b00111010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 358=0b00101100111 Gray=0b00111010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 359=0b00101101000 Gray=0b00111011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 360=0b00101101001 Gray=0b00111011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 361=0b00101101010 Gray=0b00111011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 362=0b00101101011 Gray=0b00111011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 363=0b00101101100 Gray=0b00111011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 364=0b00101101101 Gray=0b00111011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 365=0b00101101110 Gray=0b00111011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 366=0b00101101111 Gray=0b00111011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 367=0b00101110000 Gray=0b00111001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 368=0b00101110001 Gray=0b00111001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 369=0b00101110010 Gray=0b00111001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 370=0b00101110011 Gray=0b00111001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 371=0b00101110100 Gray=0b00111001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 372=0b00101110101 Gray=0b00111001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 373=0b00101110110 Gray=0b00111001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 374=0b00101110111 Gray=0b00111001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 375=0b00101111000 Gray=0b00111000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 376=0b00101111001 Gray=0b00111000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 377=0b00101111010 Gray=0b00111000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 378=0b00101111011 Gray=0b00111000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 379=0b00101111100 Gray=0b00111000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 380=0b00101111101 Gray=0b00111000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 381=0b00101111110 Gray=0b00111000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 382=0b00101111111 Gray=0b00111000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 383=0b00110000000 Gray=0b00101000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear= 384=0b00110000001 Gray=0b00101000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 385=0b00110000010 Gray=0b00101000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 386=0b00110000011 Gray=0b00101000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 387=0b00110000100 Gray=0b00101000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 388=0b00110000101 Gray=0b00101000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 389=0b00110000110 Gray=0b00101000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 390=0b00110000111 Gray=0b00101000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 391=0b00110001000 Gray=0b00101001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 392=0b00110001001 Gray=0b00101001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 393=0b00110001010 Gray=0b00101001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 394=0b00110001011 Gray=0b00101001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 395=0b00110001100 Gray=0b00101001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 396=0b00110001101 Gray=0b00101001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 397=0b00110001110 Gray=0b00101001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 398=0b00110001111 Gray=0b00101001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 399=0b00110010000 Gray=0b00101011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 400=0b00110010001 Gray=0b00101011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 401=0b00110010010 Gray=0b00101011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 402=0b00110010011 Gray=0b00101011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 403=0b00110010100 Gray=0b00101011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 404=0b00110010101 Gray=0b00101011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 405=0b00110010110 Gray=0b00101011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 406=0b00110010111 Gray=0b00101011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 407=0b00110011000 Gray=0b00101010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 408=0b00110011001 Gray=0b00101010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 409=0b00110011010 Gray=0b00101010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 410=0b00110011011 Gray=0b00101010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 411=0b00110011100 Gray=0b00101010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 412=0b00110011101 Gray=0b00101010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 413=0b00110011110 Gray=0b00101010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 414=0b00110011111 Gray=0b00101010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 415=0b00110100000 Gray=0b00101110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 416=0b00110100001 Gray=0b00101110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 417=0b00110100010 Gray=0b00101110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 418=0b00110100011 Gray=0b00101110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 419=0b00110100100 Gray=0b00101110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 420=0b00110100101 Gray=0b00101110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 421=0b00110100110 Gray=0b00101110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 422=0b00110100111 Gray=0b00101110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 423=0b00110101000 Gray=0b00101111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 424=0b00110101001 Gray=0b00101111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 425=0b00110101010 Gray=0b00101111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 426=0b00110101011 Gray=0b00101111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 427=0b00110101100 Gray=0b00101111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 428=0b00110101101 Gray=0b00101111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 429=0b00110101110 Gray=0b00101111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 430=0b00110101111 Gray=0b00101111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 431=0b00110110000 Gray=0b00101101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 432=0b00110110001 Gray=0b00101101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 433=0b00110110010 Gray=0b00101101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 434=0b00110110011 Gray=0b00101101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 435=0b00110110100 Gray=0b00101101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 436=0b00110110101 Gray=0b00101101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 437=0b00110110110 Gray=0b00101101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 438=0b00110110111 Gray=0b00101101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 439=0b00110111000 Gray=0b00101100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 440=0b00110111001 Gray=0b00101100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 441=0b00110111010 Gray=0b00101100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 442=0b00110111011 Gray=0b00101100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 443=0b00110111100 Gray=0b00101100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 444=0b00110111101 Gray=0b00101100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 445=0b00110111110 Gray=0b00101100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 446=0b00110111111 Gray=0b00101100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 447=0b00111000000 Gray=0b00100100000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 448=0b00111000001 Gray=0b00100100001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 449=0b00111000010 Gray=0b00100100011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 450=0b00111000011 Gray=0b00100100010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 451=0b00111000100 Gray=0b00100100110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 452=0b00111000101 Gray=0b00100100111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 453=0b00111000110 Gray=0b00100100101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 454=0b00111000111 Gray=0b00100100100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 455=0b00111001000 Gray=0b00100101100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 456=0b00111001001 Gray=0b00100101101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 457=0b00111001010 Gray=0b00100101111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 458=0b00111001011 Gray=0b00100101110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 459=0b00111001100 Gray=0b00100101010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 460=0b00111001101 Gray=0b00100101011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 461=0b00111001110 Gray=0b00100101001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 462=0b00111001111 Gray=0b00100101000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 463=0b00111010000 Gray=0b00100111000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 464=0b00111010001 Gray=0b00100111001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 465=0b00111010010 Gray=0b00100111011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 466=0b00111010011 Gray=0b00100111010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 467=0b00111010100 Gray=0b00100111110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 468=0b00111010101 Gray=0b00100111111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 469=0b00111010110 Gray=0b00100111101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 470=0b00111010111 Gray=0b00100111100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 471=0b00111011000 Gray=0b00100110100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 472=0b00111011001 Gray=0b00100110101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 473=0b00111011010 Gray=0b00100110111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 474=0b00111011011 Gray=0b00100110110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 475=0b00111011100 Gray=0b00100110010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 476=0b00111011101 Gray=0b00100110011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 477=0b00111011110 Gray=0b00100110001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 478=0b00111011111 Gray=0b00100110000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 479=0b00111100000 Gray=0b00100010000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 480=0b00111100001 Gray=0b00100010001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 481=0b00111100010 Gray=0b00100010011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 482=0b00111100011 Gray=0b00100010010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 483=0b00111100100 Gray=0b00100010110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 484=0b00111100101 Gray=0b00100010111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 485=0b00111100110 Gray=0b00100010101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 486=0b00111100111 Gray=0b00100010100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 487=0b00111101000 Gray=0b00100011100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 488=0b00111101001 Gray=0b00100011101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 489=0b00111101010 Gray=0b00100011111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 490=0b00111101011 Gray=0b00100011110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 491=0b00111101100 Gray=0b00100011010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 492=0b00111101101 Gray=0b00100011011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 493=0b00111101110 Gray=0b00100011001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 494=0b00111101111 Gray=0b00100011000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 495=0b00111110000 Gray=0b00100001000 Rel Eta,Phi=1,5 Expect 2 B$ Linear= 496=0b00111110001 Gray=0b00100001001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 497=0b00111110010 Gray=0b00100001011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 498=0b00111110011 Gray=0b00100001010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 499=0b00111110100 Gray=0b00100001110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 500=0b00111110101 Gray=0b00100001111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 501=0b00111110110 Gray=0b00100001101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 502=0b00111110111 Gray=0b00100001100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 503=0b00111111000 Gray=0b00100000100 Rel Eta,Phi=1,6 Expect 2 B$ Linear= 504=0b00111111001 Gray=0b00100000101 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 505=0b00111111010 Gray=0b00100000111 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 506=0b00111111011 Gray=0b00100000110 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 507=0b00111111100 Gray=0b00100000010 Rel Eta,Phi=2,1 Expect 2 B$ Linear= 508=0b00111111101 Gray=0b00100000011 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 509=0b00111111110 Gray=0b00100000001 Rel Eta,Phi=2,0 Expect 2 B$ Linear= 510=0b00111111111 Gray=0b00100000000 Rel Eta,Phi=1,7 Expect 1 B$ Linear= 511=0b01000000000 Gray=0b01100000000 Rel Eta,Phi=2,5 Expect 2 B$ Linear= 512=0b01000000001 Gray=0b01100000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 513=0b01000000010 Gray=0b01100000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 514=0b01000000011 Gray=0b01100000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 515=0b01000000100 Gray=0b01100000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 516=0b01000000101 Gray=0b01100000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 517=0b01000000110 Gray=0b01100000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 518=0b01000000111 Gray=0b01100000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 519=0b01000001000 Gray=0b01100001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 520=0b01000001001 Gray=0b01100001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 521=0b01000001010 Gray=0b01100001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 522=0b01000001011 Gray=0b01100001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 523=0b01000001100 Gray=0b01100001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 524=0b01000001101 Gray=0b01100001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 525=0b01000001110 Gray=0b01100001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 526=0b01000001111 Gray=0b01100001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 527=0b01000010000 Gray=0b01100011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 528=0b01000010001 Gray=0b01100011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 529=0b01000010010 Gray=0b01100011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 530=0b01000010011 Gray=0b01100011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 531=0b01000010100 Gray=0b01100011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 532=0b01000010101 Gray=0b01100011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 533=0b01000010110 Gray=0b01100011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 534=0b01000010111 Gray=0b01100011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 535=0b01000011000 Gray=0b01100010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 536=0b01000011001 Gray=0b01100010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 537=0b01000011010 Gray=0b01100010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 538=0b01000011011 Gray=0b01100010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 539=0b01000011100 Gray=0b01100010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 540=0b01000011101 Gray=0b01100010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 541=0b01000011110 Gray=0b01100010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 542=0b01000011111 Gray=0b01100010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 543=0b01000100000 Gray=0b01100110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 544=0b01000100001 Gray=0b01100110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 545=0b01000100010 Gray=0b01100110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 546=0b01000100011 Gray=0b01100110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 547=0b01000100100 Gray=0b01100110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 548=0b01000100101 Gray=0b01100110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 549=0b01000100110 Gray=0b01100110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 550=0b01000100111 Gray=0b01100110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 551=0b01000101000 Gray=0b01100111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 552=0b01000101001 Gray=0b01100111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 553=0b01000101010 Gray=0b01100111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 554=0b01000101011 Gray=0b01100111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 555=0b01000101100 Gray=0b01100111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 556=0b01000101101 Gray=0b01100111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 557=0b01000101110 Gray=0b01100111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 558=0b01000101111 Gray=0b01100111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 559=0b01000110000 Gray=0b01100101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 560=0b01000110001 Gray=0b01100101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 561=0b01000110010 Gray=0b01100101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 562=0b01000110011 Gray=0b01100101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 563=0b01000110100 Gray=0b01100101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 564=0b01000110101 Gray=0b01100101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 565=0b01000110110 Gray=0b01100101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 566=0b01000110111 Gray=0b01100101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 567=0b01000111000 Gray=0b01100100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 568=0b01000111001 Gray=0b01100100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 569=0b01000111010 Gray=0b01100100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 570=0b01000111011 Gray=0b01100100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 571=0b01000111100 Gray=0b01100100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 572=0b01000111101 Gray=0b01100100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 573=0b01000111110 Gray=0b01100100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 574=0b01000111111 Gray=0b01100100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 575=0b01001000000 Gray=0b01101100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 576=0b01001000001 Gray=0b01101100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 577=0b01001000010 Gray=0b01101100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 578=0b01001000011 Gray=0b01101100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 579=0b01001000100 Gray=0b01101100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 580=0b01001000101 Gray=0b01101100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 581=0b01001000110 Gray=0b01101100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 582=0b01001000111 Gray=0b01101100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 583=0b01001001000 Gray=0b01101101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 584=0b01001001001 Gray=0b01101101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 585=0b01001001010 Gray=0b01101101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 586=0b01001001011 Gray=0b01101101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 587=0b01001001100 Gray=0b01101101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 588=0b01001001101 Gray=0b01101101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 589=0b01001001110 Gray=0b01101101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 590=0b01001001111 Gray=0b01101101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 591=0b01001010000 Gray=0b01101111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear= 592=0b01001010001 Gray=0b01101111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 593=0b01001010010 Gray=0b01101111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 594=0b01001010011 Gray=0b01101111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 595=0b01001010100 Gray=0b01101111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 596=0b01001010101 Gray=0b01101111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 597=0b01001010110 Gray=0b01101111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 598=0b01001010111 Gray=0b01101111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 599=0b01001011000 Gray=0b01101110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 600=0b01001011001 Gray=0b01101110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 601=0b01001011010 Gray=0b01101110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 602=0b01001011011 Gray=0b01101110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 603=0b01001011100 Gray=0b01101110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 604=0b01001011101 Gray=0b01101110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 605=0b01001011110 Gray=0b01101110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 606=0b01001011111 Gray=0b01101110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 607=0b01001100000 Gray=0b01101010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 608=0b01001100001 Gray=0b01101010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 609=0b01001100010 Gray=0b01101010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 610=0b01001100011 Gray=0b01101010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 611=0b01001100100 Gray=0b01101010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 612=0b01001100101 Gray=0b01101010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 613=0b01001100110 Gray=0b01101010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 614=0b01001100111 Gray=0b01101010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 615=0b01001101000 Gray=0b01101011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 616=0b01001101001 Gray=0b01101011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 617=0b01001101010 Gray=0b01101011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 618=0b01001101011 Gray=0b01101011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 619=0b01001101100 Gray=0b01101011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 620=0b01001101101 Gray=0b01101011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 621=0b01001101110 Gray=0b01101011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 622=0b01001101111 Gray=0b01101011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 623=0b01001110000 Gray=0b01101001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 624=0b01001110001 Gray=0b01101001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 625=0b01001110010 Gray=0b01101001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 626=0b01001110011 Gray=0b01101001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 627=0b01001110100 Gray=0b01101001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 628=0b01001110101 Gray=0b01101001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 629=0b01001110110 Gray=0b01101001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 630=0b01001110111 Gray=0b01101001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 631=0b01001111000 Gray=0b01101000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 632=0b01001111001 Gray=0b01101000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 633=0b01001111010 Gray=0b01101000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 634=0b01001111011 Gray=0b01101000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 635=0b01001111100 Gray=0b01101000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 636=0b01001111101 Gray=0b01101000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 637=0b01001111110 Gray=0b01101000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 638=0b01001111111 Gray=0b01101000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 639=0b01010000000 Gray=0b01111000000 Rel Eta,Phi=2,3 Expect 4 B$ Linear= 640=0b01010000001 Gray=0b01111000001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 641=0b01010000010 Gray=0b01111000011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 642=0b01010000011 Gray=0b01111000010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 643=0b01010000100 Gray=0b01111000110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 644=0b01010000101 Gray=0b01111000111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 645=0b01010000110 Gray=0b01111000101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 646=0b01010000111 Gray=0b01111000100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 647=0b01010001000 Gray=0b01111001100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 648=0b01010001001 Gray=0b01111001101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 649=0b01010001010 Gray=0b01111001111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 650=0b01010001011 Gray=0b01111001110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 651=0b01010001100 Gray=0b01111001010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 652=0b01010001101 Gray=0b01111001011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 653=0b01010001110 Gray=0b01111001001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 654=0b01010001111 Gray=0b01111001000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 655=0b01010010000 Gray=0b01111011000 Rel Eta,Phi=1,5 Expect 6 B$ Linear= 656=0b01010010001 Gray=0b01111011001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 657=0b01010010010 Gray=0b01111011011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 658=0b01010010011 Gray=0b01111011010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 659=0b01010010100 Gray=0b01111011110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 660=0b01010010101 Gray=0b01111011111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 661=0b01010010110 Gray=0b01111011101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 662=0b01010010111 Gray=0b01111011100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 663=0b01010011000 Gray=0b01111010100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 664=0b01010011001 Gray=0b01111010101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 665=0b01010011010 Gray=0b01111010111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 666=0b01010011011 Gray=0b01111010110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 667=0b01010011100 Gray=0b01111010010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 668=0b01010011101 Gray=0b01111010011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 669=0b01010011110 Gray=0b01111010001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 670=0b01010011111 Gray=0b01111010000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 671=0b01010100000 Gray=0b01111110000 Rel Eta,Phi=1,4 Expect 6 B$ Linear= 672=0b01010100001 Gray=0b01111110001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 673=0b01010100010 Gray=0b01111110011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 674=0b01010100011 Gray=0b01111110010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 675=0b01010100100 Gray=0b01111110110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 676=0b01010100101 Gray=0b01111110111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 677=0b01010100110 Gray=0b01111110101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 678=0b01010100111 Gray=0b01111110100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 679=0b01010101000 Gray=0b01111111100 Rel Eta,Phi=1,6 Expect 8 B$ Linear= 680=0b01010101001 Gray=0b01111111101 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 681=0b01010101010 Gray=0b01111111111 Rel Eta,Phi=2,0 Expect 10 B$ Linear= 682=0b01010101011 Gray=0b01111111110 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 683=0b01010101100 Gray=0b01111111010 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 684=0b01010101101 Gray=0b01111111011 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 685=0b01010101110 Gray=0b01111111001 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 686=0b01010101111 Gray=0b01111111000 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 687=0b01010110000 Gray=0b01111101000 Rel Eta,Phi=1,5 Expect 6 B$ Linear= 688=0b01010110001 Gray=0b01111101001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 689=0b01010110010 Gray=0b01111101011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 690=0b01010110011 Gray=0b01111101010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 691=0b01010110100 Gray=0b01111101110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 692=0b01010110101 Gray=0b01111101111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 693=0b01010110110 Gray=0b01111101101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 694=0b01010110111 Gray=0b01111101100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 695=0b01010111000 Gray=0b01111100100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 696=0b01010111001 Gray=0b01111100101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 697=0b01010111010 Gray=0b01111100111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 698=0b01010111011 Gray=0b01111100110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 699=0b01010111100 Gray=0b01111100010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 700=0b01010111101 Gray=0b01111100011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 701=0b01010111110 Gray=0b01111100001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 702=0b01010111111 Gray=0b01111100000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 703=0b01011000000 Gray=0b01110100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 704=0b01011000001 Gray=0b01110100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 705=0b01011000010 Gray=0b01110100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 706=0b01011000011 Gray=0b01110100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 707=0b01011000100 Gray=0b01110100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 708=0b01011000101 Gray=0b01110100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 709=0b01011000110 Gray=0b01110100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 710=0b01011000111 Gray=0b01110100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 711=0b01011001000 Gray=0b01110101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 712=0b01011001001 Gray=0b01110101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 713=0b01011001010 Gray=0b01110101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 714=0b01011001011 Gray=0b01110101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 715=0b01011001100 Gray=0b01110101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 716=0b01011001101 Gray=0b01110101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 717=0b01011001110 Gray=0b01110101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 718=0b01011001111 Gray=0b01110101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 719=0b01011010000 Gray=0b01110111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear= 720=0b01011010001 Gray=0b01110111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 721=0b01011010010 Gray=0b01110111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 722=0b01011010011 Gray=0b01110111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 723=0b01011010100 Gray=0b01110111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 724=0b01011010101 Gray=0b01110111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 725=0b01011010110 Gray=0b01110111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 726=0b01011010111 Gray=0b01110111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 727=0b01011011000 Gray=0b01110110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 728=0b01011011001 Gray=0b01110110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 729=0b01011011010 Gray=0b01110110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 730=0b01011011011 Gray=0b01110110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 731=0b01011011100 Gray=0b01110110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 732=0b01011011101 Gray=0b01110110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 733=0b01011011110 Gray=0b01110110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 734=0b01011011111 Gray=0b01110110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 735=0b01011100000 Gray=0b01110010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 736=0b01011100001 Gray=0b01110010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 737=0b01011100010 Gray=0b01110010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 738=0b01011100011 Gray=0b01110010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 739=0b01011100100 Gray=0b01110010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 740=0b01011100101 Gray=0b01110010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 741=0b01011100110 Gray=0b01110010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 742=0b01011100111 Gray=0b01110010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 743=0b01011101000 Gray=0b01110011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 744=0b01011101001 Gray=0b01110011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 745=0b01011101010 Gray=0b01110011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 746=0b01011101011 Gray=0b01110011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 747=0b01011101100 Gray=0b01110011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 748=0b01011101101 Gray=0b01110011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 749=0b01011101110 Gray=0b01110011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 750=0b01011101111 Gray=0b01110011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 751=0b01011110000 Gray=0b01110001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 752=0b01011110001 Gray=0b01110001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 753=0b01011110010 Gray=0b01110001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 754=0b01011110011 Gray=0b01110001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 755=0b01011110100 Gray=0b01110001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 756=0b01011110101 Gray=0b01110001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 757=0b01011110110 Gray=0b01110001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 758=0b01011110111 Gray=0b01110001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 759=0b01011111000 Gray=0b01110000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 760=0b01011111001 Gray=0b01110000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 761=0b01011111010 Gray=0b01110000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 762=0b01011111011 Gray=0b01110000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 763=0b01011111100 Gray=0b01110000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 764=0b01011111101 Gray=0b01110000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 765=0b01011111110 Gray=0b01110000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 766=0b01011111111 Gray=0b01110000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 767=0b01100000000 Gray=0b01010000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear= 768=0b01100000001 Gray=0b01010000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 769=0b01100000010 Gray=0b01010000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 770=0b01100000011 Gray=0b01010000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 771=0b01100000100 Gray=0b01010000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 772=0b01100000101 Gray=0b01010000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 773=0b01100000110 Gray=0b01010000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 774=0b01100000111 Gray=0b01010000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 775=0b01100001000 Gray=0b01010001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 776=0b01100001001 Gray=0b01010001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 777=0b01100001010 Gray=0b01010001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 778=0b01100001011 Gray=0b01010001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 779=0b01100001100 Gray=0b01010001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 780=0b01100001101 Gray=0b01010001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 781=0b01100001110 Gray=0b01010001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 782=0b01100001111 Gray=0b01010001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 783=0b01100010000 Gray=0b01010011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 784=0b01100010001 Gray=0b01010011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 785=0b01100010010 Gray=0b01010011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 786=0b01100010011 Gray=0b01010011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 787=0b01100010100 Gray=0b01010011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 788=0b01100010101 Gray=0b01010011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 789=0b01100010110 Gray=0b01010011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 790=0b01100010111 Gray=0b01010011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 791=0b01100011000 Gray=0b01010010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 792=0b01100011001 Gray=0b01010010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 793=0b01100011010 Gray=0b01010010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 794=0b01100011011 Gray=0b01010010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 795=0b01100011100 Gray=0b01010010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 796=0b01100011101 Gray=0b01010010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 797=0b01100011110 Gray=0b01010010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 798=0b01100011111 Gray=0b01010010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 799=0b01100100000 Gray=0b01010110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 800=0b01100100001 Gray=0b01010110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 801=0b01100100010 Gray=0b01010110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 802=0b01100100011 Gray=0b01010110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 803=0b01100100100 Gray=0b01010110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 804=0b01100100101 Gray=0b01010110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 805=0b01100100110 Gray=0b01010110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 806=0b01100100111 Gray=0b01010110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 807=0b01100101000 Gray=0b01010111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 808=0b01100101001 Gray=0b01010111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 809=0b01100101010 Gray=0b01010111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 810=0b01100101011 Gray=0b01010111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 811=0b01100101100 Gray=0b01010111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 812=0b01100101101 Gray=0b01010111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 813=0b01100101110 Gray=0b01010111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 814=0b01100101111 Gray=0b01010111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 815=0b01100110000 Gray=0b01010101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 816=0b01100110001 Gray=0b01010101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 817=0b01100110010 Gray=0b01010101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 818=0b01100110011 Gray=0b01010101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 819=0b01100110100 Gray=0b01010101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 820=0b01100110101 Gray=0b01010101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 821=0b01100110110 Gray=0b01010101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 822=0b01100110111 Gray=0b01010101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 823=0b01100111000 Gray=0b01010100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 824=0b01100111001 Gray=0b01010100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 825=0b01100111010 Gray=0b01010100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 826=0b01100111011 Gray=0b01010100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 827=0b01100111100 Gray=0b01010100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 828=0b01100111101 Gray=0b01010100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 829=0b01100111110 Gray=0b01010100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 830=0b01100111111 Gray=0b01010100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 831=0b01101000000 Gray=0b01011100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear= 832=0b01101000001 Gray=0b01011100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 833=0b01101000010 Gray=0b01011100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 834=0b01101000011 Gray=0b01011100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 835=0b01101000100 Gray=0b01011100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 836=0b01101000101 Gray=0b01011100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 837=0b01101000110 Gray=0b01011100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 838=0b01101000111 Gray=0b01011100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 839=0b01101001000 Gray=0b01011101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 840=0b01101001001 Gray=0b01011101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 841=0b01101001010 Gray=0b01011101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 842=0b01101001011 Gray=0b01011101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 843=0b01101001100 Gray=0b01011101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 844=0b01101001101 Gray=0b01011101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 845=0b01101001110 Gray=0b01011101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 846=0b01101001111 Gray=0b01011101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 847=0b01101010000 Gray=0b01011111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear= 848=0b01101010001 Gray=0b01011111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 849=0b01101010010 Gray=0b01011111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 850=0b01101010011 Gray=0b01011111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 851=0b01101010100 Gray=0b01011111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear= 852=0b01101010101 Gray=0b01011111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear= 853=0b01101010110 Gray=0b01011111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 854=0b01101010111 Gray=0b01011111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 855=0b01101011000 Gray=0b01011110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 856=0b01101011001 Gray=0b01011110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 857=0b01101011010 Gray=0b01011110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 858=0b01101011011 