Inventory List of the H-Clk Cards ----------------------------------- Rev. 21-Sept-2012 SN #1 Clock Type - Final assembly (with a temporary front-panel) and initial testing on 7-Mar-12 DE No problems found during initial testing. - Delivered to the Udara on the 3rd floor 12-Mar-12 - Installed the final version of the front-panel and completed all current final assembly steps on 23-May-12 DE This card remained on the 3rd floor. SN #2 Clock type - Final assembly (with a temporary front-panel) and initial testing on 8-Mar-12 DE No problems found during initial testing. - Delivered to the Udara on the 3rd floor 12-Mar-12 - Installed the final version of the front-panel and completed all current final assembly steps on 23-May-12 DE This card remained on the 3rd floor. - Fed Exp shipped to Gerd at LANL (via Bob DeLay) 6-June-12 SN #3 Control type - Final assembly (with a temporary front-panel) finished on 20-APR-12 DE DS No initial testing by DE DS - Delivered to the Udara on the 3rd floor 20-Apr-12 - Installed the final version of the front-panel and completed all current final assembly steps on 23-May-12 DE This card remained on the 3rd floor. SN #4 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 21-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 23-May-12 - Fed Exp shipped to Gerd at LANL (via Bob DeLay) 25-May-12 SN #5 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 22-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 23-May-12 SN #6 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 24-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 - Fed Exp shipped to Ignacio Taboada Georgia Tech. 21-June-12 SN #7 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 24-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 - Fed Exp shipped to Ian Wisher Univ. of Wisconsin 21-June-12 SN #8 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 24-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #9 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 24-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #10 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 25-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #11 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 26-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 - Fed Exp shipped to Ian Wisher Univ. of Wisconsin 21-June-12 SN #12 Clock type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 26-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #13 Control type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 28-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #14 Control type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 28-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #15 Control type - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 28-May-12 DE No problems found during the limited initial testing. - Delivered to the Udara on the 3rd floor 4-June-2012 SN #16 Control type External Clock - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 24-July-2012 DE No problems found during the limited initial testing. - At final assembly H-Clk SN #16 was setup to use an External Clock. - Delivered to the Udara on the 3rd floor 24-July-2012 SN #17 Control type External Clock - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 26-July-2012 DE No problems found during the limited initial testing. - At final assembly H-Clk SN #17 was setup to use an External Clock. - Delivered to the Udara on the 3rd floor 27-July-2012 SN #18 Control type External Clock - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 26-July-2012 DE No problems found during the limited initial testing. - At final assembly H-Clk SN #18 was setup to use an External Clock. - Delivered to the Udara on the 3rd floor 27-July-2012 SN #19 Control type External Clock - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 26-July-2012 DE No problems found during the limited initial testing. - At final assembly H-Clk SN #19 was setup to use an External Clock. - Delivered to the Udara on the 3rd floor 27-July-2012 SN #20 Control type External Clock - Final assembly with full set of final assembly steps and final version of components and initial "demo" firmware testing on: 26-July-2012 DE No problems found during the limited initial testing. - At final assembly H-Clk SN #20 was setup to use an External Clock. - Delivered to the Udara on the 3rd floor 27-July-2012 Access Connector Cables ------------------------- - Three pairs of Access Connector cables that allow one H-Clk card to pass its 40 MHz Clock signal to another H-Clk card have been made. All 6 of these cables also allow the upper front panel push-button to cause the MEZ-456 FPGA to Configure. The intended purpose of this type of Access Connector cable is to allow a Clock type H-Clk card to provide the 40 MHz clock signal to a Control type H-Clk card. The detials of the wiring in this type of Access Connector cables is given in the file: h_clk_mez_456_access_conn_cables.txt As delivered to the 3rd floor the 3 cables that source the 40 MHz clock were installed on Clock type H-Clk cards Serial Numbers: 1, 8, and 12. As delivered to the 3rd floor the 3 cables that receive the 40 MHz clock were installed on Control type H-Clk cards Serial Numbers: 16, 17, and 18. On 21-Sept-2012 Ship to David Anchondo in El Paso Texas - Three Clock type H-Clk cards SN 5, 8, and 9 - Two Control type H-Clk cards SN 14 and 16 - CW46S-RS232 93.005401 V1.79.00.02.10 1787855 - CW46S-RS232 93.005401 V1.79.00.02.10 1787856 - Two type 2 cables, Two type 3 cables - Three type 4 cables, Two type 10 cables - Five CB-Fan cards Serial Nunbers: 2, 6, 7, 8, and 9