ATLAS TILECAL |
|
OPTICAL INSTRUMENTATION
QUALITY CONTROL (REV. 0) |
MSU QC Manager: R. Miller
Updated: May 18, 1999
The cover page serves as an index to the optical instrumentation check list and to this document. It will be updated as necessary but will not need to be duplicated for each module. The latest version of this document is identified on the cover page by a reference link (REF), a revision number and date.
The check list serves as the log of all tasks that are performed during the optical instrumentation of each module of the TileCal. It should include a record of who did what, when it was done, how long it took to do, what batches of materials were used, the results of tests and checks, any problems that were encountered and what repairs were made. It will be our primary quality control tool, a means of communication within each instrumentation site and between sites, be a monitor of the progress being made and a source of information for solving and avoiding problems.
The optical instrumentation tasks are grouped under 11 headings, numbered 1 to 11. Under the column labeled 'DESCRIPTION' are links to the check lists for that set of tasks. 'QC Page' refers to the corresponding section in this document.
The 'CONTROL SYMBOLS' are used on the check sheets to indicate what action must be taken to satisfy the quality control for that task. All tasks will require at least a signature or initials, S, to indicate the persons who performed the task, and the time and date when it was finished. The hold symbol, H, means that no subsequent tasks should be started on the module until the H task has been finished and passed inspection. The witness control, W, indicates a task that requires the signature of the designated Quality Control technician. The symbol, #, indicates that some data or other information is to be produced at that point.
Start the 'Optics Instrumentation Check Sheet' for this module.
Check that the module serial number corresponds to the check sheet.
Check that the module is secure on the stands. The stands should
be symmetrically placed under the base so that the module does not
rock.
Inspect the module and record on the check sheets the location of any
of the following problems:
Correct any problems.
Sign and date the check sheet.
Report any serious or recurrent problems to the Quality Control technician.
Before inserting the tiles, they should be inspected (in a stack of
about 20 tiles):
Record the batch numbers of the tiles on the check sheet.
After tiles have been inserted into the module, check that:
Repair or replace any problem tiles.
Sign and date the check sheet.
Report any serious or recurrent problems.
Record the batch numbers of the profiles/fibers.
Record the ID numbers of the ITC fiber assemblies and the laser fiber
bundles.
Check all WLS fibers:
Sign and date the check sheet.
Report any serious or recurrent problems.
Check all fiber sub-bundles on both sides of the module:
Repair any problems.
Sign and date the check sheet.
Report any serious or recurrent problems.
Sign and date the check sheet.
Report any serious or recurrent problems.
Inspect the polished fiber ends with the video system -the epoxy surfaces
should be completely cured, mirror smooth, without scratches or chips.
Illuminate the fibers with the light source in the source tubes - note
any fibers that give low light or that appear to be below the polished
surface.
Record any problem on the check sheet and notify the QC manager.
Sign and date the check sheet.