Dan's Notes on Parts for Liquefier Installation ------------------------------------------------- Rev. Date: 5-Mar-2021 ============================================================= The big Helium Pulse Tube Hoses takes: 32625T61 1-1/2" ID Clamps with inner tube padding The Water Hoses & the Liquefier Vent to Bag Hose take: 32625T71 13/16" ID Clamps The Purifier Gas to Liquefier Hose & the HP Tank Gas Hose: 32625T17 9/16" ID Clamps 1/2" No Tab inner tube fits 32625T52 1/2" ID Clamps 1/2" With Tab No inner tube The 400 psi Compressor to Tanks Hose takes: 32625T55 7/8" ID Clamps The 400 psi Tanks to Purifier Hose takes: 32625T17 9/16" ID Clamps 1/2" No Tab The Electrical Cables take: 1/2" or 9/16" Supported Item Diameter Range --------------------------- -------------- Large Pulse Tube Hose: 1.42" - 1.46" Liquefier Vent to Bag Hose: 0.77" - 0.78" Purifier to Liquefier Hose: 0.48" - 0.50" Compressor to Tank Hose: 0.86" Tank to Purifier Hose: 0.54" Water Hoses: 0.83" - 0.85" Electrical Cable Compressor: 0.37" - 0.41" to Cryo Head Motor Electrical Cables: 1/2" and under all in one clamp Hose Clamps: Hard Hose 1/2" to 1 1/16" ID Range 9/16 Wide Band 5407K59 Soft Hose 5/8" to 1" ID Range 1/2 Wide Band 5413K51 Soft Hose 5/8" to 1 1/16" ID Range 3/8 Wide Band 5476K14 Hose Lengths for the Purifier: from the South Wall Water Connection to the top of the hole in the floor is: 237" or 20 feet from the top surface of the floor to the front of the Purifier with enough length to connect is: 288" or 24 feet ============================================================= ============================================================= ============================================================= Vertical Struts Going CW from the South Wall Water -------------------------------------------------- On the South Wall: Items and Number of Clamps 38" from Pillar, 15" from Water: 2x Water Hoses 20" from Pillar, 33" from Water: New Water Filter 7" from Pillar, 46" from Water: 2x Water Hoses 1x Electrical Cables On the East Surface of the Pillar: Center of East Surface of Pillar: 2x Water Hoses 1x Electrical Cables On the North Surface of the Pillar: 21" from the West Wall: 2x Water Hoses 1x Electrical Cables 7" from the West Wall: 2x Water Hoses 1x Electrical Cables On the West Wall: 7" from the Pillar: 2x Water Hoses 1x Electrical Cables 36" from the Pillar: 2x Water Hoses 1x Electrical Cables 65" from the Pillar: 3x or 4x Water Hoses 1x Electrical Cables Liquefier Vent to Bag Hose Purifier to Liquefier Hose High Pressure Tanks Hose 89" from the Pillar: 4x Water Hoses centered between 1x Electrical Cables two of the Liquefier Vent to Bag Hose Recovery System Purifier to Liquefier Hose copper pipes High Pressure Tanks Hose 103" from the Pillar: Passing through the Floor Hole: Floor Hole Center 2x Big Cryo Pulse Tube Hoses 4x Water Hoses 3x Electrical Cables Liquefier Vent to Bag Hose Purifier to Liquefier Hose 117" from the Pillar: 2x Water Hoses High Pressure Tanks Hose 123" from the Pillar: Existing Water Filter 140" from the Pillar: 1x Water Hose High Pressure Tanks Hose 164" from the Pillar: High Pressure Tanks Hose 168" from the Pillar: Center Line of the High Pressure Tanks ============================================================= Horizontal Struts ----------------- On the North Surface of the Pillar: Two Horizontal Struts, each 1 foot long, center of these horizontal struts is 14" from West Wall, one horizontal strut is 16" up from the floor, the other is 34" up from the floor, the upper horizontal strut is double height, each strut has clamps for the 2 big Helium gas hoses for the Cryo Pulse Tube On the West Wall Centered above the Hole: Two Horizontal Struts, each 1 foot long, center of these horizontal struts is 103" from the pillar, one horizontal strut is 11" up from the floor, the other is 28" up from the floor, the lower horizontal strut is double height The Upper Horizontal Strut has Clamps for: - 4x Water Hoses - 1x Electrical Cables - Liquefier Vent to Bag Hose - Purifier to Liquefier Hose The Lower Horizontal Strut has Clamps for: - 2x big Helium gas hoses for the Cryo Pulse Tube - 4x Water Hoses - 1x Electrical Cables ============================================================= The lifting flag on the Liquefier cryostat is: - 3.0" long horizontally at its top - 2.0" long vertically on its short side - 3.0" long vertically on its long side - the diameter of its hole is 1 1/8" - the top edge of this hole is 1/2" below the top edge of the flag - a mounting plate bolted to the lifting flag: can extend upward 2.0" above the top of the flag can extend in the up-hill direction 2.0" past the flag can extend in the down-hill direction 2.0" past the flag =============================================================