MSU

Module:
ANL-12

ATLAS TILECAL 

OPTICS INSTRUMENTATION  CHECK LIST

Cover Sheet
REF
REV: 2.2

June 16, '00

TASK
DESCRIPTION
QC Page
1
MODULE PREPARATION
2
2
TILES INSTALLATION
3
3
ROUTING PREPARATION
 
4
PROFILES AND FIBRES INSTALLATION
4
5
FIBRES ROUTING
5
6
FIBRES BUNDLES GLUING
6
7
SECURE FIBRES BUNDLES
 
8
POLISHING AND CUTTING
7
9
INSTALL SOURCE TUBES
 
10
CLOSEUP
 
11
QUANTITATIVE TESTING
 
NOTES
Work crew should initial each task that they work on.

Supervisor should indicate the date as each task is completed.

QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started.

Work crew shold fill in the materials list for all items used.

Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. 



 
1. Module Preparation
Task
Description
Date 
Work Crew 
1.1
Setup Module 
 6/20/00 MN,RR,RJM 
1.2
QC0:
Initial Inspection 
   
Item
OK
Not OK : List problems and repairs
Residual Glue
 X  
Spring Pins
 X  
Plate/Weld Bar Edges
   
Submodule Shims and Spacing
   
Pained Surfaces
 X  
Slot Widths
 X  
Contaminants
 X  
Task
Description
Date 
Work Crew 
1.3
Clean out Slots
6/22 RW
1.4
Clean Out Source Holes
6/24 BZ, RW
1.5
Cover Holes in Girder
 6/22 AR 
1.6
Clean Module Surfaces
6/22 RW
1.7
Mark Cell Boundaries 
6/22 RW, AR
1.8
Install Cell & PMT Labels
6/22 RW, AR
1.9
Ream Girder Rings

NOTES:



 
2. Tile Installation
Task
Description
Date
Work Crew 
2.1
Measure gaps for shims
 6/22 RW 
2.2
Install Shims
6/22 AR
2.3
Record Tile Batch Numbers
6/26 RW, BZ, AR
2.4
Insert Tiles
6/26 RW, BZ, AR
2.5
Insert Special ITC Tiles
6/26 RW
2.4
QC1:
Tile Inspection 
6/26 RJM
Item
OK
Not OK : List problems and repairs
Tile Color
X
Tile Sizes
 X  
Tile End Surfaces
 X  
Tile Wrappers
 X  
Task
Description
Date
Work Crew 
2.5
Install Rods
 6/27 RW, AR 

NOTES:
 


 
3. Fiber Preparations
Task
Description
Date
Work Crew 
3.1
Install LED Light Tubes 
 6/26 RW, AR 
3.2
Label Bottom of Aspirin Tubes
6/22 RW, AR
3.3
Install Aspirin Tubes
 6/22 RW, AR 
3.4
Install Fixation Rails
 6/29 RW, BZ 
3.5
Label Laser Fiber Bundles
3.6
Install Laser Fiber Bundles 
6/30  RW, AR 
3.7
Record Laser Fiber #
6/30 Even: 52
Odd: 53
3.8
Cover Girder Area
7/03 RW, BZ
3.9
Install ITC Fiber Supports
7/04 BZ

NOTES:
 


 
4. Fiber/Profile Installation
Task
Description
Date
Work Crew 
4.1
Setup Profile Cart
 6/30 RW, AR, BZ 
4.2
Record Profile Batch 

Numbers

 6/30
4.3
Insert Profiles/WLS Fibers
 6/30  
4.4
Install ITC Fibers
7/04 BZ
4.5
Record ITC Fiber #
4.6
Install Fiber Separator Wires 
7/04 BZ
4.7
Separate fibers by depth
7/04 BZ
4.8
Make subbundles
7/04 BZ
4.9
QC2: Verify Sorting 
 7/06 RJM 
Item
OK
Not OK : List problems and repairs
Fiber Lengths
 X  
Fiber Counts
 X  
Depth Sorting
 X  
Visual Light Levels
   SEE NOTES
4.8
Remove Fiber SeparatorWires
7/06 RW, BZ

NOTES:
 
 
 
5. Fiber Routing
Task
Description
Date 
Work Crew 
5.1
Route Sub-bundles To Aspirin Tubes
 7/06 BZ, RW 
5.2
Route the Laser Fibers
7/05 BZ, RW
5.3
QC3:
Verify Fiber Routing 
 7/06 RJM, CJW 
Item
OK
Not OK : List problems and repairs
Odd Side Cells
 X SEE LIST 
Even Side Cells
 X  
5.4
Insert Gluing tubes
7/06 BZ, RW
5.5
Insert Teflon Rods
7/06 BZ, RW
5.6
Register and Secure Fibers in Aspirin Tubes
 7/06  BZ, RW
5.7
Insert Dummy fibers
 7/06  BZ, RW
5.8
QC4: Check Fiber Damage 
 7/17  RJM
Item
OK
Not OK : List problems and repairs
Broken fibers
   
Stress Crazing
   
Cladding Damage
   
Fiber Curvature
   
Fiber Contact
   
5.9
Secure the Sub-bundles
 7/20 RW, BZ 

NOTES:

  1. Bundles not marked- PMTS #4-12 even side
  2. ReRoute laser fiber PMT #29
  3. Reregister PMT #41, 37, 21- all of odd side bundle.

