To Do List -------------- Rev. 25-SEPT-1997 1. Electronics Box Cable Clamps Air Duct Connection Wiring Cables inside the Electronics Box and their toroids 2. Blower Mounting, Finger Guard, Air Duct Connection, Power Cord Air Duct 3. Power Supply for VME Equipment Standard D-Zero Supply but must add +- 12V 200 mA supplies 4. Power Supply, Analog, for Camera -4.5V_D, -2.0V_D, +5.0V_D, -9V_A, +9V_A -------- -------- -------- ------ ------ 0.66 A 1.75 A 0.70 A 0.71 A 1.02 A <-- Actual Used 1.00 A 2.65 A 1.10 A 1.10 A 1.55 A <-- Min Supply Mounting Box Isolation Transformer Power Cable(s), Power Connectors Tantalum capacitors for remote sense stability Power Cord and Power Inlet 5. FPGA Programming Board Support FPGA Array #? FPGA 6. 68k Code and Issues Code to load FPGA Configurations Code to set Array operating parameters Diagnostics Code ? Obtain 1 or 2 MVME-133A-20 modules 7. Connection to Sun EDT Card Software Cables 8. Dewar Rock Board Internal Cables Array IC To Do List -------------- Rev. 13-JAN-1998 1. Verify proper Analog Processor operation with current 3rd stage offsets. 2. Prep spare A-Cards for use. 3. Collect toroid inductors and grounding straps for the servo motors. 4. Collect the spare parts that will go to Panama. Spare Cards Spare small Components Spare Power Supplies 5. Make a guard bracket for the Front Paddle Board. 6. Make an MSA4 configuration to sent incrementing values to EDT. 7. Make a spare ROCK card ?? 8. Prep a spare M-Card for use ??