MODULE PREPARATION

1

2

TILES INSTALLATION

2

3

ROUTING PREPARATION

 3

4

PROFILES AND FIBRES INSTALLATION

4

5

FIBRES ROUTING

5

6

FIBRES BUNDLES GLUING

6

7

POLISHING AND CUTTING

 7

8

SECURE FIBRES BUNDLES

8

9

QC6 SCAN

 9

10

CLOSEUP

 10

NOTES

Work crew should initial each task that they work on.

Supervisor should indicate the date as each task is completed.

QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started.

Work crew shold fill in the materials list for all items used.

Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. 



 
 

1. Module Preparation

Task

Description

Date 

Work Crew 

1.1

Setup Module 

1-17-01

MN,RR, RJM

1.2

QC0:
Initial Inspection 

1-18-01

RJM

Item

OK

Not OK : List problems and repairs

Residual Glue

XX

Spring Pins

X

Plate/Weld Bar Edges

X

Submodule Shims and Spacing

X

Pained Surfaces

X

Paint peeling from UC144

Slot Widths

X

Contaminants

X

Task

Description

Date 

Work Crew 

1.3

Clean out Slots

1/22/01

MR

1.4

Clean out Source Holes

1/23/01

MR

1.5

Cover Holes in Girder

1/23/01

MR

1.6

Drill & Tap Holes for belt and laser fiber connector

2/04/01

DD

1.7

Clean Module Surfaces

1/24/01

PBL

1.8

Mark Cell Boundaries 

1/26/01

MR, RW

1.9

Install Cell & PMT Labels

1/25/01

MR

1.10

Ream Girder Rings

1/25/01

MR

NOTES:



 
 

2. Tile Installation

Task

Description

Date

Work Crew 

2.1

Measure gaps for shims

1/26/01

MR

2.2

Install Shims

1/29/01

MR

2.3

Record Tile Pak Numbers

1/29/01

MR

2.4

Insert Tiles

1/29/01

MR,

2.5

Insert Special ITC Tiles

?

?

2.4

QC1:
Tile Inspection 

2/6/01

RJM

Item

OK

Not OK : List problems and repairs

Tile Color

X

Tile Sizes

X

Tile End Surfaces

X

Tile Wrappers

X

Task

Description

Date

Work Crew 

2.5

Install Rods

 X

 ?

NOTES:


 
 

3. Fiber Preparations

Task

Description

Date

Work Crew 

3.1

Install LED Light Tubes 

X

RJM

3.2

Label Bottom of Aspirin Tubes

1/25/01

MR

3.3

Install Aspirin Tubes and Washers 

1/25/01

MR

3.4

Install Fixation Rails

1/24/01

PBL

3.5

Label Laser Fiber Bundles

2/08/01

MR

3.6

Install Laser Fiber Bundles 

2/08/01

MR

3.7

Record Laser Fiber #

2/9/01

MR

3.8

Cover Girder Area

2/09/01

MR

3.9

Install ITC Fiber Supports

?

?

NOTES:
 


 
 

4. Fiber/Profile Installation

Task

Description

Date

Work Crew 

4.1

Setup Profile Shelves

2/13/01

DD, DK

4.2

Record Profile Batch Numbers

2/15

RW

4.3

Insert Profiles/WLS Fibers

2/15

RW, AR, MR

4.4

Install Fiber Separator Wires 

?

?

4.5

Install ITC Fibers

2/16

RW

4.6

Record ITC Fiber #

2/15

RW

4.7

Separate fibers by depth

2-27

DK, AR

4.8

Make subbundles

2/27

AR

4.9

QC2: Verify Sorting 

2/28

RJM

Item

OK

Not OK : List problems and repairs

Fiber Lengths

X

Fiber Counts

X

Depth Sorting

X

Visual Light Levels

x

2 fibers replaced

4.10

Remove Fiber SeparatorWires

 

 

NOTES:  4.9 Sparkle defects on D fibers - RJM
 
 
 

5. Fiber Routing

Task

Description

Date 

Work Crew 

5.1

Route Sub-bundles To Aspirin Tubes

3/14/01

RW, AR

5.2

Route the Laser Fibers

3/20

RW

5.3

QC3:
Verify Fiber Routing 

3/15

RJM

Item

OK

Not OK : List problems and repairs

Odd Side Cells

 

See Notes

Even Side Cells

 

See Notes

5.4

Insert Gluing tubes

X

5.5

Insert Teflon Rods

X

5.6

Register and Secure Fibers in Aspirin Tubes

X

5.7

Insert Dummy fibers

X

 

5.8

QC4: Check Fiber Damage 

3-21

RJM

Item

OK

Not OK : List problems and repairs

Broken fibers

X

 

Stress Crazing

X

See Notes

Cladding Damage

X

 

Fiber Curvature

X

 

Fiber Contact

x

 

5.9

Secure the Sub-bundles

 

 

NOTES:

5.3 The laser fiber bundles should go to the outside of PMT's 1&2 - except for the fibers going to PMT's 1,2,3 - fixed by RJM

The L bundle to PMT10 is on the wrong side of R bundle to PMT12 (fixed, RJM)

The Laser fibers to PMT 42,44 were interchanged, fixed, RJM

Laser fiber to PMT7 should be on the outside of E1 bundle - fixed, RJM

Laser fiber to PMT13 is wrapped around the rail - too much stress - fixed, RJM

5.4 A15-PMT30 - The left bundle is misrouted to PMT34

B14- PMT34 - Right bundle is misrouted ot PMT30

B11 - PMT10 - Left bundle is entangled with the R bundle to A13-PMT12 - should go under it as per model

Laser fibers should be routed outside of PMT1 - see model

None of the bundles have been marked before inserting into the aspirin tubes

All Problems fixed by MN
.