Gray=0b01011110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 859=0b01101011100 Gray=0b01011110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 860=0b01101011101 Gray=0b01011110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 861=0b01101011110 Gray=0b01011110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 862=0b01101011111 Gray=0b01011110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 863=0b01101100000 Gray=0b01011010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 864=0b01101100001 Gray=0b01011010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 865=0b01101100010 Gray=0b01011010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 866=0b01101100011 Gray=0b01011010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 867=0b01101100100 Gray=0b01011010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 868=0b01101100101 Gray=0b01011010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 869=0b01101100110 Gray=0b01011010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 870=0b01101100111 Gray=0b01011010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 871=0b01101101000 Gray=0b01011011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 872=0b01101101001 Gray=0b01011011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 873=0b01101101010 Gray=0b01011011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 874=0b01101101011 Gray=0b01011011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 875=0b01101101100 Gray=0b01011011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 876=0b01101101101 Gray=0b01011011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 877=0b01101101110 Gray=0b01011011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 878=0b01101101111 Gray=0b01011011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 879=0b01101110000 Gray=0b01011001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 880=0b01101110001 Gray=0b01011001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 881=0b01101110010 Gray=0b01011001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 882=0b01101110011 Gray=0b01011001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 883=0b01101110100 Gray=0b01011001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 884=0b01101110101 Gray=0b01011001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 885=0b01101110110 Gray=0b01011001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 886=0b01101110111 Gray=0b01011001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 887=0b01101111000 Gray=0b01011000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 888=0b01101111001 Gray=0b01011000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 889=0b01101111010 Gray=0b01011000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 890=0b01101111011 Gray=0b01011000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 891=0b01101111100 Gray=0b01011000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 892=0b01101111101 Gray=0b01011000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 893=0b01101111110 Gray=0b01011000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 894=0b01101111111 Gray=0b01011000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 895=0b01110000000 Gray=0b01001000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear= 896=0b01110000001 Gray=0b01001000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 897=0b01110000010 Gray=0b01001000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 898=0b01110000011 Gray=0b01001000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 899=0b01110000100 Gray=0b01001000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 900=0b01110000101 Gray=0b01001000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 901=0b01110000110 Gray=0b01001000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 902=0b01110000111 Gray=0b01001000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 903=0b01110001000 Gray=0b01001001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 904=0b01110001001 Gray=0b01001001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 905=0b01110001010 Gray=0b01001001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 906=0b01110001011 Gray=0b01001001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 907=0b01110001100 Gray=0b01001001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 908=0b01110001101 Gray=0b01001001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 909=0b01110001110 Gray=0b01001001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 910=0b01110001111 Gray=0b01001001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 911=0b01110010000 Gray=0b01001011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 912=0b01110010001 Gray=0b01001011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 913=0b01110010010 Gray=0b01001011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 914=0b01110010011 Gray=0b01001011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 915=0b01110010100 Gray=0b01001011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 916=0b01110010101 Gray=0b01001011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 917=0b01110010110 Gray=0b01001011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 918=0b01110010111 Gray=0b01001011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 919=0b01110011000 Gray=0b01001010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 920=0b01110011001 Gray=0b01001010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 921=0b01110011010 Gray=0b01001010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 922=0b01110011011 Gray=0b01001010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 923=0b01110011100 Gray=0b01001010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 924=0b01110011101 Gray=0b01001010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 925=0b01110011110 Gray=0b01001010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 926=0b01110011111 Gray=0b01001010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 927=0b01110100000 Gray=0b01001110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 928=0b01110100001 Gray=0b01001110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 929=0b01110100010 Gray=0b01001110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 930=0b01110100011 Gray=0b01001110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 931=0b01110100100 Gray=0b01001110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 932=0b01110100101 Gray=0b01001110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 933=0b01110100110 Gray=0b01001110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 934=0b01110100111 Gray=0b01001110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 935=0b01110101000 Gray=0b01001111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 936=0b01110101001 Gray=0b01001111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 937=0b01110101010 Gray=0b01001111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 938=0b01110101011 Gray=0b01001111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 939=0b01110101100 Gray=0b01001111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 940=0b01110101101 Gray=0b01001111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 941=0b01110101110 Gray=0b01001111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 942=0b01110101111 Gray=0b01001111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 943=0b01110110000 Gray=0b01001101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 944=0b01110110001 Gray=0b01001101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 945=0b01110110010 Gray=0b01001101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 946=0b01110110011 Gray=0b01001101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 947=0b01110110100 Gray=0b01001101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 948=0b01110110101 Gray=0b01001101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 949=0b01110110110 Gray=0b01001101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 950=0b01110110111 Gray=0b01001101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 951=0b01110111000 Gray=0b01001100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 952=0b01110111001 Gray=0b01001100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 953=0b01110111010 Gray=0b01001100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 954=0b01110111011 Gray=0b01001100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 955=0b01110111100 Gray=0b01001100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 956=0b01110111101 Gray=0b01001100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 957=0b01110111110 Gray=0b01001100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 958=0b01110111111 Gray=0b01001100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 959=0b01111000000 Gray=0b01000100000 Rel Eta,Phi=1,3 Expect 2 B$ Linear= 960=0b01111000001 Gray=0b01000100001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 961=0b01111000010 Gray=0b01000100011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 962=0b01111000011 Gray=0b01000100010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 963=0b01111000100 Gray=0b01000100110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 964=0b01111000101 Gray=0b01000100111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 965=0b01111000110 Gray=0b01000100101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 966=0b01111000111 Gray=0b01000100100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 967=0b01111001000 Gray=0b01000101100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 968=0b01111001001 Gray=0b01000101101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 969=0b01111001010 Gray=0b01000101111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 970=0b01111001011 Gray=0b01000101110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 971=0b01111001100 Gray=0b01000101010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 972=0b01111001101 Gray=0b01000101011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 973=0b01111001110 Gray=0b01000101001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 974=0b01111001111 Gray=0b01000101000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 975=0b01111010000 Gray=0b01000111000 Rel Eta,Phi=1,5 Expect 4 B$ Linear= 976=0b01111010001 Gray=0b01000111001 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 977=0b01111010010 Gray=0b01000111011 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 978=0b01111010011 Gray=0b01000111010 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 979=0b01111010100 Gray=0b01000111110 Rel Eta,Phi=2,1 Expect 6 B$ Linear= 980=0b01111010101 Gray=0b01000111111 Rel Eta,Phi=1,7 Expect 7 B$ Linear= 981=0b01111010110 Gray=0b01000111101 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 982=0b01111010111 Gray=0b01000111100 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 983=0b01111011000 Gray=0b01000110100 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 984=0b01111011001 Gray=0b01000110101 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 985=0b01111011010 Gray=0b01000110111 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 986=0b01111011011 Gray=0b01000110110 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 987=0b01111011100 Gray=0b01000110010 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 988=0b01111011101 Gray=0b01000110011 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 989=0b01111011110 Gray=0b01000110001 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 990=0b01111011111 Gray=0b01000110000 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 991=0b01111100000 Gray=0b01000010000 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 992=0b01111100001 Gray=0b01000010001 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 993=0b01111100010 Gray=0b01000010011 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 994=0b01111100011 Gray=0b01000010010 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 995=0b01111100100 Gray=0b01000010110 Rel Eta,Phi=2,1 Expect 4 B$ Linear= 996=0b01111100101 Gray=0b01000010111 Rel Eta,Phi=1,7 Expect 5 B$ Linear= 997=0b01111100110 Gray=0b01000010101 Rel Eta,Phi=2,0 Expect 4 B$ Linear= 998=0b01111100111 Gray=0b01000010100 Rel Eta,Phi=1,7 Expect 3 B$ Linear= 999=0b01111101000 Gray=0b01000011100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1000=0b01111101001 Gray=0b01000011101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1001=0b01111101010 Gray=0b01000011111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1002=0b01111101011 Gray=0b01000011110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1003=0b01111101100 Gray=0b01000011010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1004=0b01111101101 Gray=0b01000011011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1005=0b01111101110 Gray=0b01000011001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1006=0b01111101111 Gray=0b01000011000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1007=0b01111110000 Gray=0b01000001000 Rel Eta,Phi=1,5 Expect 2 B$ Linear=1008=0b01111110001 Gray=0b01000001001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1009=0b01111110010 Gray=0b01000001011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1010=0b01111110011 Gray=0b01000001010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1011=0b01111110100 Gray=0b01000001110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1012=0b01111110101 Gray=0b01000001111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1013=0b01111110110 Gray=0b01000001101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1014=0b01111110111 Gray=0b01000001100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1015=0b01111111000 Gray=0b01000000100 Rel Eta,Phi=1,6 Expect 2 B$ Linear=1016=0b01111111001 Gray=0b01000000101 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1017=0b01111111010 Gray=0b01000000111 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1018=0b01111111011 Gray=0b01000000110 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1019=0b01111111100 Gray=0b01000000010 Rel Eta,Phi=2,1 Expect 2 B$ Linear=1020=0b01111111101 Gray=0b01000000011 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1021=0b01111111110 Gray=0b01000000001 Rel Eta,Phi=2,0 Expect 2 B$ Linear=1022=0b01111111111 Gray=0b01000000000 Rel Eta,Phi=1,7 Expect 1 B$ Linear=1023=0b10000000000 Gray=0b11000000000 Rel Eta,Phi=2,2 Expect 2 B$ Linear=1024=0b10000000001 Gray=0b11000000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1025=0b10000000010 Gray=0b11000000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1026=0b10000000011 Gray=0b11000000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1027=0b10000000100 Gray=0b11000000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1028=0b10000000101 Gray=0b11000000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1029=0b10000000110 Gray=0b11000000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1030=0b10000000111 Gray=0b11000000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1031=0b10000001000 Gray=0b11000001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1032=0b10000001001 Gray=0b11000001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1033=0b10000001010 Gray=0b11000001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1034=0b10000001011 Gray=0b11000001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1035=0b10000001100 Gray=0b11000001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1036=0b10000001101 Gray=0b11000001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1037=0b10000001110 Gray=0b11000001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1038=0b10000001111 Gray=0b11000001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1039=0b10000010000 Gray=0b11000011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1040=0b10000010001 Gray=0b11000011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1041=0b10000010010 Gray=0b11000011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1042=0b10000010011 Gray=0b11000011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1043=0b10000010100 Gray=0b11000011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1044=0b10000010101 Gray=0b11000011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1045=0b10000010110 Gray=0b11000011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1046=0b10000010111 Gray=0b11000011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1047=0b10000011000 Gray=0b11000010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1048=0b10000011001 Gray=0b11000010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1049=0b10000011010 Gray=0b11000010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1050=0b10000011011 Gray=0b11000010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1051=0b10000011100 Gray=0b11000010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1052=0b10000011101 Gray=0b11000010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1053=0b10000011110 Gray=0b11000010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1054=0b10000011111 Gray=0b11000010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1055=0b10000100000 Gray=0b11000110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1056=0b10000100001 Gray=0b11000110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1057=0b10000100010 Gray=0b11000110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1058=0b10000100011 Gray=0b11000110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1059=0b10000100100 Gray=0b11000110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1060=0b10000100101 Gray=0b11000110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1061=0b10000100110 Gray=0b11000110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1062=0b10000100111 Gray=0b11000110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1063=0b10000101000 Gray=0b11000111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1064=0b10000101001 Gray=0b11000111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1065=0b10000101010 Gray=0b11000111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1066=0b10000101011 Gray=0b11000111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1067=0b10000101100 Gray=0b11000111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1068=0b10000101101 Gray=0b11000111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1069=0b10000101110 Gray=0b11000111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1070=0b10000101111 Gray=0b11000111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1071=0b10000110000 Gray=0b11000101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1072=0b10000110001 Gray=0b11000101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1073=0b10000110010 Gray=0b11000101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1074=0b10000110011 Gray=0b11000101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1075=0b10000110100 Gray=0b11000101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1076=0b10000110101 Gray=0b11000101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1077=0b10000110110 Gray=0b11000101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1078=0b10000110111 Gray=0b11000101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1079=0b10000111000 Gray=0b11000100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1080=0b10000111001 Gray=0b11000100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1081=0b10000111010 Gray=0b11000100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1082=0b10000111011 Gray=0b11000100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1083=0b10000111100 Gray=0b11000100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1084=0b10000111101 Gray=0b11000100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1085=0b10000111110 Gray=0b11000100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1086=0b10000111111 Gray=0b11000100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1087=0b10001000000 Gray=0b11001100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1088=0b10001000001 Gray=0b11001100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1089=0b10001000010 Gray=0b11001100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1090=0b10001000011 Gray=0b11001100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1091=0b10001000100 Gray=0b11001100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1092=0b10001000101 Gray=0b11001100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1093=0b10001000110 Gray=0b11001100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1094=0b10001000111 Gray=0b11001100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1095=0b10001001000 Gray=0b11001101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1096=0b10001001001 Gray=0b11001101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1097=0b10001001010 Gray=0b11001101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1098=0b10001001011 Gray=0b11001101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1099=0b10001001100 Gray=0b11001101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1100=0b10001001101 Gray=0b11001101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1101=0b10001001110 Gray=0b11001101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1102=0b10001001111 Gray=0b11001101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1103=0b10001010000 Gray=0b11001111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1104=0b10001010001 Gray=0b11001111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1105=0b10001010010 Gray=0b11001111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1106=0b10001010011 Gray=0b11001111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1107=0b10001010100 Gray=0b11001111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1108=0b10001010101 Gray=0b11001111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1109=0b10001010110 Gray=0b11001111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1110=0b10001010111 Gray=0b11001111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1111=0b10001011000 Gray=0b11001110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1112=0b10001011001 Gray=0b11001110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1113=0b10001011010 Gray=0b11001110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1114=0b10001011011 Gray=0b11001110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1115=0b10001011100 Gray=0b11001110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1116=0b10001011101 Gray=0b11001110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1117=0b10001011110 Gray=0b11001110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1118=0b10001011111 Gray=0b11001110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1119=0b10001100000 Gray=0b11001010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1120=0b10001100001 Gray=0b11001010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1121=0b10001100010 Gray=0b11001010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1122=0b10001100011 Gray=0b11001010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1123=0b10001100100 Gray=0b11001010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1124=0b10001100101 Gray=0b11001010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1125=0b10001100110 Gray=0b11001010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1126=0b10001100111 Gray=0b11001010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1127=0b10001101000 Gray=0b11001011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1128=0b10001101001 Gray=0b11001011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1129=0b10001101010 Gray=0b11001011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1130=0b10001101011 Gray=0b11001011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1131=0b10001101100 Gray=0b11001011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1132=0b10001101101 Gray=0b11001011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1133=0b10001101110 Gray=0b11001011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1134=0b10001101111 Gray=0b11001011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1135=0b10001110000 Gray=0b11001001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1136=0b10001110001 Gray=0b11001001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1137=0b10001110010 Gray=0b11001001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1138=0b10001110011 Gray=0b11001001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1139=0b10001110100 Gray=0b11001001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1140=0b10001110101 Gray=0b11001001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1141=0b10001110110 Gray=0b11001001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1142=0b10001110111 Gray=0b11001001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1143=0b10001111000 Gray=0b11001000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1144=0b10001111001 Gray=0b11001000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1145=0b10001111010 Gray=0b11001000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1146=0b10001111011 Gray=0b11001000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1147=0b10001111100 Gray=0b11001000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1148=0b10001111101 Gray=0b11001000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1149=0b10001111110 Gray=0b11001000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1150=0b10001111111 Gray=0b11001000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1151=0b10010000000 Gray=0b11011000000 Rel Eta,Phi=2,3 Expect 4 B$ Linear=1152=0b10010000001 Gray=0b11011000001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1153=0b10010000010 Gray=0b11011000011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1154=0b10010000011 Gray=0b11011000010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1155=0b10010000100 Gray=0b11011000110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1156=0b10010000101 Gray=0b11011000111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1157=0b10010000110 Gray=0b11011000101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1158=0b10010000111 Gray=0b11011000100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1159=0b10010001000 Gray=0b11011001100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1160=0b10010001001 Gray=0b11011001101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1161=0b10010001010 Gray=0b11011001111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1162=0b10010001011 Gray=0b11011001110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1163=0b10010001100 Gray=0b11011001010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1164=0b10010001101 Gray=0b11011001011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1165=0b10010001110 Gray=0b11011001001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1166=0b10010001111 Gray=0b11011001000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1167=0b10010010000 Gray=0b11011011000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1168=0b10010010001 Gray=0b11011011001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1169=0b10010010010 Gray=0b11011011011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1170=0b10010010011 Gray=0b11011011010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1171=0b10010010100 Gray=0b11011011110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1172=0b10010010101 Gray=0b11011011111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1173=0b10010010110 Gray=0b11011011101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1174=0b10010010111 Gray=0b11011011100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1175=0b10010011000 Gray=0b11011010100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1176=0b10010011001 Gray=0b11011010101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1177=0b10010011010 Gray=0b11011010111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1178=0b10010011011 Gray=0b11011010110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1179=0b10010011100 Gray=0b11011010010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1180=0b10010011101 Gray=0b11011010011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1181=0b10010011110 Gray=0b11011010001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1182=0b10010011111 Gray=0b11011010000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1183=0b10010100000 Gray=0b11011110000 Rel Eta,Phi=1,4 Expect 6 B$ Linear=1184=0b10010100001 Gray=0b11011110001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1185=0b10010100010 Gray=0b11011110011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1186=0b10010100011 Gray=0b11011110010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1187=0b10010100100 Gray=0b11011110110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1188=0b10010100101 Gray=0b11011110111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1189=0b10010100110 Gray=0b11011110101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1190=0b10010100111 Gray=0b11011110100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1191=0b10010101000 Gray=0b11011111100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1192=0b10010101001 Gray=0b11011111101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1193=0b10010101010 Gray=0b11011111111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1194=0b10010101011 Gray=0b11011111110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1195=0b10010101100 Gray=0b11011111010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1196=0b10010101101 Gray=0b11011111011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1197=0b10010101110 Gray=0b11011111001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1198=0b10010101111 Gray=0b11011111000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1199=0b10010110000 Gray=0b11011101000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1200=0b10010110001 Gray=0b11011101001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1201=0b10010110010 Gray=0b11011101011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1202=0b10010110011 Gray=0b11011101010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1203=0b10010110100 Gray=0b11011101110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1204=0b10010110101 Gray=0b11011101111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1205=0b10010110110 Gray=0b11011101101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1206=0b10010110111 Gray=0b11011101100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1207=0b10010111000 Gray=0b11011100100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1208=0b10010111001 Gray=0b11011100101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1209=0b10010111010 Gray=0b11011100111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1210=0b10010111011 Gray=0b11011100110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1211=0b10010111100 Gray=0b11011100010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1212=0b10010111101 Gray=0b11011100011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1213=0b10010111110 Gray=0b11011100001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1214=0b10010111111 Gray=0b11011100000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1215=0b10011000000 Gray=0b11010100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1216=0b10011000001 Gray=0b11010100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1217=0b10011000010 Gray=0b11010100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1218=0b10011000011 Gray=0b11010100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1219=0b10011000100 Gray=0b11010100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1220=0b10011000101 Gray=0b11010100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1221=0b10011000110 Gray=0b11010100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1222=0b10011000111 Gray=0b11010100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1223=0b10011001000 Gray=0b11010101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1224=0b10011001001 Gray=0b11010101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1225=0b10011001010 Gray=0b11010101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1226=0b10011001011 Gray=0b11010101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1227=0b10011001100 Gray=0b11010101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1228=0b10011001101 Gray=0b11010101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1229=0b10011001110 Gray=0b11010101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1230=0b10011001111 Gray=0b11010101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1231=0b10011010000 Gray=0b11010111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1232=0b10011010001 Gray=0b11010111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1233=0b10011010010 Gray=0b11010111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1234=0b10011010011 Gray=0b11010111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1235=0b10011010100 Gray=0b11010111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1236=0b10011010101 Gray=0b11010111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1237=0b10011010110 Gray=0b11010111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1238=0b10011010111 Gray=0b11010111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1239=0b10011011000 Gray=0b11010110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1240=0b10011011001 Gray=0b11010110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1241=0b10011011010 Gray=0b11010110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1242=0b10011011011 Gray=0b11010110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1243=0b10011011100 Gray=0b11010110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1244=0b10011011101 Gray=0b11010110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1245=0b10011011110 Gray=0b11010110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1246=0b10011011111 Gray=0b11010110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1247=0b10011100000 Gray=0b11010010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1248=0b10011100001 Gray=0b11010010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1249=0b10011100010 Gray=0b11010010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1250=0b10011100011 Gray=0b11010010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1251=0b10011100100 Gray=0b11010010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1252=0b10011100101 Gray=0b11010010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1253=0b10011100110 Gray=0b11010010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1254=0b10011100111 Gray=0b11010010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1255=0b10011101000 Gray=0b11010011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1256=0b10011101001 Gray=0b11010011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1257=0b10011101010 Gray=0b11010011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1258=0b10011101011 Gray=0b11010011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1259=0b10011101100 Gray=0b11010011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1260=0b10011101101 Gray=0b11010011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1261=0b10011101110 Gray=0b11010011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1262=0b10011101111 Gray=0b11010011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1263=0b10011110000 Gray=0b11010001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1264=0b10011110001 Gray=0b11010001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1265=0b10011110010 Gray=0b11010001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1266=0b10011110011 Gray=0b11010001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1267=0b10011110100 Gray=0b11010001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1268=0b10011110101 Gray=0b11010001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1269=0b10011110110 Gray=0b11010001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1270=0b10011110111 Gray=0b11010001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1271=0b10011111000 Gray=0b11010000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1272=0b10011111001 Gray=0b11010000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1273=0b10011111010 Gray=0b11010000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1274=0b10011111011 Gray=0b11010000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1275=0b10011111100 Gray=0b11010000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1276=0b10011111101 Gray=0b11010000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1277=0b10011111110 Gray=0b11010000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1278=0b10011111111 Gray=0b11010000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1279=0b10100000000 Gray=0b11110000000 Rel Eta,Phi=2,4 Expect 4 B$ Linear=1280=0b10100000001 Gray=0b11110000001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1281=0b10100000010 Gray=0b11110000011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1282=0b10100000011 Gray=0b11110000010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1283=0b10100000100 Gray=0b11110000110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1284=0b10100000101 Gray=0b11110000111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1285=0b10100000110 Gray=0b11110000101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1286=0b10100000111 Gray=0b11110000100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1287=0b10100001000 Gray=0b11110001100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1288=0b10100001001 Gray=0b11110001101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1289=0b10100001010 Gray=0b11110001111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1290=0b10100001011 Gray=0b11110001110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1291=0b10100001100 Gray=0b11110001010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1292=0b10100001101 Gray=0b11110001011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1293=0b10100001110 Gray=0b11110001001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1294=0b10100001111 Gray=0b11110001000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1295=0b10100010000 Gray=0b11110011000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1296=0b10100010001 Gray=0b11110011001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1297=0b10100010010 Gray=0b11110011011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1298=0b10100010011 Gray=0b11110011010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1299=0b10100010100 Gray=0b11110011110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1300=0b10100010101 Gray=0b11110011111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1301=0b10100010110 Gray=0b11110011101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1302=0b10100010111 Gray=0b11110011100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1303=0b10100011000 Gray=0b11110010100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1304=0b10100011001 Gray=0b11110010101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1305=0b10100011010 Gray=0b11110010111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1306=0b10100011011 Gray=0b11110010110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1307=0b10100011100 Gray=0b11110010010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1308=0b10100011101 Gray=0b11110010011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1309=0b10100011110 Gray=0b11110010001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1310=0b10100011111 Gray=0b11110010000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1311=0b10100100000 Gray=0b11110110000 Rel Eta,Phi=1,4 Expect 6 B$ Linear=1312=0b10100100001 Gray=0b11110110001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1313=0b10100100010 Gray=0b11110110011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1314=0b10100100011 Gray=0b11110110010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1315=0b10100100100 Gray=0b11110110110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1316=0b10100100101 Gray=0b11110110111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1317=0b10100100110 Gray=0b11110110101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1318=0b10100100111 Gray=0b11110110100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1319=0b10100101000 Gray=0b11110111100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1320=0b10100101001 Gray=0b11110111101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1321=0b10100101010 Gray=0b11110111111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1322=0b10100101011 Gray=0b11110111110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1323=0b10100101100 Gray=0b11110111010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1324=0b10100101101 Gray=0b11110111011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1325=0b10100101110 Gray=0b11110111001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1326=0b10100101111 Gray=0b11110111000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1327=0b10100110000 Gray=0b11110101000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1328=0b10100110001 Gray=0b11110101001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1329=0b10100110010 Gray=0b11110101011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1330=0b10100110011 Gray=0b11110101010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1331=0b10100110100 Gray=0b11110101110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1332=0b10100110101 Gray=0b11110101111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1333=0b10100110110 Gray=0b11110101101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1334=0b10100110111 Gray=0b11110101100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1335=0b10100111000 Gray=0b11110100100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1336=0b10100111001 Gray=0b11110100101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1337=0b10100111010 Gray=0b11110100111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1338=0b10100111011 Gray=0b11110100110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1339=0b10100111100 Gray=0b11110100010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1340=0b10100111101 Gray=0b11110100011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1341=0b10100111110 Gray=0b11110100001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1342=0b10100111111 Gray=0b11110100000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1343=0b10101000000 Gray=0b11111100000 Rel Eta,Phi=1,3 Expect 6 B$ Linear=1344=0b10101000001 Gray=0b11111100001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1345=0b10101000010 Gray=0b11111100011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1346=0b10101000011 Gray=0b11111100010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1347=0b10101000100 Gray=0b11111100110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1348=0b10101000101 Gray=0b11111100111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1349=0b10101000110 Gray=0b11111100101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1350=0b10101000111 Gray=0b11111100100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1351=0b10101001000 Gray=0b11111101100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1352=0b10101001001 Gray=0b11111101101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1353=0b10101001010 Gray=0b11111101111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1354=0b10101001011 Gray=0b11111101110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1355=0b10101001100 Gray=0b11111101010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1356=0b10101001101 Gray=0b11111101011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1357=0b10101001110 Gray=0b11111101001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1358=0b10101001111 Gray=0b11111101000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1359=0b10101010000 Gray=0b11111111000 Rel Eta,Phi=1,5 Expect 8 B$ Linear=1360=0b10101010001 Gray=0b11111111001 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1361=0b10101010010 Gray=0b11111111011 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1362=0b10101010011 Gray=0b11111111010 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1363=0b10101010100 Gray=0b11111111110 Rel Eta,Phi=2,1 Expect 10 B$ Linear=1364=0b10101010101 Gray=0b11111111111 Rel Eta,Phi=1,7 Expect 11 B$ Linear=1365=0b10101010110 Gray=0b11111111101 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1366=0b10101010111 Gray=0b11111111100 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1367=0b10101011000 Gray=0b11111110100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1368=0b10101011001 Gray=0b11111110101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1369=0b10101011010 Gray=0b11111110111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1370=0b10101011011 Gray=0b11111110110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1371=0b10101011100 Gray=0b11111110010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1372=0b10101011101 Gray=0b11111110011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1373=0b10101011110 Gray=0b11111110001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1374=0b10101011111 Gray=0b11111110000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1375=0b10101100000 Gray=0b11111010000 Rel Eta,Phi=1,4 Expect 6 B$ Linear=1376=0b10101100001 Gray=0b11111010001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1377=0b10101100010 Gray=0b11111010011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1378=0b10101100011 Gray=0b11111010010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1379=0b10101100100 Gray=0b11111010110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1380=0b10101100101 Gray=0b11111010111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1381=0b10101100110 Gray=0b11111010101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1382=0b10101100111 Gray=0b11111010100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1383=0b10101101000 Gray=0b11111011100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1384=0b10101101001 Gray=0b11111011101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1385=0b10101101010 Gray=0b11111011111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1386=0b10101101011 Gray=0b11111011110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1387=0b10101101100 Gray=0b11111011010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1388=0b10101101101 Gray=0b11111011011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1389=0b10101101110 Gray=0b11111011001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1390=0b10101101111 Gray=0b11111011000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1391=0b10101110000 Gray=0b11111001000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1392=0b10101110001 Gray=0b11111001001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1393=0b10101110010 Gray=0b11111001011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1394=0b10101110011 Gray=0b11111001010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1395=0b10101110100 Gray=0b11111001110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1396=0b10101110101 Gray=0b11111001111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1397=0b10101110110 Gray=0b11111001101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1398=0b10101110111 Gray=0b11111001100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1399=0b10101111000 Gray=0b11111000100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1400=0b10101111001 Gray=0b11111000101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1401=0b10101111010 Gray=0b11111000111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1402=0b10101111011 Gray=0b11111000110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1403=0b10101111100 Gray=0b11111000010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1404=0b10101111101 Gray=0b11111000011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1405=0b10101111110 Gray=0b11111000001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1406=0b10101111111 Gray=0b11111000000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1407=0b10110000000 Gray=0b11101000000 Rel Eta,Phi=2,3 Expect 4 B$ Linear=1408=0b10110000001 Gray=0b11101000001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1409=0b10110000010 Gray=0b11101000011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1410=0b10110000011 Gray=0b11101000010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1411=0b10110000100 Gray=0b11101000110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1412=0b10110000101 Gray=0b11101000111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1413=0b10110000110 Gray=0b11101000101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1414=0b10110000111 Gray=0b11101000100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1415=0b10110001000 Gray=0b11101001100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1416=0b10110001001 Gray=0b11101001101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1417=0b10110001010 Gray=0b11101001111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1418=0b10110001011 Gray=0b11101001110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1419=0b10110001100 Gray=0b11101001010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1420=0b10110001101 Gray=0b11101001011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1421=0b10110001110 Gray=0b11101001001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1422=0b10110001111 Gray=0b11101001000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1423=0b10110010000 Gray=0b11101011000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1424=0b10110010001 Gray=0b11101011001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1425=0b10110010010 Gray=0b11101011011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1426=0b10110010011 Gray=0b11101011010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1427=0b10110010100 Gray=0b11101011110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1428=0b10110010101 Gray=0b11101011111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1429=0b10110010110 Gray=0b11101011101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1430=0b10110010111 Gray=0b11101011100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1431=0b10110011000 Gray=0b11101010100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1432=0b10110011001 Gray=0b11101010101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1433=0b10110011010 Gray=0b11101010111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1434=0b10110011011 Gray=0b11101010110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1435=0b10110011100 Gray=0b11101010010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1436=0b10110011101 Gray=0b11101010011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1437=0b10110011110 Gray=0b11101010001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1438=0b10110011111 Gray=0b11101010000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1439=0b10110100000 Gray=0b11101110000 Rel Eta,Phi=1,4 Expect 6 B$ Linear=1440=0b10110100001 Gray=0b11101110001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1441=0b10110100010 Gray=0b11101110011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1442=0b10110100011 Gray=0b11101110010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1443=0b10110100100 Gray=0b11101110110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1444=0b10110100101 Gray=0b11101110111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1445=0b10110100110 Gray=0b11101110101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1446=0b10110100111 Gray=0b11101110100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1447=0b10110101000 Gray=0b11101111100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1448=0b10110101001 Gray=0b11101111101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1449=0b10110101010 Gray=0b11101111111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1450=0b10110101011 Gray=0b11101111110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1451=0b10110101100 Gray=0b11101111010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1452=0b10110101101 Gray=0b11101111011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1453=0b10110101110 Gray=0b11101111001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1454=0b10110101111 Gray=0b11101111000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1455=0b10110110000 Gray=0b11101101000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1456=0b10110110001 Gray=0b11101101001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1457=0b10110110010 Gray=0b11101101011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1458=0b10110110011 Gray=0b11101101010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1459=0b10110110100 Gray=0b11101101110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1460=0b10110110101 Gray=0b11101101111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1461=0b10110110110 Gray=0b11101101101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1462=0b10110110111 Gray=0b11101101100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1463=0b10110111000 Gray=0b11101100100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1464=0b10110111001 Gray=0b11101100101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1465=0b10110111010 Gray=0b11101100111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1466=0b10110111011 Gray=0b11101100110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1467=0b10110111100 Gray=0b11101100010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1468=0b10110111101 Gray=0b11101100011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1469=0b10110111110 Gray=0b11101100001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1470=0b10110111111 Gray=0b11101100000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1471=0b10111000000 Gray=0b11100100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1472=0b10111000001 Gray=0b11100100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1473=0b10111000010 Gray=0b11100100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1474=0b10111000011 Gray=0b11100100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1475=0b10111000100 Gray=0b11100100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1476=0b10111000101 Gray=0b11100100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1477=0b10111000110 Gray=0b11100100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1478=0b10111000111 Gray=0b11100100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1479=0b10111001000 Gray=0b11100101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1480=0b10111001001 Gray=0b11100101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1481=0b10111001010 Gray=0b11100101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1482=0b10111001011 Gray=0b11100101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1483=0b10111001100 Gray=0b11100101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1484=0b10111001101 Gray=0b11100101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1485=0b10111001110 Gray=0b11100101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1486=0b10111001111 Gray=0b11100101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1487=0b10111010000 Gray=0b11100111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1488=0b10111010001 Gray=0b11100111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1489=0b10111010010 Gray=0b11100111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1490=0b10111010011 Gray=0b11100111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1491=0b10111010100 Gray=0b11100111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1492=0b10111010101 Gray=0b11100111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1493=0b10111010110 Gray=0b11100111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1494=0b10111010111 Gray=0b11100111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1495=0b10111011000 Gray=0b11100110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1496=0b10111011001 Gray=0b11100110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1497=0b10111011010 Gray=0b11100110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1498=0b10111011011 Gray=0b11100110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1499=0b10111011100 Gray=0b11100110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1500=0b10111011101 Gray=0b11100110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1501=0b10111011110 Gray=0b11100110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1502=0b10111011111 Gray=0b11100110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1503=0b10111100000 Gray=0b11100010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1504=0b10111100001 Gray=0b11100010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1505=0b10111100010 Gray=0b11100010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1506=0b10111100011 Gray=0b11100010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1507=0b10111100100 Gray=0b11100010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1508=0b10111100101 Gray=0b11100010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1509=0b10111100110 Gray=0b11100010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1510=0b10111100111 Gray=0b11100010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1511=0b10111101000 Gray=0b11100011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1512=0b10111101001 Gray=0b11100011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1513=0b10111101010 Gray=0b11100011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1514=0b10111101011 Gray=0b11100011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1515=0b10111101100 Gray=0b11100011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1516=0b10111101101 Gray=0b11100011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1517=0b10111101110 Gray=0b11100011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1518=0b10111101111 Gray=0b11100011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1519=0b10111110000 Gray=0b11100001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1520=0b10111110001 Gray=0b11100001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1521=0b10111110010 Gray=0b11100001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1522=0b10111110011 Gray=0b11100001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1523=0b10111110100 Gray=0b11100001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1524=0b10111110101 Gray=0b11100001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1525=0b10111110110 Gray=0b11100001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1526=0b10111110111 Gray=0b11100001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1527=0b10111111000 Gray=0b11100000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1528=0b10111111001 Gray=0b11100000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1529=0b10111111010 Gray=0b11100000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1530=0b10111111011 Gray=0b11100000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1531=0b10111111100 Gray=0b11100000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1532=0b10111111101 Gray=0b11100000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1533=0b10111111110 Gray=0b11100000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1534=0b10111111111 Gray=0b11100000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1535=0b11000000000 Gray=0b10100000000 Rel Eta,Phi=2,5 Expect 2 B$ Linear=1536=0b11000000001 Gray=0b10100000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1537=0b11000000010 Gray=0b10100000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1538=0b11000000011 Gray=0b10100000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1539=0b11000000100 Gray=0b10100000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1540=0b11000000101 Gray=0b10100000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1541=0b11000000110 Gray=0b10100000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1542=0b11000000111 Gray=0b10100000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1543=0b11000001000 Gray=0b10100001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1544=0b11000001001 Gray=0b10100001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1545=0b11000001010 Gray=0b10100001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1546=0b11000001011 Gray=0b10100001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1547=0b11000001100 Gray=0b10100001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1548=0b11000001101 Gray=0b10100001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1549=0b11000001110 Gray=0b10100001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1550=0b11000001111 Gray=0b10100001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1551=0b11000010000 Gray=0b10100011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1552=0b11000010001 Gray=0b10100011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1553=0b11000010010 Gray=0b10100011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1554=0b11000010011 Gray=0b10100011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1555=0b11000010100 Gray=0b10100011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1556=0b11000010101 Gray=0b10100011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1557=0b11000010110 Gray=0b10100011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1558=0b11000010111 Gray=0b10100011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1559=0b11000011000 Gray=0b10100010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1560=0b11000011001 Gray=0b10100010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1561=0b11000011010 Gray=0b10100010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1562=0b11000011011 Gray=0b10100010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1563=0b11000011100 Gray=0b10100010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1564=0b11000011101 Gray=0b10100010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1565=0b11000011110 Gray=0b10100010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1566=0b11000011111 Gray=0b10100010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1567=0b11000100000 Gray=0b10100110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1568=0b11000100001 Gray=0b10100110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1569=0b11000100010 Gray=0b10100110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1570=0b11000100011 Gray=0b10100110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1571=0b11000100100 Gray=0b10100110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1572=0b11000100101 Gray=0b10100110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1573=0b11000100110 Gray=0b10100110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1574=0b11000100111 Gray=0b10100110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1575=0b11000101000 Gray=0b10100111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1576=0b11000101001 Gray=0b10100111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1577=0b11000101010 Gray=0b10100111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1578=0b11000101011 Gray=0b10100111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1579=0b11000101100 Gray=0b10100111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1580=0b11000101101 Gray=0b10100111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1581=0b11000101110 Gray=0b10100111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1582=0b11000101111 Gray=0b10100111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1583=0b11000110000 Gray=0b10100101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1584=0b11000110001 Gray=0b10100101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1585=0b11000110010 Gray=0b10100101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1586=0b11000110011 Gray=0b10100101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1587=0b11000110100 Gray=0b10100101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1588=0b11000110101 Gray=0b10100101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1589=0b11000110110 Gray=0b10100101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1590=0b11000110111 Gray=0b10100101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1591=0b11000111000 Gray=0b10100100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1592=0b11000111001 Gray=0b10100100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1593=0b11000111010 Gray=0b10100100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1594=0b11000111011 Gray=0b10100100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1595=0b11000111100 Gray=0b10100100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1596=0b11000111101 Gray=0b10100100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1597=0b11000111110 Gray=0b10100100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1598=0b11000111111 Gray=0b10100100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1599=0b11001000000 Gray=0b10101100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1600=0b11001000001 Gray=0b10101100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1601=0b11001000010 Gray=0b10101100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1602=0b11001000011 Gray=0b10101100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1603=0b11001000100 Gray=0b10101100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1604=0b11001000101 Gray=0b10101100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1605=0b11001000110 Gray=0b10101100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1606=0b11001000111 Gray=0b10101100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1607=0b11001001000 Gray=0b10101101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1608=0b11001001001 Gray=0b10101101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1609=0b11001001010 Gray=0b10101101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1610=0b11001001011 Gray=0b10101101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1611=0b11001001100 Gray=0b10101101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1612=0b11001001101 Gray=0b10101101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1613=0b11001001110 Gray=0b10101101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1614=0b11001001111 Gray=0b10101101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1615=0b11001010000 Gray=0b10101111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1616=0b11001010001 Gray=0b10101111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1617=0b11001010010 Gray=0b10101111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1618=0b11001010011 Gray=0b10101111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1619=0b11001010100 Gray=0b10101111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1620=0b11001010101 Gray=0b10101111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1621=0b11001010110 Gray=0b10101111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1622=0b11001010111 Gray=0b10101111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1623=0b11001011000 Gray=0b10101110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1624=0b11001011001 Gray=0b10101110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1625=0b11001011010 Gray=0b10101110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1626=0b11001011011 Gray=0b10101110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1627=0b11001011100 Gray=0b10101110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1628=0b11001011101 Gray=0b10101110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1629=0b11001011110 Gray=0b10101110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1630=0b11001011111 Gray=0b10101110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1631=0b11001100000 Gray=0b10101010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1632=0b11001100001 Gray=0b10101010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1633=0b11001100010 Gray=0b10101010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1634=0b11001100011 Gray=0b10101010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1635=0b11001100100 Gray=0b10101010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1636=0b11001100101 Gray=0b10101010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1637=0b11001100110 Gray=0b10101010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1638=0b11001100111 Gray=0b10101010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1639=0b11001101000 Gray=0b10101011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1640=0b11001101001 Gray=0b10101011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1641=0b11001101010 Gray=0b10101011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1642=0b11001101011 Gray=0b10101011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1643=0b11001101100 Gray=0b10101011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1644=0b11001101101 Gray=0b10101011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1645=0b11001101110 Gray=0b10101011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1646=0b11001101111 Gray=0b10101011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1647=0b11001110000 Gray=0b10101001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1648=0b11001110001 Gray=0b10101001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1649=0b11001110010 Gray=0b10101001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1650=0b11001110011 Gray=0b10101001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1651=0b11001110100 Gray=0b10101001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1652=0b11001110101 Gray=0b10101001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1653=0b11001110110 Gray=0b10101001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1654=0b11001110111 Gray=0b10101001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1655=0b11001111000 Gray=0b10101000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1656=0b11001111001 Gray=0b10101000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1657=0b11001111010 Gray=0b10101000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1658=0b11001111011 Gray=0b10101000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1659=0b11001111100 Gray=0b10101000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1660=0b11001111101 Gray=0b10101000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1661=0b11001111110 Gray=0b10101000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1662=0b11001111111 Gray=0b10101000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1663=0b11010000000 Gray=0b10111000000 Rel Eta,Phi=2,3 Expect 4 B$ Linear=1664=0b11010000001 Gray=0b10111000001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1665=0b11010000010 Gray=0b10111000011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1666=0b11010000011 Gray=0b10111000010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1667=0b11010000100 Gray=0b10111000110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1668=0b11010000101 Gray=0b10111000111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1669=0b11010000110 Gray=0b10111000101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1670=0b11010000111 Gray=0b10111000100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1671=0b11010001000 Gray=0b10111001100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1672=0b11010001001 Gray=0b10111001101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1673=0b11010001010 Gray=0b10111001111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1674=0b11010001011 Gray=0b10111001110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1675=0b11010001100 Gray=0b10111001010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1676=0b11010001101 Gray=0b10111001011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1677=0b11010001110 Gray=0b10111001001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1678=0b11010001111 Gray=0b10111001000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1679=0b11010010000 Gray=0b10111011000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1680=0b11010010001 Gray=0b10111011001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1681=0b11010010010 Gray=0b10111011011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1682=0b11010010011 Gray=0b10111011010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1683=0b11010010100 Gray=0b10111011110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1684=0b11010010101 Gray=0b10111011111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1685=0b11010010110 Gray=0b10111011101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1686=0b11010010111 Gray=0b10111011100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1687=0b11010011000 Gray=0b10111010100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1688=0b11010011001 Gray=0b10111010101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1689=0b11010011010 Gray=0b10111010111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1690=0b11010011011 Gray=0b10111010110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1691=0b11010011100 Gray=0b10111010010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1692=0b11010011101 Gray=0b10111010011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1693=0b11010011110 Gray=0b10111010001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1694=0b11010011111 Gray=0b10111010000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1695=0b11010100000 Gray=0b10111110000 Rel Eta,Phi=1,4 Expect 6 B$ Linear=1696=0b11010100001 Gray=0b10111110001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1697=0b11010100010 Gray=0b10111110011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1698=0b11010100011 Gray=0b10111110010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1699=0b11010100100 Gray=0b10111110110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1700=0b11010100101 Gray=0b10111110111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1701=0b11010100110 Gray=0b10111110101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1702=0b11010100111 Gray=0b10111110100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1703=0b11010101000 Gray=0b10111111100 Rel Eta,Phi=1,6 Expect 8 B$ Linear=1704=0b11010101001 Gray=0b10111111101 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1705=0b11010101010 Gray=0b10111111111 Rel Eta,Phi=2,0 Expect 10 B$ Linear=1706=0b11010101011 Gray=0b10111111110 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1707=0b11010101100 Gray=0b10111111010 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1708=0b11010101101 Gray=0b10111111011 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1709=0b11010101110 Gray=0b10111111001 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1710=0b11010101111 Gray=0b10111111000 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1711=0b11010110000 Gray=0b10111101000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1712=0b11010110001 Gray=0b10111101001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1713=0b11010110010 Gray=0b10111101011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1714=0b11010110011 Gray=0b10111101010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1715=0b11010110100 Gray=0b10111101110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1716=0b11010110101 Gray=0b10111101111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1717=0b11010110110 Gray=0b10111101101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1718=0b11010110111 Gray=0b10111101100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1719=0b11010111000 Gray=0b10111100100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1720=0b11010111001 Gray=0b10111100101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1721=0b11010111010 Gray=0b10111100111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1722=0b11010111011 Gray=0b10111100110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1723=0b11010111100 Gray=0b10111100010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1724=0b11010111101 Gray=0b10111100011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1725=0b11010111110 Gray=0b10111100001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1726=0b11010111111 Gray=0b10111100000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1727=0b11011000000 Gray=0b10110100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1728=0b11011000001 Gray=0b10110100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1729=0b11011000010 Gray=0b10110100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1730=0b11011000011 Gray=0b10110100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1731=0b11011000100 Gray=0b10110100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1732=0b11011000101 Gray=0b10110100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1733=0b11011000110 Gray=0b10110100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1734=0b11011000111 Gray=0b10110100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1735=0b11011001000 Gray=0b10110101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1736=0b11011001001 Gray=0b10110101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1737=0b11011001010 Gray=0b10110101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1738=0b11011001011 Gray=0b10110101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1739=0b11011001100 Gray=0b10110101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1740=0b11011001101 Gray=0b10110101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1741=0b11011001110 Gray=0b10110101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1742=0b11011001111 Gray=0b10110101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1743=0b11011010000 Gray=0b10110111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1744=0b11011010001 Gray=0b10110111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1745=0b11011010010 Gray=0b10110111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1746=0b11011010011 Gray=0b10110111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1747=0b11011010100 Gray=0b10110111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1748=0b11011010101 Gray=0b10110111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1749=0b11011010110 Gray=0b10110111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1750=0b11011010111 Gray=0b10110111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1751=0b11011011000 Gray=0b10110110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1752=0b11011011001 Gray=0b10110110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1753=0b11011011010 Gray=0b10110110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1754=0b11011011011 Gray=0b10110110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1755=0b11011011100 Gray=0b10110110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1756=0b11011011101 Gray=0b10110110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1757=0b11011011110 Gray=0b10110110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1758=0b11011011111 Gray=0b10110110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1759=0b11011100000 Gray=0b10110010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1760=0b11011100001 Gray=0b10110010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1761=0b11011100010 Gray=0b10110010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1762=0b11011100011 Gray=0b10110010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1763=0b11011100100 Gray=0b10110010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1764=0b11011100101 Gray=0b10110010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1765=0b11011100110 Gray=0b10110010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1766=0b11011100111 Gray=0b10110010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1767=0b11011101000 Gray=0b10110011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1768=0b11011101001 Gray=0b10110011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1769=0b11011101010 Gray=0b10110011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1770=0b11011101011 Gray=0b10110011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1771=0b11011101100 Gray=0b10110011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1772=0b11011101101 Gray=0b10110011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1773=0b11011101110 Gray=0b10110011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1774=0b11011101111 Gray=0b10110011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1775=0b11011110000 Gray=0b10110001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1776=0b11011110001 Gray=0b10110001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1777=0b11011110010 Gray=0b10110001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1778=0b11011110011 Gray=0b10110001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1779=0b11011110100 Gray=0b10110001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1780=0b11011110101 Gray=0b10110001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1781=0b11011110110 Gray=0b10110001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1782=0b11011110111 Gray=0b10110001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1783=0b11011111000 Gray=0b10110000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1784=0b11011111001 Gray=0b10110000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1785=0b11011111010 Gray=0b10110000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1786=0b11011111011 Gray=0b10110000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1787=0b11011111100 Gray=0b10110000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1788=0b11011111101 Gray=0b10110000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1789=0b11011111110 Gray=0b10110000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1790=0b11011111111 Gray=0b10110000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1791=0b11100000000 Gray=0b10010000000 Rel Eta,Phi=2,4 Expect 2 B$ Linear=1792=0b11100000001 Gray=0b10010000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1793=0b11100000010 Gray=0b10010000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1794=0b11100000011 Gray=0b10010000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1795=0b11100000100 Gray=0b10010000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1796=0b11100000101 Gray=0b10010000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1797=0b11100000110 Gray=0b10010000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1798=0b11100000111 Gray=0b10010000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1799=0b11100001000 Gray=0b10010001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1800=0b11100001001 Gray=0b10010001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1801=0b11100001010 Gray=0b10010001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1802=0b11100001011 Gray=0b10010001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1803=0b11100001100 Gray=0b10010001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1804=0b11100001101 Gray=0b10010001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1805=0b11100001110 Gray=0b10010001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1806=0b11100001111 Gray=0b10010001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1807=0b11100010000 Gray=0b10010011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1808=0b11100010001 Gray=0b10010011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1809=0b11100010010 Gray=0b10010011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1810=0b11100010011 Gray=0b10010011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1811=0b11100010100 Gray=0b10010011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1812=0b11100010101 Gray=0b10010011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1813=0b11100010110 Gray=0b10010011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1814=0b11100010111 Gray=0b10010011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1815=0b11100011000 Gray=0b10010010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1816=0b11100011001 Gray=0b10010010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1817=0b11100011010 Gray=0b10010010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1818=0b11100011011 Gray=0b10010010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1819=0b11100011100 Gray=0b10010010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1820=0b11100011101 Gray=0b10010010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1821=0b11100011110 Gray=0b10010010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1822=0b11100011111 Gray=0b10010010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1823=0b11100100000 Gray=0b10010110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1824=0b11100100001 Gray=0b10010110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1825=0b11100100010 Gray=0b10010110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1826=0b11100100011 Gray=0b10010110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1827=0b11100100100 Gray=0b10010110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1828=0b11100100101 Gray=0b10010110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1829=0b11100100110 Gray=0b10010110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1830=0b11100100111 Gray=0b10010110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1831=0b11100101000 Gray=0b10010111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1832=0b11100101001 Gray=0b10010111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1833=0b11100101010 Gray=0b10010111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1834=0b11100101011 Gray=0b10010111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1835=0b11100101100 Gray=0b10010111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1836=0b11100101101 Gray=0b10010111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1837=0b11100101110 Gray=0b10010111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1838=0b11100101111 Gray=0b10010111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1839=0b11100110000 Gray=0b10010101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1840=0b11100110001 Gray=0b10010101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1841=0b11100110010 Gray=0b10010101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1842=0b11100110011 Gray=0b10010101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1843=0b11100110100 Gray=0b10010101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1844=0b11100110101 Gray=0b10010101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1845=0b11100110110 Gray=0b10010101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1846=0b11100110111 Gray=0b10010101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1847=0b11100111000 Gray=0b10010100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1848=0b11100111001 Gray=0b10010100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1849=0b11100111010 Gray=0b10010100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1850=0b11100111011 Gray=0b10010100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1851=0b11100111100 Gray=0b10010100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1852=0b11100111101 Gray=0b10010100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1853=0b11100111110 Gray=0b10010100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1854=0b11100111111 Gray=0b10010100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1855=0b11101000000 Gray=0b10011100000 Rel Eta,Phi=1,3 Expect 4 B$ Linear=1856=0b11101000001 Gray=0b10011100001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1857=0b11101000010 Gray=0b10011100011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1858=0b11101000011 Gray=0b10011100010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1859=0b11101000100 Gray=0b10011100110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1860=0b11101000101 Gray=0b10011100111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1861=0b11101000110 Gray=0b10011100101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1862=0b11101000111 Gray=0b10011100100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1863=0b11101001000 Gray=0b10011101100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1864=0b11101001001 Gray=0b10011101101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1865=0b11101001010 Gray=0b10011101111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1866=0b11101001011 Gray=0b10011101110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1867=0b11101001100 Gray=0b10011101010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1868=0b11101001101 Gray=0b10011101011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1869=0b11101001110 Gray=0b10011101001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1870=0b11101001111 Gray=0b10011101000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1871=0b11101010000 Gray=0b10011111000 Rel Eta,Phi=1,5 Expect 6 B$ Linear=1872=0b11101010001 Gray=0b10011111001 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1873=0b11101010010 Gray=0b10011111011 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1874=0b11101010011 Gray=0b10011111010 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1875=0b11101010100 Gray=0b10011111110 Rel Eta,Phi=2,1 Expect 8 B$ Linear=1876=0b11101010101 Gray=0b10011111111 Rel Eta,Phi=1,7 Expect 9 B$ Linear=1877=0b11101010110 Gray=0b10011111101 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1878=0b11101010111 Gray=0b10011111100 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1879=0b11101011000 Gray=0b10011110100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1880=0b11101011001 Gray=0b10011110101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1881=0b11101011010 Gray=0b10011110111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1882=0b11101011011 Gray=0b10011110110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1883=0b11101011100 Gray=0b10011110010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1884=0b11101011101 Gray=0b10011110011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1885=0b11101011110 Gray=0b10011110001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1886=0b11101011111 Gray=0b10011110000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1887=0b11101100000 Gray=0b10011010000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1888=0b11101100001 Gray=0b10011010001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1889=0b11101100010 Gray=0b10011010011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1890=0b11101100011 Gray=0b10011010010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1891=0b11101100100 Gray=0b10011010110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1892=0b11101100101 Gray=0b10011010111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1893=0b11101100110 Gray=0b10011010101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1894=0b11101100111 Gray=0b10011010100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1895=0b11101101000 Gray=0b10011011100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1896=0b11101101001 Gray=0b10011011101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1897=0b11101101010 Gray=0b10011011111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1898=0b11101101011 Gray=0b10011011110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1899=0b11101101100 Gray=0b10011011010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1900=0b11101101101 Gray=0b10011011011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1901=0b11101101110 Gray=0b10011011001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1902=0b11101101111 Gray=0b10011011000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1903=0b11101110000 Gray=0b10011001000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1904=0b11101110001 Gray=0b10011001001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1905=0b11101110010 Gray=0b10011001011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1906=0b11101110011 Gray=0b10011001010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1907=0b11101110100 Gray=0b10011001110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1908=0b11101110101 Gray=0b10011001111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1909=0b11101110110 Gray=0b10011001101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1910=0b11101110111 Gray=0b10011001100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1911=0b11101111000 Gray=0b10011000100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1912=0b11101111001 Gray=0b10011000101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1913=0b11101111010 Gray=0b10011000111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1914=0b11101111011 Gray=0b10011000110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1915=0b11101111100 Gray=0b10011000010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1916=0b11101111101 Gray=0b10011000011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1917=0b11101111110 Gray=0b10011000001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1918=0b11101111111 Gray=0b10011000000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1919=0b11110000000 Gray=0b10001000000 Rel Eta,Phi=2,3 Expect 2 B$ Linear=1920=0b11110000001 Gray=0b10001000001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1921=0b11110000010 Gray=0b10001000011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1922=0b11110000011 Gray=0b10001000010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1923=0b11110000100 Gray=0b10001000110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1924=0b11110000101 Gray=0b10001000111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1925=0b11110000110 Gray=0b10001000101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1926=0b11110000111 Gray=0b10001000100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1927=0b11110001000 Gray=0b10001001100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1928=0b11110001001 Gray=0b10001001101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1929=0b11110001010 Gray=0b10001001111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1930=0b11110001011 Gray=0b10001001110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1931=0b11110001100 Gray=0b10001001010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1932=0b11110001101 Gray=0b10001001011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1933=0b11110001110 Gray=0b10001001001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1934=0b11110001111 Gray=0b10001001000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1935=0b11110010000 Gray=0b10001011000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1936=0b11110010001 Gray=0b10001011001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1937=0b11110010010 Gray=0b10001011011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1938=0b11110010011 Gray=0b10001011010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1939=0b11110010100 Gray=0b10001011110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1940=0b11110010101 Gray=0b10001011111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1941=0b11110010110 Gray=0b10001011101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1942=0b11110010111 Gray=0b10001011100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1943=0b11110011000 Gray=0b10001010100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1944=0b11110011001 Gray=0b10001010101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1945=0b11110011010 Gray=0b10001010111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1946=0b11110011011 Gray=0b10001010110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1947=0b11110011100 Gray=0b10001010010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1948=0b11110011101 Gray=0b10001010011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1949=0b11110011110 Gray=0b10001010001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1950=0b11110011111 Gray=0b10001010000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1951=0b11110100000 Gray=0b10001110000 Rel Eta,Phi=1,4 Expect 4 B$ Linear=1952=0b11110100001 Gray=0b10001110001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1953=0b11110100010 Gray=0b10001110011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1954=0b11110100011 Gray=0b10001110010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1955=0b11110100100 Gray=0b10001110110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1956=0b11110100101 Gray=0b10001110111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1957=0b11110100110 Gray=0b10001110101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1958=0b11110100111 Gray=0b10001110100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1959=0b11110101000 Gray=0b10001111100 Rel Eta,Phi=1,6 Expect 6 B$ Linear=1960=0b11110101001 Gray=0b10001111101 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1961=0b11110101010 Gray=0b10001111111 Rel Eta,Phi=2,0 Expect 8 B$ Linear=1962=0b11110101011 Gray=0b10001111110 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1963=0b11110101100 Gray=0b10001111010 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1964=0b11110101101 Gray=0b10001111011 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1965=0b11110101110 Gray=0b10001111001 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1966=0b11110101111 Gray=0b10001111000 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1967=0b11110110000 Gray=0b10001101000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=1968=0b11110110001 Gray=0b10001101001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1969=0b11110110010 Gray=0b10001101011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1970=0b11110110011 Gray=0b10001101010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1971=0b11110110100 Gray=0b10001101110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=1972=0b11110110101 Gray=0b10001101111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=1973=0b11110110110 Gray=0b10001101101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1974=0b11110110111 Gray=0b10001101100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1975=0b11110111000 Gray=0b10001100100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1976=0b11110111001 Gray=0b10001100101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1977=0b11110111010 Gray=0b10001100111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1978=0b11110111011 Gray=0b10001100110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1979=0b11110111100 Gray=0b10001100010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1980=0b11110111101 Gray=0b10001100011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1981=0b11110111110 Gray=0b10001100001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1982=0b11110111111 Gray=0b10001100000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1983=0b11111000000 Gray=0b10000100000 Rel Eta,Phi=1,3 Expect 2 B$ Linear=1984=0b11111000001 Gray=0b10000100001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1985=0b11111000010 Gray=0b10000100011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1986=0b11111000011 Gray=0b10000100010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1987=0b11111000100 Gray=0b10000100110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1988=0b11111000101 Gray=0b10000100111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1989=0b11111000110 Gray=0b10000100101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1990=0b11111000111 Gray=0b10000100100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1991=0b11111001000 Gray=0b10000101100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=1992=0b11111001001 Gray=0b10000101101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1993=0b11111001010 Gray=0b10000101111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=1994=0b11111001011 Gray=0b10000101110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1995=0b11111001100 Gray=0b10000101010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=1996=0b11111001101 Gray=0b10000101011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=1997=0b11111001110 Gray=0b10000101001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=1998=0b11111001111 Gray=0b10000101000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=1999=0b11111010000 Gray=0b10000111000 Rel Eta,Phi=1,5 Expect 4 B$ Linear=2000=0b11111010001 Gray=0b10000111001 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2001=0b11111010010 Gray=0b10000111011 Rel Eta,Phi=2,0 Expect 6 B$ Linear=2002=0b11111010011 Gray=0b10000111010 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2003=0b11111010100 Gray=0b10000111110 Rel Eta,Phi=2,1 Expect 6 B$ Linear=2004=0b11111010101 Gray=0b10000111111 Rel Eta,Phi=1,7 Expect 7 B$ Linear=2005=0b11111010110 Gray=0b10000111101 Rel Eta,Phi=2,0 Expect 6 B$ Linear=2006=0b11111010111 Gray=0b10000111100 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2007=0b11111011000 Gray=0b10000110100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=2008=0b11111011001 Gray=0b10000110101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2009=0b11111011010 Gray=0b10000110111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=2010=0b11111011011 Gray=0b10000110110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2011=0b11111011100 Gray=0b10000110010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=2012=0b11111011101 Gray=0b10000110011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2013=0b11111011110 Gray=0b10000110001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2014=0b11111011111 Gray=0b10000110000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2015=0b11111100000 Gray=0b10000010000 Rel Eta,Phi=1,4 Expect 2 B$ Linear=2016=0b11111100001 Gray=0b10000010001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2017=0b11111100010 Gray=0b10000010011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2018=0b11111100011 Gray=0b10000010010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2019=0b11111100100 Gray=0b10000010110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=2020=0b11111100101 Gray=0b10000010111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2021=0b11111100110 Gray=0b10000010101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2022=0b11111100111 Gray=0b10000010100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2023=0b11111101000 Gray=0b10000011100 Rel Eta,Phi=1,6 Expect 4 B$ Linear=2024=0b11111101001 Gray=0b10000011101 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2025=0b11111101010 Gray=0b10000011111 Rel Eta,Phi=2,0 Expect 6 B$ Linear=2026=0b11111101011 Gray=0b10000011110 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2027=0b11111101100 Gray=0b10000011010 Rel Eta,Phi=2,1 Expect 4 B$ Linear=2028=0b11111101101 Gray=0b10000011011 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2029=0b11111101110 Gray=0b10000011001 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2030=0b11111101111 Gray=0b10000011000 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2031=0b11111110000 Gray=0b10000001000 Rel Eta,Phi=1,5 Expect 2 B$ Linear=2032=0b11111110001 Gray=0b10000001001 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2033=0b11111110010 Gray=0b10000001011 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2034=0b11111110011 Gray=0b10000001010 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2035=0b11111110100 Gray=0b10000001110 Rel Eta,Phi=2,1 Expect 4 B$ Linear=2036=0b11111110101 Gray=0b10000001111 Rel Eta,Phi=1,7 Expect 5 B$ Linear=2037=0b11111110110 Gray=0b10000001101 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2038=0b11111110111 Gray=0b10000001100 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2039=0b11111111000 Gray=0b10000000100 Rel Eta,Phi=1,6 Expect 2 B$ Linear=2040=0b11111111001 Gray=0b10000000101 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2041=0b11111111010 Gray=0b10000000111 Rel Eta,Phi=2,0 Expect 4 B$ Linear=2042=0b11111111011 Gray=0b10000000110 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2043=0b11111111100 Gray=0b10000000010 Rel Eta,Phi=2,1 Expect 2 B$ Linear=2044=0b11111111101 Gray=0b10000000011 Rel Eta,Phi=1,7 Expect 3 B$ Linear=2045=0b11111111110 Gray=0b10000000001 Rel Eta,Phi=2,0 Expect 2 B$ Linear=2046=0b11111111111 Gray=0b10000000000 Rel Eta,Phi=1,7 Expect 1 B$ Linear=2047=0b10000000000 Gray=0b00000000000 Rel Eta,Phi=2,2 Expect 0 I$ Scanning First Pass Prom # 2 B$ Linear= 0=0b00000000001 Gray=0b00000000001 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 1=0b00000000010 Gray=0b00000000011 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 2=0b00000000011 Gray=0b00000000010 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 3=0b00000000100 Gray=0b00000000110 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 4=0b00000000101 Gray=0b00000000111 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 5=0b00000000110 Gray=0b00000000101 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 6=0b00000000111 Gray=0b00000000100 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 7=0b00000001000 Gray=0b00000001100 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 8=0b00000001001 Gray=0b00000001101 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 9=0b00000001010 Gray=0b00000001111 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 10=0b00000001011 Gray=0b00000001110 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 11=0b00000001100 Gray=0b00000001010 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 12=0b00000001101 Gray=0b00000001011 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 13=0b00000001110 Gray=0b00000001001 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 14=0b00000001111 Gray=0b00000001000 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 15=0b00000010000 Gray=0b00000011000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 16=0b00000010001 Gray=0b00000011001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 17=0b00000010010 Gray=0b00000011011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 18=0b00000010011 Gray=0b00000011010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 19=0b00000010100 Gray=0b00000011110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 20=0b00000010101 Gray=0b00000011111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 21=0b00000010110 Gray=0b00000011101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 22=0b00000010111 Gray=0b00000011100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 23=0b00000011000 Gray=0b00000010100 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 24=0b00000011001 Gray=0b00000010101 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 25=0b00000011010 Gray=0b00000010111 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 26=0b00000011011 Gray=0b00000010110 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 27=0b00000011100 Gray=0b00000010010 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 28=0b00000011101 Gray=0b00000010011 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 29=0b00000011110 Gray=0b00000010001 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 30=0b00000011111 Gray=0b00000010000 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 31=0b00000100000 Gray=0b00000110000 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 32=0b00000100001 Gray=0b00000110001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 33=0b00000100010 Gray=0b00000110011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 34=0b00000100011 Gray=0b00000110010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 35=0b00000100100 Gray=0b00000110110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 36=0b00000100101 Gray=0b00000110111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 37=0b00000100110 Gray=0b00000110101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 38=0b00000100111 Gray=0b00000110100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 39=0b00000101000 Gray=0b00000111100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 40=0b00000101001 Gray=0b00000111101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 41=0b00000101010 Gray=0b00000111111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 42=0b00000101011 Gray=0b00000111110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 43=0b00000101100 Gray=0b00000111010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 44=0b00000101101 Gray=0b00000111011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 45=0b00000101110 Gray=0b00000111001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 46=0b00000101111 Gray=0b00000111000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 47=0b00000110000 Gray=0b00000101000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 48=0b00000110001 Gray=0b00000101001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 49=0b00000110010 Gray=0b00000101011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 50=0b00000110011 Gray=0b00000101010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 51=0b00000110100 Gray=0b00000101110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 52=0b00000110101 Gray=0b00000101111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 53=0b00000110110 Gray=0b00000101101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 54=0b00000110111 Gray=0b00000101100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 55=0b00000111000 Gray=0b00000100100 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 56=0b00000111001 Gray=0b00000100101 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 57=0b00000111010 Gray=0b00000100111 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 58=0b00000111011 Gray=0b00000100110 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 59=0b00000111100 Gray=0b00000100010 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 60=0b00000111101 Gray=0b00000100011 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 61=0b00000111110 Gray=0b00000100001 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 62=0b00000111111 Gray=0b00000100000 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 63=0b00001000000 Gray=0b00001100000 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 64=0b00001000001 Gray=0b00001100001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 65=0b00001000010 Gray=0b00001100011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 66=0b00001000011 Gray=0b00001100010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 67=0b00001000100 Gray=0b00001100110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 68=0b00001000101 Gray=0b00001100111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 69=0b00001000110 Gray=0b00001100101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 70=0b00001000111 Gray=0b00001100100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 71=0b00001001000 Gray=0b00001101100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 72=0b00001001001 Gray=0b00001101101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 73=0b00001001010 Gray=0b00001101111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 74=0b00001001011 Gray=0b00001101110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 75=0b00001001100 Gray=0b00001101010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 76=0b00001001101 Gray=0b00001101011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 77=0b00001001110 Gray=0b00001101001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 78=0b00001001111 Gray=0b00001101000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 79=0b00001010000 Gray=0b00001111000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 80=0b00001010001 Gray=0b00001111001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 81=0b00001010010 Gray=0b00001111011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 82=0b00001010011 Gray=0b00001111010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 83=0b00001010100 Gray=0b00001111110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 84=0b00001010101 Gray=0b00001111111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 85=0b00001010110 Gray=0b00001111101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 86=0b00001010111 Gray=0b00001111100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 87=0b00001011000 Gray=0b00001110100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 88=0b00001011001 Gray=0b00001110101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 89=0b00001011010 Gray=0b00001110111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 90=0b00001011011 Gray=0b00001110110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 91=0b00001011100 Gray=0b00001110010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 92=0b00001011101 Gray=0b00001110011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 93=0b00001011110 Gray=0b00001110001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 94=0b00001011111 Gray=0b00001110000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 95=0b00001100000 Gray=0b00001010000 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 96=0b00001100001 Gray=0b00001010001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 97=0b00001100010 Gray=0b00001010011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 98=0b00001100011 Gray=0b00001010010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 99=0b00001100100 Gray=0b00001010110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 100=0b00001100101 Gray=0b00001010111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 101=0b00001100110 Gray=0b00001010101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 102=0b00001100111 Gray=0b00001010100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 103=0b00001101000 Gray=0b00001011100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 104=0b00001101001 Gray=0b00001011101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 105=0b00001101010 Gray=0b00001011111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 106=0b00001101011 Gray=0b00001011110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 107=0b00001101100 Gray=0b00001011010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 108=0b00001101101 Gray=0b00001011011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 109=0b00001101110 Gray=0b00001011001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 110=0b00001101111 Gray=0b00001011000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 111=0b00001110000 Gray=0b00001001000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 112=0b00001110001 Gray=0b00001001001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 113=0b00001110010 Gray=0b00001001011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 114=0b00001110011 Gray=0b00001001010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 115=0b00001110100 Gray=0b00001001110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 116=0b00001110101 Gray=0b00001001111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 117=0b00001110110 Gray=0b00001001101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 118=0b00001110111 Gray=0b00001001100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 119=0b00001111000 Gray=0b00001000100 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 120=0b00001111001 Gray=0b00001000101 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 121=0b00001111010 Gray=0b00001000111 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 122=0b00001111011 Gray=0b00001000110 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 123=0b00001111100 Gray=0b00001000010 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 124=0b00001111101 Gray=0b00001000011 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 125=0b00001111110 Gray=0b00001000001 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 126=0b00001111111 Gray=0b00001000000 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 127=0b00010000000 Gray=0b00011000000 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 128=0b00010000001 Gray=0b00011000001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 129=0b00010000010 Gray=0b00011000011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 130=0b00010000011 Gray=0b00011000010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 131=0b00010000100 Gray=0b00011000110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 132=0b00010000101 Gray=0b00011000111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 133=0b00010000110 Gray=0b00011000101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 134=0b00010000111 Gray=0b00011000100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 135=0b00010001000 Gray=0b00011001100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 136=0b00010001001 Gray=0b00011001101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 137=0b00010001010 Gray=0b00011001111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 138=0b00010001011 Gray=0b00011001110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 139=0b00010001100 Gray=0b00011001010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 140=0b00010001101 Gray=0b00011001011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 141=0b00010001110 Gray=0b00011001001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 142=0b00010001111 Gray=0b00011001000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 143=0b00010010000 Gray=0b00011011000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 144=0b00010010001 Gray=0b00011011001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 145=0b00010010010 Gray=0b00011011011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 146=0b00010010011 Gray=0b00011011010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 147=0b00010010100 Gray=0b00011011110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 148=0b00010010101 Gray=0b00011011111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 149=0b00010010110 Gray=0b00011011101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 150=0b00010010111 Gray=0b00011011100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 151=0b00010011000 Gray=0b00011010100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 152=0b00010011001 Gray=0b00011010101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 153=0b00010011010 Gray=0b00011010111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 154=0b00010011011 Gray=0b00011010110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 155=0b00010011100 Gray=0b00011010010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 156=0b00010011101 Gray=0b00011010011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 157=0b00010011110 Gray=0b00011010001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 158=0b00010011111 Gray=0b00011010000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 159=0b00010100000 Gray=0b00011110000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 160=0b00010100001 Gray=0b00011110001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 161=0b00010100010 Gray=0b00011110011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 162=0b00010100011 Gray=0b00011110010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 163=0b00010100100 Gray=0b00011110110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 164=0b00010100101 Gray=0b00011110111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 165=0b00010100110 Gray=0b00011110101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 166=0b00010100111 Gray=0b00011110100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 167=0b00010101000 Gray=0b00011111100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 168=0b00010101001 Gray=0b00011111101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 169=0b00010101010 Gray=0b00011111111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 170=0b00010101011 Gray=0b00011111110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 171=0b00010101100 Gray=0b00011111010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 172=0b00010101101 Gray=0b00011111011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 173=0b00010101110 Gray=0b00011111001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 174=0b00010101111 Gray=0b00011111000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 175=0b00010110000 Gray=0b00011101000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 176=0b00010110001 Gray=0b00011101001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 177=0b00010110010 Gray=0b00011101011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 178=0b00010110011 Gray=0b00011101010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 179=0b00010110100 Gray=0b00011101110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 180=0b00010110101 Gray=0b00011101111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 181=0b00010110110 Gray=0b00011101101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 182=0b00010110111 Gray=0b00011101100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 183=0b00010111000 Gray=0b00011100100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 184=0b00010111001 Gray=0b00011100101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 185=0b00010111010 Gray=0b00011100111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 186=0b00010111011 Gray=0b00011100110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 187=0b00010111100 Gray=0b00011100010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 188=0b00010111101 Gray=0b00011100011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 189=0b00010111110 Gray=0b00011100001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 190=0b00010111111 Gray=0b00011100000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 191=0b00011000000 Gray=0b00010100000 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 192=0b00011000001 Gray=0b00010100001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 193=0b00011000010 Gray=0b00010100011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 194=0b00011000011 Gray=0b00010100010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 195=0b00011000100 Gray=0b00010100110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 196=0b00011000101 Gray=0b00010100111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 197=0b00011000110 Gray=0b00010100101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 198=0b00011000111 Gray=0b00010100100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 199=0b00011001000 Gray=0b00010101100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 200=0b00011001001 Gray=0b00010101101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 201=0b00011001010 Gray=0b00010101111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 202=0b00011001011 Gray=0b00010101110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 203=0b00011001100 Gray=0b00010101010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 204=0b00011001101 Gray=0b00010101011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 205=0b00011001110 Gray=0b00010101001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 206=0b00011001111 Gray=0b00010101000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 207=0b00011010000 Gray=0b00010111000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 208=0b00011010001 Gray=0b00010111001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 209=0b00011010010 Gray=0b00010111011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 210=0b00011010011 Gray=0b00010111010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 211=0b00011010100 Gray=0b00010111110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 212=0b00011010101 Gray=0b00010111111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 213=0b00011010110 Gray=0b00010111101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 214=0b00011010111 Gray=0b00010111100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 215=0b00011011000 Gray=0b00010110100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 216=0b00011011001 Gray=0b00010110101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 217=0b00011011010 Gray=0b00010110111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 218=0b00011011011 Gray=0b00010110110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 219=0b00011011100 Gray=0b00010110010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 220=0b00011011101 Gray=0b00010110011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 221=0b00011011110 Gray=0b00010110001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 222=0b00011011111 Gray=0b00010110000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 223=0b00011100000 Gray=0b00010010000 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 224=0b00011100001 Gray=0b00010010001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 225=0b00011100010 Gray=0b00010010011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 226=0b00011100011 Gray=0b00010010010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 227=0b00011100100 Gray=0b00010010110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 228=0b00011100101 Gray=0b00010010111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 229=0b00011100110 Gray=0b00010010101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 230=0b00011100111 Gray=0b00010010100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 231=0b00011101000 Gray=0b00010011100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 232=0b00011101001 Gray=0b00010011101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 233=0b00011101010 Gray=0b00010011111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 234=0b00011101011 Gray=0b00010011110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 235=0b00011101100 Gray=0b00010011010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 236=0b00011101101 Gray=0b00010011011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 237=0b00011101110 Gray=0b00010011001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 238=0b00011101111 Gray=0b00010011000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 239=0b00011110000 Gray=0b00010001000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 240=0b00011110001 Gray=0b00010001001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 241=0b00011110010 Gray=0b00010001011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 242=0b00011110011 Gray=0b00010001010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 243=0b00011110100 Gray=0b00010001110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 244=0b00011110101 Gray=0b00010001111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 245=0b00011110110 Gray=0b00010001101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 246=0b00011110111 Gray=0b00010001100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 247=0b00011111000 Gray=0b00010000100 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 248=0b00011111001 Gray=0b00010000101 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 249=0b00011111010 Gray=0b00010000111 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 250=0b00011111011 Gray=0b00010000110 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 251=0b00011111100 Gray=0b00010000010 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 252=0b00011111101 Gray=0b00010000011 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 253=0b00011111110 Gray=0b00010000001 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 254=0b00011111111 Gray=0b00010000000 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 255=0b00100000000 Gray=0b00110000000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 256=0b00100000001 Gray=0b00110000001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 257=0b00100000010 Gray=0b00110000011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 258=0b00100000011 Gray=0b00110000010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 259=0b00100000100 Gray=0b00110000110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 260=0b00100000101 Gray=0b00110000111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 261=0b00100000110 Gray=0b00110000101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 262=0b00100000111 Gray=0b00110000100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 263=0b00100001000 Gray=0b00110001100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 264=0b00100001001 Gray=0b00110001101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 265=0b00100001010 Gray=0b00110001111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 266=0b00100001011 Gray=0b00110001110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 267=0b00100001100 Gray=0b00110001010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 268=0b00100001101 Gray=0b00110001011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 269=0b00100001110 Gray=0b00110001001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 270=0b00100001111 Gray=0b00110001000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 271=0b00100010000 Gray=0b00110011000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 272=0b00100010001 Gray=0b00110011001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 273=0b00100010010 Gray=0b00110011011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 274=0b00100010011 Gray=0b00110011010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 275=0b00100010100 Gray=0b00110011110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 276=0b00100010101 Gray=0b00110011111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 277=0b00100010110 Gray=0b00110011101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 278=0b00100010111 Gray=0b00110011100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 279=0b00100011000 Gray=0b00110010100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 280=0b00100011001 Gray=0b00110010101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 281=0b00100011010 Gray=0b00110010111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 282=0b00100011011 Gray=0b00110010110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 283=0b00100011100 Gray=0b00110010010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 284=0b00100011101 Gray=0b00110010011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 285=0b00100011110 Gray=0b00110010001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 286=0b00100011111 Gray=0b00110010000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 287=0b00100100000 Gray=0b00110110000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 288=0b00100100001 Gray=0b00110110001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 289=0b00100100010 Gray=0b00110110011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 290=0b00100100011 Gray=0b00110110010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 291=0b00100100100 Gray=0b00110110110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 292=0b00100100101 Gray=0b00110110111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 293=0b00100100110 Gray=0b00110110101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 294=0b00100100111 Gray=0b00110110100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 295=0b00100101000 Gray=0b00110111100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 296=0b00100101001 Gray=0b00110111101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 297=0b00100101010 Gray=0b00110111111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 298=0b00100101011 Gray=0b00110111110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 299=0b00100101100 Gray=0b00110111010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 300=0b00100101101 Gray=0b00110111011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 301=0b00100101110 