Module:
|
OPTICS INSTRUMENTATION CHECK LIST |
|
|
||
June 16, '00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Supervisor should indicate the date as each task is completed. QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started. Work crew shold fill in the materials list for all items used. Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. |
|
||||||||||
|
|
|
|
|||||||
|
|
6/20/00 | MN,RR,RJM | |||||||
|
Initial Inspection |
|||||||||
|
|
|
||||||||
|
X | |||||||||
|
X | |||||||||
|
||||||||||
|
||||||||||
|
X | |||||||||
|
X | |||||||||
|
X | |||||||||
|
|
|
|
|||||||
|
|
6/22 | RW | |||||||
|
|
6/24 | BZ, RW | |||||||
|
|
6/22 | AR | |||||||
|
|
6/22 | RW | |||||||
|
|
6/22 | RW, AR | |||||||
|
|
6/22 | RW, AR | |||||||
|
|
NOTES:
|
||||||||||||
|
|
|
|
|||||||||
|
|
6/22 | RW | |||||||||
|
|
6/22 | AR | |||||||||
|
|
6/26 | RW, BZ, AR | |||||||||
|
|
6/26 | RW, BZ, AR | |||||||||
|
|
6/26 | RW | |||||||||
|
Tile Inspection |
6/26 | RJM | |||||||||
|
|
|
||||||||||
|
X | |||||||||||
|
X | |||||||||||
|
X | |||||||||||
|
X | |||||||||||
|
|
|
|
|||||||||
|
|
6/27 | RW, AR |
NOTES:
|
|||||||||
|
|
|
|
||||||
|
|
6/26 | RW, AR | ||||||
|
|
6/22 | RW, AR | ||||||
|
|
6/22 | RW, AR | ||||||
|
|
6/29 | RW, BZ | ||||||
|
|
||||||||
|
|
6/30 | RW, AR | ||||||
|
|
6/30 | Even: 52
Odd: 53 |
||||||
|
|
7/03 | RW, BZ | ||||||
|
|
7/04 | BZ |
NOTES:
|
||||||||||
|
|
|
|
|||||||
|
|
6/30 | RW, AR, BZ | |||||||
|
Numbers |
6/30 | ||||||||
|
|
6/30 | ||||||||
|
|
7/04 | BZ | |||||||
|
|
|||||||||
|
|
7/04 | BZ | |||||||
|
|
7/04 | BZ | |||||||
|
|
7/04 | BZ | |||||||
|
|
7/06 | RJM | |||||||
|
|
|
||||||||
|
X | |||||||||
|
X | |||||||||
|
X | |||||||||
|
SEE NOTES | |||||||||
|
|
7/06 | RW, BZ |
NOTES:
|
|||||||||||||
|
|
|
|
||||||||||
|
|
7/06 | BZ, RW | ||||||||||
|
|
7/05 | BZ, RW | ||||||||||
|
Verify Fiber Routing |
7/06 | RJM, CJW | ||||||||||
|
|
|
|||||||||||
|
X | SEE LIST | |||||||||||
|
X | ||||||||||||
|
|
7/06 | BZ, RW | ||||||||||
|
|
7/06 | BZ, RW | ||||||||||
|
|
7/06 | BZ, RW | ||||||||||
|
|
7/06 | BZ, RW | ||||||||||
|
|
7/17 | RJM | ||||||||||
|
|
|
|||||||||||
|
|||||||||||||
|
|||||||||||||
|
|||||||||||||
|
|||||||||||||
|
|||||||||||||
|
|
7/20 | RW, BZ |
NOTES:
|
|||||||||
|
|
|
|
||||||
|
|
7/21 | RW, AR | ||||||
|
|
7/21 | RW, AR | ||||||
|
|
7/21 | RW, AR | ||||||
|
|
7/21 | RW, AR | ||||||
|
|
||||||||
|
|
7/24 | TB, BZ |
|
|||||||||
|
|
|
|
||||||
|
|
7/24 | RW, BZ, TB | ||||||
|
|
7/24 | RW, BZ, TB | ||||||
|
|
7/24 | RW, TB | ||||||
|
|
7/24 | CJW, RJM | ||||||
|
|
7/24 | CJW, RJM | ||||||
|
|
|
|||||||
|
X | SEE NOTES BELOW | |||||||
|
X |
NOTES:
|
||||||||||
|
|
|
|
|||||||
|
|
7/28 | AR, TB | |||||||
|
|
7/24 | BZ, TB | |||||||
|
|
7/28 | AR, TB | |||||||
|
|
8/9/00 | MN |
|
|||||||||
|
|
|
|
||||||
|
|
