MODULE :

@MSU

ATLAS TILECAL 

OPTICS INSTRUMENTATION  CHECK LIST

Cover Sheet
REF
REV: 2.3 Sept. 26, 00
TASK
DESCRIPTION
Ref. Page
1
MODULE PREPARATION
1
2
TILES INSTALLATION
2
3
ROUTING PREPARATION
 3
4
PROFILES AND FIBRES INSTALLATION
4
5
FIBRES ROUTING
5
6
FIBRES BUNDLES GLUING
6
7
POLISHING AND CUTTING
 7
8
SECURE FIBRES BUNDLES
8
9
QC6 SCAN
 9
10
CLOSEUP
 10
NOTES
Work crew should initial each task that they work on.

Supervisor should indicate the date as each task is completed.

QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started.

Work crew shold fill in the materials list for all items used.

Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. 



 
1. Module Preparation
Task
Description
Date 
Work Crew 
1.1
Setup Module 
 9-26-00  MN,RJM,RW,RR,Andy
1.2
QC0:
Initial Inspection 
 9-26-00  RJM 
Item
OK
Not OK : List problems and repairs
Residual Glue
 X
 
Spring Pins
 X
 
Plate/Weld Bar Edges
 X
 
Submodule Shims and Spacing
 X
 Some very large gaps
Pained Surfaces
 X
 
Slot Widths
 X
 
Contaminants
 X
 
Task
Description
Date 
Work Crew 
1.3
Clean out Slots
 
1.4
Clean out Source Holes
   
1.5
Cover Holes in Girder
 10-4-00
PBL 
1.6
Drill & Tap Holes for belt and laser fiber connector
10-27-00
RW
1.7
Clean Module Surfaces
 
 
1.8
Mark Cell Boundaries 
10-4-00
RW,ANDY
1.9
 Install Cell & PMT Labels
10-4-00
RW
1.10
Ream Girder Rings
10-4-00
PBL

NOTES:



 
2. Tile Installation
Task
Description
Date
Work Crew 
2.1
Measure gaps for shims
 
 RW,ANDY
2.2
Install Shims
 
RW
2.3
Record Tile Pak Numbers
 
RW,Andy,PBL
2.4
Insert Tiles
 
RW,Andy,PBL
2.5
Insert Special ITC Tiles
 
RW
2.4
QC1:
Tile Inspection 
10-19-00
RJM
Item
OK
Not OK : List problems and repairs
Tile Color
X
 
Tile Sizes
 X
 
Tile End Surfaces
 X
 
Tile Wrappers
 X
 
Task
Description
Date
Work Crew 
2.5
Install Rods
 X
 

NOTES:
2.4    Tiles in D5, D6, were centered before profiles were installed - see if it makes any difference
 


 
3. Fiber Preparations
Task
Description
Date
Work Crew 
3.1
Install LED Light Tubes 
RJM 
3.2
Label Bottom of Aspirin Tubes
 
 
3.3
Install Aspirin Tubes and Washers 
 
 
3.4
Install Fixation Rails
 
 
3.5
Label Laser Fiber Bundles
10-27-00
RW
3.6
Install Laser Fiber Bundles 
 10-27-00
 RW
3.7
Record Laser Fiber #
10-27-00
RW
3.8
Cover Girder Area
 
AR
3.9
Install ITC Fiber Supports
   

NOTES:
 


 
4. Fiber/Profile Installation
Task
Description
Date
Work Crew 
4.1
Setup Profile Cart
 11-16-00
AR,MR 
4.2
Record Profile Batch Numbers
 11-16-00
AR,MR
4.3
Insert Profiles/WLS Fibers
 11-16:21-00 
 AR,MR,MN,RW
4.4
Install Fiber Separator Wires 
   
4.5
Install ITC Fibers
   
4.6
Record ITC Fiber #
11-30-00
RJM
4.7
Separate fibers by depth
   
4.8
Make subbundles
   
4.9
QC2: Verify Sorting 
 11-30-00
RJM 
Item
OK
Not OK : List problems and repairs
Fiber Lengths
 X
 
Fiber Counts
 X
 
Depth Sorting
 X
 
Visual Light Levels
 X
 
4.10
Remove Fiber SeparatorWires
   

NOTES:  4.9  More shims were added to submodule gaps to hold loose profiles
 
 
 
5. Fiber Routing
Task
Description
Date 
Work Crew 
5.1
Route Sub-bundles To Aspirin Tubes
 12-7-00
AR 
5.2
Route the Laser Fibers
12-7-00
AR
5.3
QC3:
Verify Fiber Routing 
12-11-00
RJM 
Item
OK
Not OK : List problems and repairs
Odd Side Cells
 
 SEE NOTES - problems repaired
Even Side Cells
 
 SEE NOTES - problems repaired
5.4
Insert Gluing tubes
12-19:20-00
RW
5.5
Insert Teflon Rods
12-19:20-00
RW
5.6
Register and Secure Fibers in Aspirin Tubes
 12-19:20-00
 RW
5.7
Insert Dummy fibers
 12-19:20-00
 RW
5.8
QC4: Check Fiber Damage 
 12-21-00
 RJM
Item
OK
Not OK : List problems and repairs
Broken fibers
 X
 
Stress Crazing
 X
 
Cladding Damage
 
 Many fibers in D5,D6 have the sparkle defects
Fiber Curvature
 X
 
Fiber Contact
 
5.9
Secure the Sub-bundles
 
 

