MSU Module: |
ATLAS TILECAL OPTICS INSTRUMENTATION CHECK LIST |
|
REV: 2.2 June 16, '00 |
TASK |
DESCRIPTION |
QC Page |
1 |
MODULE PREPARATION |
|
2 |
TILES INSTALLATION |
|
3 |
ROUTING PREPARATION |
|
4 |
PROFILES AND FIBRES INSTALLATION |
|
5 |
FIBRES ROUTING |
|
6 |
FIBRES BUNDLES GLUING |
|
7 |
SECURE FIBRES BUNDLES |
|
8 |
POLISHING AND CUTTING |
|
9 |
INSTALL SOURCE TUBES |
|
10 |
|
|
11 |
|
NOTES |
|
Work crew should initial each task that they work on. Supervisor should indicate the date as each task is completed. QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started. Work crew shold fill in the materials list for all items used. Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages. |
1. Module Preparation |
||||||||||
Task |
Description |
Date |
Work Crew |
|||||||
1.1 |
Setup Module |
|
|
|||||||
1.2 |
QC0: |
|
|
|||||||
Item |
OK |
Not OK : List problems and repairs |
||||||||
Residual Glue |
|
|
||||||||
Spring Pins |
|
|
||||||||
Plate/Weld Bar Edges |
|
|
||||||||
Submodule Shims and Spacing |
|
|
||||||||
Pained Surfaces |
|
|
||||||||
Slot Widths |
|
|
||||||||
Contaminants |
|
|
||||||||
Task |
Description |
Date |
Work Crew |
|||||||
1.3 |
Clean out Slots |
|||||||||
1.4 |
Clean Out Source Holes |
|||||||||
1.5 |
Cover Holes in Girder |
|
|
|||||||
1.6 |
Clean Module Surfaces |
|||||||||
1.7 |
Mark Cell Boundaries |
|||||||||
1.8 |
Install Cell & PMT Labels |
|||||||||
1.9 |
Ream Girder Rings |
NOTES:
2. Tile Installation |
||||||||||||
Task |
Description |
Date |
Work Crew |
|||||||||
2.1 |
Measure gaps for shims |
|
|
|||||||||
2.2 |
Install Shims |
|||||||||||
2.3 |
Record Tile Batch Numbers |
|||||||||||
2.4 |
Insert Tiles |
|||||||||||
2.5 |
Insert Special ITC Tiles |
|||||||||||
2.4 |
QC1: |
|||||||||||
Item |
OK |
Not OK : List problems and repairs |
||||||||||
Tile Color |
||||||||||||
Tile Sizes |
|
|
||||||||||
Tile End Surfaces |
|
|
||||||||||
Tile Wrappers |
|
|
||||||||||
Task |
Description |
Date |
Work Crew |
|||||||||
2.5 |
Install Rods |
|
|
NOTES:
3. Fiber Preparations |
|||||||||
Task |
Description |
Date |
Work Crew |
||||||
3.1 |
Install LED Light Tubes |
|
|
||||||
3.2 |
Label Bottom of Aspirin Tubes |
||||||||
3.3 |
Install Aspirin Tubes |
|
|
||||||
3.4 |
Install Fixation Rails |
|
|
||||||
3.5 |
Label Laser Fiber Bundles |
||||||||
3.6 |
Install Laser Fiber Bundles |
|
|
||||||
3.7 |
Record Laser Fiber # |
||||||||
3.8 |
Cover Girder Area |
||||||||
3.9 |
Install ITC Fiber Supports |
NOTES:
4. Fiber/Profile Installation |
||||||||||
Task |
Description |
Date |
Work Crew |
|||||||
4.1 |
Setup Profile Cart |
|
|
|||||||
4.2 |
Record Profile Batch Numbers |
|
||||||||
4.3 |
Insert Profiles/WLS Fibers |
|
|
|||||||
4.4 |
Install ITC Fibers |
|||||||||
4.5 |
Record ITC Fiber # |
|||||||||
4.6 |
Install Fiber Separator Wires |
|||||||||
4.7 |
Separate fibers by depth |
|||||||||
4.8 |
Make subbundles |
|||||||||
4.9 |
QC2: Verify Sorting |
|
|
|||||||
Item |
OK |
Not OK : List problems and repairs |
||||||||
Fiber Lengths |
|
|
||||||||
Fiber Counts |
|
|
||||||||
Depth Sorting |
|
|
||||||||
Visual Light Levels |
|
|
||||||||
4.8 |
Remove Fiber SeparatorWires |
NOTES:
5. Fiber Routing |
|||||||||||||
Task |
Description |
Date |
Work Crew |
||||||||||
5.1 |
Route Sub-bundles To Aspirin Tubes |
|
|
||||||||||
5.2 |
Route the Laser Fibers |
||||||||||||
5.3 |
QC3: |
|
|
||||||||||
Item |
OK |
Not OK : List problems and repairs |
|||||||||||
Odd Side Cells |
|
|
|||||||||||
Even Side Cells |
|
|
|||||||||||
5.4 |