Gray=0b00110111001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 302=0b00100101111 Gray=0b00110111000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 303=0b00100110000 Gray=0b00110101000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 304=0b00100110001 Gray=0b00110101001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 305=0b00100110010 Gray=0b00110101011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 306=0b00100110011 Gray=0b00110101010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 307=0b00100110100 Gray=0b00110101110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 308=0b00100110101 Gray=0b00110101111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 309=0b00100110110 Gray=0b00110101101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 310=0b00100110111 Gray=0b00110101100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 311=0b00100111000 Gray=0b00110100100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 312=0b00100111001 Gray=0b00110100101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 313=0b00100111010 Gray=0b00110100111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 314=0b00100111011 Gray=0b00110100110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 315=0b00100111100 Gray=0b00110100010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 316=0b00100111101 Gray=0b00110100011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 317=0b00100111110 Gray=0b00110100001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 318=0b00100111111 Gray=0b00110100000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 319=0b00101000000 Gray=0b00111100000 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 320=0b00101000001 Gray=0b00111100001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 321=0b00101000010 Gray=0b00111100011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 322=0b00101000011 Gray=0b00111100010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 323=0b00101000100 Gray=0b00111100110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 324=0b00101000101 Gray=0b00111100111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 325=0b00101000110 Gray=0b00111100101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 326=0b00101000111 Gray=0b00111100100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 327=0b00101001000 Gray=0b00111101100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 328=0b00101001001 Gray=0b00111101101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 329=0b00101001010 Gray=0b00111101111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 330=0b00101001011 Gray=0b00111101110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 331=0b00101001100 Gray=0b00111101010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 332=0b00101001101 Gray=0b00111101011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 333=0b00101001110 Gray=0b00111101001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 334=0b00101001111 Gray=0b00111101000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 335=0b00101010000 Gray=0b00111111000 Rel Eta,Phi=3,0 Expect 6 B$ Linear= 336=0b00101010001 Gray=0b00111111001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 337=0b00101010010 Gray=0b00111111011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 338=0b00101010011 Gray=0b00111111010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 339=0b00101010100 Gray=0b00111111110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 340=0b00101010101 Gray=0b00111111111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 341=0b00101010110 Gray=0b00111111101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 342=0b00101010111 Gray=0b00111111100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 343=0b00101011000 Gray=0b00111110100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 344=0b00101011001 Gray=0b00111110101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 345=0b00101011010 Gray=0b00111110111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 346=0b00101011011 Gray=0b00111110110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 347=0b00101011100 Gray=0b00111110010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 348=0b00101011101 Gray=0b00111110011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 349=0b00101011110 Gray=0b00111110001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 350=0b00101011111 Gray=0b00111110000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 351=0b00101100000 Gray=0b00111010000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 352=0b00101100001 Gray=0b00111010001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 353=0b00101100010 Gray=0b00111010011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 354=0b00101100011 Gray=0b00111010010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 355=0b00101100100 Gray=0b00111010110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 356=0b00101100101 Gray=0b00111010111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 357=0b00101100110 Gray=0b00111010101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 358=0b00101100111 Gray=0b00111010100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 359=0b00101101000 Gray=0b00111011100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 360=0b00101101001 Gray=0b00111011101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 361=0b00101101010 Gray=0b00111011111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 362=0b00101101011 Gray=0b00111011110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 363=0b00101101100 Gray=0b00111011010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 364=0b00101101101 Gray=0b00111011011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 365=0b00101101110 Gray=0b00111011001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 366=0b00101101111 Gray=0b00111011000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 367=0b00101110000 Gray=0b00111001000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 368=0b00101110001 Gray=0b00111001001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 369=0b00101110010 Gray=0b00111001011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 370=0b00101110011 Gray=0b00111001010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 371=0b00101110100 Gray=0b00111001110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 372=0b00101110101 Gray=0b00111001111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 373=0b00101110110 Gray=0b00111001101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 374=0b00101110111 Gray=0b00111001100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 375=0b00101111000 Gray=0b00111000100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 376=0b00101111001 Gray=0b00111000101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 377=0b00101111010 Gray=0b00111000111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 378=0b00101111011 Gray=0b00111000110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 379=0b00101111100 Gray=0b00111000010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 380=0b00101111101 Gray=0b00111000011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 381=0b00101111110 Gray=0b00111000001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 382=0b00101111111 Gray=0b00111000000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 383=0b00110000000 Gray=0b00101000000 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 384=0b00110000001 Gray=0b00101000001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 385=0b00110000010 Gray=0b00101000011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 386=0b00110000011 Gray=0b00101000010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 387=0b00110000100 Gray=0b00101000110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 388=0b00110000101 Gray=0b00101000111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 389=0b00110000110 Gray=0b00101000101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 390=0b00110000111 Gray=0b00101000100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 391=0b00110001000 Gray=0b00101001100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 392=0b00110001001 Gray=0b00101001101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 393=0b00110001010 Gray=0b00101001111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 394=0b00110001011 Gray=0b00101001110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 395=0b00110001100 Gray=0b00101001010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 396=0b00110001101 Gray=0b00101001011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 397=0b00110001110 Gray=0b00101001001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 398=0b00110001111 Gray=0b00101001000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 399=0b00110010000 Gray=0b00101011000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 400=0b00110010001 Gray=0b00101011001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 401=0b00110010010 Gray=0b00101011011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 402=0b00110010011 Gray=0b00101011010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 403=0b00110010100 Gray=0b00101011110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 404=0b00110010101 Gray=0b00101011111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 405=0b00110010110 Gray=0b00101011101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 406=0b00110010111 Gray=0b00101011100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 407=0b00110011000 Gray=0b00101010100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 408=0b00110011001 Gray=0b00101010101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 409=0b00110011010 Gray=0b00101010111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 410=0b00110011011 Gray=0b00101010110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 411=0b00110011100 Gray=0b00101010010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 412=0b00110011101 Gray=0b00101010011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 413=0b00110011110 Gray=0b00101010001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 414=0b00110011111 Gray=0b00101010000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 415=0b00110100000 Gray=0b00101110000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 416=0b00110100001 Gray=0b00101110001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 417=0b00110100010 Gray=0b00101110011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 418=0b00110100011 Gray=0b00101110010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 419=0b00110100100 Gray=0b00101110110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 420=0b00110100101 Gray=0b00101110111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 421=0b00110100110 Gray=0b00101110101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 422=0b00110100111 Gray=0b00101110100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 423=0b00110101000 Gray=0b00101111100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 424=0b00110101001 Gray=0b00101111101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 425=0b00110101010 Gray=0b00101111111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 426=0b00110101011 Gray=0b00101111110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 427=0b00110101100 Gray=0b00101111010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 428=0b00110101101 Gray=0b00101111011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 429=0b00110101110 Gray=0b00101111001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 430=0b00110101111 Gray=0b00101111000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 431=0b00110110000 Gray=0b00101101000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 432=0b00110110001 Gray=0b00101101001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 433=0b00110110010 Gray=0b00101101011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 434=0b00110110011 Gray=0b00101101010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 435=0b00110110100 Gray=0b00101101110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 436=0b00110110101 Gray=0b00101101111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 437=0b00110110110 Gray=0b00101101101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 438=0b00110110111 Gray=0b00101101100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 439=0b00110111000 Gray=0b00101100100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 440=0b00110111001 Gray=0b00101100101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 441=0b00110111010 Gray=0b00101100111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 442=0b00110111011 Gray=0b00101100110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 443=0b00110111100 Gray=0b00101100010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 444=0b00110111101 Gray=0b00101100011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 445=0b00110111110 Gray=0b00101100001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 446=0b00110111111 Gray=0b00101100000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 447=0b00111000000 Gray=0b00100100000 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 448=0b00111000001 Gray=0b00100100001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 449=0b00111000010 Gray=0b00100100011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 450=0b00111000011 Gray=0b00100100010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 451=0b00111000100 Gray=0b00100100110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 452=0b00111000101 Gray=0b00100100111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 453=0b00111000110 Gray=0b00100100101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 454=0b00111000111 Gray=0b00100100100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 455=0b00111001000 Gray=0b00100101100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 456=0b00111001001 Gray=0b00100101101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 457=0b00111001010 Gray=0b00100101111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 458=0b00111001011 Gray=0b00100101110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 459=0b00111001100 Gray=0b00100101010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 460=0b00111001101 Gray=0b00100101011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 461=0b00111001110 Gray=0b00100101001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 462=0b00111001111 Gray=0b00100101000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 463=0b00111010000 Gray=0b00100111000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 464=0b00111010001 Gray=0b00100111001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 465=0b00111010010 Gray=0b00100111011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 466=0b00111010011 Gray=0b00100111010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 467=0b00111010100 Gray=0b00100111110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 468=0b00111010101 Gray=0b00100111111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 469=0b00111010110 Gray=0b00100111101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 470=0b00111010111 Gray=0b00100111100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 471=0b00111011000 Gray=0b00100110100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 472=0b00111011001 Gray=0b00100110101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 473=0b00111011010 Gray=0b00100110111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 474=0b00111011011 Gray=0b00100110110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 475=0b00111011100 Gray=0b00100110010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 476=0b00111011101 Gray=0b00100110011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 477=0b00111011110 Gray=0b00100110001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 478=0b00111011111 Gray=0b00100110000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 479=0b00111100000 Gray=0b00100010000 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 480=0b00111100001 Gray=0b00100010001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 481=0b00111100010 Gray=0b00100010011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 482=0b00111100011 Gray=0b00100010010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 483=0b00111100100 Gray=0b00100010110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 484=0b00111100101 Gray=0b00100010111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 485=0b00111100110 Gray=0b00100010101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 486=0b00111100111 Gray=0b00100010100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 487=0b00111101000 Gray=0b00100011100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 488=0b00111101001 Gray=0b00100011101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 489=0b00111101010 Gray=0b00100011111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 490=0b00111101011 Gray=0b00100011110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 491=0b00111101100 Gray=0b00100011010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 492=0b00111101101 Gray=0b00100011011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 493=0b00111101110 Gray=0b00100011001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 494=0b00111101111 Gray=0b00100011000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 495=0b00111110000 Gray=0b00100001000 Rel Eta,Phi=3,0 Expect 2 B$ Linear= 496=0b00111110001 Gray=0b00100001001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 497=0b00111110010 Gray=0b00100001011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 498=0b00111110011 Gray=0b00100001010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 499=0b00111110100 Gray=0b00100001110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 500=0b00111110101 Gray=0b00100001111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 501=0b00111110110 Gray=0b00100001101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 502=0b00111110111 Gray=0b00100001100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 503=0b00111111000 Gray=0b00100000100 Rel Eta,Phi=3,1 Expect 2 B$ Linear= 504=0b00111111001 Gray=0b00100000101 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 505=0b00111111010 Gray=0b00100000111 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 506=0b00111111011 Gray=0b00100000110 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 507=0b00111111100 Gray=0b00100000010 Rel Eta,Phi=3,4 Expect 2 B$ Linear= 508=0b00111111101 Gray=0b00100000011 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 509=0b00111111110 Gray=0b00100000001 Rel Eta,Phi=3,3 Expect 2 B$ Linear= 510=0b00111111111 Gray=0b00100000000 Rel Eta,Phi=3,2 Expect 1 B$ Linear= 511=0b10000000000 Gray=0b10100000000 Rel Eta,Phi=3,5 Expect 2 B$ Linear= 512=0b10000000001 Gray=0b10100000001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 513=0b10000000010 Gray=0b10100000011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 514=0b10000000011 Gray=0b10100000010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 515=0b10000000100 Gray=0b10100000110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 516=0b10000000101 Gray=0b10100000111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 517=0b10000000110 Gray=0b10100000101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 518=0b10000000111 Gray=0b10100000100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 519=0b10000001000 Gray=0b10100001100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 520=0b10000001001 Gray=0b10100001101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 521=0b10000001010 Gray=0b10100001111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 522=0b10000001011 Gray=0b10100001110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 523=0b10000001100 Gray=0b10100001010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 524=0b10000001101 Gray=0b10100001011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 525=0b10000001110 Gray=0b10100001001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 526=0b10000001111 Gray=0b10100001000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 527=0b10000010000 Gray=0b10100011000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 528=0b10000010001 Gray=0b10100011001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 529=0b10000010010 Gray=0b10100011011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 530=0b10000010011 Gray=0b10100011010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 531=0b10000010100 Gray=0b10100011110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 532=0b10000010101 Gray=0b10100011111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 533=0b10000010110 Gray=0b10100011101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 534=0b10000010111 Gray=0b10100011100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 535=0b10000011000 Gray=0b10100010100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 536=0b10000011001 Gray=0b10100010101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 537=0b10000011010 Gray=0b10100010111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 538=0b10000011011 Gray=0b10100010110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 539=0b10000011100 Gray=0b10100010010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 540=0b10000011101 Gray=0b10100010011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 541=0b10000011110 Gray=0b10100010001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 542=0b10000011111 Gray=0b10100010000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 543=0b10000100000 Gray=0b10100110000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 544=0b10000100001 Gray=0b10100110001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 545=0b10000100010 Gray=0b10100110011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 546=0b10000100011 Gray=0b10100110010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 547=0b10000100100 Gray=0b10100110110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 548=0b10000100101 Gray=0b10100110111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 549=0b10000100110 Gray=0b10100110101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 550=0b10000100111 Gray=0b10100110100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 551=0b10000101000 Gray=0b10100111100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 552=0b10000101001 Gray=0b10100111101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 553=0b10000101010 Gray=0b10100111111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 554=0b10000101011 Gray=0b10100111110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 555=0b10000101100 Gray=0b10100111010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 556=0b10000101101 Gray=0b10100111011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 557=0b10000101110 Gray=0b10100111001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 558=0b10000101111 Gray=0b10100111000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 559=0b10000110000 Gray=0b10100101000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 560=0b10000110001 Gray=0b10100101001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 561=0b10000110010 Gray=0b10100101011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 562=0b10000110011 Gray=0b10100101010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 563=0b10000110100 Gray=0b10100101110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 564=0b10000110101 Gray=0b10100101111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 565=0b10000110110 Gray=0b10100101101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 566=0b10000110111 Gray=0b10100101100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 567=0b10000111000 Gray=0b10100100100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 568=0b10000111001 Gray=0b10100100101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 569=0b10000111010 Gray=0b10100100111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 570=0b10000111011 Gray=0b10100100110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 571=0b10000111100 Gray=0b10100100010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 572=0b10000111101 Gray=0b10100100011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 573=0b10000111110 Gray=0b10100100001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 574=0b10000111111 Gray=0b10100100000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 575=0b10001000000 Gray=0b10101100000 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 576=0b10001000001 Gray=0b10101100001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 577=0b10001000010 Gray=0b10101100011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 578=0b10001000011 Gray=0b10101100010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 579=0b10001000100 Gray=0b10101100110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 580=0b10001000101 Gray=0b10101100111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 581=0b10001000110 Gray=0b10101100101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 582=0b10001000111 Gray=0b10101100100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 583=0b10001001000 Gray=0b10101101100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 584=0b10001001001 Gray=0b10101101101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 585=0b10001001010 Gray=0b10101101111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 586=0b10001001011 Gray=0b10101101110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 587=0b10001001100 Gray=0b10101101010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 588=0b10001001101 Gray=0b10101101011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 589=0b10001001110 Gray=0b10101101001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 590=0b10001001111 Gray=0b10101101000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 591=0b10001010000 Gray=0b10101111000 Rel Eta,Phi=3,0 Expect 6 B$ Linear= 592=0b10001010001 Gray=0b10101111001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 593=0b10001010010 Gray=0b10101111011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 594=0b10001010011 Gray=0b10101111010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 595=0b10001010100 Gray=0b10101111110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 596=0b10001010101 Gray=0b10101111111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 597=0b10001010110 Gray=0b10101111101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 598=0b10001010111 Gray=0b10101111100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 599=0b10001011000 Gray=0b10101110100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 600=0b10001011001 Gray=0b10101110101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 601=0b10001011010 Gray=0b10101110111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 602=0b10001011011 Gray=0b10101110110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 603=0b10001011100 Gray=0b10101110010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 604=0b10001011101 Gray=0b10101110011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 605=0b10001011110 Gray=0b10101110001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 606=0b10001011111 Gray=0b10101110000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 607=0b10001100000 Gray=0b10101010000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 608=0b10001100001 Gray=0b10101010001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 609=0b10001100010 Gray=0b10101010011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 610=0b10001100011 Gray=0b10101010010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 611=0b10001100100 Gray=0b10101010110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 612=0b10001100101 Gray=0b10101010111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 613=0b10001100110 Gray=0b10101010101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 614=0b10001100111 Gray=0b10101010100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 615=0b10001101000 Gray=0b10101011100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 616=0b10001101001 Gray=0b10101011101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 617=0b10001101010 Gray=0b10101011111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 618=0b10001101011 Gray=0b10101011110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 619=0b10001101100 Gray=0b10101011010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 620=0b10001101101 Gray=0b10101011011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 621=0b10001101110 Gray=0b10101011001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 622=0b10001101111 Gray=0b10101011000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 623=0b10001110000 Gray=0b10101001000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 624=0b10001110001 Gray=0b10101001001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 625=0b10001110010 Gray=0b10101001011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 626=0b10001110011 Gray=0b10101001010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 627=0b10001110100 Gray=0b10101001110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 628=0b10001110101 Gray=0b10101001111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 629=0b10001110110 Gray=0b10101001101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 630=0b10001110111 Gray=0b10101001100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 631=0b10001111000 Gray=0b10101000100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 632=0b10001111001 Gray=0b10101000101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 633=0b10001111010 Gray=0b10101000111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 634=0b10001111011 Gray=0b10101000110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 635=0b10001111100 Gray=0b10101000010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 636=0b10001111101 Gray=0b10101000011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 637=0b10001111110 Gray=0b10101000001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 638=0b10001111111 Gray=0b10101000000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 639=0b10010000000 Gray=0b10111000000 Rel Eta,Phi=3,6 Expect 4 B$ Linear= 640=0b10010000001 Gray=0b10111000001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 641=0b10010000010 Gray=0b10111000011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 642=0b10010000011 Gray=0b10111000010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 643=0b10010000100 Gray=0b10111000110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 644=0b10010000101 Gray=0b10111000111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 645=0b10010000110 Gray=0b10111000101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 646=0b10010000111 Gray=0b10111000100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 647=0b10010001000 Gray=0b10111001100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 648=0b10010001001 Gray=0b10111001101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 649=0b10010001010 Gray=0b10111001111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 650=0b10010001011 Gray=0b10111001110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 651=0b10010001100 Gray=0b10111001010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 652=0b10010001101 Gray=0b10111001011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 653=0b10010001110 Gray=0b10111001001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 654=0b10010001111 Gray=0b10111001000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 655=0b10010010000 Gray=0b10111011000 Rel Eta,Phi=3,0 Expect 6 B$ Linear= 656=0b10010010001 Gray=0b10111011001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 657=0b10010010010 Gray=0b10111011011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 658=0b10010010011 Gray=0b10111011010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 659=0b10010010100 Gray=0b10111011110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 660=0b10010010101 Gray=0b10111011111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 661=0b10010010110 Gray=0b10111011101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 662=0b10010010111 Gray=0b10111011100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 663=0b10010011000 Gray=0b10111010100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 664=0b10010011001 Gray=0b10111010101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 665=0b10010011010 Gray=0b10111010111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 666=0b10010011011 Gray=0b10111010110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 667=0b10010011100 Gray=0b10111010010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 668=0b10010011101 Gray=0b10111010011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 669=0b10010011110 Gray=0b10111010001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 670=0b10010011111 Gray=0b10111010000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 671=0b10010100000 Gray=0b10111110000 Rel Eta,Phi=2,7 Expect 6 B$ Linear= 672=0b10010100001 Gray=0b10111110001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 673=0b10010100010 Gray=0b10111110011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 674=0b10010100011 Gray=0b10111110010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 675=0b10010100100 Gray=0b10111110110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 676=0b10010100101 Gray=0b10111110111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 677=0b10010100110 Gray=0b10111110101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 678=0b10010100111 Gray=0b10111110100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 679=0b10010101000 Gray=0b10111111100 Rel Eta,Phi=3,1 Expect 8 B$ Linear= 680=0b10010101001 Gray=0b10111111101 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 681=0b10010101010 Gray=0b10111111111 Rel Eta,Phi=3,3 Expect 10 B$ Linear= 682=0b10010101011 Gray=0b10111111110 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 683=0b10010101100 Gray=0b10111111010 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 684=0b10010101101 Gray=0b10111111011 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 685=0b10010101110 Gray=0b10111111001 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 686=0b10010101111 Gray=0b10111111000 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 687=0b10010110000 Gray=0b10111101000 Rel Eta,Phi=3,0 Expect 6 B$ Linear= 688=0b10010110001 Gray=0b10111101001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 689=0b10010110010 Gray=0b10111101011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 690=0b10010110011 Gray=0b10111101010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 691=0b10010110100 Gray=0b10111101110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 692=0b10010110101 Gray=0b10111101111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 693=0b10010110110 Gray=0b10111101101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 694=0b10010110111 Gray=0b10111101100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 695=0b10010111000 Gray=0b10111100100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 696=0b10010111001 Gray=0b10111100101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 697=0b10010111010 Gray=0b10111100111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 698=0b10010111011 Gray=0b10111100110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 699=0b10010111100 Gray=0b10111100010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 700=0b10010111101 Gray=0b10111100011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 701=0b10010111110 Gray=0b10111100001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 702=0b10010111111 Gray=0b10111100000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 703=0b10011000000 Gray=0b10110100000 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 704=0b10011000001 Gray=0b10110100001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 705=0b10011000010 Gray=0b10110100011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 706=0b10011000011 Gray=0b10110100010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 707=0b10011000100 Gray=0b10110100110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 708=0b10011000101 Gray=0b10110100111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 709=0b10011000110 Gray=0b10110100101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 710=0b10011000111 Gray=0b10110100100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 711=0b10011001000 Gray=0b10110101100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 712=0b10011001001 Gray=0b10110101101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 713=0b10011001010 Gray=0b10110101111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 714=0b10011001011 Gray=0b10110101110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 715=0b10011001100 Gray=0b10110101010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 716=0b10011001101 Gray=0b10110101011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 717=0b10011001110 Gray=0b10110101001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 718=0b10011001111 Gray=0b10110101000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 719=0b10011010000 Gray=0b10110111000 Rel Eta,Phi=3,0 Expect 6 B$ Linear= 720=0b10011010001 Gray=0b10110111001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 721=0b10011010010 Gray=0b10110111011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 722=0b10011010011 Gray=0b10110111010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 723=0b10011010100 Gray=0b10110111110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 724=0b10011010101 Gray=0b10110111111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 725=0b10011010110 Gray=0b10110111101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 726=0b10011010111 Gray=0b10110111100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 727=0b10011011000 Gray=0b10110110100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 728=0b10011011001 Gray=0b10110110101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 729=0b10011011010 Gray=0b10110110111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 730=0b10011011011 Gray=0b10110110110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 731=0b10011011100 Gray=0b10110110010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 732=0b10011011101 Gray=0b10110110011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 733=0b10011011110 Gray=0b10110110001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 734=0b10011011111 Gray=0b10110110000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 735=0b10011100000 Gray=0b10110010000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 736=0b10011100001 Gray=0b10110010001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 737=0b10011100010 Gray=0b10110010011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 738=0b10011100011 Gray=0b10110010010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 739=0b10011100100 Gray=0b10110010110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 740=0b10011100101 Gray=0b10110010111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 741=0b10011100110 Gray=0b10110010101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 742=0b10011100111 Gray=0b10110010100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 743=0b10011101000 Gray=0b10110011100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 744=0b10011101001 Gray=0b10110011101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 745=0b10011101010 Gray=0b10110011111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 746=0b10011101011 Gray=0b10110011110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 747=0b10011101100 Gray=0b10110011010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 748=0b10011101101 Gray=0b10110011011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 749=0b10011101110 Gray=0b10110011001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 750=0b10011101111 Gray=0b10110011000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 751=0b10011110000 Gray=0b10110001000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 752=0b10011110001 Gray=0b10110001001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 753=0b10011110010 Gray=0b10110001011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 754=0b10011110011 Gray=0b10110001010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 755=0b10011110100 Gray=0b10110001110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 756=0b10011110101 Gray=0b10110001111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 757=0b10011110110 Gray=0b10110001101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 758=0b10011110111 Gray=0b10110001100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 759=0b10011111000 Gray=0b10110000100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 760=0b10011111001 Gray=0b10110000101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 761=0b10011111010 Gray=0b10110000111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 762=0b10011111011 Gray=0b10110000110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 763=0b10011111100 Gray=0b10110000010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 764=0b10011111101 Gray=0b10110000011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 765=0b10011111110 Gray=0b10110000001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 766=0b10011111111 Gray=0b10110000000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 767=0b10100000000 Gray=0b10010000000 Rel Eta,Phi=3,7 Expect 2 B$ Linear= 768=0b10100000001 Gray=0b10010000001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 769=0b10100000010 Gray=0b10010000011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 770=0b10100000011 Gray=0b10010000010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 771=0b10100000100 Gray=0b10010000110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 772=0b10100000101 Gray=0b10010000111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 773=0b10100000110 Gray=0b10010000101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 774=0b10100000111 Gray=0b10010000100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 775=0b10100001000 Gray=0b10010001100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 776=0b10100001001 Gray=0b10010001101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 777=0b10100001010 Gray=0b10010001111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 778=0b10100001011 Gray=0b10010001110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 779=0b10100001100 Gray=0b10010001010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 780=0b10100001101 Gray=0b10010001011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 781=0b10100001110 Gray=0b10010001001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 782=0b10100001111 Gray=0b10010001000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 783=0b10100010000 Gray=0b10010011000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 784=0b10100010001 Gray=0b10010011001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 785=0b10100010010 Gray=0b10010011011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 786=0b10100010011 Gray=0b10010011010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 787=0b10100010100 Gray=0b10010011110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 788=0b10100010101 Gray=0b10010011111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 789=0b10100010110 Gray=0b10010011101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 790=0b10100010111 Gray=0b10010011100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 791=0b10100011000 Gray=0b10010010100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 792=0b10100011001 Gray=0b10010010101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 793=0b10100011010 Gray=0b10010010111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 794=0b10100011011 Gray=0b10010010110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 795=0b10100011100 Gray=0b10010010010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 796=0b10100011101 Gray=0b10010010011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 797=0b10100011110 Gray=0b10010010001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 798=0b10100011111 Gray=0b10010010000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 799=0b10100100000 Gray=0b10010110000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 800=0b10100100001 Gray=0b10010110001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 801=0b10100100010 Gray=0b10010110011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 802=0b10100100011 Gray=0b10010110010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 803=0b10100100100 Gray=0b10010110110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 804=0b10100100101 Gray=0b10010110111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 805=0b10100100110 Gray=0b10010110101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 806=0b10100100111 Gray=0b10010110100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 807=0b10100101000 Gray=0b10010111100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 808=0b10100101001 Gray=0b10010111101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 809=0b10100101010 Gray=0b10010111111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 810=0b10100101011 Gray=0b10010111110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 811=0b10100101100 Gray=0b10010111010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 812=0b10100101101 Gray=0b10010111011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 813=0b10100101110 Gray=0b10010111001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 814=0b10100101111 Gray=0b10010111000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 815=0b10100110000 Gray=0b10010101000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 816=0b10100110001 Gray=0b10010101001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 817=0b10100110010 Gray=0b10010101011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 818=0b10100110011 Gray=0b10010101010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 819=0b10100110100 Gray=0b10010101110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 820=0b10100110101 Gray=0b10010101111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 821=0b10100110110 Gray=0b10010101101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 822=0b10100110111 Gray=0b10010101100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 823=0b10100111000 Gray=0b10010100100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 824=0b10100111001 Gray=0b10010100101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 825=0b10100111010 Gray=0b10010100111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 826=0b10100111011 Gray=0b10010100110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 827=0b10100111100 Gray=0b10010100010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 828=0b10100111101 Gray=0b10010100011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 829=0b10100111110 Gray=0b10010100001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 830=0b10100111111 Gray=0b10010100000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 831=0b10101000000 Gray=0b10011100000 Rel Eta,Phi=2,6 Expect 4 B$ Linear= 832=0b10101000001 Gray=0b10011100001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 833=0b10101000010 Gray=0b10011100011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 834=0b10101000011 Gray=0b10011100010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 835=0b10101000100 Gray=0b10011100110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 836=0b10101000101 Gray=0b10011100111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 837=0b10101000110 Gray=0b10011100101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 838=0b10101000111 Gray=0b10011100100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 839=0b10101001000 Gray=0b10011101100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 840=0b10101001001 Gray=0b10011101101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 841=0b10101001010 Gray=0b10011101111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 842=0b10101001011 Gray=0b10011101110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 843=0b10101001100 Gray=0b10011101010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 844=0b10101001101 Gray=0b10011101011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 845=0b10101001110 Gray=0b10011101001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 846=0b10101001111 Gray=0b10011101000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 847=0b10101010000 Gray=0b10011111000 Rel Eta,Phi=3,0 Expect 6 B$ Linear= 848=0b10101010001 Gray=0b10011111001 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 849=0b10101010010 Gray=0b10011111011 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 850=0b10101010011 Gray=0b10011111010 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 851=0b10101010100 Gray=0b10011111110 Rel Eta,Phi=3,4 Expect 8 B$ Linear= 852=0b10101010101 Gray=0b10011111111 Rel Eta,Phi=3,2 Expect 9 B$ Linear= 853=0b10101010110 Gray=0b10011111101 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 854=0b10101010111 Gray=0b10011111100 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 855=0b10101011000 Gray=0b10011110100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 856=0b10101011001 Gray=0b10011110101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 857=0b10101011010 Gray=0b10011110111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 858=0b10101011011 Gray=0b10011110110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 859=0b10101011100 Gray=0b10011110010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 860=0b10101011101 Gray=0b10011110011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 861=0b10101011110 Gray=0b10011110001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 862=0b10101011111 Gray=0b10011110000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 863=0b10101100000 Gray=0b10011010000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 864=0b10101100001 Gray=0b10011010001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 865=0b10101100010 Gray=0b10011010011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 866=0b10101100011 Gray=0b10011010010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 867=0b10101100100 Gray=0b10011010110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 868=0b10101100101 Gray=0b10011010111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 869=0b10101100110 Gray=0b10011010101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 870=0b10101100111 Gray=0b10011010100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 871=0b10101101000 Gray=0b10011011100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 872=0b10101101001 Gray=0b10011011101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 873=0b10101101010 Gray=0b10011011111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 874=0b10101101011 Gray=0b10011011110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 875=0b10101101100 Gray=0b10011011010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 876=0b10101101101 Gray=0b10011011011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 877=0b10101101110 Gray=0b10011011001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 878=0b10101101111 Gray=0b10011011000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 879=0b10101110000 Gray=0b10011001000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 880=0b10101110001 Gray=0b10011001001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 881=0b10101110010 Gray=0b10011001011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 882=0b10101110011 Gray=0b10011001010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 883=0b10101110100 Gray=0b10011001110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 884=0b10101110101 Gray=0b10011001111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 885=0b10101110110 Gray=0b10011001101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 886=0b10101110111 Gray=0b10011001100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 887=0b10101111000 Gray=0b10011000100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 888=0b10101111001 Gray=0b10011000101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 889=0b10101111010 Gray=0b10011000111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 890=0b10101111011 Gray=0b10011000110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 891=0b10101111100 Gray=0b10011000010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 892=0b10101111101 Gray=0b10011000011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 893=0b10101111110 Gray=0b10011000001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 894=0b10101111111 Gray=0b10011000000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 895=0b10110000000 Gray=0b10001000000 Rel Eta,Phi=3,6 Expect 2 B$ Linear= 896=0b10110000001 Gray=0b10001000001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 897=0b10110000010 Gray=0b10001000011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 898=0b10110000011 Gray=0b10001000010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 899=0b10110000100 Gray=0b10001000110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 900=0b10110000101 Gray=0b10001000111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 901=0b10110000110 Gray=0b10001000101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 902=0b10110000111 Gray=0b10001000100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 903=0b10110001000 Gray=0b10001001100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 904=0b10110001001 Gray=0b10001001101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 905=0b10110001010 Gray=0b10001001111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 906=0b10110001011 Gray=0b10001001110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 907=0b10110001100 Gray=0b10001001010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 908=0b10110001101 Gray=0b10001001011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 909=0b10110001110 Gray=0b10001001001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 910=0b10110001111 Gray=0b10001001000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 911=0b10110010000 Gray=0b10001011000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 912=0b10110010001 Gray=0b10001011001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 913=0b10110010010 Gray=0b10001011011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 914=0b10110010011 Gray=0b10001011010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 915=0b10110010100 Gray=0b10001011110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 916=0b10110010101 Gray=0b10001011111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 917=0b10110010110 Gray=0b10001011101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 918=0b10110010111 Gray=0b10001011100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 919=0b10110011000 Gray=0b10001010100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 920=0b10110011001 Gray=0b10001010101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 921=0b10110011010 Gray=0b10001010111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 922=0b10110011011 Gray=0b10001010110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 923=0b10110011100 Gray=0b10001010010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 924=0b10110011101 Gray=0b10001010011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 925=0b10110011110 Gray=0b10001010001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 926=0b10110011111 Gray=0b10001010000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 927=0b10110100000 Gray=0b10001110000 Rel Eta,Phi=2,7 Expect 4 B$ Linear= 928=0b10110100001 Gray=0b10001110001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 929=0b10110100010 Gray=0b10001110011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 930=0b10110100011 Gray=0b10001110010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 931=0b10110100100 Gray=0b10001110110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 932=0b10110100101 Gray=0b10001110111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 933=0b10110100110 Gray=0b10001110101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 934=0b10110100111 Gray=0b10001110100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 935=0b10110101000 Gray=0b10001111100 Rel Eta,Phi=3,1 Expect 6 B$ Linear= 936=0b10110101001 Gray=0b10001111101 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 937=0b10110101010 Gray=0b10001111111 Rel Eta,Phi=3,3 Expect 8 B$ Linear= 938=0b10110101011 Gray=0b10001111110 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 939=0b10110101100 Gray=0b10001111010 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 940=0b10110101101 Gray=0b10001111011 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 941=0b10110101110 Gray=0b10001111001 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 942=0b10110101111 Gray=0b10001111000 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 943=0b10110110000 Gray=0b10001101000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 944=0b10110110001 Gray=0b10001101001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 945=0b10110110010 Gray=0b10001101011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 946=0b10110110011 Gray=0b10001101010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 947=0b10110110100 Gray=0b10001101110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 948=0b10110110101 Gray=0b10001101111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 949=0b10110110110 Gray=0b10001101101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 950=0b10110110111 Gray=0b10001101100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 951=0b10110111000 Gray=0b10001100100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 952=0b10110111001 Gray=0b10001100101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 953=0b10110111010 Gray=0b10001100111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 954=0b10110111011 Gray=0b10001100110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 955=0b10110111100 Gray=0b10001100010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 956=0b10110111101 Gray=0b10001100011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 957=0b10110111110 Gray=0b10001100001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 958=0b10110111111 Gray=0b10001100000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 959=0b10111000000 Gray=0b10000100000 Rel Eta,Phi=2,6 Expect 2 B$ Linear= 960=0b10111000001 Gray=0b10000100001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 961=0b10111000010 Gray=0b10000100011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 962=0b10111000011 Gray=0b10000100010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 963=0b10111000100 Gray=0b10000100110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 964=0b10111000101 Gray=0b10000100111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 965=0b10111000110 Gray=0b10000100101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 966=0b10111000111 Gray=0b10000100100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 967=0b10111001000 Gray=0b10000101100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 968=0b10111001001 Gray=0b10000101101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 969=0b10111001010 Gray=0b10000101111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 970=0b10111001011 Gray=0b10000101110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 971=0b10111001100 Gray=0b10000101010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 972=0b10111001101 Gray=0b10000101011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 973=0b10111001110 Gray=0b10000101001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 974=0b10111001111 Gray=0b10000101000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 975=0b10111010000 Gray=0b10000111000 Rel Eta,Phi=3,0 Expect 4 B$ Linear= 976=0b10111010001 Gray=0b10000111001 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 977=0b10111010010 Gray=0b10000111011 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 978=0b10111010011 Gray=0b10000111010 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 979=0b10111010100 Gray=0b10000111110 Rel Eta,Phi=3,4 Expect 6 B$ Linear= 980=0b10111010101 Gray=0b10000111111 Rel Eta,Phi=3,2 Expect 7 B$ Linear= 981=0b10111010110 Gray=0b10000111101 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 982=0b10111010111 Gray=0b10000111100 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 983=0b10111011000 Gray=0b10000110100 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 984=0b10111011001 Gray=0b10000110101 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 985=0b10111011010 Gray=0b10000110111 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 986=0b10111011011 Gray=0b10000110110 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 987=0b10111011100 Gray=0b10000110010 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 988=0b10111011101 Gray=0b10000110011 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 989=0b10111011110 Gray=0b10000110001 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 990=0b10111011111 Gray=0b10000110000 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 991=0b10111100000 Gray=0b10000010000 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 992=0b10111100001 Gray=0b10000010001 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 993=0b10111100010 Gray=0b10000010011 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 994=0b10111100011 Gray=0b10000010010 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 995=0b10111100100 Gray=0b10000010110 Rel Eta,Phi=3,4 Expect 4 B$ Linear= 996=0b10111100101 Gray=0b10000010111 Rel Eta,Phi=3,2 Expect 5 B$ Linear= 997=0b10111100110 Gray=0b10000010101 Rel Eta,Phi=3,3 Expect 4 B$ Linear= 998=0b10111100111 Gray=0b10000010100 Rel Eta,Phi=3,2 Expect 3 B$ Linear= 999=0b10111101000 Gray=0b10000011100 Rel Eta,Phi=3,1 Expect 4 B$ Linear=1000=0b10111101001 Gray=0b10000011101 Rel Eta,Phi=3,2 Expect 5 B$ Linear=1001=0b10111101010 Gray=0b10000011111 Rel Eta,Phi=3,3 Expect 6 B$ Linear=1002=0b10111101011 Gray=0b10000011110 Rel Eta,Phi=3,2 Expect 5 B$ Linear=1003=0b10111101100 Gray=0b10000011010 Rel Eta,Phi=3,4 Expect 4 B$ Linear=1004=0b10111101101 Gray=0b10000011011 Rel Eta,Phi=3,2 Expect 5 B$ Linear=1005=0b10111101110 Gray=0b10000011001 Rel Eta,Phi=3,3 Expect 4 B$ Linear=1006=0b10111101111 Gray=0b10000011000 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1007=0b10111110000 Gray=0b10000001000 Rel Eta,Phi=3,0 Expect 2 B$ Linear=1008=0b10111110001 Gray=0b10000001001 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1009=0b10111110010 Gray=0b10000001011 Rel Eta,Phi=3,3 Expect 4 B$ Linear=1010=0b10111110011 Gray=0b10000001010 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1011=0b10111110100 Gray=0b10000001110 Rel Eta,Phi=3,4 Expect 4 B$ Linear=1012=0b10111110101 Gray=0b10000001111 Rel Eta,Phi=3,2 Expect 5 B$ Linear=1013=0b10111110110 Gray=0b10000001101 Rel Eta,Phi=3,3 Expect 4 B$ Linear=1014=0b10111110111 Gray=0b10000001100 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1015=0b10111111000 Gray=0b10000000100 Rel Eta,Phi=3,1 Expect 2 B$ Linear=1016=0b10111111001 Gray=0b10000000101 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1017=0b10111111010 Gray=0b10000000111 Rel Eta,Phi=3,3 Expect 4 B$ Linear=1018=0b10111111011 Gray=0b10000000110 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1019=0b10111111100 Gray=0b10000000010 Rel Eta,Phi=3,4 Expect 2 B$ Linear=1020=0b10111111101 Gray=0b10000000011 Rel Eta,Phi=3,2 Expect 3 B$ Linear=1021=0b10111111110 Gray=0b10000000001 Rel Eta,Phi=3,3 Expect 2 B$ Linear=1022=0b10111111111 Gray=0b10000000000 Rel Eta,Phi=3,2 Expect 1 B$ Linear=1023=0b10000000000 Gray=0b00000000000 Rel Eta,Phi=3,5 Expect 0 I$ Scanning Second Pass Prom B$ Linear= 0/ 0/ 1 Gray= 0/ 0/ 1 Rel Eta,Phi=0,0 Expect 1 B$ Linear= 0/ 0/ 2 Gray= 0/ 0/ 2 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 0/ 0/ 3 Gray= 0/ 0/ 3 Rel Eta,Phi=0,2 Expect 3 B$ Linear= 0/ 0/ 4 Gray= 0/ 0/ 4 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 0/ 0/ 5 Gray= 0/ 0/ 5 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 0/ 0/ 6 Gray= 0/ 0/ 6 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 0/ 0/ 7 Gray= 0/ 0/ 7 Rel Eta,Phi=0,6 Expect 7 B$ Linear= 0/ 0/ 8 Gray= 0/ 0/ 8 Rel Eta,Phi=0,7 Expect 8 B$ Linear= 0/ 0/ 9 Gray= 0/ 0/ 9 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 0/ 0/10 Gray= 0/ 0/10 Rel Eta,Phi=1,1 Expect 10 B$ Linear= 0/ 0/11 Gray= 0/ 0/11 Rel Eta,Phi=1,2 Expect 11 B$ Linear= 0/ 1/ 0 Gray= 0/ 1/11 Rel Eta,Phi=1,3 Expect 12 B$ Linear= 0/ 1/ 1 Gray= 0/ 1/10 Rel Eta,Phi=1,2 Expect 11 B$ Linear= 0/ 1/ 2 Gray= 0/ 1/ 9 Rel Eta,Phi=1,1 Expect 10 B$ Linear= 0/ 1/ 3 Gray= 0/ 1/ 8 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 0/ 1/ 4 Gray= 0/ 1/ 7 Rel Eta,Phi=0,7 Expect 8 B$ Linear= 0/ 1/ 5 Gray= 0/ 1/ 6 Rel Eta,Phi=0,6 Expect 7 B$ Linear= 0/ 1/ 6 Gray= 0/ 1/ 5 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 0/ 1/ 7 Gray= 0/ 1/ 4 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 0/ 1/ 8 Gray= 0/ 1/ 3 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 0/ 1/ 9 Gray= 0/ 1/ 2 Rel Eta,Phi=0,2 Expect 3 B$ Linear= 0/ 1/10 Gray= 0/ 1/ 1 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 0/ 1/11 Gray= 0/ 1/ 0 Rel Eta,Phi=0,0 Expect 1 B$ Linear= 0/ 2/ 0 Gray= 0/ 2/ 0 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 0/ 2/ 1 Gray= 0/ 2/ 1 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 0/ 2/ 2 Gray= 0/ 2/ 2 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 0/ 2/ 3 Gray= 0/ 2/ 3 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 0/ 2/ 4 Gray= 0/ 2/ 4 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 0/ 2/ 5 Gray= 0/ 2/ 5 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 0/ 2/ 6 Gray= 0/ 2/ 6 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 0/ 2/ 7 Gray= 0/ 2/ 7 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 0/ 2/ 8 Gray= 0/ 2/ 8 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 0/ 2/ 9 Gray= 0/ 2/ 9 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 0/ 2/10 Gray= 0/ 2/10 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 0/ 2/11 Gray= 0/ 2/11 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 0/ 3/ 0 Gray= 0/ 3/11 Rel Eta,Phi=1,5 Expect 14 B$ Linear= 0/ 3/ 1 Gray= 0/ 3/10 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 0/ 3/ 2 Gray= 0/ 3/ 9 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 0/ 3/ 3 Gray= 0/ 3/ 8 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 0/ 3/ 4 Gray= 0/ 3/ 7 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 0/ 3/ 5 Gray= 0/ 3/ 6 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 0/ 3/ 6 Gray= 0/ 3/ 5 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 0/ 3/ 7 Gray= 0/ 3/ 4 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 0/ 3/ 8 Gray= 0/ 3/ 3 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 0/ 3/ 9 Gray= 0/ 3/ 2 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 0/ 3/10 Gray= 0/ 3/ 1 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 0/ 3/11 Gray= 0/ 3/ 0 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 0/ 4/ 0 Gray= 0/ 4/ 0 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 0/ 4/ 1 Gray= 0/ 4/ 1 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 0/ 4/ 2 Gray= 0/ 4/ 2 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 0/ 4/ 3 Gray= 0/ 4/ 3 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 0/ 4/ 4 Gray= 0/ 4/ 4 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 0/ 4/ 5 Gray= 0/ 4/ 5 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 0/ 4/ 6 Gray= 0/ 4/ 6 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 0/ 4/ 7 Gray= 0/ 4/ 7 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 0/ 4/ 8 Gray= 0/ 4/ 8 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 0/ 4/ 9 Gray= 0/ 4/ 9 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 0/ 4/10 Gray= 0/ 4/10 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 0/ 4/11 Gray= 0/ 4/11 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 0/ 5/ 0 Gray= 0/ 5/11 Rel Eta,Phi=1,7 Expect 16 B$ Linear= 0/ 5/ 1 Gray= 0/ 5/10 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 0/ 5/ 2 Gray= 0/ 5/ 9 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 0/ 5/ 3 Gray= 0/ 5/ 8 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 0/ 5/ 4 Gray= 0/ 5/ 7 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 0/ 5/ 5 Gray= 0/ 5/ 6 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 0/ 5/ 6 Gray= 0/ 5/ 5 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 0/ 5/ 7 Gray= 0/ 5/ 4 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 0/ 5/ 8 Gray= 0/ 5/ 3 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 0/ 5/ 9 Gray= 0/ 5/ 2 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 0/ 5/10 Gray= 0/ 5/ 1 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 0/ 5/11 Gray= 0/ 5/ 0 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 0/ 6/ 0 Gray= 0/ 6/ 0 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 0/ 6/ 1 Gray= 0/ 6/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 0/ 6/ 2 Gray= 0/ 6/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 0/ 6/ 3 Gray= 0/ 6/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 0/ 6/ 4 Gray= 0/ 6/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 0/ 6/ 5 Gray= 0/ 6/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 0/ 6/ 6 Gray= 0/ 6/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 0/ 6/ 7 Gray= 0/ 6/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 0/ 6/ 8 Gray= 0/ 6/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 0/ 6/ 9 Gray= 0/ 6/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 0/ 6/10 Gray= 0/ 6/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 0/ 6/11 Gray= 0/ 6/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 0/ 7/ 0 Gray= 0/ 7/11 Rel Eta,Phi=2,1 Expect 18 B$ Linear= 0/ 7/ 1 Gray= 0/ 7/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 0/ 7/ 2 Gray= 0/ 7/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 0/ 7/ 3 Gray= 0/ 7/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 0/ 7/ 4 Gray= 0/ 7/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 0/ 7/ 5 Gray= 0/ 7/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 0/ 7/ 6 Gray= 0/ 7/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 0/ 7/ 7 Gray= 0/ 7/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 0/ 7/ 8 Gray= 0/ 7/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 0/ 7/ 9 Gray= 0/ 7/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 0/ 7/10 Gray= 0/ 7/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 0/ 7/11 Gray= 0/ 7/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 0/ 8/ 0 Gray= 0/ 8/ 0 Rel Eta,Phi=2,2 Expect 8 B$ Linear= 0/ 8/ 1 Gray= 0/ 8/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 0/ 8/ 2 Gray= 0/ 8/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 0/ 8/ 3 Gray= 0/ 8/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 0/ 8/ 4 Gray= 0/ 8/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 0/ 8/ 5 Gray= 0/ 8/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 0/ 8/ 6 Gray= 0/ 8/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 0/ 8/ 7 Gray= 0/ 8/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 0/ 8/ 8 Gray= 0/ 8/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 0/ 8/ 9 Gray= 0/ 8/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 0/ 8/10 Gray= 0/ 8/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 0/ 8/11 Gray= 0/ 8/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 0/ 9/ 0 Gray= 0/ 9/11 Rel Eta,Phi=2,3 Expect 20 B$ Linear= 0/ 9/ 1 Gray= 0/ 9/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 0/ 9/ 2 Gray= 0/ 9/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 0/ 9/ 3 Gray= 0/ 9/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 0/ 9/ 4 Gray= 0/ 9/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 0/ 9/ 5 Gray= 0/ 9/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 0/ 9/ 6 Gray= 0/ 9/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 0/ 9/ 7 Gray= 0/ 9/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 0/ 9/ 8 Gray= 0/ 9/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 0/ 9/ 9 Gray= 0/ 9/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 0/ 9/10 Gray= 0/ 9/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 0/ 9/11 Gray= 0/ 9/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 0/10/ 0 Gray= 0/10/ 0 Rel Eta,Phi=2,4 Expect 10 B$ Linear= 0/10/ 1 Gray= 0/10/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 0/10/ 2 Gray= 0/10/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 0/10/ 3 Gray= 0/10/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 0/10/ 4 Gray= 0/10/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 0/10/ 5 Gray= 0/10/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 0/10/ 6 Gray= 0/10/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 0/10/ 7 Gray= 0/10/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 0/10/ 8 Gray= 0/10/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 0/10/ 9 Gray= 0/10/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 0/10/10 Gray= 0/10/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 0/10/11 Gray= 0/10/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 0/11/ 0 Gray= 0/11/11 Rel Eta,Phi=2,5 Expect 22 B$ Linear= 0/11/ 1 Gray= 0/11/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 0/11/ 2 Gray= 0/11/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 0/11/ 3 Gray= 0/11/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 0/11/ 4 Gray= 0/11/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 0/11/ 5 Gray= 0/11/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 0/11/ 6 Gray= 0/11/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 0/11/ 7 Gray= 0/11/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 0/11/ 8 Gray= 0/11/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 0/11/ 9 Gray= 0/11/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 0/11/10 Gray= 0/11/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 0/11/11 Gray= 0/11/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 1/ 0/ 0 Gray= 1/11/ 0 Rel Eta,Phi=2,6 Expect 12 B$ Linear= 1/ 0/ 1 Gray= 1/11/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 1/ 0/ 2 Gray= 1/11/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 1/ 0/ 3 Gray= 1/11/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 1/ 0/ 4 Gray= 1/11/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 1/ 0/ 5 Gray= 1/11/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 1/ 0/ 6 Gray= 1/11/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 1/ 0/ 7 Gray= 1/11/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 1/ 0/ 8 Gray= 1/11/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 1/ 0/ 9 Gray= 1/11/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 1/ 0/10 Gray= 1/11/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 1/ 0/11 Gray= 1/11/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 1/ 1/ 0 Gray= 1/10/11 Rel Eta,Phi=2,5 Expect 22 B$ Linear= 1/ 1/ 1 Gray= 1/10/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 1/ 1/ 2 Gray= 1/10/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 1/ 1/ 3 Gray= 1/10/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 1/ 1/ 4 Gray= 1/10/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 1/ 1/ 5 Gray= 1/10/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 1/ 1/ 6 Gray= 1/10/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 1/ 1/ 7 Gray= 1/10/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 1/ 1/ 8 Gray= 1/10/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 1/ 1/ 9 Gray= 1/10/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 1/ 1/10 Gray= 1/10/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 1/ 1/11 Gray= 1/10/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 1/ 2/ 0 Gray= 1/ 9/ 0 Rel Eta,Phi=2,4 Expect 10 B$ Linear= 1/ 2/ 1 Gray= 1/ 9/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 1/ 2/ 2 Gray= 1/ 9/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 1/ 2/ 3 Gray= 1/ 9/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 1/ 2/ 4 Gray= 1/ 9/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 1/ 2/ 5 Gray= 1/ 9/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 1/ 2/ 6 Gray= 1/ 9/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 1/ 2/ 7 Gray= 1/ 9/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 1/ 2/ 8 Gray= 1/ 9/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 1/ 2/ 9 Gray= 1/ 9/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 1/ 2/10 Gray= 1/ 9/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 1/ 2/11 Gray= 1/ 9/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 1/ 3/ 0 Gray= 1/ 8/11 Rel Eta,Phi=2,3 Expect 20 B$ Linear= 1/ 3/ 1 Gray= 1/ 8/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 1/ 3/ 2 Gray= 1/ 8/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 1/ 3/ 3 Gray= 1/ 8/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 1/ 3/ 4 Gray= 1/ 8/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 1/ 3/ 5 Gray= 1/ 8/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 1/ 3/ 6 Gray= 1/ 8/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 1/ 3/ 7 Gray= 1/ 8/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 1/ 3/ 8 Gray= 1/ 8/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 1/ 3/ 9 Gray= 1/ 8/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 1/ 3/10 Gray= 1/ 8/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 1/ 3/11 Gray= 1/ 8/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 1/ 4/ 0 Gray= 1/ 7/ 0 Rel Eta,Phi=2,2 Expect 8 B$ Linear= 1/ 4/ 1 Gray= 1/ 7/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 1/ 4/ 2 Gray= 1/ 7/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 1/ 4/ 3 Gray= 1/ 7/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 1/ 4/ 4 Gray= 1/ 7/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 1/ 4/ 5 Gray= 1/ 7/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 1/ 4/ 6 Gray= 1/ 7/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 1/ 4/ 7 Gray= 1/ 7/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 1/ 4/ 8 Gray= 1/ 7/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 1/ 4/ 9 Gray= 1/ 7/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 1/ 4/10 Gray= 1/ 7/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 1/ 4/11 Gray= 1/ 7/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 1/ 5/ 0 Gray= 1/ 6/11 Rel Eta,Phi=2,1 Expect 18 B$ Linear= 1/ 5/ 1 Gray= 1/ 6/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 1/ 5/ 2 Gray= 1/ 6/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 1/ 5/ 3 Gray= 1/ 6/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 1/ 5/ 4 Gray= 1/ 6/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 1/ 5/ 5 Gray= 1/ 6/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 1/ 5/ 6 Gray= 1/ 6/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 1/ 5/ 7 Gray= 1/ 6/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 1/ 5/ 8 Gray= 1/ 6/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 1/ 5/ 9 Gray= 1/ 6/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 1/ 5/10 Gray= 1/ 6/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 1/ 5/11 Gray= 1/ 6/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 1/ 6/ 0 Gray= 1/ 5/ 0 Rel Eta,Phi=2,0 Expect 6 B$ Linear= 1/ 6/ 1 Gray= 1/ 5/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 1/ 6/ 2 Gray= 1/ 5/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 1/ 6/ 3 Gray= 1/ 5/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 1/ 6/ 4 Gray= 1/ 5/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 1/ 6/ 5 Gray= 1/ 5/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 1/ 6/ 6 Gray= 1/ 5/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 1/ 6/ 7 Gray= 1/ 5/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 1/ 6/ 8 Gray= 1/ 5/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 1/ 6/ 9 Gray= 1/ 5/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 1/ 6/10 Gray= 1/ 5/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 1/ 6/11 Gray= 1/ 5/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 1/ 7/ 0 Gray= 1/ 4/11 Rel Eta,Phi=1,7 Expect 16 B$ Linear= 1/ 7/ 1 Gray= 1/ 4/10 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 1/ 7/ 2 Gray= 1/ 4/ 9 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 1/ 7/ 3 Gray= 1/ 4/ 8 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 1/ 7/ 4 Gray= 1/ 4/ 7 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 1/ 7/ 5 Gray= 1/ 4/ 6 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 1/ 7/ 6 Gray= 1/ 4/ 5 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 1/ 7/ 7 Gray= 1/ 4/ 4 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 1/ 7/ 8 Gray= 1/ 4/ 3 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 1/ 7/ 9 Gray= 1/ 4/ 2 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 1/ 7/10 Gray= 1/ 4/ 1 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 1/ 7/11 Gray= 1/ 4/ 0 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 1/ 8/ 0 Gray= 1/ 3/ 0 Rel Eta,Phi=1,6 Expect 4 B$ Linear= 1/ 8/ 1 Gray= 1/ 3/ 1 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 1/ 8/ 2 Gray= 1/ 3/ 2 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 1/ 8/ 3 Gray= 1/ 3/ 3 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 1/ 8/ 4 Gray= 1/ 3/ 4 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 1/ 8/ 5 Gray= 1/ 3/ 5 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 1/ 8/ 6 Gray= 1/ 3/ 6 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 1/ 8/ 7 Gray= 1/ 3/ 7 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 1/ 8/ 8 Gray= 1/ 3/ 8 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 1/ 8/ 9 Gray= 1/ 3/ 9 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 1/ 8/10 Gray= 1/ 3/10 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 1/ 8/11 Gray= 1/ 3/11 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 1/ 9/ 0 Gray= 1/ 2/11 Rel Eta,Phi=1,5 Expect 14 B$ Linear= 1/ 9/ 1 Gray= 1/ 2/10 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 1/ 9/ 2 Gray= 1/ 2/ 9 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 1/ 9/ 3 Gray= 1/ 2/ 8 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 1/ 9/ 4 Gray= 1/ 2/ 7 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 1/ 9/ 5 Gray= 1/ 2/ 6 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 1/ 9/ 6 Gray= 1/ 2/ 5 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 1/ 9/ 7 Gray= 1/ 2/ 4 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 1/ 9/ 8 Gray= 1/ 2/ 3 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 1/ 9/ 9 Gray= 1/ 2/ 2 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 1/ 9/10 Gray= 1/ 2/ 1 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 1/ 9/11 Gray= 1/ 2/ 0 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 1/10/ 0 Gray= 1/ 1/ 0 Rel Eta,Phi=1,4 Expect 2 B$ Linear= 1/10/ 1 Gray= 1/ 1/ 1 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 1/10/ 2 Gray= 1/ 1/ 2 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 1/10/ 3 Gray= 1/ 1/ 3 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 1/10/ 4 Gray= 1/ 1/ 4 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 1/10/ 5 Gray= 1/ 1/ 5 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 1/10/ 6 Gray= 1/ 1/ 6 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 1/10/ 7 Gray= 1/ 1/ 7 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 1/10/ 8 Gray= 1/ 1/ 8 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 1/10/ 9 Gray= 1/ 1/ 9 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 1/10/10 Gray= 1/ 1/10 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 1/10/11 Gray= 1/ 1/11 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 1/11/ 0 Gray= 1/ 0/11 Rel Eta,Phi=1,3 Expect 12 B$ Linear= 1/11/ 1 Gray= 1/ 0/10 Rel Eta,Phi=1,2 Expect 11 B$ Linear= 1/11/ 2 Gray= 1/ 0/ 9 Rel Eta,Phi=1,1 Expect 10 B$ Linear= 1/11/ 3 Gray= 1/ 0/ 8 Rel Eta,Phi=1,0 Expect 9 B$ Linear= 1/11/ 4 Gray= 1/ 0/ 7 Rel Eta,Phi=0,7 Expect 8 B$ Linear= 1/11/ 5 Gray= 1/ 0/ 6 Rel Eta,Phi=0,6 Expect 7 B$ Linear= 1/11/ 6 Gray= 1/ 0/ 5 Rel Eta,Phi=0,5 Expect 6 B$ Linear= 1/11/ 7 Gray= 1/ 0/ 4 Rel Eta,Phi=0,4 Expect 5 B$ Linear= 1/11/ 8 Gray= 1/ 0/ 3 Rel Eta,Phi=0,3 Expect 4 B$ Linear= 1/11/ 9 Gray= 1/ 0/ 2 Rel Eta,Phi=0,2 Expect 3 B$ Linear= 1/11/10 Gray= 1/ 0/ 1 Rel Eta,Phi=0,1 Expect 2 B$ Linear= 1/11/11 Gray= 1/ 0/ 0 Rel Eta,Phi=0,0 Expect 1 B$ Linear= 2/ 0/ 0 Gray= 2/ 0/ 0 Rel Eta,Phi=2,7 Expect 2 B$ Linear= 2/ 0/ 1 Gray= 2/ 0/ 1 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 2/ 0/ 2 Gray= 2/ 0/ 2 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 2/ 0/ 3 Gray= 2/ 0/ 3 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 2/ 0/ 4 Gray= 2/ 0/ 4 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 2/ 0/ 5 Gray= 2/ 0/ 5 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 2/ 0/ 6 Gray= 2/ 0/ 6 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 2/ 0/ 7 Gray= 2/ 0/ 7 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 2/ 0/ 8 Gray= 2/ 0/ 8 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 2/ 0/ 9 Gray= 2/ 0/ 9 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 2/ 0/10 Gray= 2/ 0/10 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 2/ 0/11 Gray= 2/ 0/11 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 2/ 1/ 0 Gray= 2/ 1/11 Rel Eta,Phi=1,3 Expect 14 B$ Linear= 2/ 1/ 1 Gray= 2/ 1/10 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 2/ 1/ 2 Gray= 2/ 1/ 9 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 2/ 1/ 3 Gray= 2/ 1/ 8 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 2/ 1/ 4 Gray= 2/ 1/ 7 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 2/ 1/ 5 Gray= 2/ 1/ 6 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 2/ 1/ 6 Gray= 2/ 1/ 5 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 2/ 1/ 7 Gray= 2/ 1/ 4 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 2/ 1/ 8 Gray= 2/ 1/ 3 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 2/ 1/ 9 Gray= 2/ 1/ 2 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 2/ 1/10 Gray= 2/ 1/ 1 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 2/ 1/11 Gray= 2/ 1/ 0 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 2/ 2/ 0 Gray= 2/ 2/ 0 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 2/ 2/ 1 Gray= 2/ 2/ 1 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 2/ 2/ 2 Gray= 2/ 2/ 2 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 2/ 2/ 3 Gray= 2/ 2/ 3 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 2/ 2/ 4 Gray= 2/ 2/ 4 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 2/ 2/ 5 Gray= 2/ 2/ 5 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 2/ 2/ 6 Gray= 2/ 2/ 6 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 2/ 2/ 7 Gray= 2/ 2/ 7 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 2/ 2/ 8 Gray= 2/ 2/ 8 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 2/ 2/ 9 Gray= 2/ 2/ 9 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 2/ 2/10 Gray= 2/ 2/10 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 2/ 2/11 Gray= 2/ 2/11 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 2/ 3/ 0 Gray= 2/ 3/11 Rel Eta,Phi=1,5 Expect 16 B$ Linear= 2/ 3/ 1 Gray= 2/ 3/10 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 2/ 3/ 2 Gray= 2/ 3/ 9 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 2/ 3/ 3 Gray= 2/ 3/ 8 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 2/ 3/ 4 Gray= 2/ 3/ 7 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 2/ 3/ 5 Gray= 2/ 3/ 6 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 2/ 3/ 6 Gray= 2/ 3/ 5 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 2/ 3/ 7 Gray= 2/ 3/ 4 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 2/ 3/ 8 Gray= 2/ 3/ 3 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 2/ 3/ 9 Gray= 2/ 3/ 2 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 2/ 3/10 Gray= 2/ 3/ 1 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 2/ 3/11 Gray= 2/ 3/ 0 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 2/ 4/ 0 Gray= 2/ 4/ 0 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 2/ 4/ 1 Gray= 2/ 4/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 2/ 4/ 2 Gray= 2/ 4/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 2/ 4/ 3 Gray= 2/ 4/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 2/ 4/ 4 Gray= 2/ 4/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 2/ 4/ 5 Gray= 2/ 4/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 2/ 4/ 6 Gray= 2/ 4/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 2/ 4/ 7 Gray= 2/ 4/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 2/ 4/ 8 Gray= 2/ 4/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 2/ 4/ 9 Gray= 2/ 4/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 2/ 4/10 Gray= 2/ 4/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 2/ 4/11 Gray= 2/ 4/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 2/ 5/ 0 Gray= 2/ 5/11 Rel Eta,Phi=1,7 Expect 18 B$ Linear= 2/ 5/ 1 Gray= 2/ 5/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 2/ 5/ 2 Gray= 2/ 5/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 2/ 5/ 3 Gray= 2/ 5/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 2/ 5/ 4 Gray= 2/ 5/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 2/ 5/ 5 Gray= 2/ 5/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 2/ 5/ 6 Gray= 2/ 5/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 2/ 5/ 7 Gray= 2/ 5/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 2/ 5/ 8 Gray= 2/ 5/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 2/ 5/ 9 Gray= 2/ 5/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 2/ 5/10 Gray= 2/ 5/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 2/ 5/11 Gray= 2/ 5/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 2/ 6/ 0 Gray= 2/ 6/ 0 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 2/ 6/ 1 Gray= 2/ 6/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 2/ 6/ 2 Gray= 2/ 6/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 2/ 6/ 3 Gray= 2/ 6/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 2/ 6/ 4 Gray= 2/ 6/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 2/ 6/ 5 Gray= 2/ 6/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 2/ 6/ 6 Gray= 2/ 6/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 2/ 6/ 7 Gray= 2/ 6/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 2/ 6/ 8 Gray= 2/ 6/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 2/ 6/ 9 Gray= 2/ 6/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 2/ 6/10 Gray= 2/ 6/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 2/ 6/11 Gray= 2/ 6/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 2/ 7/ 0 Gray= 2/ 7/11 Rel Eta,Phi=2,1 Expect 20 B$ Linear= 2/ 7/ 1 Gray= 2/ 7/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 2/ 7/ 2 Gray= 2/ 7/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 2/ 7/ 3 Gray= 2/ 7/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 2/ 7/ 4 Gray= 2/ 7/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 2/ 7/ 5 Gray= 2/ 7/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 2/ 7/ 6 Gray= 2/ 7/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 2/ 7/ 7 Gray= 2/ 7/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 2/ 7/ 8 Gray= 2/ 7/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 2/ 7/ 9 Gray= 2/ 7/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 2/ 7/10 Gray= 2/ 7/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 2/ 7/11 Gray= 2/ 7/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 2/ 8/ 0 Gray= 2/ 8/ 0 Rel Eta,Phi=2,2 Expect 10 B$ Linear= 2/ 8/ 1 Gray= 2/ 8/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 2/ 8/ 2 Gray= 2/ 8/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 2/ 8/ 3 Gray= 2/ 8/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 2/ 8/ 4 Gray= 2/ 8/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 2/ 8/ 5 Gray= 2/ 8/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 2/ 8/ 6 Gray= 2/ 8/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 2/ 8/ 7 Gray= 2/ 8/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 2/ 8/ 8 Gray= 2/ 8/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 2/ 8/ 9 Gray= 2/ 8/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 2/ 8/10 Gray= 2/ 8/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 2/ 8/11 Gray= 2/ 8/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 2/ 9/ 0 Gray= 2/ 9/11 Rel Eta,Phi=2,3 Expect 22 B$ Linear= 2/ 9/ 1 Gray= 2/ 9/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 2/ 9/ 2 Gray= 2/ 9/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 2/ 9/ 3 Gray= 2/ 9/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 2/ 9/ 4 Gray= 2/ 9/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 2/ 9/ 5 Gray= 2/ 9/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 2/ 9/ 6 Gray= 2/ 9/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 2/ 9/ 7 Gray= 2/ 9/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 2/ 9/ 8 Gray= 2/ 9/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 2/ 9/ 9 Gray= 2/ 9/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 2/ 9/10 Gray= 2/ 9/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 2/ 9/11 Gray= 2/ 9/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 2/10/ 0 Gray= 2/10/ 0 Rel Eta,Phi=2,4 Expect 12 B$ Linear= 2/10/ 1 Gray= 2/10/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 2/10/ 2 Gray= 2/10/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 2/10/ 3 Gray= 2/10/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 2/10/ 4 Gray= 2/10/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 2/10/ 5 Gray= 2/10/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 2/10/ 6 Gray= 2/10/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 2/10/ 7 Gray= 2/10/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 2/10/ 8 Gray= 2/10/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 2/10/ 9 Gray= 2/10/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 2/10/10 Gray= 2/10/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 2/10/11 Gray= 2/10/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 2/11/ 0 Gray= 2/11/11 Rel Eta,Phi=2,5 Expect 24 B$ Linear= 2/11/ 1 Gray= 2/11/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 2/11/ 2 Gray= 2/11/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 2/11/ 3 Gray= 2/11/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 2/11/ 4 Gray= 2/11/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 2/11/ 5 Gray= 2/11/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 2/11/ 6 Gray= 2/11/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 2/11/ 7 Gray= 2/11/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 2/11/ 8 Gray= 2/11/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 2/11/ 9 Gray= 2/11/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 2/11/10 Gray= 2/11/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 2/11/11 Gray= 2/11/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 3/ 0/ 0 Gray= 3/11/ 0 Rel Eta,Phi=3,0 Expect 14 B$ Linear= 3/ 0/ 1 Gray= 3/11/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 3/ 0/ 2 Gray= 3/11/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 3/ 0/ 3 Gray= 3/11/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 3/ 0/ 4 Gray= 3/11/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 3/ 0/ 5 Gray= 3/11/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 3/ 0/ 6 Gray= 3/11/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 3/ 0/ 7 Gray= 3/11/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 3/ 0/ 8 Gray= 3/11/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 3/ 0/ 9 Gray= 3/11/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 3/ 0/10 Gray= 3/11/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 3/ 0/11 Gray= 3/11/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 3/ 1/ 0 Gray= 3/10/11 Rel Eta,Phi=2,5 Expect 24 B$ Linear= 3/ 1/ 1 Gray= 3/10/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 3/ 1/ 2 Gray= 3/10/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 3/ 1/ 3 Gray= 3/10/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 3/ 1/ 4 Gray= 3/10/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 3/ 1/ 5 Gray= 3/10/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 3/ 1/ 6 Gray= 3/10/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 3/ 1/ 7 Gray= 3/10/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 3/ 1/ 8 Gray= 3/10/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 3/ 1/ 9 Gray= 3/10/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 3/ 1/10 Gray= 3/10/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 3/ 1/11 Gray= 3/10/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 3/ 2/ 0 Gray= 3/ 9/ 0 Rel Eta,Phi=2,4 Expect 12 B$ Linear= 3/ 2/ 1 Gray= 3/ 9/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 3/ 2/ 2 Gray= 3/ 9/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 3/ 2/ 3 Gray= 3/ 9/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 3/ 2/ 4 Gray= 3/ 9/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 3/ 2/ 5 Gray= 3/ 9/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 3/ 2/ 6 Gray= 3/ 9/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 3/ 2/ 7 Gray= 3/ 9/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 3/ 2/ 8 Gray= 3/ 9/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 3/ 2/ 9 Gray= 3/ 9/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 3/ 2/10 Gray= 3/ 9/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 3/ 2/11 Gray= 3/ 9/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 3/ 3/ 0 Gray= 3/ 8/11 Rel Eta,Phi=2,3 Expect 22 B$ Linear= 3/ 3/ 1 Gray= 3/ 8/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 3/ 3/ 2 Gray= 3/ 8/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 3/ 3/ 3 Gray= 3/ 8/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 3/ 3/ 4 Gray= 3/ 8/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 3/ 3/ 5 Gray= 3/ 8/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 3/ 3/ 6 Gray= 3/ 8/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 3/ 3/ 7 Gray= 3/ 8/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 3/ 3/ 8 Gray= 3/ 8/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 3/ 3/ 9 Gray= 3/ 8/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 3/ 3/10 Gray= 3/ 8/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 3/ 3/11 Gray= 3/ 8/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 3/ 4/ 0 Gray= 3/ 7/ 0 Rel Eta,Phi=2,2 Expect 10 B$ Linear= 3/ 4/ 1 Gray= 3/ 7/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 3/ 4/ 2 Gray= 3/ 7/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 3/ 4/ 3 Gray= 3/ 7/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 3/ 4/ 4 Gray= 3/ 7/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 3/ 4/ 5 Gray= 3/ 7/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 3/ 4/ 6 Gray= 3/ 7/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 3/ 4/ 7 Gray= 3/ 7/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 3/ 4/ 8 Gray= 3/ 7/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 3/ 4/ 9 Gray= 3/ 7/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 3/ 4/10 Gray= 3/ 7/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 3/ 4/11 Gray= 3/ 7/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 3/ 5/ 0 Gray= 3/ 6/11 Rel Eta,Phi=2,1 Expect 20 B$ Linear= 3/ 5/ 1 Gray= 3/ 6/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 3/ 5/ 2 Gray= 3/ 6/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 3/ 5/ 3 Gray= 3/ 6/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 3/ 5/ 4 Gray= 3/ 6/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 3/ 5/ 5 Gray= 3/ 6/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 3/ 5/ 6 Gray= 3/ 6/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 3/ 5/ 7 Gray= 3/ 6/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 3/ 5/ 8 Gray= 3/ 6/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 3/ 5/ 9 Gray= 3/ 6/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 3/ 5/10 Gray= 3/ 6/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 3/ 5/11 Gray= 3/ 6/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 3/ 6/ 0 Gray= 3/ 5/ 0 Rel Eta,Phi=2,0 Expect 8 B$ Linear= 3/ 6/ 1 Gray= 3/ 5/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 3/ 6/ 2 Gray= 3/ 5/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 3/ 6/ 3 Gray= 3/ 5/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 3/ 6/ 4 Gray= 3/ 5/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 3/ 6/ 5 Gray= 3/ 5/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 3/ 6/ 6 Gray= 3/ 5/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 3/ 6/ 7 Gray= 3/ 5/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 3/ 6/ 8 Gray= 3/ 5/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 3/ 6/ 9 Gray= 3/ 5/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 3/ 6/10 Gray= 3/ 5/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 3/ 6/11 Gray= 3/ 5/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 3/ 7/ 0 Gray= 3/ 4/11 Rel Eta,Phi=1,7 Expect 18 B$ Linear= 3/ 7/ 1 Gray= 3/ 4/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 3/ 7/ 2 Gray= 3/ 4/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 3/ 7/ 3 Gray= 3/ 4/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 3/ 7/ 4 Gray= 3/ 4/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 3/ 7/ 5 Gray= 3/ 4/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 3/ 7/ 6 Gray= 3/ 4/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 3/ 7/ 7 Gray= 3/ 4/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 3/ 7/ 8 Gray= 3/ 4/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 3/ 7/ 9 Gray= 3/ 4/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 3/ 7/10 Gray= 3/ 4/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 3/ 7/11 Gray= 3/ 4/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 3/ 8/ 0 Gray= 3/ 3/ 0 Rel Eta,Phi=1,6 Expect 6 B$ Linear= 3/ 8/ 1 Gray= 3/ 3/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 3/ 8/ 2 Gray= 3/ 3/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 3/ 8/ 3 Gray= 3/ 3/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 3/ 8/ 4 Gray= 3/ 3/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 3/ 8/ 5 Gray= 3/ 3/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 3/ 8/ 6 Gray= 3/ 3/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 3/ 8/ 7 Gray= 3/ 3/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 3/ 8/ 8 Gray= 3/ 3/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 3/ 8/ 9 Gray= 3/ 3/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 3/ 8/10 Gray= 3/ 3/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 3/ 8/11 Gray= 3/ 3/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 3/ 9/ 0 Gray= 3/ 2/11 Rel Eta,Phi=1,5 Expect 16 B$ Linear= 3/ 9/ 1 Gray= 3/ 2/10 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 3/ 9/ 2 Gray= 3/ 2/ 9 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 3/ 9/ 3 Gray= 3/ 2/ 8 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 3/ 9/ 4 Gray= 3/ 2/ 7 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 3/ 9/ 5 Gray= 3/ 2/ 6 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 3/ 9/ 6 Gray= 3/ 2/ 5 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 3/ 9/ 7 Gray= 3/ 2/ 4 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 3/ 9/ 8 Gray= 3/ 2/ 3 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 3/ 9/ 9 Gray= 3/ 2/ 2 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 3/ 9/10 Gray= 3/ 2/ 1 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 3/ 9/11 Gray= 3/ 2/ 0 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 3/10/ 0 Gray= 3/ 1/ 0 Rel Eta,Phi=1,4 Expect 4 B$ Linear= 3/10/ 1 Gray= 3/ 1/ 1 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 3/10/ 2 Gray= 3/ 1/ 2 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 3/10/ 3 Gray= 3/ 1/ 3 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 3/10/ 4 Gray= 3/ 1/ 4 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 3/10/ 5 Gray= 3/ 1/ 5 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 3/10/ 6 Gray= 3/ 1/ 6 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 3/10/ 7 Gray= 3/ 1/ 7 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 3/10/ 8 Gray= 3/ 1/ 8 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 3/10/ 9 Gray= 3/ 1/ 9 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 3/10/10 Gray= 3/ 1/10 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 3/10/11 Gray= 3/ 1/11 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 3/11/ 0 Gray= 3/ 0/11 Rel Eta,Phi=1,3 Expect 14 B$ Linear= 3/11/ 1 Gray= 3/ 0/10 Rel Eta,Phi=1,2 Expect 13 B$ Linear= 3/11/ 2 Gray= 3/ 0/ 9 Rel Eta,Phi=1,1 Expect 12 B$ Linear= 3/11/ 3 Gray= 3/ 0/ 8 Rel Eta,Phi=1,0 Expect 11 B$ Linear= 3/11/ 4 Gray= 3/ 0/ 7 Rel Eta,Phi=0,7 Expect 10 B$ Linear= 3/11/ 5 Gray= 3/ 0/ 6 Rel Eta,Phi=0,6 Expect 9 B$ Linear= 3/11/ 6 Gray= 3/ 0/ 5 Rel Eta,Phi=0,5 Expect 8 B$ Linear= 3/11/ 7 Gray= 3/ 0/ 4 Rel Eta,Phi=0,4 Expect 7 B$ Linear= 3/11/ 8 Gray= 3/ 0/ 3 Rel Eta,Phi=0,3 Expect 6 B$ Linear= 3/11/ 9 Gray= 3/ 0/ 2 Rel Eta,Phi=0,2 Expect 5 B$ Linear= 3/11/10 Gray= 3/ 0/ 1 Rel Eta,Phi=0,1 Expect 4 B$ Linear= 3/11/11 Gray= 3/ 0/ 0 Rel Eta,Phi=0,0 Expect 3 B$ Linear= 4/ 0/ 0 Gray= 4/ 0/ 0 Rel Eta,Phi=3,1 Expect 4 B$ Linear= 4/ 0/ 1 Gray= 4/ 0/ 1 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 4/ 0/ 2 Gray= 4/ 0/ 2 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 4/ 0/ 3 Gray= 4/ 0/ 3 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 4/ 0/ 4 Gray= 4/ 0/ 4 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 4/ 0/ 5 Gray= 4/ 0/ 5 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 4/ 0/ 6 Gray= 4/ 0/ 6 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 4/ 0/ 7 Gray= 4/ 0/ 7 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 4/ 0/ 8 Gray= 4/ 0/ 8 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 4/ 0/ 9 Gray= 4/ 0/ 9 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 4/ 0/10 Gray= 4/ 0/10 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 4/ 0/11 Gray= 4/ 0/11 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 4/ 1/ 0 Gray= 4/ 1/11 Rel Eta,Phi=1,3 Expect 16 B$ Linear= 4/ 1/ 1 Gray= 4/ 1/10 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 4/ 1/ 2 Gray= 4/ 1/ 9 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 4/ 1/ 3 Gray= 4/ 1/ 8 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 4/ 1/ 4 Gray= 4/ 1/ 7 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 4/ 1/ 5 Gray= 4/ 1/ 6 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 4/ 1/ 6 Gray= 4/ 1/ 5 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 4/ 1/ 7 Gray= 4/ 1/ 4 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 4/ 1/ 8 Gray= 4/ 1/ 3 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 4/ 1/ 9 Gray= 4/ 1/ 2 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 4/ 1/10 Gray= 4/ 1/ 1 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 4/ 1/11 Gray= 4/ 1/ 0 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 4/ 2/ 0 Gray= 4/ 2/ 0 Rel Eta,Phi=1,4 Expect 6 B$ Linear= 4/ 2/ 1 Gray= 4/ 2/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 4/ 2/ 2 Gray= 4/ 2/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 4/ 2/ 3 Gray= 4/ 2/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 4/ 2/ 4 Gray= 4/ 2/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 4/ 2/ 5 Gray= 4/ 2/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 4/ 2/ 6 Gray= 4/ 2/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 4/ 2/ 7 Gray= 4/ 2/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 4/ 2/ 8 Gray= 4/ 2/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 4/ 2/ 9 Gray= 4/ 2/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 4/ 2/10 Gray= 4/ 2/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 4/ 2/11 Gray= 4/ 2/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 4/ 3/ 0 Gray= 4/ 3/11 Rel Eta,Phi=1,5 Expect 18 B$ Linear= 4/ 3/ 1 Gray= 4/ 3/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 4/ 3/ 2 Gray= 4/ 3/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 4/ 3/ 3 Gray= 4/ 3/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 4/ 3/ 4 Gray= 4/ 3/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 4/ 3/ 5 Gray= 4/ 3/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 4/ 3/ 6 Gray= 4/ 3/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 4/ 3/ 7 Gray= 4/ 3/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 4/ 3/ 8 Gray= 4/ 3/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 4/ 3/ 9 Gray= 4/ 3/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 4/ 3/10 Gray= 4/ 3/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 4/ 3/11 Gray= 4/ 3/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 4/ 4/ 0 Gray= 4/ 4/ 0 Rel Eta,Phi=1,6 Expect 8 B$ Linear= 4/ 4/ 1 Gray= 4/ 4/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 4/ 4/ 2 Gray= 4/ 4/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 4/ 4/ 3 Gray= 4/ 4/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 4/ 4/ 4 Gray= 4/ 4/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 4/ 4/ 5 Gray= 4/ 4/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 4/ 4/ 6 Gray= 4/ 4/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 4/ 4/ 7 Gray= 4/ 4/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 4/ 4/ 8 Gray= 4/ 4/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 4/ 4/ 9 Gray= 4/ 4/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 4/ 4/10 Gray= 4/ 4/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 4/ 4/11 Gray= 4/ 4/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 4/ 5/ 0 Gray= 4/ 5/11 Rel Eta,Phi=1,7 Expect 20 B$ Linear= 4/ 5/ 1 Gray= 4/ 5/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 4/ 5/ 2 Gray= 4/ 5/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 4/ 5/ 3 Gray= 4/ 5/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 4/ 5/ 4 Gray= 4/ 5/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 4/ 5/ 5 Gray= 4/ 5/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 4/ 5/ 6 Gray= 4/ 5/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 4/ 5/ 7 Gray= 4/ 5/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 4/ 5/ 8 Gray= 4/ 5/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 4/ 5/ 9 Gray= 4/ 5/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 4/ 5/10 Gray= 4/ 5/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 4/ 5/11 Gray= 4/ 5/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 4/ 6/ 0 Gray= 4/ 6/ 0 Rel Eta,Phi=2,0 Expect 10 B$ Linear= 4/ 6/ 1 Gray= 4/ 6/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 4/ 6/ 2 Gray= 4/ 6/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 4/ 6/ 3 Gray= 4/ 6/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 4/ 6/ 4 Gray= 4/ 6/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 4/ 6/ 5 Gray= 4/ 6/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 4/ 6/ 6 Gray= 4/ 6/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 4/ 6/ 7 Gray= 4/ 6/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 4/ 6/ 8 Gray= 4/ 6/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 4/ 6/ 9 Gray= 4/ 6/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 4/ 6/10 Gray= 4/ 6/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 4/ 6/11 Gray= 4/ 6/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 4/ 7/ 0 Gray= 4/ 7/11 Rel Eta,Phi=2,1 Expect 22 B$ Linear= 4/ 7/ 1 Gray= 4/ 7/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 4/ 7/ 2 Gray= 4/ 7/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 4/ 7/ 3 Gray= 4/ 7/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 4/ 7/ 4 Gray= 4/ 7/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 4/ 7/ 5 Gray= 4/ 7/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 4/ 7/ 6 Gray= 4/ 7/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 4/ 7/ 7 Gray= 4/ 7/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 4/ 7/ 8 Gray= 4/ 7/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 4/ 7/ 9 Gray= 4/ 7/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 4/ 7/10 Gray= 4/ 7/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 4/ 7/11 Gray= 4/ 7/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 4/ 8/ 0 Gray= 4/ 8/ 0 Rel Eta,Phi=2,2 Expect 12 B$ Linear= 4/ 8/ 1 Gray= 4/ 8/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 4/ 8/ 2 Gray= 4/ 8/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 4/ 8/ 3 Gray= 4/ 8/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 4/ 8/ 4 Gray= 4/ 8/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 4/ 8/ 5 Gray= 4/ 8/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 4/ 8/ 6 Gray= 4/ 8/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 4/ 8/ 7 Gray= 4/ 8/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 4/ 8/ 8 Gray= 4/ 8/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 4/ 8/ 9 Gray= 4/ 8/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 4/ 8/10 Gray= 4/ 8/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 4/ 8/11 Gray= 4/ 8/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 4/ 9/ 0 Gray= 4/ 9/11 Rel Eta,Phi=2,3 Expect 24 B$ Linear= 4/ 9/ 1 Gray= 4/ 9/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 4/ 9/ 2 Gray= 4/ 9/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 4/ 9/ 3 Gray= 4/ 9/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 4/ 9/ 4 Gray= 4/ 9/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 4/ 9/ 5 Gray= 4/ 9/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 4/ 9/ 6 Gray= 4/ 9/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 4/ 9/ 7 Gray= 4/ 9/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 4/ 9/ 8 Gray= 4/ 9/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 4/ 9/ 9 Gray= 4/ 9/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 4/ 9/10 Gray= 4/ 9/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 4/ 9/11 Gray= 4/ 9/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 4/10/ 0 Gray= 4/10/ 0 Rel Eta,Phi=2,4 Expect 14 B$ Linear= 4/10/ 1 Gray= 4/10/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 4/10/ 2 Gray= 4/10/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 4/10/ 3 Gray= 4/10/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 4/10/ 4 Gray= 4/10/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 4/10/ 5 Gray= 4/10/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 4/10/ 6 Gray= 4/10/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 4/10/ 7 Gray= 4/10/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 4/10/ 8 Gray= 4/10/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 4/10/ 9 Gray= 4/10/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 4/10/10 Gray= 4/10/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 4/10/11 Gray= 4/10/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 4/11/ 0 Gray= 4/11/11 Rel Eta,Phi=2,5 Expect 26 B$ Linear= 4/11/ 1 Gray= 4/11/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 4/11/ 2 Gray= 4/11/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 4/11/ 3 Gray= 4/11/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 4/11/ 4 Gray= 4/11/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 4/11/ 5 Gray= 4/11/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 4/11/ 6 Gray= 4/11/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 4/11/ 7 Gray= 4/11/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 4/11/ 8 Gray= 4/11/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 4/11/ 9 Gray= 4/11/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 4/11/10 Gray= 4/11/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 4/11/11 Gray= 4/11/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 5/ 0/ 0 Gray= 5/11/ 0 Rel Eta,Phi=3,2 Expect 16 B$ Linear= 5/ 0/ 1 Gray= 5/11/ 1 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 5/ 0/ 2 Gray= 5/11/ 2 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 5/ 0/ 3 Gray= 5/11/ 3 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 5/ 0/ 4 Gray= 5/11/ 4 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 5/ 0/ 5 Gray= 5/11/ 5 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 5/ 0/ 6 Gray= 5/11/ 6 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 5/ 0/ 7 Gray= 5/11/ 7 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 5/ 0/ 8 Gray= 5/11/ 8 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 5/ 0/ 9 Gray= 5/11/ 9 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 5/ 0/10 Gray= 5/11/10 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 5/ 0/11 Gray= 5/11/11 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 5/ 1/ 0 Gray= 5/10/11 Rel Eta,Phi=2,5 Expect 26 B$ Linear= 5/ 1/ 1 Gray= 5/10/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 5/ 1/ 2 Gray= 5/10/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 5/ 1/ 3 Gray= 5/10/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 5/ 1/ 4 Gray= 5/10/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 5/ 1/ 5 Gray= 5/10/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 5/ 1/ 6 Gray= 5/10/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 5/ 1/ 7 Gray= 5/10/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 5/ 1/ 8 Gray= 5/10/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 5/ 1/ 9 Gray= 5/10/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 5/ 1/10 Gray= 5/10/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 5/ 1/11 Gray= 5/10/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 5/ 2/ 0 Gray= 5/ 9/ 0 Rel Eta,Phi=2,4 Expect 14 B$ Linear= 5/ 2/ 1 Gray= 5/ 9/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 5/ 2/ 2 Gray= 5/ 9/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 5/ 2/ 3 Gray= 5/ 9/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 5/ 2/ 4 Gray= 5/ 9/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 5/ 2/ 5 Gray= 5/ 9/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 5/ 2/ 6 Gray= 5/ 9/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 5/ 2/ 7 Gray= 5/ 9/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 5/ 2/ 8 Gray= 5/ 9/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 5/ 2/ 9 Gray= 5/ 9/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 5/ 2/10 Gray= 5/ 9/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 5/ 2/11 Gray= 5/ 9/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 5/ 3/ 0 Gray= 5/ 8/11 Rel Eta,Phi=2,3 Expect 24 B$ Linear= 5/ 3/ 1 Gray= 5/ 8/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 5/ 3/ 2 Gray= 5/ 8/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 5/ 3/ 3 Gray= 5/ 8/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 5/ 3/ 4 Gray= 5/ 8/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 5/ 3/ 5 Gray= 5/ 8/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 5/ 3/ 6 Gray= 5/ 8/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 5/ 3/ 7 Gray= 5/ 8/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 5/ 3/ 8 Gray= 5/ 8/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 5/ 3/ 9 Gray= 5/ 8/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 5/ 3/10 Gray= 5/ 8/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 5/ 3/11 Gray= 5/ 8/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 5/ 4/ 0 Gray= 5/ 7/ 0 Rel Eta,Phi=2,2 Expect 12 B$ Linear= 5/ 4/ 1 Gray= 5/ 7/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 5/ 4/ 2 Gray= 5/ 7/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 5/ 4/ 3 Gray= 5/ 7/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 5/ 4/ 4 Gray= 5/ 7/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 5/ 4/ 5 Gray= 5/ 7/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 5/ 4/ 6 Gray= 5/ 7/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 5/ 4/ 7 Gray= 5/ 7/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 5/ 4/ 8 Gray= 5/ 7/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 5/ 4/ 9 Gray= 5/ 7/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 5/ 4/10 Gray= 5/ 7/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 5/ 4/11 Gray= 5/ 7/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 5/ 5/ 0 Gray= 5/ 6/11 Rel Eta,Phi=2,1 Expect 22 B$ Linear= 5/ 5/ 1 Gray= 5/ 6/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 5/ 5/ 2 Gray= 5/ 6/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 5/ 5/ 3 Gray= 5/ 6/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 5/ 5/ 4 Gray= 5/ 6/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 5/ 5/ 5 Gray= 5/ 6/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 5/ 5/ 6 Gray= 5/ 6/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 5/ 5/ 7 Gray= 5/ 6/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 5/ 5/ 8 Gray= 5/ 6/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 5/ 5/ 9 Gray= 5/ 6/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 5/ 5/10 Gray= 5/ 6/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 5/ 5/11 Gray= 5/ 6/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 5/ 6/ 0 Gray= 5/ 5/ 0 Rel Eta,Phi=2,0 Expect 10 B$ Linear= 5/ 6/ 1 Gray= 5/ 5/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 5/ 6/ 2 Gray= 5/ 5/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 5/ 6/ 3 Gray= 5/ 5/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 5/ 6/ 4 Gray= 5/ 5/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 5/ 6/ 5 Gray= 5/ 5/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 5/ 6/ 6 Gray= 5/ 5/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 5/ 6/ 7 Gray= 5/ 5/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 5/ 6/ 8 Gray= 5/ 5/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 5/ 6/ 9 Gray= 5/ 5/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 5/ 6/10 Gray= 5/ 5/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 5/ 6/11 Gray= 5/ 5/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 5/ 7/ 0 Gray= 5/ 4/11 Rel Eta,Phi=1,7 Expect 20 B$ Linear= 5/ 7/ 1 Gray= 5/ 4/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 5/ 7/ 2 Gray= 5/ 4/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 5/ 7/ 3 Gray= 5/ 4/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 5/ 7/ 4 Gray= 5/ 4/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 5/ 7/ 5 Gray= 5/ 4/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 5/ 7/ 6 Gray= 5/ 4/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 5/ 7/ 7 Gray= 5/ 4/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 5/ 7/ 8 Gray= 5/ 4/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 5/ 7/ 9 Gray= 5/ 4/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 5/ 7/10 Gray= 5/ 4/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 5/ 7/11 Gray= 5/ 4/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 5/ 8/ 0 Gray= 5/ 3/ 0 Rel Eta,Phi=1,6 Expect 8 B$ Linear= 5/ 8/ 1 Gray= 5/ 3/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 5/ 8/ 2 Gray= 5/ 3/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 5/ 8/ 3 Gray= 5/ 3/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 5/ 8/ 4 Gray= 5/ 3/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 5/ 8/ 5 Gray= 5/ 3/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 5/ 8/ 6 Gray= 5/ 3/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 5/ 8/ 7 Gray= 5/ 3/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 5/ 8/ 8 Gray= 5/ 3/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 5/ 8/ 9 Gray= 5/ 3/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 5/ 8/10 Gray= 5/ 3/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 5/ 8/11 Gray= 5/ 3/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 5/ 9/ 0 Gray= 5/ 2/11 Rel Eta,Phi=1,5 Expect 18 B$ Linear= 5/ 9/ 1 Gray= 5/ 2/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 5/ 9/ 2 Gray= 5/ 2/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 5/ 9/ 3 Gray= 5/ 2/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 5/ 9/ 4 Gray= 5/ 2/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 5/ 9/ 5 Gray= 5/ 2/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 5/ 9/ 6 Gray= 5/ 2/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 5/ 9/ 7 Gray= 5/ 2/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 5/ 9/ 8 Gray= 5/ 2/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 5/ 9/ 9 Gray= 5/ 2/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 5/ 9/10 Gray= 5/ 2/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 5/ 9/11 Gray= 5/ 2/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 5/10/ 0 Gray= 5/ 1/ 0 Rel Eta,Phi=1,4 Expect 6 B$ Linear= 5/10/ 1 Gray= 5/ 1/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 5/10/ 2 Gray= 5/ 1/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 5/10/ 3 Gray= 5/ 1/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 5/10/ 4 Gray= 5/ 1/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 5/10/ 5 Gray= 5/ 1/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 5/10/ 6 Gray= 5/ 1/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 5/10/ 7 Gray= 5/ 1/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 5/10/ 8 Gray= 5/ 1/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 5/10/ 9 Gray= 5/ 1/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 5/10/10 Gray= 5/ 1/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 5/10/11 Gray= 5/ 1/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 5/11/ 0 Gray= 5/ 0/11 Rel Eta,Phi=1,3 Expect 16 B$ Linear= 5/11/ 1 Gray= 5/ 0/10 Rel Eta,Phi=1,2 Expect 15 B$ Linear= 5/11/ 2 Gray= 5/ 0/ 9 Rel Eta,Phi=1,1 Expect 14 B$ Linear= 5/11/ 3 Gray= 5/ 0/ 8 Rel Eta,Phi=1,0 Expect 13 B$ Linear= 5/11/ 4 Gray= 5/ 0/ 7 Rel Eta,Phi=0,7 Expect 12 B$ Linear= 5/11/ 5 Gray= 5/ 0/ 6 Rel Eta,Phi=0,6 Expect 11 B$ Linear= 5/11/ 6 Gray= 5/ 0/ 5 Rel Eta,Phi=0,5 Expect 10 B$ Linear= 5/11/ 7 Gray= 5/ 0/ 4 Rel Eta,Phi=0,4 Expect 9 B$ Linear= 5/11/ 8 Gray= 5/ 0/ 3 Rel Eta,Phi=0,3 Expect 8 B$ Linear= 5/11/ 9 Gray= 5/ 0/ 2 Rel Eta,Phi=0,2 Expect 7 B$ Linear= 5/11/10 Gray= 5/ 0/ 1 Rel Eta,Phi=0,1 Expect 6 B$ Linear= 5/11/11 Gray= 5/ 0/ 0 Rel Eta,Phi=0,0 Expect 5 B$ Linear= 6/ 0/ 0 Gray= 6/ 0/ 0 Rel Eta,Phi=3,3 Expect 6 B$ Linear= 6/ 0/ 1 Gray= 6/ 0/ 1 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 6/ 0/ 2 Gray= 6/ 0/ 2 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 6/ 0/ 3 Gray= 6/ 0/ 3 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 6/ 0/ 4 Gray= 6/ 0/ 4 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 6/ 0/ 5 Gray= 6/ 0/ 5 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 6/ 0/ 6 Gray= 6/ 0/ 6 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 6/ 0/ 7 Gray= 6/ 0/ 7 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 6/ 0/ 8 Gray= 6/ 0/ 8 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 6/ 0/ 9 Gray= 6/ 0/ 9 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 6/ 0/10 Gray= 6/ 0/10 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 6/ 0/11 Gray= 6/ 0/11 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 6/ 1/ 0 Gray= 6/ 1/11 Rel Eta,Phi=1,3 Expect 18 B$ Linear= 6/ 1/ 1 Gray= 6/ 1/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 6/ 1/ 2 Gray= 6/ 1/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 6/ 1/ 3 Gray= 6/ 1/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 6/ 1/ 4 Gray= 6/ 1/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 6/ 1/ 5 Gray= 6/ 1/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 6/ 1/ 6 Gray= 6/ 1/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 6/ 1/ 7 Gray= 6/ 1/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 6/ 1/ 8 Gray= 6/ 1/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 6/ 1/ 9 Gray= 6/ 1/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 6/ 1/10 Gray= 6/ 1/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 6/ 1/11 Gray= 6/ 1/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 6/ 2/ 0 Gray= 6/ 2/ 0 Rel Eta,Phi=1,4 Expect 8 B$ Linear= 6/ 2/ 1 Gray= 6/ 2/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 6/ 2/ 2 Gray= 6/ 2/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 6/ 2/ 3 Gray= 6/ 2/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 6/ 2/ 4 Gray= 6/ 2/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 6/ 2/ 5 Gray= 6/ 2/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 6/ 2/ 6 Gray= 6/ 2/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 6/ 2/ 7 Gray= 6/ 2/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 6/ 2/ 8 Gray= 6/ 2/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 6/ 2/ 9 Gray= 6/ 2/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 6/ 2/10 Gray= 6/ 2/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 6/ 2/11 Gray= 6/ 2/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 6/ 3/ 0 Gray= 6/ 3/11 Rel Eta,Phi=1,5 Expect 20 B$ Linear= 6/ 3/ 1 Gray= 6/ 3/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 6/ 3/ 2 Gray= 6/ 3/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 6/ 3/ 3 Gray= 6/ 3/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 6/ 3/ 4 Gray= 6/ 3/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 6/ 3/ 5 Gray= 6/ 3/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 6/ 3/ 6 Gray= 6/ 3/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 6/ 3/ 7 Gray= 6/ 3/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 6/ 3/ 8 Gray= 6/ 3/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 6/ 3/ 9 Gray= 6/ 3/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 6/ 3/10 Gray= 6/ 3/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 6/ 3/11 Gray= 6/ 3/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 6/ 4/ 0 Gray= 6/ 4/ 0 Rel Eta,Phi=1,6 Expect 10 B$ Linear= 6/ 4/ 1 Gray= 6/ 4/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 6/ 4/ 2 Gray= 6/ 4/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 6/ 4/ 3 Gray= 6/ 4/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 6/ 4/ 4 Gray= 6/ 4/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 6/ 4/ 5 Gray= 6/ 4/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 6/ 4/ 6 Gray= 6/ 4/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 6/ 4/ 7 Gray= 6/ 4/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 6/ 4/ 8 Gray= 6/ 4/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 6/ 4/ 9 Gray= 6/ 4/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 6/ 4/10 Gray= 6/ 4/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 6/ 4/11 Gray= 6/ 4/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 6/ 5/ 0 Gray= 6/ 5/11 Rel Eta,Phi=1,7 Expect 22 B$ Linear= 6/ 5/ 1 Gray= 6/ 5/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 6/ 5/ 2 Gray= 6/ 5/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 6/ 5/ 3 Gray= 6/ 5/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 6/ 5/ 4 Gray= 6/ 5/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 6/ 5/ 5 Gray= 6/ 5/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 6/ 5/ 6 Gray= 6/ 5/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 6/ 5/ 7 Gray= 6/ 5/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 6/ 5/ 8 Gray= 6/ 5/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 6/ 5/ 9 Gray= 6/ 5/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 6/ 5/10 Gray= 6/ 5/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 6/ 5/11 Gray= 6/ 