1. Module Preparation

Task

Description

Controls

Date &Time

Work
Crew

Comments

1.1

Setup Module 

S

 2/2/00

 RJM, MN,RR,DS

 

1.2

Setup Work Space and Supplies 

S
H

 

 

 

1.3

QC0:
Initial Inspection 

S
W
#

 2/7-18

 RJM

 

Item

OK

Not OK : List problems and repairs

Residual Glue

 

 Some glue in source holes ?

Spring Pins

  OK

 

Plate/Weld Bar Edges

 OK

 We will use plastic sheets to cover bottom edge of girder while installing profiles

Submodule Spacing

 

 Some big (> 6 mm) gaps

Pained Surfaces

 

 We cleared paint from all edge slots. Paint is peeling from the top edge of girder. Some paint globs need to be cleared for tiles.

Slot Widths

 

 Some slots had been scrapped at ANL. We scrapped paint from all edge slots.

Contaminants

 

 

Task

Description

Controls

Date &Time

Work
Crew

Comments

1.4

Clean Module Surfaces

S

1.5

Install Fiber Fixation Rails

S

2/17

1.6

Install Aspirin Tubes

S

Had to ream out many girder rings to fit

1.7

Mark Cell Boundaries and Label PMT

S

2/11

 

Additional Notes:

 

 

 

 

 

2. Tile Installation

Task

Description

Controls

Date &Time

Work
Crew

Comments

2.1

QC1a:
Tile Inspection 

S
W
#

 

 

 

Item

OK

Not OK : List problems and repairs

Tile Color

OK

Tile End Surfaces

OK

Tile Wrappers

OK

2.2

Record Tile Batch Numbers

S
#

2.3a

Insert Tiles

S
H

2.3b

Insert Special

ITC Tiles

S
H

 

 

 

 

 

 

Task

Description

Controls

Date &Time

Work
Crew s

Comments

2.4

QC1b:
Tile Inspection 

S
W
#

 

 

 

Item

OK

Not OK : List problems and repairs

Tile Sizes

 

 

Tile End Surfaces

 

 

Tile Wrappers

 

 

2.5

Install Rods

S

 

 

 

2.6

Install Inspection Light Tubes 

S

 

 

 

Additional Notes:

 

3. Routing Preparations

Task

Description

Controls


Date & Time

Work Crew

Comments

3.1

Install QC Light Sources 

S

 

 

 

3.2

Install Fiber Separator Wires 

S

 

 

 

3.3

Install ITC Fiber Assemblies

S #

 

 

ID #:

3.4

Install Laser Fiber Bundles 

S #

 

 

ID #:

Additional Notes:

 

4. Fiber/Profile Installation

Task

Description

Controls

Date &Time

Work Crew

Comments

4.1

Insert Profiles/fibers 

S
H

 

 

 

4.2

Record Profile Batch Numbers

S
#

 

 

4.3

QC2:
Verify Fiber Lengths and Sorting 

S
W
#

 

 

 

Item

OK

Not OK : List problems and repairs

Fiber Lengths

 

 

Fiber Counts

 

 

Depth Sorting

 

 

Visual Light Levels

 

 

4.4

Tape Profiles

S
R

 

 

 

 

5. Fiber Routing

Task

Description

Controls

Date &Time

Work
Crew

Comments

5.1

Make fiber sub-bundles

S

 

 

 

5.2

Route Sub-bundles To Aspirin Tubes

S
H

 

 

 

5.3

QC3:
Verify Fiber Routing 

S
W
#

 

 

 

Item

OK

Not OK : List problems and repairs

Side A Cells

 

 

Side B Cells

 

 

5.4

Register and Secure Fibers in Aspirin Tubes

S
H

 

 

 

Additional Notes:

 

 

Task

Description

Controls

Date &Time

Work
Crew

Comments

5.5

QC4:
Fiber Registraton and Damage 

S
W
#

 

 

 

Item

OK

Not OK : List problems and repairs

Broken fibers

 

 

Stress Crazing

 

 

Cladding Damage

 

 

Fiber Curvature

 

 

Fiber Contact

 

 

5.6

Secure the Sub-bundles

S
R

 

 

 

Additional Notes:

 

 

6. Glue fiber bundles

Task

Description

Controls

Date & Time

Work
Crew

Comments

6.1

Glue Side A 

S

 

 

 

6.2

Glue Side B

S

 

 

 

 

6.3

Reserve Samples of Epoxy

S

 

 

 

6.4

Epoxy Cure

S
H

 

 

 

7. Secure fiber bundles

Task

Description

Controls

Date & Time

Work
Crew

Comments

7.1

Cut dummy fibers 

S

 

 

 

7.2

Tie Fiber Bundles to Rails

S

 

 

 

 

Additional Notes:

 

 

 


8. Polish Fiber Ends

Task

Description

Controls

Date & Time

Work
Crew

Comments

8.1

Setup the Polishing Machine

S

 

 

 

8.2

Polish Fibers

S

 

 

 

8.3

Remove Polishing Machine

S
H

 

 

 

8.4

QC5:
Inspect Fiber Ends 

S
W
#
R

 

 

 

Item

OK

Not OK : List problems and repairs

Surface Quality

 

 

Visual Light Level

 

 

 

Additional Notes:

 

10. Close up

Task

Description

Controls

Date & Time

Work
Crew

Comments

10.1

Remove Fiber Separator

S

 

 

 

10.2

Remove Temporary Labels

S

 

 

 

10.3

Cover Module with Aluminum Sheet

S

 

 

 

10.4

Attach Girder End Plates 

S

 

 

 

11. Cleanup

Task

Description

Controls

Date & Time

Work
Crew

Comments

11.1

Remove Assembly Fixture 

S

 

 

 

11.2

Remove Supplies and Tools

S

 

 

 

Additional Notes: