MODULE :

ANL-019 @MSU

ATLAS TILECAL 

OPTICS INSTRUMENTATION  CHECK LIST

Cover Sheet

REF

REV: 2.3 Sept. 26, 00

TASK

DESCRIPTION

Ref. Page

1

MODULE PREPARATION

1

2

TILES INSTALLATION

2

3

ROUTING PREPARATION

 3

4

PROFILES AND FIBRES INSTALLATION

4

5

FIBRES ROUTING

5

6

FIBRES BUNDLES GLUING

6

7

POLISHING AND CUTTING

 7

8

SECURE FIBRES BUNDLES

8

9

QC6 SCAN

 9

10

CLOSEUP

 10

NOTES

Work crew should initial each task that they work on.

Supervisor should indicate the date as each task is completed.

QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started.

Work crew shold fill in the materials list for all items used.

Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. 



 

1. Module Preparation

Task

Description

Date 

Work Crew 

1.1

Setup Module 

 10-19-00

 MN,RJM,RW,RR

1.2

QC0:
Initial Inspection 

 10-23-00

 RJM 

Item

OK

Not OK : List problems and repairs

Residual Glue

 X

 

Spring Pins

 

1 loose pin removed

Plate/Weld Bar Edges

 X

 

Submodule Shims and Spacing

 X

Pained Surfaces

 X

 

Slot Widths

 X

 

Contaminants

 X

 

Task

Description

Date 

Work Crew 

1.3

Clean out Slots

10-23-00

RW, DD

1.4

Clean out Source Holes

11-14

RW

1.5

Cover Holes in Girder

10-23-00

RW

1.6

Drill & Tap Holes for belt and laser fiber connector

12-5-00

AR

1.7

Clean Module Surfaces

1.8

Mark Cell Boundaries 

10-24

DD, RW

1.9

Install Cell & PMT Labels

1.10

Ream Girder Rings

NOTES:



 

2. Tile Installation

Task

Description

Date

Work Crew 

2.1

Measure gaps for shims

11/21/00

MR

2.2

Install Shims

11/21/00

MR

2.3

Record Tile Pak Numbers

11/21/00

MR

2.4

Insert Tiles

11/21/00

MR

2.5

Insert Special ITC Tiles

x

2.4

QC1:
Tile Inspection 

12-4

RJM

Item

OK

Not OK : List problems and repairs

Tile Color

X

 

Tile Sizes

 X

 

Tile End Surfaces

 X

 

Tile Wrappers

 X

 

Task

Description

Date

Work Crew 

2.5

Install Rods

 X

 

NOTES:
 


 

3. Fiber Preparations

Task

Description

Date

Work Crew 

3.1

Install LED Light Tubes 

RJM 

3.2

Label Bottom of Aspirin Tubes

 11-14

RW

3.3

Install Aspirin Tubes and Washers 

 11-14

RW

3.4

Install Fixation Rails

 

 

3.5

Label Laser Fiber Bundles

3.6

Install Laser Fiber Bundles 

3.7

Record Laser Fiber #

X

RJM

3.8

Cover Girder Area

3.9

Install ITC Fiber Supports

NOTES:
 


 

4. Fiber/Profile Installation

Task

Description

Date

Work Crew 

4.1

Setup Profile Shelves

12-6-00

MR,DK

4.2

Record Profile Batch Numbers

12-6-00

MR

4.3

Insert Profiles/WLS Fibers

12-6-00

MR

4.4

Install Fiber Separator Wires 

4.5

Install ITC Fibers

12-19-00

DK

4.6

Record ITC Fiber #

x

4.7

Separate fibers by depth

4.8

Make subbundles

4.9

QC2: Verify Sorting 

1/4/01

RJM

Item

OK

Not OK : List problems and repairs

Fiber Lengths

 X

 

Fiber Counts

 X

 

Depth Sorting

 X

 

Visual Light Levels

 X

2 Problems Fixed

4.10

Remove Fiber SeparatorWires

 

 

NOTES:  4.3  A large number of fibers were found in Box 75, received 11/2, that had a strange curve in them. We guess that this curve came from the way that the fibers were twisted around each other in the storage box.
 
 

5. Fiber Routing

Task

Description

Date 

Work Crew 

5.1

Route Sub-bundles To Aspirin Tubes

1-7-01

RW, DD

5.2

Route the Laser Fibers

1-7-01

RW, DD

5.3

QC3:
Verify Fiber Routing 

1-10-01

RJM

Item

OK

Not OK : List problems and repairs

Odd Side Cells

 

 SEE NOTES - problems repaired

Even Side Cells

 

 SEE NOTES - problems repaired

5.4

Insert Gluing tubes

1-10-01

AR, RW

5.5

Insert Teflon Rods

1-10-01

AR, RW

5.6

Register and Secure Fibers in Aspirin Tubes

1-10-01

AR, RW

5.7

Insert Dummy fibers

1-10-01

AR, RW

5.8

QC4: Check Fiber Damage 

1-18-01

RJM

Item

OK

Not OK : List problems and repairs

Broken fibers

 X

 

Stress Crazing

 X

 

Cladding Damage

 x

 

Fiber Curvature

 X

 

Fiber Contact

 

5.9

Secure the Sub-bundles

 

 

NOTES:
5.3 PMT 41: L bundle is not split properly around PMT37. PMT33: Laser fiber is wrapped around WLS fiber. PMT11: Laser fiber should be routed below WLS fiber to PMT9. PMT1: Fibers are wrapped around fibers to PMT13. Laser input fibers need to be routed to the other end of girder - Both sides. PMT16: All fibers in L bundle should be under D6 fibers. PMT14: Lost its laser fiber. PMT6: Laser fiber should be on top of L bundle to PMT4, remove it from the velcro wrap.
 

6. Glue fiber bundles

Task

Description

Date 

Work Crew 

6.1

Prepare Glue Cartridges

1-19-01

RJM

6.2

Glue Odd Side 

1-19-01

RR, MN, RJM

6.3

Glue Even Side

1-19-01

RR, MN, RJM

6.4

Reserve Samples of Epoxy

1-19-01

RR, MN

6.5

Epoxy Cure

1-22

OK-RJM

6.6

Remove Cable Ties from Silicon Tubes

1-22

RJM


 


 

7. Polish Fiber Ends

Task

Description

Date 

Work Crew 

7.1

Setup the Polishing Machine

1-23-01

MN

7.2

Polish Fibers, Odd Side

1-23-01

MN

7.3

Polish Fibers, Even Side

1-23-01

MN, RW

7.4

Remove Polishing Machine

1-23

RW

7.5

QC5: Inspect Fiber Ends 

1-23

RJM

Item

OK

Not OK : List problems and repairs

Surface Quality

 X

 

Visual Light Level

 X

 

NOTES:
  7.5 PMT12, A13 has a void next to one of the Teflon fibers. WLS fibers look OK.
 
 

8. Secure fiber bundles

Task

Description

Date

Work Crew

8.1

Cut dummy fibers 

1-22

RJM

8.2

Cut Gluing tubes

1-22

RJM

8.2

Tie FiberBundles to Rails

1-25

RW, AR

8.3

Install Cotton Belt

1-25

RJM

  8.4        Tape Profiles             1-29-01    RJM

 

10. Close up

Task

Description

Date 

Work Crew

10.1

Cover Module with Plastic Sheet

1-25

 RJM,MN

10.2

Cover Girder Ends

1-30-01

 RJM

10.3

Install Plastic Source Tubes

1-30-01

 RJM

10.4

Cover Source holes

1-30-01

 RJM

10.5

Tape ITC Fiber Support Panels

1-30-01

 RJM

10.6

Install Shipping Cover 

 

 

NOTES:
 
 

Shimming Data Sheet



 
 
 
 
 

 

 

Measured Widths

(mm)

Shims Required

Gap #

Tile 

Oddside

Even side

1/2

3/4

1

1

1

4.9

4.6

1

2

1

5.0

4.7

1

3

1

4.7

4.7

1

4

1

4.3

4.3

5

1

4.3

4.4

6

1

5.0

5.2

1

7

1

4.9

5.0

1

8

1

4.2

4.1

9

1

5.0

5.5

1

Total

1

 

 

 

 

 

 

 

 

 

 

 

1

11

4.2

4.5

 

2

11

4.1

4.1

 

3

11

4.0

4.0

 

4

11

4.5

4.3

 

5

11

4.2

4.2

 

6

11

4.3

3.9

 

7

11

4.2

4.2

 

8

11

4.4

4.2

 

9

11

4.4

4.2

Total 

11

NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top

(where the widths are assumed to be minimum)

    1. Required shims make the minimum slot width in the range 4:4.5 mm
    2. Gaps are numbered starting at the ITC end.

Materials List

Tile Size

Color

Pkg.# (number of tiles) in order from ITC end

 

1

Yellow

1413,1411,1296,1458,1459,1297,1324

2

Yellow

146,38,113,76,19,22,143(replaced with 1415)

3

Yellow

757,826,782,660,834,732,743

4

Yellow

317,258,342,263,265,267,266

5

Yellow

372,259,262,62,184,488,299

6

Yellow

283,132,260,284,285,281,269

7

Blue, 45 mm Masked

8

Blue

355,607,622,40,35,615,352,180

9

Blue

278,178,279,275,327,328,326,290

10

Blue

412,496,27,178,28,47,63,247,227

11

Blue

491,460,470,471,407,457,556,4

Date of BATCH 

WLS/profile

Long Profiles 

Short Profiles

A12B11

8-29-00, 11-02-00

11-02-00

A13B11

8-29-00, 11-02-00

No date,11-02-00

A13B12

11-02-00

11-02-00

A14B12

11-02-00

11-02-00

A14B13

11-02-00

11-02-00

A15B13

11-02-00

11-02-00

A15B14

11-02-00

8-29-00, 11-02-00

A16B14

11-02-00

11-02-00

A16B15

8-29-00,11-02-00

11-02-00

C10

 

 

D4

10-13-00

10-13-00

ITC Fibers #:

Right: 77

Left: 77

Aspirin Tubes :

Laser Fiber #'s

Odd Side: EB83

Even Side:EB86

Epoxy Batch #

Resin:30C100517

Hardner:300472817 - Exp. 3/17/01


 
 
 

QC 2,3,4 Problem List

Tile Layer

Cell

Side

Tile *

Problem

Fixed ?

QC2

2

A16

E

3

Fiber is not lit - not attached to the profile

Reglued - RJM

5

B12

E

18

Low light ?

Reseated profile

No problems seen in QC3, QC4 checks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.


QC6 PROBLEMS


This page maintained by: - RJM