6. Glue fiber bundles

Task

Description

Date 

Work Crew 

6.1

Prepare Glue Cartridges

3-23

RJM

6.2

Glue Odd Side 

3-23

MN. RR, RJM

6.3

Glue Even Side

3-23

MN. RR, RJM

6.4

Reserve Samples of Epoxy

X

MN

6.5

Epoxy Cure

3-25

MN

6.6

Remove Cable Ties from Silicon Tubes

3-27

MN

NOTES:

 
 


 

7. Polish Fiber Ends

Task

Description

Date 

Work Crew 

7.1

Setup the Polishing Machine

3-26

MN

7.2

Polish Fibers, Odd Side

3-26

MN

7.3

Polish Fibers, Even Side

3-26

MN

7.4

Remove Polishing Machine

3-26

MN

7.5

QC5: Inspect Fiber Ends 

3-27

RJM

Item

OK

Not OK : List problems and repairs

Surface Quality

X

 

Visual Light Level

X

 

NOTES:

 
 
 

8. Secure fiber bundles

Task

Description

Date

Work Crew

8.1

Cut dummy fibers 

3-26

MN

8.2

Cut Gluing tubes

3-26

MN

8.2

Tie FiberBundles to Rails

3-26

MN

8.3

Install Cotton Belt

3-27

RJM

  8.4      Install AL Tape done

 
 

10. Close up

Task

Description

Date 

Work Crew

10.1

Cover Module with Plastic Sheet

3-27

RJM

10.2

Cover Girder Ends

4-12

RJM

10.3

Install Plastic Source Tubes

4-12

RJM

10.4

Cover Source holes

4-12

RJM

10.5

Tape ITC Fiber Support Panels

3-26

RJM

10.6

Install Shipping Cover 

4-13,16

RW, MN

NOTES:
 
 

Shimming Data Sheet



 
 
 
 
 
 
 
 

 

 

Measured Widths

(mm)

Shims Required

Gap #

Tile 

Oddside

Even side

1/2

3/4

1

1

1

5.0

5.0

1

2

1

4.6

4.8

1

3

1

4.4

4.8

1

4

1

4.5

4.6

1

5

1

4.5

4.8

1

6

1

4.8

4.8

1

7

1

4.4

4.8

1

8

1

4.4

4.6

1

9

1

4.6

4.8

1

Total

1

 

 

 

 

 

 

 

 

 

 

 

1

11

4.8

5.1

1

2

11

4.4

4.4

3

11

4.3

4.4

4

11

4.5

4.4

5

11

4.4

4.4

6

11

4.4

4.6

1

7

11

4.5

4.4

8

11

4.5

4.3

9

11

4.5

4.6

1

Total 

11

NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top

(where the widths are assumed to be minimum)

    1. Required shims make the minimum slot width in the range 4:4.5 mm
    2. Gaps are numbered starting at the ITC end.

Materials List

Tile Size

Color

Pkg.# (number of tiles) in order from ITC end

 

1

Y

1349,1352,1340,1354,1360,1351,1343

2

Y

1341,1355,1327,1331,1410,1449,1390

3

Y

399,458,392,226,382,454,455

4

Y

87,164,346,92,227,345,223

5

Y

120,411,149,320,365,195,470,311(2)

6

Y

295,256,250,156,251,280,286

7

B

17,503,62,77,18,8,82,81

8

B

31,476,114,507,423,154,432,13

9

B

27,34,600,212,625,74,2,248

10

B

142,451,474,197,471,469,218,210,449

11

B

79,15,20,77,4,65,1,74,33

Date of BATCH 

WLS/profile

Long Profiles 

Short Profiles

A12B11

1-23-01+ 2 from 11-2-00

A13B11

1-23-01

1-23-01

A13B12

1-23-01

1-23-01

A14B12

1-23-01

1-23-01

A14B13

1-23-01

1-23-01

A15B13

1-23-01

1-23-01

A15B14

1-23-01

1-23-01

A16B14

1-23-01

1-23-01

A16B15

1-23-01

1-23-01

C10

D4

ITC Fibers #:

Right: 73

Left: 73

Aspirin Tubes :

Laser Fiber #'s

Odd Side: EB 91

Even Side:EB 94

Epoxy Batch #

Resin:60C124428 EXP: 6/28/01

Hardner:70136110


 
 
 
 

QC 2,3,4 Problem List

Tile Layer

Cell

Side

Tile *

Problem

Fixed ?

QC2

10

D6

E

2,35

Crazed fibers

AR, 3-1-01

QC4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.