8/15 | |||||||
|
|
8/15 | |||||||
|
|
8/12 | RJM | ||||||
|
|
8/12 | RJM | ||||||
|
|
8/12 | RJM | ||||||
|
|
8/15 |
NOTES:
(mm) |
|
||||||||
|
|
|
|
|
|
|
|||
1 | 1 | 5.0 | 4.8 | 1 | |||||
2 | 1 | 6.0 | 5.8 | 1 | 1 | ||||
3 | 1 | 4.2 | 4.2 | ||||||
4 | 1 | 4.4 | 4.8 | 1 | |||||
5 | 1 | 5.6 | 5.0 | 1 | |||||
6 | 1 | 4.4 | 4.6 | 1 | |||||
7 | 1 | 4.6 | 4.8 | 1 | |||||
8 | 1 | 4.2 | 4.2 | ||||||
9 | 1 | 5.4 | 5.6 | 1 | 1 | ||||
Total | 1 | ||||||||
1 | 11 | 5.0 | 4.8 | 1 | |||||
2 | 11 | 5.0 | 4.4 | 1 | |||||
3 | 11 | 4.2 | 4.4 | ||||||
4 | 11 | 4.4 | 4.4 | ||||||
5 | 11 | 4.6 | 4.8 | 1 | |||||
6 | 11 | 4.6 | 4.6 | 1 | |||||
7 | 11 | 4.2 | 4.0 | ||||||
8 | 11 | 4.2 | 4.6 | ||||||
9 | 11 | 4.8 | 4.8 | 1 | |||||
Total | 11 |
NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top
(where the widths are assumed to be minimum)
|
|
|
|||||||||||||||||||||
|
9 | 147, 138, 127, 155, 142 | |||||||||||||||||||||
|
7, 1 | 94, 95, 109, 6, 23, 7, 5 | |||||||||||||||||||||
|
6 | 82, 87, 110, 78, 84, 136, 156 | |||||||||||||||||||||
|
42, 16 | 459; 177, 172, 188, 198, 195, 194 | |||||||||||||||||||||
|
10 | 96, 106, 103, 104, 105, 111, 110 | |||||||||||||||||||||
|
24, 42 | 287, 286, 277, 278, 492, 487, 277 | |||||||||||||||||||||
|
49, 14 | 454, 441, 497; 146, 129, 115, 113; 45 | |||||||||||||||||||||
|
34, 39 | 277, 301, 300, 302, 276, 279; 346, 343 | |||||||||||||||||||||
|
44 | 395, 392, 396, 393, 394, 391, 388 | |||||||||||||||||||||
|
26, 64 | 458, 457, 466, 366, 369, 380, 382, 367, 381 | |||||||||||||||||||||
|
11, 43 | 378, 370, 382, 380, 387, 379, 165, 166, 171 | |||||||||||||||||||||
|
|||||||||||||||||||||||
WLS/profile |
|
|
|||||||||||||||||||||
|
3RD SHIPMENT | ||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
ITC Fibers #: | Right:
72 |
Left:
72 |
|||||||||||||||||||||
Aspirin Tubes : | |||||||||||||||||||||||
Laser Fiber #'s | Odd Side: | Even Side: | |||||||||||||||||||||
EB53 | EB52 | ||||||||||||||||||||||
Epoxy Batch # | Resin:
N9C129216 |
Hardner:
93015216 |
QC Problem List
|
|
|
|
|
|
1 | A14 | E | 4 | Nicked fiber | X |
1 | A13 | E | 8 | crazed fiber | X |
9 | D6 | O | 9 | split fiber | X |
9 | D6 | O | 20 | cracked fiber | X |
1 | A15 | O | 6 | nicked fiber | X |
1 | A15 | E | 4 | nicked fiber | X |
1 | A13 | O | 21 | nicked fiber | X |
1 | A12 | O | 6 | nicked fiber | X |
8 | D5 | O | 64 | nicked fiber | X |
NOTE: Tiles are numbered from the beginning of
the cell, starting at the tile closest to the ITC end of the module. Count
every other profile to count the tiles. Odd tile layers start at the cell
boundary (count from the first profile), even tile layers start with a
spacer plate (count from the second profile). The tile counting stick makes
it easier to locate the tiles.
This page maintained by: - RJM
Last Update: 08/21/00 by: -CJW