1. Module Preparation |
||||||
Task |
Description |
Controls |
Date &Time |
Work Crew |
Comments |
|
1.1 |
Setup Module |
S |
2/2/00 |
RJM, MN,RR,DS |
|
|
1.2 |
Setup Work Space and Supplies |
S H |
|
|
|
|
1.3 |
QC0: Initial Inspection |
S W # |
2/7-18 |
RJM |
|
|
Item |
OK |
Not OK : List problems and repairs |
||||
Residual Glue |
|
Some glue in source holes ? |
||||
Spring Pins |
OK |
|
||||
Plate/Weld Bar Edges |
OK |
We will use plastic sheets to cover bottom edge of girder while installing profiles |
||||
Submodule Spacing |
|
Some big (> 6 mm) gaps |
||||
Pained Surfaces |
|
We cleared paint from all edge slots. Paint is peeling from the top edge of girder. Some paint globs need to be cleared for tiles. |
||||
Slot Widths |
|
Some slots had been scrapped at ANL. We scrapped paint from all edge slots. |
||||
Contaminants |
|
|
||||
Task |
Description |
Controls |
Date &Time |
Work Crew |
Comments |
|
1.4 |
Clean Module Surfaces |
S |
||||
1.5 |
Install Fiber Fixation Rails |
S |
2/17 |
|||
1.6 |
Install Aspirin Tubes |
S |
Had to ream out many girder rings to fit |
|||
1.7 |
Mark Cell Boundaries and Label PMT |
S |
2/11 |
Additional Notes:
2. Tile Installation |
||||||
Task |
Description |
Controls |
Date &Time |
Work Crew |
Comments |
|
2.1 |
QC1a: Tile Inspection |
S W # |
|
|
|
|
Item |
OK |
Not OK : List problems and repairs |
||||
Tile Color |
OK |
|||||
Tile End Surfaces |
OK |
|||||
Tile Wrappers |
OK |
|||||
2.2 |
Record Tile Batch Numbers |
S # |
||||
2.3a |
Insert Tiles |
S H |
||||
2.3b |
Insert Special ITC Tiles |
S H |
|
|
|
Task |
Description |
Controls |
Date &Time |
Work Crew s |
Comments |
|||||||
2.4 |
QC1b: Tile Inspection |
S W # |
|
|
|
|||||||
Item |
OK |
Not OK : List problems and repairs |
||||||||||
Tile Sizes |
|
|
||||||||||
Tile End Surfaces |
|
|
||||||||||
Tile Wrappers |
|
|
||||||||||
2.5 |
Install Rods |
S |
|
|
|
|||||||
2.6 |
Install Inspection Light Tubes |
S |
|
|
|
Additional Notes:
3. Routing Preparations |
||||||
Task |
Description |
Controls |
|
Work Crew |
Comments |
|
3.1 |
Install QC Light Sources |
S |
|
|
|
|
3.2 |
Install Fiber Separator Wires |
S |
|
|
|
|
3.3 |
Install ITC Fiber Assemblies |
S # |
|
|
ID #: |
|
3.4 |
Install Laser Fiber Bundles |
S # |
|
|
ID #: |
Additional Notes:
4. Fiber/Profile Installation |
||||||
Task |
Description |
Controls |
Date &Time |
Work Crew |
Comments |
|
4.1 |
Insert Profiles/fibers |
S H |
|
|
|
|
4.2 |
Record Profile Batch Numbers |
S # |
|
|||
4.3 |
QC2: Verify Fiber Lengths and Sorting |
S W # |
|
|
|
|
Item |
OK |
Not OK : List problems and repairs |
||||
Fiber Lengths |
|
|
||||
Fiber Counts |
|
|
||||
Depth Sorting |
|
|
||||
Visual Light Levels |
|
|
||||
4.4 |
Tape Profiles |
S R |
|
|
|
5. Fiber Routing |
||||||
Task |
Description |
Controls |
Date &Time |
Work Crew |
Comments |
|
5.1 |
Make fiber sub-bundles |
S |
|
|
|
|
5.2 |
Route Sub-bundles To Aspirin Tubes |
S H |
|
|
|
|
5.3 |
QC3: Verify Fiber Routing |
S W # |
|
|
|
|
Item |
OK |
Not OK : List problems and repairs |
||||
Side A Cells |
|
|
||||
Side B Cells |
|
|
||||
5.4 |
Register and Secure Fibers in Aspirin Tubes |
S H |
|
|
|
Additional Notes:
Task |
Description |
Controls |
Date &Time |
Work Crew |
Comments |
|||||
5.5 |
QC4: Fiber Registraton and Damage |
S W # |
|
|
||||||
Item |
OK |
Not OK : List problems and repairs |
||||||||
Broken fibers |
|
|
||||||||
Stress Crazing |
|
|
||||||||
Cladding Damage |
|
|
||||||||
Fiber Curvature |
|
|
||||||||
Fiber Contact |
|
|
||||||||
5.6 |
Secure the Sub-bundles |
S R |
|
|
|
Additional Notes:
6. Glue fiber bundles |
||||||
Task |
Description |
Controls |
Date & Time |
Work Crew |
Comments |
|
6.1 |
Glue Side A |
S |
|
|
|
|
6.2 |
Glue Side B |
S |
|
|
|
|
6.3 |
Reserve Samples of Epoxy |
S |
|
|
|
|
6.4 |
Epoxy Cure |
S H |
|
|
|
7. Secure fiber bundles |
||||||
Task |
Description |
Controls |
Date & Time |
Work Crew |
Comments |
|
7.1 |
Cut dummy fibers |
S |
|
|
|
|
7.2 |
Tie Fiber Bundles to Rails |
S |
|
|
|
Additional Notes:
8. Polish Fiber Ends |
||||||
Task |
Description |
Controls |
Date & Time |
Work Crew |
Comments |
|
8.1 |
Setup the Polishing Machine |
S |
|
|
|
|
8.2 |
Polish Fibers |
S |
|
|
|
|
8.3 |
Remove Polishing Machine |
S H |
|
|
|
|
8.4 |
QC5: Inspect Fiber Ends |
S W # R |
|
|
|
|
Item |
OK |
Not OK : List problems and repairs |
||||
Surface Quality |
|
|
||||
Visual Light Level |
|
|
Additional Notes:
10. Close up |
||||||
Task |
Description |
Controls |
Date & Time |
Work Crew |
Comments |
|
10.1 |
Remove Fiber Separator |
S |
|
|
|
|
10.2 |
Remove Temporary Labels |
S |
|
|
|
|
10.3 |
Cover Module with Aluminum Sheet |
S |
|
|
|
|
10.4 |
Attach Girder End Plates |
S |
|
|
|
11. Cleanup |
||||||
Task |
Description |
Controls |
Date & Time |
Work Crew |
Comments |
|
11.1 |
Remove Assembly Fixture |
S |
|
|
|
|
11.2 |
Remove Supplies and Tools |
S |
|
|
|
Additional Notes: