Best current FIC information
Rough description of FIC card functionality
Status of FIC cards and test results
Test card GSTM: programmable G-link source
Draft specifications of FIC card functionality
FIC propsals from J-F Renardy, Saclay, April 17, 1998 in pdf
UIC Workshop on FIC and related topics, April 24-25, 1998 in pdf
FIC status and protocol questions from J-F Renardy, Saclay, Sept 24, 1998 in pdf
FIC monitoring proposal from J-F Renardy, Saclay, Oct 15, 1998 in pdf
Here are notes from the FIC and L2 protocol meetings of September 1998. Jim will boil down some of these to lists and we will reach a decision by the October Trigger workshop at MSU
G-link layout tips; the page also contains specs and resynch protoco (G-link "usage") from FNAL Barsotti group
SVX readout documentation
Also of interest are G-link resynch measurements