5/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 6/ 6/ 0 Gray= 6/ 6/ 0 Rel Eta,Phi=2,0 Expect 12 B$ Linear= 6/ 6/ 1 Gray= 6/ 6/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 6/ 6/ 2 Gray= 6/ 6/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 6/ 6/ 3 Gray= 6/ 6/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 6/ 6/ 4 Gray= 6/ 6/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 6/ 6/ 5 Gray= 6/ 6/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 6/ 6/ 6 Gray= 6/ 6/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 6/ 6/ 7 Gray= 6/ 6/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 6/ 6/ 8 Gray= 6/ 6/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 6/ 6/ 9 Gray= 6/ 6/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 6/ 6/10 Gray= 6/ 6/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 6/ 6/11 Gray= 6/ 6/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 6/ 7/ 0 Gray= 6/ 7/11 Rel Eta,Phi=2,1 Expect 24 B$ Linear= 6/ 7/ 1 Gray= 6/ 7/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 6/ 7/ 2 Gray= 6/ 7/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 6/ 7/ 3 Gray= 6/ 7/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 6/ 7/ 4 Gray= 6/ 7/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 6/ 7/ 5 Gray= 6/ 7/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 6/ 7/ 6 Gray= 6/ 7/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 6/ 7/ 7 Gray= 6/ 7/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 6/ 7/ 8 Gray= 6/ 7/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 6/ 7/ 9 Gray= 6/ 7/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 6/ 7/10 Gray= 6/ 7/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 6/ 7/11 Gray= 6/ 7/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 6/ 8/ 0 Gray= 6/ 8/ 0 Rel Eta,Phi=2,2 Expect 14 B$ Linear= 6/ 8/ 1 Gray= 6/ 8/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 6/ 8/ 2 Gray= 6/ 8/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 6/ 8/ 3 Gray= 6/ 8/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 6/ 8/ 4 Gray= 6/ 8/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 6/ 8/ 5 Gray= 6/ 8/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 6/ 8/ 6 Gray= 6/ 8/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 6/ 8/ 7 Gray= 6/ 8/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 6/ 8/ 8 Gray= 6/ 8/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 6/ 8/ 9 Gray= 6/ 8/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 6/ 8/10 Gray= 6/ 8/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 6/ 8/11 Gray= 6/ 8/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 6/ 9/ 0 Gray= 6/ 9/11 Rel Eta,Phi=2,3 Expect 26 B$ Linear= 6/ 9/ 1 Gray= 6/ 9/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 6/ 9/ 2 Gray= 6/ 9/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 6/ 9/ 3 Gray= 6/ 9/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 6/ 9/ 4 Gray= 6/ 9/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 6/ 9/ 5 Gray= 6/ 9/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 6/ 9/ 6 Gray= 6/ 9/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 6/ 9/ 7 Gray= 6/ 9/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 6/ 9/ 8 Gray= 6/ 9/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 6/ 9/ 9 Gray= 6/ 9/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 6/ 9/10 Gray= 6/ 9/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 6/ 9/11 Gray= 6/ 9/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 6/10/ 0 Gray= 6/10/ 0 Rel Eta,Phi=2,4 Expect 16 B$ Linear= 6/10/ 1 Gray= 6/10/ 1 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 6/10/ 2 Gray= 6/10/ 2 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 6/10/ 3 Gray= 6/10/ 3 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 6/10/ 4 Gray= 6/10/ 4 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 6/10/ 5 Gray= 6/10/ 5 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 6/10/ 6 Gray= 6/10/ 6 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 6/10/ 7 Gray= 6/10/ 7 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 6/10/ 8 Gray= 6/10/ 8 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 6/10/ 9 Gray= 6/10/ 9 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 6/10/10 Gray= 6/10/10 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 6/10/11 Gray= 6/10/11 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 6/11/ 0 Gray= 6/11/11 Rel Eta,Phi=2,5 Expect 28 B$ Linear= 6/11/ 1 Gray= 6/11/10 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 6/11/ 2 Gray= 6/11/ 9 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 6/11/ 3 Gray= 6/11/ 8 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 6/11/ 4 Gray= 6/11/ 7 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 6/11/ 5 Gray= 6/11/ 6 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 6/11/ 6 Gray= 6/11/ 5 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 6/11/ 7 Gray= 6/11/ 4 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 6/11/ 8 Gray= 6/11/ 3 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 6/11/ 9 Gray= 6/11/ 2 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 6/11/10 Gray= 6/11/ 1 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 6/11/11 Gray= 6/11/ 0 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 7/ 0/ 0 Gray= 7/11/ 0 Rel Eta,Phi=3,4 Expect 18 B$ Linear= 7/ 0/ 1 Gray= 7/11/ 1 Rel Eta,Phi=0,0 Expect 19 B$ Linear= 7/ 0/ 2 Gray= 7/11/ 2 Rel Eta,Phi=0,1 Expect 20 B$ Linear= 7/ 0/ 3 Gray= 7/11/ 3 Rel Eta,Phi=0,2 Expect 21 B$ Linear= 7/ 0/ 4 Gray= 7/11/ 4 Rel Eta,Phi=0,3 Expect 22 B$ Linear= 7/ 0/ 5 Gray= 7/11/ 5 Rel Eta,Phi=0,4 Expect 23 B$ Linear= 7/ 0/ 6 Gray= 7/11/ 6 Rel Eta,Phi=0,5 Expect 24 B$ Linear= 7/ 0/ 7 Gray= 7/11/ 7 Rel Eta,Phi=0,6 Expect 25 B$ Linear= 7/ 0/ 8 Gray= 7/11/ 8 Rel Eta,Phi=0,7 Expect 26 B$ Linear= 7/ 0/ 9 Gray= 7/11/ 9 Rel Eta,Phi=1,0 Expect 27 B$ Linear= 7/ 0/10 Gray= 7/11/10 Rel Eta,Phi=1,1 Expect 28 B$ Linear= 7/ 0/11 Gray= 7/11/11 Rel Eta,Phi=1,2 Expect 29 B$ Linear= 7/ 1/ 0 Gray= 7/10/11 Rel Eta,Phi=2,5 Expect 28 B$ Linear= 7/ 1/ 1 Gray= 7/10/10 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 7/ 1/ 2 Gray= 7/10/ 9 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 7/ 1/ 3 Gray= 7/10/ 8 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 7/ 1/ 4 Gray= 7/10/ 7 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 7/ 1/ 5 Gray= 7/10/ 6 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 7/ 1/ 6 Gray= 7/10/ 5 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 7/ 1/ 7 Gray= 7/10/ 4 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 7/ 1/ 8 Gray= 7/10/ 3 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 7/ 1/ 9 Gray= 7/10/ 2 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 7/ 1/10 Gray= 7/10/ 1 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 7/ 1/11 Gray= 7/10/ 0 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 7/ 2/ 0 Gray= 7/ 9/ 0 Rel Eta,Phi=2,4 Expect 16 B$ Linear= 7/ 2/ 1 Gray= 7/ 9/ 1 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 7/ 2/ 2 Gray= 7/ 9/ 2 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 7/ 2/ 3 Gray= 7/ 9/ 3 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 7/ 2/ 4 Gray= 7/ 9/ 4 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 7/ 2/ 5 Gray= 7/ 9/ 5 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 7/ 2/ 6 Gray= 7/ 9/ 6 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 7/ 2/ 7 Gray= 7/ 9/ 7 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 7/ 2/ 8 Gray= 7/ 9/ 8 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 7/ 2/ 9 Gray= 7/ 9/ 9 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 7/ 2/10 Gray= 7/ 9/10 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 7/ 2/11 Gray= 7/ 9/11 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 7/ 3/ 0 Gray= 7/ 8/11 Rel Eta,Phi=2,3 Expect 26 B$ Linear= 7/ 3/ 1 Gray= 7/ 8/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 7/ 3/ 2 Gray= 7/ 8/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 7/ 3/ 3 Gray= 7/ 8/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 7/ 3/ 4 Gray= 7/ 8/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 7/ 3/ 5 Gray= 7/ 8/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 7/ 3/ 6 Gray= 7/ 8/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 7/ 3/ 7 Gray= 7/ 8/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 7/ 3/ 8 Gray= 7/ 8/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 7/ 3/ 9 Gray= 7/ 8/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 7/ 3/10 Gray= 7/ 8/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 7/ 3/11 Gray= 7/ 8/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 7/ 4/ 0 Gray= 7/ 7/ 0 Rel Eta,Phi=2,2 Expect 14 B$ Linear= 7/ 4/ 1 Gray= 7/ 7/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 7/ 4/ 2 Gray= 7/ 7/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 7/ 4/ 3 Gray= 7/ 7/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 7/ 4/ 4 Gray= 7/ 7/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 7/ 4/ 5 Gray= 7/ 7/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 7/ 4/ 6 Gray= 7/ 7/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 7/ 4/ 7 Gray= 7/ 7/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 7/ 4/ 8 Gray= 7/ 7/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 7/ 4/ 9 Gray= 7/ 7/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 7/ 4/10 Gray= 7/ 7/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 7/ 4/11 Gray= 7/ 7/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 7/ 5/ 0 Gray= 7/ 6/11 Rel Eta,Phi=2,1 Expect 24 B$ Linear= 7/ 5/ 1 Gray= 7/ 6/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 7/ 5/ 2 Gray= 7/ 6/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 7/ 5/ 3 Gray= 7/ 6/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 7/ 5/ 4 Gray= 7/ 6/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 7/ 5/ 5 Gray= 7/ 6/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 7/ 5/ 6 Gray= 7/ 6/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 7/ 5/ 7 Gray= 7/ 6/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 7/ 5/ 8 Gray= 7/ 6/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 7/ 5/ 9 Gray= 7/ 6/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 7/ 5/10 Gray= 7/ 6/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 7/ 5/11 Gray= 7/ 6/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 7/ 6/ 0 Gray= 7/ 5/ 0 Rel Eta,Phi=2,0 Expect 12 B$ Linear= 7/ 6/ 1 Gray= 7/ 5/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 7/ 6/ 2 Gray= 7/ 5/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 7/ 6/ 3 Gray= 7/ 5/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 7/ 6/ 4 Gray= 7/ 5/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 7/ 6/ 5 Gray= 7/ 5/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 7/ 6/ 6 Gray= 7/ 5/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 7/ 6/ 7 Gray= 7/ 5/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 7/ 6/ 8 Gray= 7/ 5/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 7/ 6/ 9 Gray= 7/ 5/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 7/ 6/10 Gray= 7/ 5/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 7/ 6/11 Gray= 7/ 5/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 7/ 7/ 0 Gray= 7/ 4/11 Rel Eta,Phi=1,7 Expect 22 B$ Linear= 7/ 7/ 1 Gray= 7/ 4/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 7/ 7/ 2 Gray= 7/ 4/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 7/ 7/ 3 Gray= 7/ 4/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 7/ 7/ 4 Gray= 7/ 4/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 7/ 7/ 5 Gray= 7/ 4/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 7/ 7/ 6 Gray= 7/ 4/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 7/ 7/ 7 Gray= 7/ 4/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 7/ 7/ 8 Gray= 7/ 4/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 7/ 7/ 9 Gray= 7/ 4/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 7/ 7/10 Gray= 7/ 4/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 7/ 7/11 Gray= 7/ 4/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 7/ 8/ 0 Gray= 7/ 3/ 0 Rel Eta,Phi=1,6 Expect 10 B$ Linear= 7/ 8/ 1 Gray= 7/ 3/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 7/ 8/ 2 Gray= 7/ 3/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 7/ 8/ 3 Gray= 7/ 3/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 7/ 8/ 4 Gray= 7/ 3/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 7/ 8/ 5 Gray= 7/ 3/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 7/ 8/ 6 Gray= 7/ 3/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 7/ 8/ 7 Gray= 7/ 3/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 7/ 8/ 8 Gray= 7/ 3/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 7/ 8/ 9 Gray= 7/ 3/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 7/ 8/10 Gray= 7/ 3/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 7/ 8/11 Gray= 7/ 3/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 7/ 9/ 0 Gray= 7/ 2/11 Rel Eta,Phi=1,5 Expect 20 B$ Linear= 7/ 9/ 1 Gray= 7/ 2/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 7/ 9/ 2 Gray= 7/ 2/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 7/ 9/ 3 Gray= 7/ 2/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 7/ 9/ 4 Gray= 7/ 2/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 7/ 9/ 5 Gray= 7/ 2/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 7/ 9/ 6 Gray= 7/ 2/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 7/ 9/ 7 Gray= 7/ 2/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 7/ 9/ 8 Gray= 7/ 2/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 7/ 9/ 9 Gray= 7/ 2/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 7/ 9/10 Gray= 7/ 2/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 7/ 9/11 Gray= 7/ 2/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 7/10/ 0 Gray= 7/ 1/ 0 Rel Eta,Phi=1,4 Expect 8 B$ Linear= 7/10/ 1 Gray= 7/ 1/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 7/10/ 2 Gray= 7/ 1/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 7/10/ 3 Gray= 7/ 1/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 7/10/ 4 Gray= 7/ 1/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 7/10/ 5 Gray= 7/ 1/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 7/10/ 6 Gray= 7/ 1/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 7/10/ 7 Gray= 7/ 1/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 7/10/ 8 Gray= 7/ 1/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 7/10/ 9 Gray= 7/ 1/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 7/10/10 Gray= 7/ 1/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 7/10/11 Gray= 7/ 1/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 7/11/ 0 Gray= 7/ 0/11 Rel Eta,Phi=1,3 Expect 18 B$ Linear= 7/11/ 1 Gray= 7/ 0/10 Rel Eta,Phi=1,2 Expect 17 B$ Linear= 7/11/ 2 Gray= 7/ 0/ 9 Rel Eta,Phi=1,1 Expect 16 B$ Linear= 7/11/ 3 Gray= 7/ 0/ 8 Rel Eta,Phi=1,0 Expect 15 B$ Linear= 7/11/ 4 Gray= 7/ 0/ 7 Rel Eta,Phi=0,7 Expect 14 B$ Linear= 7/11/ 5 Gray= 7/ 0/ 6 Rel Eta,Phi=0,6 Expect 13 B$ Linear= 7/11/ 6 Gray= 7/ 0/ 5 Rel Eta,Phi=0,5 Expect 12 B$ Linear= 7/11/ 7 Gray= 7/ 0/ 4 Rel Eta,Phi=0,4 Expect 11 B$ Linear= 7/11/ 8 Gray= 7/ 0/ 3 Rel Eta,Phi=0,3 Expect 10 B$ Linear= 7/11/ 9 Gray= 7/ 0/ 2 Rel Eta,Phi=0,2 Expect 9 B$ Linear= 7/11/10 Gray= 7/ 0/ 1 Rel Eta,Phi=0,1 Expect 8 B$ Linear= 7/11/11 Gray= 7/ 0/ 0 Rel Eta,Phi=0,0 Expect 7 B$ Linear= 8/ 0/ 0 Gray= 8/ 0/ 0 Rel Eta,Phi=3,5 Expect 8 B$ Linear= 8/ 0/ 1 Gray= 8/ 0/ 1 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 8/ 0/ 2 Gray= 8/ 0/ 2 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 8/ 0/ 3 Gray= 8/ 0/ 3 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 8/ 0/ 4 Gray= 8/ 0/ 4 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 8/ 0/ 5 Gray= 8/ 0/ 5 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 8/ 0/ 6 Gray= 8/ 0/ 6 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 8/ 0/ 7 Gray= 8/ 0/ 7 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 8/ 0/ 8 Gray= 8/ 0/ 8 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 8/ 0/ 9 Gray= 8/ 0/ 9 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 8/ 0/10 Gray= 8/ 0/10 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 8/ 0/11 Gray= 8/ 0/11 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 8/ 1/ 0 Gray= 8/ 1/11 Rel Eta,Phi=1,3 Expect 20 B$ Linear= 8/ 1/ 1 Gray= 8/ 1/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 8/ 1/ 2 Gray= 8/ 1/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 8/ 1/ 3 Gray= 8/ 1/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 8/ 1/ 4 Gray= 8/ 1/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 8/ 1/ 5 Gray= 8/ 1/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 8/ 1/ 6 Gray= 8/ 1/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 8/ 1/ 7 Gray= 8/ 1/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 8/ 1/ 8 Gray= 8/ 1/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 8/ 1/ 9 Gray= 8/ 1/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 8/ 1/10 Gray= 8/ 1/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 8/ 1/11 Gray= 8/ 1/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear= 8/ 2/ 0 Gray= 8/ 2/ 0 Rel Eta,Phi=1,4 Expect 10 B$ Linear= 8/ 2/ 1 Gray= 8/ 2/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 8/ 2/ 2 Gray= 8/ 2/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 8/ 2/ 3 Gray= 8/ 2/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 8/ 2/ 4 Gray= 8/ 2/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 8/ 2/ 5 Gray= 8/ 2/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 8/ 2/ 6 Gray= 8/ 2/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 8/ 2/ 7 Gray= 8/ 2/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 8/ 2/ 8 Gray= 8/ 2/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 8/ 2/ 9 Gray= 8/ 2/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 8/ 2/10 Gray= 8/ 2/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 8/ 2/11 Gray= 8/ 2/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 8/ 3/ 0 Gray= 8/ 3/11 Rel Eta,Phi=1,5 Expect 22 B$ Linear= 8/ 3/ 1 Gray= 8/ 3/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 8/ 3/ 2 Gray= 8/ 3/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 8/ 3/ 3 Gray= 8/ 3/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 8/ 3/ 4 Gray= 8/ 3/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 8/ 3/ 5 Gray= 8/ 3/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 8/ 3/ 6 Gray= 8/ 3/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 8/ 3/ 7 Gray= 8/ 3/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 8/ 3/ 8 Gray= 8/ 3/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 8/ 3/ 9 Gray= 8/ 3/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 8/ 3/10 Gray= 8/ 3/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 8/ 3/11 Gray= 8/ 3/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 8/ 4/ 0 Gray= 8/ 4/ 0 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 8/ 4/ 1 Gray= 8/ 4/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 8/ 4/ 2 Gray= 8/ 4/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 8/ 4/ 3 Gray= 8/ 4/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 8/ 4/ 4 Gray= 8/ 4/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 8/ 4/ 5 Gray= 8/ 4/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 8/ 4/ 6 Gray= 8/ 4/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 8/ 4/ 7 Gray= 8/ 4/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 8/ 4/ 8 Gray= 8/ 4/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 8/ 4/ 9 Gray= 8/ 4/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 8/ 4/10 Gray= 8/ 4/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 8/ 4/11 Gray= 8/ 4/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 8/ 5/ 0 Gray= 8/ 5/11 Rel Eta,Phi=1,7 Expect 24 B$ Linear= 8/ 5/ 1 Gray= 8/ 5/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 8/ 5/ 2 Gray= 8/ 5/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 8/ 5/ 3 Gray= 8/ 5/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 8/ 5/ 4 Gray= 8/ 5/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 8/ 5/ 5 Gray= 8/ 5/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 8/ 5/ 6 Gray= 8/ 5/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 8/ 5/ 7 Gray= 8/ 5/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 8/ 5/ 8 Gray= 8/ 5/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 8/ 5/ 9 Gray= 8/ 5/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 8/ 5/10 Gray= 8/ 5/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 8/ 5/11 Gray= 8/ 5/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 8/ 6/ 0 Gray= 8/ 6/ 0 Rel Eta,Phi=2,0 Expect 14 B$ Linear= 8/ 6/ 1 Gray= 8/ 6/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 8/ 6/ 2 Gray= 8/ 6/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 8/ 6/ 3 Gray= 8/ 6/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 8/ 6/ 4 Gray= 8/ 6/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 8/ 6/ 5 Gray= 8/ 6/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 8/ 6/ 6 Gray= 8/ 6/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 8/ 6/ 7 Gray= 8/ 6/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 8/ 6/ 8 Gray= 8/ 6/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 8/ 6/ 9 Gray= 8/ 6/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 8/ 6/10 Gray= 8/ 6/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 8/ 6/11 Gray= 8/ 6/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 8/ 7/ 0 Gray= 8/ 7/11 Rel Eta,Phi=2,1 Expect 26 B$ Linear= 8/ 7/ 1 Gray= 8/ 7/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 8/ 7/ 2 Gray= 8/ 7/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 8/ 7/ 3 Gray= 8/ 7/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 8/ 7/ 4 Gray= 8/ 7/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 8/ 7/ 5 Gray= 8/ 7/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 8/ 7/ 6 Gray= 8/ 7/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 8/ 7/ 7 Gray= 8/ 7/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 8/ 7/ 8 Gray= 8/ 7/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 8/ 7/ 9 Gray= 8/ 7/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 8/ 7/10 Gray= 8/ 7/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 8/ 7/11 Gray= 8/ 7/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 8/ 8/ 0 Gray= 8/ 8/ 0 Rel Eta,Phi=2,2 Expect 16 B$ Linear= 8/ 8/ 1 Gray= 8/ 8/ 1 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 8/ 8/ 2 Gray= 8/ 8/ 2 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 8/ 8/ 3 Gray= 8/ 8/ 3 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 8/ 8/ 4 Gray= 8/ 8/ 4 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 8/ 8/ 5 Gray= 8/ 8/ 5 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 8/ 8/ 6 Gray= 8/ 8/ 6 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 8/ 8/ 7 Gray= 8/ 8/ 7 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 8/ 8/ 8 Gray= 8/ 8/ 8 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 8/ 8/ 9 Gray= 8/ 8/ 9 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 8/ 8/10 Gray= 8/ 8/10 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 8/ 8/11 Gray= 8/ 8/11 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 8/ 9/ 0 Gray= 8/ 9/11 Rel Eta,Phi=2,3 Expect 28 B$ Linear= 8/ 9/ 1 Gray= 8/ 9/10 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 8/ 9/ 2 Gray= 8/ 9/ 9 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 8/ 9/ 3 Gray= 8/ 9/ 8 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 8/ 9/ 4 Gray= 8/ 9/ 7 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 8/ 9/ 5 Gray= 8/ 9/ 6 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 8/ 9/ 6 Gray= 8/ 9/ 5 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 8/ 9/ 7 Gray= 8/ 9/ 4 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 8/ 9/ 8 Gray= 8/ 9/ 3 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 8/ 9/ 9 Gray= 8/ 9/ 2 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 8/ 9/10 Gray= 8/ 9/ 1 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 8/ 9/11 Gray= 8/ 9/ 0 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 8/10/ 0 Gray= 8/10/ 0 Rel Eta,Phi=2,4 Expect 18 B$ Linear= 8/10/ 1 Gray= 8/10/ 1 Rel Eta,Phi=0,0 Expect 19 B$ Linear= 8/10/ 2 Gray= 8/10/ 2 Rel Eta,Phi=0,1 Expect 20 B$ Linear= 8/10/ 3 Gray= 8/10/ 3 Rel Eta,Phi=0,2 Expect 21 B$ Linear= 8/10/ 4 Gray= 8/10/ 4 Rel Eta,Phi=0,3 Expect 22 B$ Linear= 8/10/ 5 Gray= 8/10/ 5 Rel Eta,Phi=0,4 Expect 23 B$ Linear= 8/10/ 6 Gray= 8/10/ 6 Rel Eta,Phi=0,5 Expect 24 B$ Linear= 8/10/ 7 Gray= 8/10/ 7 Rel Eta,Phi=0,6 Expect 25 B$ Linear= 8/10/ 8 Gray= 8/10/ 8 Rel Eta,Phi=0,7 Expect 26 B$ Linear= 8/10/ 9 Gray= 8/10/ 9 Rel Eta,Phi=1,0 Expect 27 B$ Linear= 8/10/10 Gray= 8/10/10 Rel Eta,Phi=1,1 Expect 28 B$ Linear= 8/10/11 Gray= 8/10/11 Rel Eta,Phi=1,2 Expect 29 B$ Linear= 8/11/ 0 Gray= 8/11/11 Rel Eta,Phi=2,5 Expect 30 B$ Linear= 8/11/ 1 Gray= 8/11/10 Rel Eta,Phi=1,2 Expect 29 B$ Linear= 8/11/ 2 Gray= 8/11/ 9 Rel Eta,Phi=1,1 Expect 28 B$ Linear= 8/11/ 3 Gray= 8/11/ 8 Rel Eta,Phi=1,0 Expect 27 B$ Linear= 8/11/ 4 Gray= 8/11/ 7 Rel Eta,Phi=0,7 Expect 26 B$ Linear= 8/11/ 5 Gray= 8/11/ 6 Rel Eta,Phi=0,6 Expect 25 B$ Linear= 8/11/ 6 Gray= 8/11/ 5 Rel Eta,Phi=0,5 Expect 24 B$ Linear= 8/11/ 7 Gray= 8/11/ 4 Rel Eta,Phi=0,4 Expect 23 B$ Linear= 8/11/ 8 Gray= 8/11/ 3 Rel Eta,Phi=0,3 Expect 22 B$ Linear= 8/11/ 9 Gray= 8/11/ 2 Rel Eta,Phi=0,2 Expect 21 B$ Linear= 8/11/10 Gray= 8/11/ 1 Rel Eta,Phi=0,1 Expect 20 B$ Linear= 8/11/11 Gray= 8/11/ 0 Rel Eta,Phi=0,0 Expect 19 B$ Linear= 9/ 0/ 0 Gray= 9/11/ 0 Rel Eta,Phi=3,6 Expect 20 B$ Linear= 9/ 0/ 1 Gray= 9/11/ 1 Rel Eta,Phi=0,0 Expect 21 B$ Linear= 9/ 0/ 2 Gray= 9/11/ 2 Rel Eta,Phi=0,1 Expect 22 B$ Linear= 9/ 0/ 3 Gray= 9/11/ 3 Rel Eta,Phi=0,2 Expect 23 B$ Linear= 9/ 0/ 4 Gray= 9/11/ 4 Rel Eta,Phi=0,3 Expect 24 B$ Linear= 9/ 0/ 5 Gray= 9/11/ 5 Rel Eta,Phi=0,4 Expect 25 B$ Linear= 9/ 0/ 6 Gray= 9/11/ 6 Rel Eta,Phi=0,5 Expect 26 B$ Linear= 9/ 0/ 7 Gray= 9/11/ 7 Rel Eta,Phi=0,6 Expect 27 B$ Linear= 9/ 0/ 8 Gray= 9/11/ 8 Rel Eta,Phi=0,7 Expect 28 B$ Linear= 9/ 0/ 9 Gray= 9/11/ 9 Rel Eta,Phi=1,0 Expect 29 B$ Linear= 9/ 0/10 Gray= 9/11/10 Rel Eta,Phi=1,1 Expect 30 B$ Linear= 9/ 0/11 Gray= 9/11/11 Rel Eta,Phi=1,2 Expect 31 B$ Linear= 9/ 1/ 0 Gray= 9/10/11 Rel Eta,Phi=2,5 Expect 30 B$ Linear= 9/ 1/ 1 Gray= 9/10/10 Rel Eta,Phi=1,2 Expect 29 B$ Linear= 9/ 1/ 2 Gray= 9/10/ 9 Rel Eta,Phi=1,1 Expect 28 B$ Linear= 9/ 1/ 3 Gray= 9/10/ 8 Rel Eta,Phi=1,0 Expect 27 B$ Linear= 9/ 1/ 4 Gray= 9/10/ 7 Rel Eta,Phi=0,7 Expect 26 B$ Linear= 9/ 1/ 5 Gray= 9/10/ 6 Rel Eta,Phi=0,6 Expect 25 B$ Linear= 9/ 1/ 6 Gray= 9/10/ 5 Rel Eta,Phi=0,5 Expect 24 B$ Linear= 9/ 1/ 7 Gray= 9/10/ 4 Rel Eta,Phi=0,4 Expect 23 B$ Linear= 9/ 1/ 8 Gray= 9/10/ 3 Rel Eta,Phi=0,3 Expect 22 B$ Linear= 9/ 1/ 9 Gray= 9/10/ 2 Rel Eta,Phi=0,2 Expect 21 B$ Linear= 9/ 1/10 Gray= 9/10/ 1 Rel Eta,Phi=0,1 Expect 20 B$ Linear= 9/ 1/11 Gray= 9/10/ 0 Rel Eta,Phi=0,0 Expect 19 B$ Linear= 9/ 2/ 0 Gray= 9/ 9/ 0 Rel Eta,Phi=2,4 Expect 18 B$ Linear= 9/ 2/ 1 Gray= 9/ 9/ 1 Rel Eta,Phi=0,0 Expect 19 B$ Linear= 9/ 2/ 2 Gray= 9/ 9/ 2 Rel Eta,Phi=0,1 Expect 20 B$ Linear= 9/ 2/ 3 Gray= 9/ 9/ 3 Rel Eta,Phi=0,2 Expect 21 B$ Linear= 9/ 2/ 4 Gray= 9/ 9/ 4 Rel Eta,Phi=0,3 Expect 22 B$ Linear= 9/ 2/ 5 Gray= 9/ 9/ 5 Rel Eta,Phi=0,4 Expect 23 B$ Linear= 9/ 2/ 6 Gray= 9/ 9/ 6 Rel Eta,Phi=0,5 Expect 24 B$ Linear= 9/ 2/ 7 Gray= 9/ 9/ 7 Rel Eta,Phi=0,6 Expect 25 B$ Linear= 9/ 2/ 8 Gray= 9/ 9/ 8 Rel Eta,Phi=0,7 Expect 26 B$ Linear= 9/ 2/ 9 Gray= 9/ 9/ 9 Rel Eta,Phi=1,0 Expect 27 B$ Linear= 9/ 2/10 Gray= 9/ 9/10 Rel Eta,Phi=1,1 Expect 28 B$ Linear= 9/ 2/11 Gray= 9/ 9/11 Rel Eta,Phi=1,2 Expect 29 B$ Linear= 9/ 3/ 0 Gray= 9/ 8/11 Rel Eta,Phi=2,3 Expect 28 B$ Linear= 9/ 3/ 1 Gray= 9/ 8/10 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 9/ 3/ 2 Gray= 9/ 8/ 9 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 9/ 3/ 3 Gray= 9/ 8/ 8 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 9/ 3/ 4 Gray= 9/ 8/ 7 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 9/ 3/ 5 Gray= 9/ 8/ 6 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 9/ 3/ 6 Gray= 9/ 8/ 5 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 9/ 3/ 7 Gray= 9/ 8/ 4 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 9/ 3/ 8 Gray= 9/ 8/ 3 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 9/ 3/ 9 Gray= 9/ 8/ 2 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 9/ 3/10 Gray= 9/ 8/ 1 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 9/ 3/11 Gray= 9/ 8/ 0 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 9/ 4/ 0 Gray= 9/ 7/ 0 Rel Eta,Phi=2,2 Expect 16 B$ Linear= 9/ 4/ 1 Gray= 9/ 7/ 1 Rel Eta,Phi=0,0 Expect 17 B$ Linear= 9/ 4/ 2 Gray= 9/ 7/ 2 Rel Eta,Phi=0,1 Expect 18 B$ Linear= 9/ 4/ 3 Gray= 9/ 7/ 3 Rel Eta,Phi=0,2 Expect 19 B$ Linear= 9/ 4/ 4 Gray= 9/ 7/ 4 Rel Eta,Phi=0,3 Expect 20 B$ Linear= 9/ 4/ 5 Gray= 9/ 7/ 5 Rel Eta,Phi=0,4 Expect 21 B$ Linear= 9/ 4/ 6 Gray= 9/ 7/ 6 Rel Eta,Phi=0,5 Expect 22 B$ Linear= 9/ 4/ 7 Gray= 9/ 7/ 7 Rel Eta,Phi=0,6 Expect 23 B$ Linear= 9/ 4/ 8 Gray= 9/ 7/ 8 Rel Eta,Phi=0,7 Expect 24 B$ Linear= 9/ 4/ 9 Gray= 9/ 7/ 9 Rel Eta,Phi=1,0 Expect 25 B$ Linear= 9/ 4/10 Gray= 9/ 7/10 Rel Eta,Phi=1,1 Expect 26 B$ Linear= 9/ 4/11 Gray= 9/ 7/11 Rel Eta,Phi=1,2 Expect 27 B$ Linear= 9/ 5/ 0 Gray= 9/ 6/11 Rel Eta,Phi=2,1 Expect 26 B$ Linear= 9/ 5/ 1 Gray= 9/ 6/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 9/ 5/ 2 Gray= 9/ 6/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 9/ 5/ 3 Gray= 9/ 6/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 9/ 5/ 4 Gray= 9/ 6/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 9/ 5/ 5 Gray= 9/ 6/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 9/ 5/ 6 Gray= 9/ 6/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 9/ 5/ 7 Gray= 9/ 6/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 9/ 5/ 8 Gray= 9/ 6/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 9/ 5/ 9 Gray= 9/ 6/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 9/ 5/10 Gray= 9/ 6/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 9/ 5/11 Gray= 9/ 6/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 9/ 6/ 0 Gray= 9/ 5/ 0 Rel Eta,Phi=2,0 Expect 14 B$ Linear= 9/ 6/ 1 Gray= 9/ 5/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear= 9/ 6/ 2 Gray= 9/ 5/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear= 9/ 6/ 3 Gray= 9/ 5/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear= 9/ 6/ 4 Gray= 9/ 5/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear= 9/ 6/ 5 Gray= 9/ 5/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear= 9/ 6/ 6 Gray= 9/ 5/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear= 9/ 6/ 7 Gray= 9/ 5/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear= 9/ 6/ 8 Gray= 9/ 5/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear= 9/ 6/ 9 Gray= 9/ 5/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear= 9/ 6/10 Gray= 9/ 5/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear= 9/ 6/11 Gray= 9/ 5/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear= 9/ 7/ 0 Gray= 9/ 4/11 Rel Eta,Phi=1,7 Expect 24 B$ Linear= 9/ 7/ 1 Gray= 9/ 4/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 9/ 7/ 2 Gray= 9/ 4/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 9/ 7/ 3 Gray= 9/ 4/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 9/ 7/ 4 Gray= 9/ 4/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 9/ 7/ 5 Gray= 9/ 4/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 9/ 7/ 6 Gray= 9/ 4/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 9/ 7/ 7 Gray= 9/ 4/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 9/ 7/ 8 Gray= 9/ 4/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 9/ 7/ 9 Gray= 9/ 4/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 9/ 7/10 Gray= 9/ 4/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 9/ 7/11 Gray= 9/ 4/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 9/ 8/ 0 Gray= 9/ 3/ 0 Rel Eta,Phi=1,6 Expect 12 B$ Linear= 9/ 8/ 1 Gray= 9/ 3/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear= 9/ 8/ 2 Gray= 9/ 3/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear= 9/ 8/ 3 Gray= 9/ 3/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear= 9/ 8/ 4 Gray= 9/ 3/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear= 9/ 8/ 5 Gray= 9/ 3/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear= 9/ 8/ 6 Gray= 9/ 3/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear= 9/ 8/ 7 Gray= 9/ 3/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear= 9/ 8/ 8 Gray= 9/ 3/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear= 9/ 8/ 9 Gray= 9/ 3/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear= 9/ 8/10 Gray= 9/ 3/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear= 9/ 8/11 Gray= 9/ 3/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear= 9/ 9/ 0 Gray= 9/ 2/11 Rel Eta,Phi=1,5 Expect 22 B$ Linear= 9/ 9/ 1 Gray= 9/ 2/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 9/ 9/ 2 Gray= 9/ 2/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 9/ 9/ 3 Gray= 9/ 2/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 9/ 9/ 4 Gray= 9/ 2/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 9/ 9/ 5 Gray= 9/ 2/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 9/ 9/ 6 Gray= 9/ 2/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 9/ 9/ 7 Gray= 9/ 2/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 9/ 9/ 8 Gray= 9/ 2/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 9/ 9/ 9 Gray= 9/ 2/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 9/ 9/10 Gray= 9/ 2/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 9/ 9/11 Gray= 9/ 2/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 9/10/ 0 Gray= 9/ 1/ 0 Rel Eta,Phi=1,4 Expect 10 B$ Linear= 9/10/ 1 Gray= 9/ 1/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear= 9/10/ 2 Gray= 9/ 1/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear= 9/10/ 3 Gray= 9/ 1/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear= 9/10/ 4 Gray= 9/ 1/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear= 9/10/ 5 Gray= 9/ 1/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear= 9/10/ 6 Gray= 9/ 1/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear= 9/10/ 7 Gray= 9/ 1/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear= 9/10/ 8 Gray= 9/ 1/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear= 9/10/ 9 Gray= 9/ 1/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear= 9/10/10 Gray= 9/ 1/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear= 9/10/11 Gray= 9/ 1/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear= 9/11/ 0 Gray= 9/ 0/11 Rel Eta,Phi=1,3 Expect 20 B$ Linear= 9/11/ 1 Gray= 9/ 0/10 Rel Eta,Phi=1,2 Expect 19 B$ Linear= 9/11/ 2 Gray= 9/ 0/ 9 Rel Eta,Phi=1,1 Expect 18 B$ Linear= 9/11/ 3 Gray= 9/ 0/ 8 Rel Eta,Phi=1,0 Expect 17 B$ Linear= 9/11/ 4 Gray= 9/ 0/ 7 Rel Eta,Phi=0,7 Expect 16 B$ Linear= 9/11/ 5 Gray= 9/ 0/ 6 Rel Eta,Phi=0,6 Expect 15 B$ Linear= 9/11/ 6 Gray= 9/ 0/ 5 Rel Eta,Phi=0,5 Expect 14 B$ Linear= 9/11/ 7 Gray= 9/ 0/ 4 Rel Eta,Phi=0,4 Expect 13 B$ Linear= 9/11/ 8 Gray= 9/ 0/ 3 Rel Eta,Phi=0,3 Expect 12 B$ Linear= 9/11/ 9 Gray= 9/ 0/ 2 Rel Eta,Phi=0,2 Expect 11 B$ Linear= 9/11/10 Gray= 9/ 0/ 1 Rel Eta,Phi=0,1 Expect 10 B$ Linear= 9/11/11 Gray= 9/ 0/ 0 Rel Eta,Phi=0,0 Expect 9 B$ Linear=10/ 0/ 0 Gray=10/ 0/ 0 Rel Eta,Phi=3,7 Expect 10 B$ Linear=10/ 0/ 1 Gray=10/ 0/ 1 Rel Eta,Phi=0,0 Expect 11 B$ Linear=10/ 0/ 2 Gray=10/ 0/ 2 Rel Eta,Phi=0,1 Expect 12 B$ Linear=10/ 0/ 3 Gray=10/ 0/ 3 Rel Eta,Phi=0,2 Expect 13 B$ Linear=10/ 0/ 4 Gray=10/ 0/ 4 Rel Eta,Phi=0,3 Expect 14 B$ Linear=10/ 0/ 5 Gray=10/ 0/ 5 Rel Eta,Phi=0,4 Expect 15 B$ Linear=10/ 0/ 6 Gray=10/ 0/ 6 Rel Eta,Phi=0,5 Expect 16 B$ Linear=10/ 0/ 7 Gray=10/ 0/ 7 Rel Eta,Phi=0,6 Expect 17 B$ Linear=10/ 0/ 8 Gray=10/ 0/ 8 Rel Eta,Phi=0,7 Expect 18 B$ Linear=10/ 0/ 9 Gray=10/ 0/ 9 Rel Eta,Phi=1,0 Expect 19 B$ Linear=10/ 0/10 Gray=10/ 0/10 Rel Eta,Phi=1,1 Expect 20 B$ Linear=10/ 0/11 Gray=10/ 0/11 Rel Eta,Phi=1,2 Expect 21 B$ Linear=10/ 1/ 0 Gray=10/ 1/11 Rel Eta,Phi=1,3 Expect 22 B$ Linear=10/ 1/ 1 Gray=10/ 1/10 Rel Eta,Phi=1,2 Expect 21 B$ Linear=10/ 1/ 2 Gray=10/ 1/ 9 Rel Eta,Phi=1,1 Expect 20 B$ Linear=10/ 1/ 3 Gray=10/ 1/ 8 Rel Eta,Phi=1,0 Expect 19 B$ Linear=10/ 1/ 4 Gray=10/ 1/ 7 Rel Eta,Phi=0,7 Expect 18 B$ Linear=10/ 1/ 5 Gray=10/ 1/ 6 Rel Eta,Phi=0,6 Expect 17 B$ Linear=10/ 1/ 6 Gray=10/ 1/ 5 Rel Eta,Phi=0,5 Expect 16 B$ Linear=10/ 1/ 7 Gray=10/ 1/ 4 Rel Eta,Phi=0,4 Expect 15 B$ Linear=10/ 1/ 8 Gray=10/ 1/ 3 Rel Eta,Phi=0,3 Expect 14 B$ Linear=10/ 1/ 9 Gray=10/ 1/ 2 Rel Eta,Phi=0,2 Expect 13 B$ Linear=10/ 1/10 Gray=10/ 1/ 1 Rel Eta,Phi=0,1 Expect 12 B$ Linear=10/ 1/11 Gray=10/ 1/ 0 Rel Eta,Phi=0,0 Expect 11 B$ Linear=10/ 2/ 0 Gray=10/ 2/ 0 Rel Eta,Phi=1,4 Expect 12 B$ Linear=10/ 2/ 1 Gray=10/ 2/ 1 Rel Eta,Phi=0,0 Expect 13 B$ Linear=10/ 2/ 2 Gray=10/ 2/ 2 Rel Eta,Phi=0,1 Expect 14 B$ Linear=10/ 2/ 3 Gray=10/ 2/ 3 Rel Eta,Phi=0,2 Expect 15 B$ Linear=10/ 2/ 4 Gray=10/ 2/ 4 Rel Eta,Phi=0,3 Expect 16 B$ Linear=10/ 2/ 5 Gray=10/ 2/ 5 Rel Eta,Phi=0,4 Expect 17 B$ Linear=10/ 2/ 6 Gray=10/ 2/ 6 Rel Eta,Phi=0,5 Expect 18 B$ Linear=10/ 2/ 7 Gray=10/ 2/ 7 Rel Eta,Phi=0,6 Expect 19 B$ Linear=10/ 2/ 8 Gray=10/ 2/ 8 Rel Eta,Phi=0,7 Expect 20 B$ Linear=10/ 2/ 9 Gray=10/ 2/ 9 Rel Eta,Phi=1,0 Expect 21 B$ Linear=10/ 2/10 Gray=10/ 2/10 Rel Eta,Phi=1,1 Expect 22 B$ Linear=10/ 2/11 Gray=10/ 2/11 Rel Eta,Phi=1,2 Expect 23 B$ Linear=10/ 3/ 0 Gray=10/ 3/11 Rel Eta,Phi=1,5 Expect 24 B$ Linear=10/ 3/ 1 Gray=10/ 3/10 Rel Eta,Phi=1,2 Expect 23 B$ Linear=10/ 3/ 2 Gray=10/ 3/ 9 Rel Eta,Phi=1,1 Expect 22 B$ Linear=10/ 3/ 3 Gray=10/ 3/ 8 Rel Eta,Phi=1,0 Expect 21 B$ Linear=10/ 3/ 4 Gray=10/ 3/ 7 Rel Eta,Phi=0,7 Expect 20 B$ Linear=10/ 3/ 5 Gray=10/ 3/ 6 Rel Eta,Phi=0,6 Expect 19 B$ Linear=10/ 3/ 6 Gray=10/ 3/ 5 Rel Eta,Phi=0,5 Expect 18 B$ Linear=10/ 3/ 7 Gray=10/ 3/ 4 Rel Eta,Phi=0,4 Expect 17 B$ Linear=10/ 3/ 8 Gray=10/ 3/ 3 Rel Eta,Phi=0,3 Expect 16 B$ Linear=10/ 3/ 9 Gray=10/ 3/ 2 Rel Eta,Phi=0,2 Expect 15 B$ Linear=10/ 3/10 Gray=10/ 3/ 1 Rel Eta,Phi=0,1 Expect 14 B$ Linear=10/ 3/11 Gray=10/ 3/ 0 Rel Eta,Phi=0,0 Expect 13 B$ Linear=10/ 4/ 0 Gray=10/ 4/ 0 Rel Eta,Phi=1,6 Expect 14 B$ Linear=10/ 4/ 1 Gray=10/ 4/ 1 Rel Eta,Phi=0,0 Expect 15 B$ Linear=10/ 4/ 2 Gray=10/ 4/ 2 Rel Eta,Phi=0,1 Expect 16 B$ Linear=10/ 4/ 3 Gray=10/ 4/ 3 Rel Eta,Phi=0,2 Expect 17 B$ Linear=10/ 4/ 4 Gray=10/ 4/ 4 Rel Eta,Phi=0,3 Expect 18 B$ Linear=10/ 4/ 5 Gray=10/ 4/ 5 Rel Eta,Phi=0,4 Expect 19 B$ Linear=10/ 4/ 6 Gray=10/ 4/ 6 Rel Eta,Phi=0,5 Expect 20 B$ Linear=10/ 4/ 7 Gray=10/ 4/ 7 Rel Eta,Phi=0,6 Expect 21 B$ Linear=10/ 4/ 8 Gray=10/ 4/ 8 Rel Eta,Phi=0,7 Expect 22 B$ Linear=10/ 4/ 9 Gray=10/ 4/ 9 Rel Eta,Phi=1,0 Expect 23 B$ Linear=10/ 4/10 Gray=10/ 4/10 Rel Eta,Phi=1,1 Expect 24 B$ Linear=10/ 4/11 Gray=10/ 4/11 Rel Eta,Phi=1,2 Expect 25 B$ Linear=10/ 5/ 0 Gray=10/ 5/11 Rel Eta,Phi=1,7 Expect 26 B$ Linear=10/ 5/ 1 Gray=10/ 5/10 Rel Eta,Phi=1,2 Expect 25 B$ Linear=10/ 5/ 2 Gray=10/ 5/ 9 Rel Eta,Phi=1,1 Expect 24 B$ Linear=10/ 5/ 3 Gray=10/ 5/ 8 Rel Eta,Phi=1,0 Expect 23 B$ Linear=10/ 5/ 4 Gray=10/ 5/ 7 Rel Eta,Phi=0,7 Expect 22 B$ Linear=10/ 5/ 5 Gray=10/ 5/ 6 Rel Eta,Phi=0,6 Expect 21 B$ Linear=10/ 5/ 6 Gray=10/ 5/ 5 Rel Eta,Phi=0,5 Expect 20 B$ Linear=10/ 5/ 7 Gray=10/ 5/ 4 Rel Eta,Phi=0,4 Expect 19 B$ Linear=10/ 5/ 8 Gray=10/ 5/ 3 Rel Eta,Phi=0,3 Expect 18 B$ Linear=10/ 5/ 9 Gray=10/ 5/ 2 Rel Eta,Phi=0,2 Expect 17 B$ Linear=10/ 5/10 Gray=10/ 5/ 1 Rel Eta,Phi=0,1 Expect 16 B$ Linear=10/ 5/11 Gray=10/ 5/ 0 Rel Eta,Phi=0,0 Expect 15 B$ Linear=10/ 6/ 0 Gray=10/ 6/ 0 Rel Eta,Phi=2,0 Expect 16 B$ Linear=10/ 6/ 1 Gray=10/ 6/ 1 Rel Eta,Phi=0,0 Expect 17 B$ Linear=10/ 6/ 2 Gray=10/ 6/ 2 Rel Eta,Phi=0,1 Expect 18 B$ Linear=10/ 6/ 3 Gray=10/ 6/ 3 Rel Eta,Phi=0,2 Expect 19 B$ Linear=10/ 6/ 4 Gray=10/ 6/ 4 Rel Eta,Phi=0,3 Expect 20 B$ Linear=10/ 6/ 5 Gray=10/ 6/ 5 Rel Eta,Phi=0,4 Expect 21 B$ Linear=10/ 6/ 6 Gray=10/ 6/ 6 Rel Eta,Phi=0,5 Expect 22 B$ Linear=10/ 6/ 7 Gray=10/ 6/ 7 Rel Eta,Phi=0,6 Expect 23 B$ Linear=10/ 6/ 8 Gray=10/ 6/ 8 Rel Eta,Phi=0,7 Expect 24 B$ Linear=10/ 6/ 9 Gray=10/ 6/ 9 Rel Eta,Phi=1,0 Expect 25 B$ Linear=10/ 6/10 Gray=10/ 6/10 Rel Eta,Phi=1,1 Expect 26 B$ Linear=10/ 6/11 Gray=10/ 6/11 Rel Eta,Phi=1,2 Expect 27 B$ Linear=10/ 7/ 0 Gray=10/ 7/11 Rel Eta,Phi=2,1 Expect 28 B$ Linear=10/ 7/ 1 Gray=10/ 7/10 Rel Eta,Phi=1,2 Expect 27 B$ Linear=10/ 7/ 2 Gray=10/ 7/ 9 Rel Eta,Phi=1,1 Expect 26 B$ Linear=10/ 7/ 3 Gray=10/ 7/ 8 Rel Eta,Phi=1,0 Expect 25 B$ Linear=10/ 7/ 4 Gray=10/ 7/ 7 Rel Eta,Phi=0,7 Expect 24 B$ Linear=10/ 7/ 5 Gray=10/ 7/ 6 Rel Eta,Phi=0,6 Expect 23 B$ Linear=10/ 7/ 6 Gray=10/ 7/ 5 Rel Eta,Phi=0,5 Expect 22 B$ Linear=10/ 7/ 7 Gray=10/ 7/ 4 Rel Eta,Phi=0,4 Expect 21 B$ Linear=10/ 7/ 8 Gray=10/ 7/ 3 Rel Eta,Phi=0,3 Expect 20 B$ Linear=10/ 7/ 9 Gray=10/ 7/ 2 Rel Eta,Phi=0,2 Expect 19 B$ Linear=10/ 7/10 Gray=10/ 7/ 1 Rel Eta,Phi=0,1 Expect 18 B$ Linear=10/ 7/11 Gray=10/ 7/ 0 Rel Eta,Phi=0,0 Expect 17 B$ Linear=10/ 8/ 0 Gray=10/ 8/ 0 Rel Eta,Phi=2,2 Expect 18 B$ Linear=10/ 8/ 1 Gray=10/ 8/ 1 Rel Eta,Phi=0,0 Expect 19 B$ Linear=10/ 8/ 2 Gray=10/ 8/ 2 Rel Eta,Phi=0,1 Expect 20 B$ Linear=10/ 8/ 3 Gray=10/ 8/ 3 Rel Eta,Phi=0,2 Expect 21 B$ Linear=10/ 8/ 4 Gray=10/ 8/ 4 Rel Eta,Phi=0,3 Expect 22 B$ Linear=10/ 8/ 5 Gray=10/ 8/ 5 Rel Eta,Phi=0,4 Expect 23 B$ Linear=10/ 8/ 6 Gray=10/ 8/ 6 Rel Eta,Phi=0,5 Expect 24 B$ Linear=10/ 8/ 7 Gray=10/ 8/ 7 Rel Eta,Phi=0,6 Expect 25 B$ Linear=10/ 8/ 8 Gray=10/ 8/ 8 Rel Eta,Phi=0,7 Expect 26 B$ Linear=10/ 8/ 9 Gray=10/ 8/ 9 Rel Eta,Phi=1,0 Expect 27 B$ Linear=10/ 8/10 Gray=10/ 8/10 Rel Eta,Phi=1,1 Expect 28 B$ Linear=10/ 8/11 Gray=10/ 8/11 Rel Eta,Phi=1,2 Expect 29 B$ Linear=10/ 9/ 0 Gray=10/ 9/11 Rel Eta,Phi=2,3 Expect 30 B$ Linear=10/ 9/ 1 Gray=10/ 9/10 Rel Eta,Phi=1,2 Expect 29 B$ Linear=10/ 9/ 2 Gray=10/ 9/ 9 Rel Eta,Phi=1,1 Expect 28 B$ Linear=10/ 9/ 3 Gray=10/ 9/ 8 Rel Eta,Phi=1,0 Expect 27 B$ Linear=10/ 9/ 4 Gray=10/ 9/ 7 Rel Eta,Phi=0,7 Expect 26 B$ Linear=10/ 9/ 5 Gray=10/ 9/ 6 Rel Eta,Phi=0,6 Expect 25 B$ Linear=10/ 9/ 6 Gray=10/ 9/ 5 Rel Eta,Phi=0,5 Expect 24 B$ Linear=10/ 9/ 7 Gray=10/ 9/ 4 Rel Eta,Phi=0,4 Expect 23 B$ Linear=10/ 9/ 8 Gray=10/ 9/ 3 Rel Eta,Phi=0,3 Expect 22 B$ Linear=10/ 9/ 9 Gray=10/ 9/ 2 Rel Eta,Phi=0,2 Expect 21 B$ Linear=10/ 9/10 Gray=10/ 9/ 1 Rel Eta,Phi=0,1 Expect 20 B$ Linear=10/ 9/11 Gray=10/ 9/ 0 Rel Eta,Phi=0,0 Expect 19 B$ Linear=10/10/ 0 Gray=10/10/ 0 Rel Eta,Phi=2,4 Expect 20 B$ Linear=10/10/ 1 Gray=10/10/ 1 Rel Eta,Phi=0,0 Expect 21 B$ Linear=10/10/ 2 Gray=10/10/ 2 Rel Eta,Phi=0,1 Expect 22 B$ Linear=10/10/ 3 Gray=10/10/ 3 Rel Eta,Phi=0,2 Expect 23 B$ Linear=10/10/ 4 Gray=10/10/ 4 Rel Eta,Phi=0,3 Expect 24 B$ Linear=10/10/ 5 Gray=10/10/ 5 Rel Eta,Phi=0,4 Expect 25 B$ Linear=10/10/ 6 Gray=10/10/ 6 Rel Eta,Phi=0,5 Expect 26 B$ Linear=10/10/ 7 Gray=10/10/ 7 Rel Eta,Phi=0,6 Expect 27 B$ Linear=10/10/ 8 Gray=10/10/ 8 Rel Eta,Phi=0,7 Expect 28 B$ Linear=10/10/ 9 Gray=10/10/ 9 Rel Eta,Phi=1,0 Expect 29 B$ Linear=10/10/10 Gray=10/10/10 Rel Eta,Phi=1,1 Expect 30 B$ Linear=10/10/11 Gray=10/10/11 Rel Eta,Phi=1,2 Expect 31 B$ Linear=10/11/ 0 Gray=10/11/11 Rel Eta,Phi=2,5 Expect 32 B$ Linear=10/11/ 1 Gray=10/11/10 Rel Eta,Phi=1,2 Expect 31 B$ Linear=10/11/ 2 Gray=10/11/ 9 Rel Eta,Phi=1,1 Expect 30 B$ Linear=10/11/ 3 Gray=10/11/ 8 Rel Eta,Phi=1,0 Expect 29 B$ Linear=10/11/ 4 Gray=10/11/ 7 Rel Eta,Phi=0,7 Expect 28 B$ Linear=10/11/ 5 Gray=10/11/ 6 Rel Eta,Phi=0,6 Expect 27 B$ Linear=10/11/ 6 Gray=10/11/ 5 Rel Eta,Phi=0,5 Expect 26 B$ Linear=10/11/ 7 Gray=10/11/ 4 Rel Eta,Phi=0,4 Expect 25 B$ Linear=10/11/ 8 Gray=10/11/ 3 Rel Eta,Phi=0,3 Expect 24 B$ Linear=10/11/ 9 Gray=10/11/ 2 Rel Eta,Phi=0,2 Expect 23 B$ Linear=10/11/10 Gray=10/11/ 1 Rel Eta,Phi=0,1 Expect 22 B$ Linear=10/11/11 Gray=10/11/ 0 Rel Eta,Phi=0,0 Expect 21 I$ Chan # 2 of 2 - Failed = 0 ... W$ CHTCR PROM Check Completed w$