MSU

Module:

ATLAS TILECAL 

OPTICS INSTRUMENTATION  CHECK LIST

Cover Sheet

REF

REV: 2.2

June 16, '00

TASK

DESCRIPTION

QC Page

1

MODULE PREPARATION

2

2

TILES INSTALLATION

3

3

ROUTING PREPARATION

 

4

PROFILES AND FIBRES INSTALLATION

4

5

FIBRES ROUTING

5

6

FIBRES BUNDLES GLUING

6

7

SECURE FIBRES BUNDLES

 

8

POLISHING AND CUTTING

7

9

INSTALL SOURCE TUBES

 

10

CLOSEUP

 

11

QUANTITATIVE TESTING

 

NOTES

Work crew should initial each task that they work on.

Supervisor should indicate the date as each task is completed.

QC person should fill in the report for each QC task. The QC tasks must be completed before subsequent tasks are started.

Work crew shold fill in the materials list for all items used.

Note any problems, deviations from procedures, suggestions, etc. in the space at the bottom and on the reverse side of pages.


 

1. Module Preparation

Task

Description

Date

Work Crew

1.1

Setup Module 

 

 

1.2

QC0:
Initial Inspection 

 

 

Item

OK

Not OK : List problems and repairs

Residual Glue

 

 

Spring Pins

 

 

Plate/Weld Bar Edges

 

 

Submodule Shims and Spacing

 

 

Pained Surfaces

 

 

Slot Widths

 

 

Contaminants

 

 

Task

Description

Date

Work Crew

1.3

Clean out Slots

1.4

Clean Out Source Holes

1.5

Cover Holes in Girder

 

 

1.6

Clean Module Surfaces

1.7

Mark Cell Boundaries

1.8

Install Cell & PMT Labels

1.9

Ream Girder Rings

NOTES:


2. Tile Installation

Task

Description

Date

Work Crew

2.1

Measure gaps for shims

 

 

2.2

Install Shims

2.3

Record Tile Batch Numbers

2.4

Insert Tiles

2.5

Insert Special ITC Tiles

2.4

QC1:
Tile Inspection 

Item

OK

Not OK : List problems and repairs

Tile Color

Tile Sizes

 

 

Tile End Surfaces

 

 

Tile Wrappers

 

 

Task

Description

Date

Work Crew

2.5

Install Rods

 

 

NOTES:


3. Fiber Preparations

Task

Description

Date

Work Crew

3.1

Install LED Light Tubes 

 

 

3.2

Label Bottom of Aspirin Tubes

3.3

Install Aspirin Tubes

 

 

3.4

Install Fixation Rails

 

 

3.5

Label Laser Fiber Bundles

3.6

Install Laser Fiber Bundles 

 

 

3.7

Record Laser Fiber #

3.8

Cover Girder Area

3.9

Install ITC Fiber Supports

NOTES:


4. Fiber/Profile Installation

Task

Description

Date

Work Crew

4.1

Setup Profile Cart

 

 

4.2

Record Profile Batch

Numbers

  

4.3

Insert Profiles/WLS Fibers

 

 

4.4

Install ITC Fibers

4.5

Record ITC Fiber #

4.6

Install Fiber Separator Wires 

4.7

Separate fibers by depth

4.8

Make subbundles

4.9

QC2: Verify Sorting 

 

 

Item

OK

Not OK : List problems and repairs

Fiber Lengths

 

 

Fiber Counts

 

 

Depth Sorting

 

 

Visual Light Levels

 

 

4.8

Remove Fiber SeparatorWires

NOTES:

 

5. Fiber Routing

Task

Description

Date

Work Crew

5.1

Route Sub-bundles To Aspirin Tubes

 

 

5.2

Route the Laser Fibers

5.3

QC3:
Verify Fiber Routing 

 

 

Item

OK

Not OK : List problems and repairs

Odd Side Cells

 

 

Even Side Cells

 

 

5.4

Insert Gluing tubes

5.5

Insert Teflon Rods

5.6

Register and Secure Fibers in Aspirin Tubes

 

 

5.7

Insert Dummy fibers

 

 

5.8

QC4: Check Fiber Damage 

 

 

Item

OK

Not OK : List problems and repairs

Broken fibers

 

 

Stress Crazing

 

 

Cladding Damage

 

 

Fiber Curvature

 

 

Fiber Contact

 

 

5.9

Secure the Sub-bundles

 

 

NOTES:


6. Glue fiber bundles

Task

Description

Date

Work Crew

6.1

Prepare Glue Cartridges

 

 

6.2

Glue Odd Side

 

 

6.3

Glue Even Side

 

 

6.4

Reserve Samples of Epoxy

 

 

6.5

Epoxy Cure

 

 

6.6

Remove Cable Ties from Silicon Tubes

 

 

 


7. Polish Fiber Ends

Task

Description

Date

Work Crew

7.1

Setup the Polishing Machine

 

 

7.2

Polish Odd Side

 

 

7.3

Polish Even Side

 

 

7.4

Remove Polishing Machine

 

 

7.5

QC5: Inspect Fiber Ends 

 

 

Item

OK

Not OK : List problems and repairs

Surface Quality

 

 

Visual Light Level

 

 

NOTES:

 


8. Secure fiber bundles

Task

Description

Date

Work Crew

8.1

Cut dummy fibers 

 

 

8.2

Cut Gluing tubes

 

 

8.2

Tie Fiber Bundles to Rails

 

 

8.3

Install Cotton Belt

 

 

 

10. Close up

Task

Description

Date

Work Crew

10.1

Cover Module with PlasticSheet

 

 

10.2

Cover Girder Ends

 

 

10.3

Install Plastic Source Tubes

 

 

10.4

Cover Source holes

 

 

10.5

Tape ITC Fiber Support Panels

 

 

10.6

Install Shipping Cover

 

 

NOTES:


Shimming Data Sheet

 

   

Measured Widths

(mm)

Shims Required

Gap #

Tile

Oddside

Even side

1/2

3/4

1

1

1

2

1

3

1

4

1

5

1

6

1

7

1

8

1

9

1

Total

1

1

11

2

11

3

11

4

11

5

11

6

11

7

11

8

11

9

11

Total

11

NOTES: 1. Measure Tile Slot 1 at the bottom of the slot and Tile Slot 11 at the top

(where the widths are assumed to be minimum)

    1. Required shims make the minimum slot width in the range 4:4.5 mm
    2. Gaps are numbered starting at the ITC end.

Materials List

Tile Size

Box #'s

Pkg. #'s

1

2

3

4

5

6

7

8

9

10

11

BATCH #

WLS/profile

Long Profiles

Short Profiles

A12B11

A13B11

A13B12

A14B12

A14B13

A15B13

A15B14

A16B14

A16B15

C10

D4

ITC Fibers #:

Right:

Left:

Aspirin Tubes :

Laser Fiber #'s

Odd Side:

Even Side:

Epoxy Batch #

Resin:

Hardner:

 

QC Problem List

Tile Layer

Cell

Side

Tile *

Problem

Fixed ?

NOTE: Tiles are numbered from the beginning of the cell, starting at the tile closest to the ITC end of the module. Count every other profile to count the tiles. Odd tile layers start at the cell boundary (count from the first profile), even tile layers start with a spacer plate (count from the second profile). The tile counting stick makes it easier to locate the tiles.

 


This page maintained by: - RJM