Insert Gluing tubes |
||||||||||||
5.5 |
Insert Teflon Rods |
||||||||||||
5.6 |
Register and Secure Fibers in Aspirin Tubes |
|
|
||||||||||
5.7 |
Insert Dummy fibers |
|
|
||||||||||
5.8 |
QC4: Check Fiber Damage |
|
|
||||||||||
Item |
OK |
Not OK : List problems and repairs |
|||||||||||
Broken fibers |
|
|
|||||||||||
Stress Crazing |
|
|
|||||||||||
Cladding Damage |
|
|
|||||||||||
Fiber Curvature |
|
|
|||||||||||
Fiber Contact |
|
|
|||||||||||
5.9 |
Secure the Sub-bundles |
|
|
NOTES:
6. Glue fiber bundles |
|||||||||
Task |
Description |
Date |
Work Crew |
||||||
6.1 |
Prepare Glue Cartridges |
|
|
||||||
6.2 |
Glue Odd Side |
|
|
||||||
6.3 |
Glue Even Side |
|
|
||||||
6.4 |
Reserve Samples of Epoxy |
|
|
||||||
6.5 |
Epoxy Cure |
|
|
||||||
6.6 |
Remove Cable Ties from Silicon Tubes |
|
|
|
|||||||||
Task |
Description |
Date |
Work Crew |
||||||
7.1 |
Setup the Polishing Machine |
|
|
||||||
7.2 |
Polish Odd Side |
|
|
||||||
7.3 |
Polish Even Side |
|
|
||||||
7.4 |
Remove Polishing Machine |
|
|
||||||
7.5 |
QC5: Inspect Fiber Ends |
|
|
||||||
Item |
OK |
Not OK : List problems and repairs |
|||||||
Surface Quality |
|
|
|||||||
Visual Light Level |
|
|
NOTES:
8. Secure fiber bundles |
||||||||||
Task |
Description |
Date |
Work Crew |
|||||||
8.1 |
Cut dummy fibers |
|
|
|||||||
8.2 |
Cut Gluing tubes |
|
|
|||||||
8.2 |
Tie Fiber Bundles to Rails |
|
|
|||||||
8.3 |
Install Cotton Belt |
|
|
10. Close up |
|||||||||
Task |
Description |
Date |
Work Crew |
||||||
10.1 |
Cover Module with PlasticSheet |
|
|
||||||
10.2 |
Cover Girder Ends |
|
|
||||||
10.3 |
Install Plastic Source Tubes |
|
|
||||||
10.4 |
Cover Source holes |
|
|
||||||
10.5 |
Tape ITC Fiber Support Panels |
|
|
||||||
10.6 |
Install Shipping Cover |
|
|
NOTES:
Measured Widths (mm) |
Shims Required |
||||||||
Gap # |
Tile |
Oddside |
Even side |
1/2 |
3/4 |
1 |
|||
1 |
1 |
||||||||
2 |
1 |
||||||||
3 |
1 |
||||||||
4 |
1 |
||||||||
5 |
1 |
||||||||
6 |
1 |
||||||||
7 |
1 |
||||||||
8 |
1 |
||||||||
9 |
1 |
||||||||
Total |
1 |
||||||||
1 |
11 |
||||||||
2 |
11 |
||||||||
3 |
11 |
||||||||
4 |
11 |
||||||||
5 |
11 |
||||||||
6 |
11 |
||||||||
7 |
11 |
||||||||
8 |
11 |
||||||||
9 |
11 |
||||||||
Total |
11 |
NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top
(where the widths are assumed to be minimum)
Materials List
Tile Size |
Box #'s |
Pkg. #'s |
|||||||||||||||||||||
1 |
|||||||||||||||||||||||
2 |
|||||||||||||||||||||||
3 |
|||||||||||||||||||||||
4 |
|||||||||||||||||||||||
5 |
|||||||||||||||||||||||
6 |
|||||||||||||||||||||||
7 |
|||||||||||||||||||||||
8 |
|||||||||||||||||||||||
9 |
|||||||||||||||||||||||
10 |
|||||||||||||||||||||||
11 |
|||||||||||||||||||||||
BATCH # |
|||||||||||||||||||||||
WLS/profile |
Long Profiles |
Short Profiles |
|||||||||||||||||||||
A12B11 |
|||||||||||||||||||||||
A13B11 |
|||||||||||||||||||||||
A13B12 |
|||||||||||||||||||||||
A14B12 |
|||||||||||||||||||||||
A14B13 |
|||||||||||||||||||||||
A15B13 |
|||||||||||||||||||||||
A15B14 |
|||||||||||||||||||||||
A16B14 |
|||||||||||||||||||||||
A16B15 |
|||||||||||||||||||||||
C10 |
|||||||||||||||||||||||
D4 |
|||||||||||||||||||||||
ITC Fibers #: |
Right: |
Left: |
|||||||||||||||||||||
Aspirin Tubes : |
|||||||||||||||||||||||
Laser Fiber #'s |
Odd Side: |
Even Side: |
|||||||||||||||||||||
Epoxy Batch # |
Resin: |
Hardner: |
QC Problem List
Tile Layer |
Cell |
Side |
Tile * |
Problem |
Fixed ? |
NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.
This page maintained by: - RJM