NOTES:
5.3 Odd Side
    1.  Fibers to PMT6 are entangled with fibers to PMT2 and on top of fibers to PMT14
    2.  Left bundle to PMT10 is on top of Right bundle to PMT12
     3.  Laser fibers to PMT16,18 are entangled with Left bundle to PMT-12
     4.  Left bundle to PMT22 is on top of Right bundle to PMT24
    Even Side
    1.  Laser fibers to PMT5 should be on top of left bundle to PMT3
    2.  The bundle of clear fibers to PMT13 should be under the right bundle to PMT3
    3.  The right bundle to PMT9 should be on top of the Left bundle to PMT11
 


 
6. Glue fiber bundles
Task
Description
Date 
Work Crew 
6.1
Prepare Glue Cartridges
 12-20-00
RJM 
6.2
Glue Odd Side 
 12-21-00
MN,RJM,RW 
6.3
Glue Even Side
 12-21-00
 MN,RJM,RW 
6.4
Reserve Samples of Epoxy
 12-21-00
 MN,RJM,RW 
6.5
Epoxy Cure
 GOOD
 
6.6
Remove Cable Ties from Silicon Tubes
 12-22-00
 RJM


 

 

7. Polish Fiber Ends

Task
Description
Date 
Work Crew 
7.1
Setup the Polishing Machine
 1/3/01
RJM,RW 
7.2
Polish Fibers, Odd Side
 1/3/01
 MN,RW
7.3
Polish Fibers, Even Side
 1/3/01
 MN,RW
7.4
Remove Polishing Machine
 1/3/01
 MN,RW
7.5
QC5: Inspect Fiber Ends 
 1-4-01
 RJM
Item
OK
Not OK : List problems and repairs
Surface Quality
 X
 
Visual Light Level
 X
 

NOTES:
 
 
 
8. Secure fiber bundles
Task
Description
Date
Work Crew
8.1
Cut dummy fibers 
 1-3-01
 RW
8.2
Cut Gluing tubes
 1-3-01
 RW
8.2
Tie FiberBundles to Rails
 1-3-01
 RW
8.3
Install Cotton Belt
 1-5-01
 RJM
         8.4                                Tape Profiles                        1-11-01                                            RJM

 
10. Close up
Task
Description
Date 
Work Crew
10.1
Cover Module with Plastic Sheet
 1-8-01
 RJM,MN
10.2
Cover Girder Ends
 1-12-01
 RJM
10.3
Install Plastic Source Tubes
 1-15-01
 RJM
10.4
Cover Source holes
 1-15-01
 RJM
10.5
Tape ITC Fiber Support Panels
 1-12-01
 RJM
10.6
Install Shipping Cover 
 
 

NOTES:
 
 

Shimming Data Sheet



 
 
 
 
 
   
Measured Widths

(mm)

Shims Required
Gap #
Tile 
Oddside
Even side
1/2
3/4
1
1
1
5.0
4.8
 
1
 
2
1
4.6
4.2
     
3
1
4.4
4.4
     
4
1
4.2
4.2
     
5
1
5.4
5.6
1
 
1
6
1
5.2
5.2
   
1
7
1
5.0
4.6
1
   
8
1
4.8
4.4
1
   
9
1
3.9
4.2
     
Total
1
       
             
1
11
4.4
4.0
     
2
11
4.6
4.2
     
3
11
4.6
4.6
1
   
4
11
4.0
4.4
     
5
11
4.0
4.4
     
6
11
4.0
4.0
     
7
11
4.0
4.0
     
8
11
4.2
4.0
     
9
11
4.2
4.4
     
Total 
11

NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top

(where the widths are assumed to be minimum)

    1. Required shims make the minimum slot width in the range 4:4.5 mm
    2. Gaps are numbered starting at the ITC end.
Materials List


Tile Size
Color
Pkg.# (number of tiles) in order from ITC end
 
1
Yellow
1445,1285,1410,1443,1382,1457,1295
2
Yellow
45,32,31,30,94,55,161
3
Yellow
1063,754,783,796,759,760,756
4
Yellow
341,261,262,354,260,287,290
5
Yellow
490,274,464,185,182,307,468
6
Yellow
133,258,136,131,278,267,277
7
Blue, 45 mm Masked
 
8
Blue
240,184,46,258,262,78,274
9
Blue
104,236,6,49,52,65,54,256
10
Blue
8,141,118,38,11,79,9,46,47
11
Blue
171,187,182,184,134,161,188,185,22
Date of BATCH 
WLS/profile
Long Profiles 
Short Profiles
A12B11
8-29-00
8-29-00
A13B11
8-29-00
8-29-00
A13B12
8-29-00
8-29-00
A14B12
8-29-00
8-29-00
A14B13
8-29-00
8-29-00
A15B13
8-29-00
8-29-00
A15B14
8-29-00
8-29-00
A16B14
8-29-00
8-29-00
A16B15
8-29-00
8-29-00
C10
   
D4
10-13-00
10-13-00
ITC Fibers #: Right: 82 Left: 82
Aspirin Tubes :
Laser Fiber #'s Odd Side: EB85 Even Side:EB84
Epoxy Batch # Resin:30C100517 Hardner:300472817 - Exp. 3/17/01

 
 
 

QC 2,3,4 Problem List

Tile Layer
Cell
Side
Tile *
Problem
Fixed ?
10
D4
E
5
Crazed fiber
RJM
10
D4
o
6
Crazed fiber
RJM
11
D4,5,6
E,0
 
Profiles loose in submodule gaps
Added more shims - RJM
1
A16
O
5
Loose Profile
Added more shims - RJM
QC4:
         
4
B14
E
24,25
Sparkle fiber defects
No
8,10
D6
E,0
MANY
Sparkle fiber defects
No
8,10
D5
E,0
MANY
Sparkle fiber defects
No
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           

NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.


QC6 PROBLEMS


This page maintained by: - RJM