MODULE :

@MSU

ATLAS TILECAL 

OPTICS INSTRUMENTATION  CHECK LIST

Cover Sheet
REF
REV: 2.3 Sept. 26, 00
TASK
DESCRIPTION
Ref. Page
1
MODULE PREPARATION
1
2
TILES INSTALLATION
2
3
ROUTING PREPARATION
 3
4
PROFILES AND FIBRES INSTALLATION
4
5
FIBRES ROUTING
5
6
FIBRES BUNDLES GLUING
6
7
POLISHING AND CUTTING
 7
8
SECURE FIBRES BUNDLES
8
9
QC6 SCAN
 9
10
CLOSEUP
 10
NOTES
Work crew should initial each task that they work on.

Supervisor should indicate the date as each task is completed.

QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started.

Work crew shold fill in the materials list for all items used.

Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. 



 
1. Module Preparation
Task
Description
Date 
Work Crew 
1.1
Setup Module 
   
1.2
QC0:
Initial Inspection 
   
Item
OK
Not OK : List problems and repairs
Residual Glue
   
Spring Pins
   
Plate/Weld Bar Edges
   
Submodule Shims and Spacing
   
Pained Surfaces
   
Slot Widths
   
Contaminants
   
Task
Description
Date 
Work Crew 
1.3
Clean out Slots
1.4
Clean out Source Holes
1.5
Cover Holes in Girder
   
1.6
Drill & Tap Holes for belt and laser fiber connector
1.7
Clean Module Surfaces
 
1.8
Mark Cell Boundaries 
1.9
 Install Cell & PMT Labels
1.10 Ream Girder Rings

NOTES:



 
2. Tile Installation
Task
Description
Date
Work Crew 
2.1
Measure gaps for shims
   
2.2
Install Shims
2.3
Record Tile Pak Numbers
2.4
Insert Tiles
2.5
Insert Special ITC Tiles
2.4
QC1:
Tile Inspection 
Item
OK
Not OK : List problems and repairs
Tile Color
Tile Sizes
   
Tile End Surfaces
   
Tile Wrappers
   
Task
Description
Date
Work Crew 
2.5
Install Rods
   

NOTES:
 


 
3. Fiber Preparations
Task
Description
Date
Work Crew 
3.1
Install LED Light Tubes 
   
3.2
Label Bottom of Aspirin Tubes
   
3.3
Install Aspirin Tubes and Washers 
   
3.4
Install Fixation Rails
   
3.5
Label Laser Fiber Bundles
3.6
Install Laser Fiber Bundles 
   
3.7
Record Laser Fiber #
3.8
Cover Girder Area
3.9
Install ITC Fiber Supports

NOTES:
 


 
4. Fiber/Profile Installation
Task
Description
Date
Work Crew 
4.1
Setup Profile Cart
   
4.2
Record Profile Batch Numbers
 
4.3
Insert Profiles/WLS Fibers
   
4.4
Install Fiber Separator Wires 
4.5
Install ITC Fibers
4.6
Record ITC Fiber #
4.7
Separate fibers by depth
4.8
Make subbundles
4.9
QC2: Verify Sorting 
   
Item
OK
Not OK : List problems and repairs
Fiber Lengths
   
Fiber Counts
   
Depth Sorting
   
Visual Light Levels
   
4.10
Remove Fiber SeparatorWires

NOTES:
 
 
 
5. Fiber Routing
Task
Description
Date 
Work Crew 
5.1
Route Sub-bundles To Aspirin Tubes
   
5.2
Route the Laser Fibers
5.3
QC3:
Verify Fiber Routing 
   
Item
OK
Not OK : List problems and repairs
Odd Side Cells
   
Even Side Cells
   
5.4
Insert Gluing tubes
5.5
Insert Teflon Rods
5.6
Register and Secure Fibers in Aspirin Tubes
   
5.7
Insert Dummy fibers
   
5.8
QC4: Check Fiber Damage 
   
Item
OK
Not OK : List problems and repairs
Broken fibers
   
Stress Crazing
   
Cladding Damage
   
Fiber Curvature
   
Fiber Contact
   
5.9
Secure the Sub-bundles
   

NOTES:
 


 
6. Glue fiber bundles
Task
Description
Date 
Work Crew 
6.1
Prepare Glue Cartridges
   
6.2
Glue Odd Side 
   
6.3
Glue Even Side
   
6.4
Reserve Samples of Epoxy
   
6.5
Epoxy Cure
   
6.6
Remove Cable Ties from Silicon Tubes
   


 

 

7. Polish Fiber Ends

Task
Description
Date 
Work Crew 
7.1
Setup the Polishing Machine
   
7.2
Polish Fibers, Odd Side
   
7.3
Polish Fibers, Even Side
   
7.4
Remove Polishing Machine
   
7.5
QC5: Inspect Fiber Ends 
   
Item
OK
Not OK : List problems and repairs
Surface Quality
   
Visual Light Level
   

NOTES:
 
 
 
8. Secure fiber bundles
Task
Description
Date
Work Crew
8.1
Cut dummy fibers 
   
8.2
Cut Gluing tubes
   
8.2
Tie FiberBundles to Rails
   
8.3
Install Cotton Belt
   


 
10. Close up
Task
Description
Date 
Work Crew
10.1
Cover Module with Plastic Sheet
   
10.2
Cover Girder Ends
   
10.3
Install Plastic Source Tubes
   
10.4
Cover Source holes
   
10.5
Tape ITC Fiber Support Panels
   
10.6
Install Shipping Cover 
   

NOTES:
 
 

Shimming Data Sheet



 
 
 
 
   
Measured Widths

(mm)

Shims Required
Gap #
Tile 
Oddside
Even side
1/2
3/4
1
1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
Total 1
1 11
2 11
3 11
4 11
5 11
6 11
7 11
8 11
9 11
Total  11

NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top

(where the widths are assumed to be minimum)

    1. Required shims make the minimum slot width in the range 4:4.5 mm
    2. Gaps are numbered starting at the ITC end.
Materials List


Tile Size
1
2
3
4
5
6
7
8
9
10
11
Date of BATCH 
WLS/profile
Long Profiles 
Short Profiles
A12B11
A13B11
A13B12
A14B12
A14B13
A15B13
A15B14
A16B14
A16B15
C10
D4
ITC Fibers #: Right: Left:
Aspirin Tubes :
Laser Fiber #'s Odd Side: Even Side:
Epoxy Batch # Resin: Hardner:

 
 
 

QC 2,3,4 Problem List

Tile Layer
Cell
Side
Tile *
Problem
Fixed ?

NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.


QC6 PROBLEMS


This page maintained by: - RJM