 
6. Glue fiber bundles
Task
Description
Date 
Work Crew 
6.1
Prepare Glue Cartridges
 7/21 RW, AR
6.2
Glue Odd Side
 7/21  RW, AR
6.3
Glue Even Side
 7/21  RW, AR
6.4
Reserve Samples of Epoxy
 7/21  RW, AR
6.5
Epoxy Cure
   
6.6
Remove Cable Ties from Silicon Tubes
 7/24  TB, BZ

 

7. Polish Fiber Ends

Task
Description
Date 
Work Crew 
7.1
Setup the Polishing Machine
 7/24  RW, BZ, TB
7.2
Polish Odd Side
 7/24  RW, BZ, TB
7.3
Polish Even Side
 7/24  RW, TB
7.4
Remove Polishing Machine
 7/24  CJW, RJM
7.5
QC5: Inspect Fiber Ends 
 7/24  CJW, RJM
Item
OK
Not OK : List problems and repairs
Surface Quality
 X SEE NOTES BELOW 
Visual Light Level
 X  

NOTES:
 

  1. PMT #41: Two fibers in this bundle did not appear to be polished.  Repaired by applying more epoxy to face of bundle, removed aspirin tube washer and repolished.
  2. PMT # 33: Replaced fiber.
  3. PMT # 11: Replaced 2 fibers.

 
8. Secure fiber bundles
Task
Description
Date
Work Crew
8.1
Cut dummy fibers 
 7/28  AR, TB
8.2
Cut Gluing tubes
 7/24  BZ, TB
8.2
Tie Fiber Bundles to Rails
 7/28  AR, TB
8.3
Install Cotton Belt
 8/9/00  MN

 
 
10. Close up
Task
Description
Date 
Work Crew
10.1
Cover Module with PlasticSheet
 8/15  
10.2
Cover Girder Ends
 8/15  
10.3
Install Plastic Source Tubes
 8/12  RJM
10.4
Cover Source holes
 8/12  RJM
10.5
Tape ITC Fiber Support Panels
 8/12  RJM
10.6
Install Shipping Cover 
 8/15  

NOTES:
 
 

Shimming Data Sheet



 
 
 
   
Measured Widths

(mm)

Shims Required
Gap #
Tile 
Oddside
Even side
1/2
3/4
1
1 1 5.0 4.8 1
2 1 6.0 5.8 1 1
3 1 4.2 4.2
4 1 4.4 4.8 1
5 1 5.6 5.0 1
6 1 4.4 4.6 1
7 1 4.6 4.8 1
8 1 4.2 4.2
9 1 5.4 5.6 1 1
Total 1
1 11 5.0 4.8 1
2 11 5.0 4.4 1
3 11 4.2 4.4
4 11 4.4 4.4
5 11 4.6 4.8 1
6 11 4.6 4.6 1
7 11 4.2 4.0
8 11 4.2 4.6
9 11 4.8 4.8 1
Total  11

NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top

(where the widths are assumed to be minimum)

    1. Required shims make the minimum slot width in the range 4:4.5 mm
    2. Gaps are numbered starting at the ITC end.
Materials List


Tile Size
Box #'s
Pkg. #'s
1
9 147, 138, 127, 155, 142
2
7, 1 94, 95, 109, 6, 23, 7, 5
3
6 82, 87, 110, 78, 84, 136, 156
4
42, 16 459;  177, 172, 188, 198, 195, 194
5
10 96, 106, 103, 104, 105, 111, 110
6
24, 42 287, 286, 277, 278, 492, 487, 277
7
49, 14 454, 441, 497;  146, 129, 115, 113; 45
8
34, 39 277, 301, 300, 302, 276, 279;  346, 343
9
44 395, 392, 396, 393, 394, 391, 388
10
26, 64 458, 457, 466, 366, 369, 380, 382, 367, 381
11
11, 43 378, 370, 382, 380, 387, 379, 165, 166, 171
BATCH #
WLS/profile
Long Profiles 
Short Profiles
A12B11
3RD SHIPMENT
A13B11
A13B12
A14B12
A14B13
A15B13
A15B14
A16B14
A16B15
C10
D4
ITC Fibers #: Right:
72
Left:
72
Aspirin Tubes :
Laser Fiber #'s Odd Side: Even Side:
EB53 EB52
Epoxy Batch # Resin:
N9C129216
Hardner:
93015216

 

QC Problem List
Tile Layer
Cell
Side
Tile *
Problem
Fixed ?
1 A14 E 4 Nicked fiber X
1 A13 E 8 crazed fiber X
9 D6 O 9 split fiber X
9 D6 O 20 cracked fiber X
1 A15 O 6 nicked fiber X
1 A15 E 4 nicked fiber X
1 A13 O 21 nicked fiber X
1 A12 O 6 nicked fiber X
8 D5 O 64 nicked fiber X

NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.
 
 