U.S. ATLAS

WBS Summary Cost Estimates

Fiscal Year::All

Funding Source:AllFunding Type:All1/23/98 11:40:32 AM

Institution:All

Base
Cont
Cont
Total
EDIA
Mfg
EDIA
Mfg
FTEs
FTEs



Cost
%


Labor
Labor
Matls
Matls
All Other

WBS
Cost
(k$)
Cost








All

Number
(k$)
(k$)
(k$)
(k$)
(k$)
(k$)

Description
(k$)
(k$)
(k$)
(k$)
(k$)
(k$)
1.4.2Extended Barrel Optics1500.89256.88171757.77258.05728.6033.41480.8219.720.00

1.4.2.1Extended Barrel Scintillator537.1572.9114610.0765.49142.2832.41296.974.320.00

1.4.2.2Extended Barrel Fibers692.38104.6715797.05158.74523.991.008.6413.880.00

1.4.2.3Optical Installation Fixtures211.3669.7033281.0624.0562.330.00124.981.380.00

1.4.2.4Supplies60.009.601669.609.770.000.0050.230.140.00

Page 1 of 1